Highlights
•
New, follow-up Induced Polarisation (IP) geophysical surveys have significantly extended the target zone
for new copper lodes immediately adjacent to the Canbelego Main Lode Mineral Resource 1.
•
The extended zone is 625 metres (m) long which is larger than the 350m long IP anomaly over the
Canbelego Main Lode12.
•
Drilling will commence later this month to test the target which may represent a parallel zone of copper
lodes and potentially lead to an increase in the scale of the copper deposit.
•
Multiple copper bearing lodes are a feature of Cobar-style copper deposits such as the CSA mine located
53km to the northwest.
•
These new IP results have necessitated a re-prioritisation of the drill targets, building on the initial
Canbelego IP results 3.
•
There is no drilling along the new anomaly (‘Western’) which is located 600m west of the Canbelego Main
Lode and was detected at 135m below surface and is open to depth.
•
The ‘Western’ IP anomaly occurs within the 1.8km x 0.8km Canbelego surface copper geochemistry
anomaly and is also coincident with a modelled structure which may control the formation of
mineralisation.
•
Drilling is planned to commence in mid May with assays anticipated in mid-June.
Helix Resources Ltd (ASX:HLX, Helix or the Company) is preparing to drill a new, large scale Induced Polarisation
(IP) geophysical target larger than the IP anomaly over the adjacent Canbelego Main Lode Copper Mineral
Resource. This 625m long target zone has never been drilled before and is considered prospective for new copper
lodes to add to the mineral resources defined at Canbelego Main Lode already1. The Canbelego Joint Venture
project is located within EL61052, part of Helix’s Western Group Tenements.
Helix’s Executive Technical Director, Kylie Prendergast commented:
“Upcoming drilling will confirm if the compelling new IP geophysics anomaly at Canbelego represents a new zone
of copper mineralisation and demonstrate that Canbelego has multiple near-surface copper lodes.
1 Refer Appendix A for further details on the Mineral Resource Estimate
2
The Canbelego Project is a joint venture with Aeris Resources Ltd (ASX:AIS); HLX holds 70% & AIS 30%
3 Refer ASX report 29 February 2024.
BOARD & MANAGEMENT
Chair
Mike Rosenstreich
Managing Director
Kyle Prendergast
Non-Executive Director
Emmanuel Correia
CAPITAL STRUCTURE
Share
2,323M
Market Cap.
$9.29M
Share Price
$0.004
CONTACT US
helix@helixresources.com.au
Level 4 225 St Georges Terrace
Perth, WA 6000
helixresources.com.au
ASX: HLX
Multiple copper lodes are a characteristic feature of several Cobar-style deposits including Metal Acquisition
Limited’s large CSA copper deposit. Helix believes that the Canbelego copper deposit is analogous to the CSA
copper deposit. To date, three separate high-grade copper lodes have been identified by drilling at Canbelego
including the main lode copper resource and two smaller western lodes which are narrower but well developed. All
of the lodes have geophysical IP anomalies however the new ‘far’ Western anomaly is the largest we have
identified.
IP geophysics was first deployed by Helix in early February as a tool to rapidly assess the near-surface potential of
the Canbelego copper footprint, down to a depth of ~400m, for additional copper lodes or extensions to known
copper lodes. It is now time to drill test the new targets and Helix is planning to bring a drill rig to site in the
coming weeks.
In addition, Helix continues to advance further high priority copper and gold targets in its portfolio in the prolific
Cobar region.
Figure 1 – Rochford Trend Canbelego to Bijoux area showing copper geochemistry,
structure and IP survey areas. (Refer Appendix A for details on Canbelego MRE)
Introduction
The Company has completed an extensional induced polarisation (IP) survey northwest of the Canbelego copper
deposit. The aim of the survey was to extend the IP coverage north of known mineralised zones at Canbelego.
The IP survey consisted of three additional 1.5km long survey lines to the northwest of the Main Lode Mineral
Resource 4 and Western Lodes mineralisation (Figure 1). The lines were parallel to the lines undertaken on the
previous IP survey 5. A pole-dipole (PDIP) array was used for all lines, using 100m receiver dipoles on the two
southern lines and 50m receiver dipoles on the northern most line.
