2. Results for announcement to the market
2023
$'000
2022
$'000
Revenues from ordinary activities
612,490
386,587
225,903
58%
Adjusted Earnings Before Interest, Tax, Depreciation and
Amortisation (Adjusted EBITDA)*
32,014
93,652
(61,638)
(66%)
Profit/(loss) from ordinary activities after tax attributable to
the owners of Aeris Resources Limited
(139,754)
6,010
(145,764)
(2425%)
Profit/(loss) for the year attributable to the owners of Aeris
Resources Limited
(139,754)
6,010
(145,764)
(2425%)
2023
Cents
2022
Cents
*
Change
$'000
Change
%
Refer to the Directors' Report for a reconciliation of Adjusted EBITDA
Earnings per share
Basic earnings/(loss) per share
Diluted earnings/(loss) per share
(20.2)
(20.2)
1.8
1.7
On 8 July 2022, the Company completed a share consolidation. Aeris shares were consolidated at the ratio of 7 fully paid
ordinary shares into 1 fully paid ordinary share. Earnings per share calculations for both the current year and prior year
are reflective of the share consolidation.
Dividends
There were no dividends paid, recommended or declared during the current financial period.
Comments
The loss for the consolidated entity after providing for income tax amounted to $139,754,000 (30 June 2022: profit of
$6,010,000).
3. Net tangible assets
Reporting
period
Cents
Net tangible assets per ordinary security
38.6
Previous
period
Cents
62.8
The net tangible assets per ordinary security at 30 June 2022 has been restated for the share consolidation that was
completed on 8 July 2022.
Aeris Resources Limited
Appendix 4E
Preliminary final report
4. Control gained over entities
On 1 July 2022, Aeris Resources Limited acquired 100% of the issued shares in Round Oak Minerals Pty Limited. Please
refer to note 30 of the 30 June 2023 Annual Financial Report for additional information regarding this acquisition.
5. Loss of control over entities
Not applicable.
6. Dividends
Current period
There were no dividends paid, recommended or declared during the current financial period.
Previous period
There were no dividends paid, recommended or declared during the previous financial period.
7. Dividend reinvestment plans
Not applicable.
8. Details of associates and joint venture entities
Not applicable.
9. Foreign entities
Details of origin of accounting standards used in compiling the report:
Not applicable.
10. Audit qualification or review
Details of audit/review dispute or qualification (if any):
The financial statements have been audited by PricewaterhouseCoopers and an unmodified opinion has been issued.
11. Attachments
Details of attachments (if any):
The Annual Financial Report of Aeris Resources Limited for the year ended 30 June 2023 is attached.
Aeris Resources Limited
ABN 30 147 131 977
Annual Financial Report - 30 June 2023
Aeris Resources Limited
Corporate directory
30 June 2023
Directors
Andre Labuschagne - Executive Chairman
Michele Muscillo - Non-executive Director
Colin Moorhead - Non-executive Director
Sylvia Wiggins - Non-executive Director
Robert Millner - Non-executive Director
Company secretaries
Robert Brainsbury
Dane van Heerden
Registered office and principal
place of business
Level 6
120 Edward Street
Brisbane
QLD 4000
Phone: (07) 3034 6200
Share register
Automic
Level 5
126 Phillip Street
Sydney
NSW 2000
Phone: 1300 288 664 (within Australia)
+61 2 9698 5414 (outside Australia)
Auditor
PricewaterhouseCoopers
Level 23
480 Queen Street
Brisbane
QLD 4000
Solicitors
HopgoodGanim Lawyers
Level 8
1 Waterfront Place
Brisbane
QLD 4000
Stock exchange listing
Aeris Resources Limited shares are listed on the Australian Securities Exchange
(ASX code: AIS)
Website
www.aerisresources.com.au
Corporate Governance Statement www.aerisresources.com.au/about/corporate-governance/
1
Aeris Resources Limited
Directors' Report
30 June 2023
The Directors present their report, together with the consolidated financial report of the Aeris Resources Limited Group
(‘consolidated entity’), consisting of Aeris Resources Limited (‘Aeris’ or ‘Company’) and the entities it controlled at the end of,
or during, the year ended 30 June 2023.