The PDIP data from the three new lines has been modelled using 2D inversion techniques, and the three new lines
were integrated with the five existing Canbelego PDIP lines to develop a 3D inversion model. The PDIP results
from the previous survey confirmed that the Main Lode copper mineralisation at Canbelego is detectable by IP
and the expanded PDIP survey is being used to identify further potential sulphide lodes. Further details on the IP
survey specifications and data processing are provided in Attachment 1 (JORC Table 1).
Figure 2 – Canbelego 3D inversion IP chargeability depth slice at 130mRL (175m
below surface).
4 Refer Appendix A for further details
5 Refer ASX report 29 February 2024
3
Canbelego IP results
The new northern Canbelego PDIP survey generated high-quality and low noise data and expanded the previously
defined Western anomaly 600m to the north at a chargeability threshold of 30mV/V (Figure 2). When combined
with the earlier survey, the 3D IP inversion confirmed that the 350m long eastern chargeable anomaly is
associated with the Canbelego Main Lode copper mineralisation.
The NNW-trending Western chargeable anomaly has been extended to a strike length of 625m, and it is more
chargeable and larger than the anomaly associated with the Canbelego Main Lode. Significantly, this anomaly is
outside the previously drilled area, but within the surface copper geochemical anomaly (Figure 2). The depth to
the top of the chargeable zone is approximately 130m vertical and this PDIP anomaly represents a compelling drill
target.
The previously defined Western Lodes have a moderate chargeability trend between the Main Lode and the
newly defined Western PDIP anomaly. This could be related to lower order mineralisation in the hanging wall of
the Main Lode, and it appears to be untested by drilling, particularly at its southern end. This target will be tested
in a future drill program.
Figure 3 – Canbelego 3D inversion IP chargeability shells looking down towards the northwest, showing drilling,
the Main Lode MRE block model 6, the West Lodes >0.1% Cu mineralisation shells. Three drillholes are proposed
to test the new Western IP anomaly (XXCAN labels).
6 Refer Appendix A for further details.
4
Next Steps
Initial drilling of the Western PDIP anomaly is planned to commence mid-May 2024. Up to three, 300m deep RC
holes will be drilled into the peak of the anomaly. The drilling is expected to take one week for the RC drilling,
with assay results expected four weeks after that. However, if the RC holes produce water, or if they deviate
significantly from target, they will be completed with diamond tails to ensure that the strongest part of the IP
anomaly is adequately tested by the drilling. If diamond drilling is necessary, the drill program would take an
additional 2 weeks to complete.
COMPETENT PERSON STATEMENT
The information in this report that relates to exploration results, Mineral Resource estimates and geological data
for the Cobar projects is based on information generated and compiled by Mr. Gordon Barnes and Dr. Kylie
Prendergast who are both employees and shareholders of the Company. Mr. Barnes and Dr. Prendergast are
Members of the Australian Institute of Geoscientists. They both have sufficient experience that is relevant to the
styles of mineralisation and types of deposits under consideration and to the activities being undertaken to each
qualify as Competent Person(s) as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr. Barnes and Dr. Prendergast have consented to the
inclusion of this information in the form and context in which it appears in this report.
This ASX release was authorised by the Board of Directors of Helix Resources Ltd.
HLX
ABN: 27 009 138 738
ASX: HLX
Board of Directors:
Mike Rosenstreich - Chair
Kylie Prendergast - Managing Director
Emmanuel Correia – Non-executive Director
Contact Details:
Helix Resources Limited
Level 4, 225 St Georges Terrace,
Perth, WA, 6000
Company Secretary
Ben Donovan
PO Box 7237
Cloisters Square PO
Perth, WA 6850
Investor Contact:
Mike Rosenstreich
Company Contacts
Email: helix@helixresources.com.au
Web: www.helixresources.com.au
Tel: +61 (0)8 9321 2644
Media Contact:
David Tasker
Chapter One Advisers
Email: dtasker@chapteroneadvisors.com.au
Tel: 0433 112 936
5
About Helix Resources
Helix Resources is an ASX-listed resources company which is
exploring in the prolific copper producing region of Cobar, NSW.
The Company possesses a sizable ground position across three
tenement groups which are largely untested despite being
located within ~50km of significant copper producing operations.
The strategy is to generate new copper and gold targets on its
large, underexplored ground position and test them through
drilling to make new discoveries.
project.