DIRECTORS
The Directors of the Company in office during the financial year and up to the date of this report were:
Name, experience and other directorships
Andre Labuschagne – Executive Chairman
Mr Labuschagne is an experienced mining executive with a career
spanning over 30 years across operations in Australia, Indonesia, South
Africa, PNG and Fiji. Mr Labuschagne has held various corporate and
operational roles in companies including Norton Gold Fields, Emperor
Gold Mines, DRD Gold and AngloGold Ashanti. Mr Labuschagne holds a
Bachelor of Commerce from Potchefstroom University in South Africa.
Special
Responsibilities
Appointed /
Resigned
Executive Chairman
Appointed
20-Dec-2012
Chairman of the
Audit and Risk
Committee and
member of the
Remuneration and
Nomination
committee and the
Sustainability
Committee
Appointed
2-May-2013
Chairman of the
Remuneration and
Nomination
Committee and
Member of the
Audit and Risk
Committee and the
Sustainability
Committee
Appointed
27-July-2020
Other current directorships (ASX listed entities): Magontec Limited
(ASX:MGL)
Former directorships in the past 3 years (ASX listed entities): None
Michele Muscillo – Independent Non-Executive Director
Mr Muscillo is a Partner specialising in corporate law with
HopgoodGanim Lawyers. Mr Muscillo is an admitted Solicitor and has a
practice focussed almost exclusively on mergers & acquisitions and
capital raising. Mr Muscillo has acted on a variety of corporate
transactions including initial public offerings, takeovers and acquisitions.
Mr Muscillo has a Bachelor of Laws from Queensland University of
Technology and was a recipient of the QUT University Medal.
Other current directorships (ASX listed entities): Xanadu Mines Limited
(ASX:XAM) and Mako Gold Limited (ASX:MKG).
Former directorships in the past 3 years (ASX listed entities): Cardinal
Resources Limited (ASX:CDV).
Colin Moorhead – Independent Non-Executive Director
Mr Moorhead is an experienced industry executive with a demonstrated
track record over three decades of building value in mining companies
through innovation, discovery, project development and safe, efficient
operations.
A geologist by training, Mr Moorhead is also known for strong leadership,
strategy and execution. Mr Moorhead’s career has involved both
operational and corporate executive responsibilities including global
responsibility for exploration and resource development at Newcrest
Mining and CEO of PT Merdeka Copper Gold (IDX:MDKA), where he built
and led the team that constructed and commissioned the highly successful
Tujuh Bukit Gold Mine. Colin is also currently Non-Executive Chairman of
Xanadu Mines (ASX:XAM), Non-Executive Chairman of Sihayo Gold
Limited (ASX: SIH), Non-Executive Director of Coda Minerals (ASX: COD)
and Non-Executive Director of Ramelius Resources Limited (ASX:RMS).
Former directorships in the past 3 years (ASX listed entities): Finders
Resources Limited.
2
Aeris Resources Limited
Directors' Report
30 June 2023
Name, experience and other directorships
Sylvia Wiggins – Non-Executive Director
Ms Wiggins is a globally experienced senior executive and investment
banker with a demonstrated track record over 25 years in public markets,
with a focus on finance, strategy and risk.
Ms Wiggins has been the CEO and CFO of public listed entities, with her
most recent role as Executive Director – Finance & Commercial at ASX
listed renewable energy company Infigen Energy, prior to its takeover. As
an executive, Ms Wiggins has been a part of the leadership teams
transforming businesses from the strategic, operating and capital structure
perspectives to both preserve and create shareholder value. Ms Wiggins
is a member of the Independent Assurance Review Board for the
Department of Defence and is also currently Non-Executive Director of
Service Stream, Non-Executive Director of Collgar Renewables, NonExecutive Director of Scheme Financial Vehicle (NSW Energy Roadmap)
and Non-Executive Director of Epic Energy.
Special
Responsibilities
Appointed /
Resigned
Chairman of the
Sustainability
Committee and
Member of Audit
and Risk
Committee
Appointed
18-October2021
Former directorships in the past 3 years (ASX listed entities): None
Robert Millner – Non-Executive Director
Mr Millner is the Chairman of Australian investment house Washington H
Soul Pattinson (ASX:SOL). Mr Millner has extensive experience in the
investment industry, and the Chairman of Brickworks Limited (ASX: BKW),
BKI Investment Co Ltd and New Hope Corporation Limited (ASX:NHC) and
a Non-Executive Director of Tuas Limited (ASX:TUA), Apex Healthcare
Berhad and TPG Telecom Ltd (ASX:TPG).