The western tenement group consists of 30km of contiguous
strike and the Company is advancing a pipeline of wholly owned
copper opportunities, as well as the Canbelego JV Project (70%
owned and operated by Helix and 30% owned by Aeris
Resources) where a Mineral Resource of 32.8kt of contained
copper has been estimated (refer Appendix A). The eastern
tenement group encompasses more than 150km of prospective
strike and includes the 100% owned high-grade CZ copper
6
Appendix A: Canbelego Main Lode Mineral Resource Estimate
A Mineral Resource estimate for the Canbelego Main Lode was completed by MEC Mining. This was the first
update of the Canbelego resource since the 2010 resource estimate.
The 2023 updated Mineral Resource Estimate for the Canbelego Main Lode is presented in Table 1 below.
Table 1: 2023 Canbelego Main Lode Mineral Resource Estimate (MRE)
MRE Category
Tonnes
Grade (Cu%)
Cu-Metal (t)
Total opencut MRE, ≥240mRL; 0.3 Cu% cut-off grade & underground MRE, <240mRL; 0.8 Cu% cut-off grade
Indicated
340,600
1.65
5,620
Inferred
1,493,700
1.75
26,140
Total: Opencut & Underground
1,830,000
1.74
31,842
Tonnes
Grade (Cu%)
Comprising:
MRE Category
Cu-Metal (t)
Potential opencut MRE, ≥240mRL; 0.3 Cu% cut-off grade
Indicated
99,700
1.28
1,276
Inferred
282,300
1.21
3,416
Total: potential opencut MRE
377,000
1.23
4,637
Potential underground MRE, <240mRL; 0.8 Cu% cut-off grade
Indicated
240,900
1.81
4,360
Inferred
1,211,400
1.88
22,774
1.87
27,171
Total: potential underground MRE
1,453,000
* Numbers may not sum due to rounding
* Numbers are rounded to reflect that they are estimates
* A top-cut grade of Cu 12% was applied to the MRE
* Stated MRE complies with Reasonable prospects of eventual economic extraction
The Mineral Resource Estimate announced on 14 June 2023.
The Company confirms that it is not aware of any new information or data that materially affects the information included in
the relevant market announcement and, in the case of mineral resource estimate, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed.
7
ATTACHMENT 1: JORC Code Table 1
May 2024 – Canbelego IP surveys
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
•
•
•
•
Drilling
techniques
•
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sounds, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of
any measurement tools or systems used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
Drill type (e.g. core, reverse circulation, open- hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what
method, etc.).
Commentary
PDIP Survey
• In a pole-dipole IP (PDIP) survey, electrodes are arranged in a triangular configuration
consisting of a current electrode (pole), a potential electrode (dipole), and a remote
electrode (another dipole).
• Measurements are taken by systematically moving the current and potential
electrodes along a survey line while keeping the remote electrode fixed.
• Pole-dipole surveys are designed to provide deeper penetration and are typically used
to investigate larger-scale subsurface features and structures.
• This method is suitable for identifying large chargeability and resistivity anomalies.
• The PDIP survey was completed by Fender Geophysics between 11 April and 30 April
2024.
• Equipment used included a GDD TxIV 9kVA Transmitter and a GDD Rx32 16 channel IP
Receiver.
• Receiving electrodes were standard non-polarising porous pots and transmitter
electrodes were buried metal plates.
• Survey lines were 1.5km long.
• A PDIP array was used for all lines, using 100m receiver dipoles, with the northernmost
line using 50m dipoles.
• The PDIP lines had 16 x 100m receiver channels laid out along the entire 1.5km long
line, apart from the northernmost line which had 33 x 50m receiver channels.
• The transmitter pole electrode was moved along the line at 100m stations.
• All receiver channels were read for every transmitter station resulting in forward and
backward-looking pole-dipole data.
• The remote transmitter electrode was located several kilometres away from the survey
lines.
• The transmit frequency used was 0.125 Hz (2 seconds on-time, 2 seconds off-time).
• No new drilling in this report.
Criteria
JORC Code explanation
Drill sample
recovery
•
•
•
Logging
•
•
•
Sub- sampling
techniques
and sample
preparation
•
•
•
•
•
•
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected
including for instance results for field,
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Commentary
•
No new drilling in this report.
• No new drilling in this report.
• No new drilling in this report.
9
Criteria
JORC Code explanation
Quality of
assay data
and
laboratory
tests
•
•
•
Verification
of sampling
and assaying
Location of
data points
•
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
Commentary
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in
determining the analysis including instrument make
and model, reading times, calibrations factors
applied and their derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
•
Refer to Sampling Techniques above for survey specifications.
Field QAQC was completed by Fender Geophysics staff. Post-survey, further QAQC and
data processing, including 2D and 3D inversion modelling was undertaken by Mitre
Geophysics.
•
No new drilling in this report.
•
The PDIP transmitter and receiver sites were positioned using a Garmin GPS62 GPS (±5m
accuracy).
Grid system is MGA94 Zone 55.
Surface RL data for PDIP sites is collected using GPS and rectified by high-resolution
publicly available digital elevation data (ELVIS 5m data).
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has been applied.
•
•
•
•
The survey spacing is considered adequate for an orientation IP.
No new drilling in this report.
10
Criteria
JORC Code explanation
Orientation
of data in
relation to
geological
structure
•
Sample
security
Audits or
reviews
Commentary
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
•
The orientation IP lines were oriented perpendicular to geological strike.
•
The measures taken to ensure sample security.
•
No new samples reported.
•
The results of any audits or reviews of sampling
techniques and data.
•
No additional audits or reviews have been conducted to date.
•
11
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
•
•
Commentary
Type, reference name/number, location and ownership
including agreements or material issues with third parties such
as joint ventures, partnerships, overriding royalties, native
title interests, historical sites, wilderness or national park and
environmental settings.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to
operate in the area.
•
•
•
Exploration
done by
other parties
•
Geology
•
Deposit type, geological setting and style of mineralisation.
•
Drill hole
Information
•
A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level
in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that
the information is not Material and this exclusion does not
detract from the understanding of the report, the Competent
•
Acknowledgment and appraisal of exploration by other
parties.
•
•
•
12
The Company has 20 Exploration Licenses (EL’s) in the Cobar-Nyngan region
of NSW held by its 100% subsidiary company, Oxley Exploration Pty Ltd.
• 19 are held 100% by Oxley Exploration Pty Ltd, a wholly owned
subsidiary of Helix Resources: EL6140, EL6501, EL6739, EL7438,
EL7439, EL7482, EL8433, EL8608, EL8633, EL8710, EL8768, EL8845,
EL8948, EL8703, EL9345, EL9385, EL9386, EL9387, EL9581.
• EL6105 is a joint venture with Aeris Resources Ltd (30%
participating interest) and Oxley Resources Pty Ltd (70%
participating interest and Manager).
Native Title Claim NC2012/001 has been lodged by NTSCORP Ltd on behalf
of the Ngemba, Ngiyampaa, Wangaaypuwan and Wayilwan traditional
owners in the Cobar-Nyngan region which covers the Oxley Exploration Pty
Ltd tenement portfolio.
All tenements are in good standing and there are no known impediments
to operating in this area.
All tenements have been the subject of previous exploration by numerous
companies.
Previous exploration data has been compiled, reviewed and assessed for all
tenements held by the Company.
The tenements are prospective for structurally controlled base metal and
gold deposits.
No new drilling in this report.
Criteria
JORC Code explanation
Data
aggregation
methods
•
•
Relationship
between
mineralisation
widths and
intercept
lengths
•
Diagrams
•
Balanced
reporting
•
Further work
•
•
•
Commentary
Person should clearly explain why this is the case.
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short lengths of
high-grade results and longer lengths of low-grade results,
the procedure used for such aggregation should be stated and
some typical examples of such aggregations should be shown
in detail.
These relationships are particularly important in the reporting
of Exploration Results.
If the geometry of the mineralisation with respect to the drill
hole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drill hole collar locations and appropriate
sectional views.
Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
reporting of Exploration Results.
The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations and
future drilling areas, provided this information is not
commercially sensitive.
•
No new assay results in this report.
•
No new drilling in this report.
•
Refer to Figures in this report.
•
The reporting is balanced, and all material information has been disclosed.
•
Confirmed geophysical and geochemical anomalies will be followed-up
with initial RC drilling.
Further auger sampling is in progress in the broader area.
•