Appointed
1-July 2022
Former directorships in the past 3 years (ASX listed entities): Milton
Corporation Limited (delisted from ASX on 5 October 2021)
COMPANY SECRETARIES
Robert Brainsbury
Mr Brainsbury is an experienced financial executive and has held senior operational and finance roles with several bluechip industrial and resources companies including Norton Gold Fields, MIM Holdings Limited, Xstrata, Rio Tinto and BIS
Industrial Logistics. Mr Brainsbury is a qualified accountant and holds a Bachelor of Business degree with majors in
Accounting and Marketing.
Dane van Heerden CA
Ms van Heerden is a qualified chartered accountant, with over 20 years’ experience in both Australia and abroad.
MEETINGS OF DIRECTORS
The attendance of Directors at Board and Committee meetings during the financial year were as follows:
Directors
Andre Labuschagne
Michele Muscillo
Colin Moorhead
Sylvia Wiggins
Robert Millner
Board
A
12
12
12
12
12
ARC
B
12
12
12
12
12
A
3
3
3
-
B
3
3
3
-
Sustainability
A
B
2
2
2
2
2
2
-
A = Number of meetings held during the time the Director was a member of the Board and/or Committee
B = Number of meetings attended during the time the Director was a member of the Board and/or Committee
3
Remuneration
A
B
1
1
1
1
-
Aeris Resources Limited
Directors' Report
30 June 2023
The Board established a Risk and Sustainability Committee on 28 June 2022. During the reporting period, the Board
restructured its committees and transferred risk responsibilities from the Risk and Sustainability Committee to the Audit
Committee and in line with the change of responsibilities, changed the Committees names to Sustainability Committee
and Audit and Risk Committee. On 23 May 2023, the Board reconstituted the Remuneration Committee and the
Nomination Committee into a single committee and named the committee ‘Remuneration and Nomination Committee’.
The members of the Remuneration and Nomination Committee are the previous members of the Remuneration
Committee - Mr Colin Moorhead (Chair) and Mr Michele Muscillo. There were no meetings of the Nomination Committee
during the financial year.
CORPORATE GOVERNANCE
The Company’s Corporate Governance Statement for the year ended 30 June 2023 may be accessed from the Company’s
website at https://www.aerisresources.com.au/about/corporate-governance.
PRINCIPAL ACTIVITIES
The principal activities of the consolidated entity for the year ended 30 June 2023 were the production, sale and
exploration of copper, zinc, gold and silver. Other than as referred to on pages 4 to 7, there were no significant changes
in those activities during the financial year.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
ACQUISITION OF ROUND OAK MINERALS PTY LTD
Aeris acquired the Round Oak Group (Round Oak Minerals Pty Ltd and wholly owned subsidiaries) from Washington H.
Soul Pattinson Limited (WHSP).
Round Oak Minerals is an Australian focused resources company with its primary assets being:
Jaguar Zn/Cu mine in Western Australia;
Mt Colin Cu/Au mine in North-West Queensland; and
Stockman Cu/Zn development project in Victoria
The purchase consideration for the acquisition included the following components:
cash payment on settlement of $80 million. This was funded through a fully underwritten $117 million equity
raise; and
the issue and allotment of fully paid ordinary shares in Aeris at a deemed issue price of $0.105 per share to a total
value of $154 million, being 1,466,666,667 shares valued at $0.067 per share on 1 July 2022 totalling $98.27
million.
The transaction completed on 1 July 2022. Transaction costs relating to the acquisition of $11.580 million were incurred
and recognised in the profit and loss for the year ending 30 June 2023.
Aeris also received working capital adjustments of $29.20 million and was adjusted against the purchase consideration
allocated on 1 July 2022.
COMPLETION OF EQUITY PLACEMENT
On 1 July 2022, $17.1 million, representing the balance of the $117 million equity raise (placement and entitlement offer)
was received. The other $100 million of the equity raise was received by 30 June 2022.
SHARE CONSOLIDATION
At an Extraordinary General Meeting of shareholders held on 24 June 2022, shareholders approved to consolidate every 7
ordinary shares into 1 ordinary share, post completion of the $117.1 million equity raise. The share consolidation took
effect in early July 2022.
OPERATING REVIEW
TRITTON COPPER OPERATIONS (TRITTON)
Operations
The Tritton Copper Operations produced 17,206 tonnes of copper during the financial year ending 30 June 2023. A total of
1.37 million tonnes of ore were mined, predominantly from the Tritton and Murrawombie underground mines, at an
average grade of 1.36% Cu. The high-grade Avoca Tank mine was brought into production in Q4. Production from the
Budgerygar deposit, part of the Tritton mine complex, was delayed by approximately 9 months due to geotechnical issues
installing the ventilation shaft. The delay accessing ore from Budgerygar significantly impacted copper production for the
year. The ventilation shaft was subsequently completed in July 2023 enabling production to ramp up in FY2024.
4
Aeris Resources Limited
Directors' Report
30 June 2023
Ore mined
Grade mined
Ore milled
Grade milled
Recovery
Total copper produced
Gold produced
Units
tonnes
% Cu
tonnes
% Cu
%
tonnes
Oz
30 June 2023
1,369,364
1.36
1,352,424
1.34
94.6
17,205
4,582
30 June 2022
1,488,120
1.30
1,500,463
1.30
94.6
18,581
4,312
30 June 2021
1,573,679
1.56
1,557,803
1.56
93.7
22,987
7,228
Approximately $39.1 million was invested in growth capital at Tritton over the financial year ending 30 June 2023. This was
mostly associated with the development of the new Avoca Tank and Budgerygar underground mines. A further $5.6 million
was invested in exploration.
Exploration
Exploration activities at Tritton during the financial year ended 30 June 2023 focused on extending known deposits and
identifying greenfield targets for new resources.
At the Constellation deposit, located 45km north of the Tritton mill, an updated Mineral Resource was released. The
Mineral Resource now totals 6.7Mt at 1.85% Cu and 0.58g/t Au, an uplift from the previous resource by 102% in tonnage
and 162% in contained copper metal. The Constellation deposit remains open down plunge with several downhole
electromagnetic (EM) modelled plates yet to be adequately tested. Constellation remains a key development project to
extend the life of the Tritton Operation. Environmental impact studies and preliminary studies on open pit and
underground mining options progressed during the year, with further resource definition drilling planned in FY2024.
The northern portion of the Tritton tenement package, on which the Constellation deposit was discovered in late 2020, is
considered highly prospective for further discoveries. During the financial year ended 30 June 2023, the airborne
electromagnetic (AEM) survey was completed over these tenements and 14 high-priority anomalies were identified. Work
commenced on ground-based EM surveys to further define targets for a subsequent drilling program.
Drilling was also undertaken on the Kurrajong deposit, located approximately 25km east of the Tritton processing plant. A
maiden Mineral Resource was released totalling 2.2Mt at 1.7% Cu, 0.2g/t Au and 5g/t Ag for 37kt contained Cu metal,
13koz contained Au metal and 347koz contained Ag metal. High-grade copper is associated with massive sulphide lenses,
of which three have been modelled and incorporated into the Mineral Resource estimate. The Kurrajong mineralised
system remains open down-plunge and drilling has intersected mineralisation 300m down plunge below the current
Mineral Resource including:
TKJD024W1: 17m @ 1.3% Cu, 0.2g/t Au and 4g/t Ag (17m true width)
At the Murrawombie deposit, an exploration hole (MWNM001) was drilled targeting down-plunge extensions below the
current Mineral Resource footprint. Several high-grade copper lenses were intersected approximately 250m down-plunge
of the known mineralisation. A downhole EM survey also defined multiple EM conductors positioned directly along strike
from the drill hole. A follow up drill program is planned, targeting the modelled EM plates at Murrawombie.
At the Avoca Tank deposit, underground drilling intersected massive sulphide mineralisation 180m below the current
Mineral Resource. Further drilling is planned in FY2024, targeting increases to the Mineral Resource at the Avoca Tank
deposit.
CRACOW GOLD OPERATIONS (CRACOW)
Cracow produced 48,221oz of gold during the financial year ended 30 June 2023. Mined ore tonnes of 575,382 was
supplemented with stockpiles, for total ore tonnes milled of 666,978. Mined grades steadily improved over the year (FY23
average 2.75g/t Au) and reconciled well to the rebuilt geological model.
Ore mined
Grade mined
Ore milled
Grade milled
Recovery
Gold produced
Gold sold
Units
Tonnes
g/t Au
Tonnes
g/t Au
%
Oz
Oz
30 June 2023
575,382
2.75
666,978
2.50
90.0
48,221
47,839
5
30 June 2022
505,260
3.26
663,912
2.80
90.2
53,920
55,358
30 June 2021
541,910
4.49
602,789
4.12
92.3
73,685
73,692
Aeris Resources Limited
Directors' Report
30 June 2023
Exploration
Exploration activities during the year focused on drilling at the Golden Plateau deposit and drill testing of targets within
the current mining area, the Western Vein Field. A total of $4.5 million was invested in exploration at Cracow during the
financial year ended 30 June 2023.
A drill campaign was completed at the Golden Plateau deposit during the first half of the financial year ended 30 June
2023, targeting interpreted high-grade north-south structures surrounding the historical workings. A maiden Mineral
Resource estimate of 620kt at 3.1g/t Au containing 62koz Au metal was reported during the year. The reported Mineral
Resource includes potential open pit and underground mineralisation.
In addition, an Exploration Target of 430kt – 1,000kt at 3g/t – 4g/t Au for 60koz – 130koz of contained gold has been
defined for the Golden Plateau deposit, peripheral to the Mineral Resource. Golden Plateau is considered to be a potential
near-term source of additional ore for the Cracow mill and is a priority for exploration in FY2024.
The potential quantity and grade of the Exploration Target is conceptual in nature and is therefore an approximation.
There has been insufficient exploration drilling to estimate a Mineral Resource and it is uncertain if further exploration will
result in the estimation of a Mineral Resource. The Exploration Target has been prepared and reported in accordance with
the 2012 edition of the JORC Code.
Exploration was also conducted in the Southern Vein Field, a highly prospective 5km x 4km corridor located immediately
south of the current underground mine infrastructure. The prospective structures which host gold mineralisation in the
Western Vein Field are interpreted to continue under several hundred metres of cover in the Southern Vein Field. To gain
an understanding of the geology beneath the cover sequences, magneto-telluric (MT) and ambient noise tomography
(ANT) geophysical surveys were undertaken. A series of structural lineaments were interpreted from the dataset, which is
highly encouraging. Target areas defined from the geophysical surveys will form the basis for a first-pass drill program at
the Southern Vein Field.
NORTH QUEENSLAND OPERATIONS
Mining operations at the Mt Colin mine produced 426.1kt of copper/gold ore during the financial year ended 30 June 2023.
Mined ore was trucked to Glencore’s Mt Isa Operations and Evolution Mining’s Ernest Henry Operations for processing. A
total of 362,876 tonnes of ore was processed during the financial year, producing 7,110 tonnes of copper and 3,852 ounces
of gold. At the end of the year, stockpiles of over 100kt of mined ore remained at Ernest Henry for processing in FY2024,
approximately 86kt of stockpiled ore was pre-sold (provisional payment received) at the end of the financial year. As the
mine is in its final years of production, minimal capital development was undertaken. The Mt Colin mine was affected by
a severe weather event in north Queensland during the first half of the financial year ended 30 June 2023, impacting mining
activities and toll processing at Ernest Henry.
Ore mined
Grade mined
Ore milled
Grade milled
Recovery
Copper produced
Gold produced
Units
Tonnes
% Cu
Tonnes
% Cu
%
Tonnes
Oz
30 June 2023
426,135
2.39
362,876
2.18
89.8
7,110
3,852
Exploration
Exploration activities during the financial year ended 30 June 2023 focused on the Barbara deposit, located approximately
70km northeast of Mt Isa. The Barbara open pit copper mine commenced production in March 2019 with sulphide ore
crushed and trucked to Mt Isa for processing, and ceased operations in December 2020.
During the year a 15 hole drill program was undertaken to better define the mineralisation remaining below the old pits.
An updated Mineral Resource of 2.2Mt at 2.0% Cu and 0.2g/t Au containing 45kt contained Cu metal and 12koz contained
Au metal was estimated based on the new drilling.
Mineralisation at Barbara has been traced approximately 700m along-strike with 400m vertical extent in the deepest
southern portion of the deposit and remains open down-plunge. There is significant potential to increase the Mineral
Resource with further drilling. In FY2024 Aeris will undertake feasibility studies and permitting activities for a potential
underground mining operation at Barbara.
6
Aeris Resources Limited
Directors' Report
30 June 2023
JAGUAR OPERATIONS (JAGUAR)
During the financial year ended 30 June 2023 operations at the Bentley mine (Bentley) produced 402,574 tonnes of ore,
resulting in metal production of 22,479 tonnes of zinc, 3,057 tonnes of copper, 718,147 ounces of silver and 2,958 ounces
of gold. Over the last two quarters of the financial year the mine experienced three separate mining induced seismic
events, which delayed production and required a cessation of operations in the high-grade Bentayga mining area.
Production was also impacted by low development rates caused by congestion in the lower levels of the mine and limited
ventilation.
In August 2023 an announcement was made to suspend production and place Jaguar Operations on care and maintenance
due to forecast operating losses in FY2024. The decision preserves the in-ground value of the significant resources
identified across the Jaguar tenements. In FY2024 Aeris will undertake a feasibility study on options to restart Jaguar at
higher throughput rates by incorporating other known resources on the tenements.
Ore mined
Grade mined
Ore milled
Grade milled
Zinc recovery
Zinc produced
Copper produced
Gold produced
Silver produced
Units
Tonnes
% Zn
Tonnes
% Zn
%
Tonnes
Tonnes
Oz
Oz
30 June 2023
402,574
5.95
432,631
5.97
87.1
22,479
3,057
2,958
718,147
Exploration
During the financial year ended 30 June 2023, exploration activities were focused on the high-grade Turbo lens at Bentley
and a review of greenfield targets along strike from known deposits.
Resource definition drilling extended the footprint of the Turbo mineralisation a further 200m along strike. An updated
Mineral Resource estimate was completed resulting in 1.26Mt at 1.82% Cu, 8.5% Zn, 0.72g/t Au and 47g/t Ag. This Mineral
Resource was a 23% increase in tonnage, 17% increase in contained copper metal and 39% increase in contained zinc metal
compared to the previous estimate. The Turbo lens is now the second largest massive sulphide lens ever discovered at the
Bentley mine.
Grade control drilling at Bentley extended the high-grade Java Deeps lens and also intersected a new massive sulphide
lens, named Bacalar. High grade drill intersections through the Bacalar lens include:
23BUDD009
15.8m @ 3.70% Cu, 6.06% Zn, 101g/t Ag, 1.61g/t Au (14.4m true width)
23BUDD005
11.3m @ 1.95% Cu, 12.1% Zn, 63g/t Ag, 0.85g/t Au (10.6m true width)
23BUDD013
18.6m @ 1.80% Cu, 6.85% Zn, 75g/t Ag, 1.49g/t Au (15.6m true width).
Bacalar has now been defined 70m along strike and 120m down plunge, while Java Deeps has been defined 100m along
strike and 140m down plunge.
During the year, a re-estimation of the remaining Mineral Resource at the previously operating Jaguar mine was
completed. A Mineral Resource of 0.8Mt grading 2.28% Cu, 4.66% Zn and 61g/t Ag was defined, comprising high-grade
remnant sills and pillars within the old mine workings as well as additional mineralisation outside the mining footprint.
Dewatering of the Jaguar mine commenced to enable a review of ground conditions for potential restart studies.
The broader Jaguar tenements are considered highly prospective for both base metals and gold mineralisation. During the
year a regional gravity survey was completed to assist with identifying prospective targets along with regional mapping,
surface geochemistry and electromagnetic geophysics datasets. Approximately 2,500 historical bottom-of-hole air-core
(BOH AC) drill holes were also re-assayed to improve the understanding of geochemical vectors associated with volcanic
hosted massive sulphide (VHMS) deposits.
The initial focus has been an 8km strike corridor between the Jaguar and Triumph deposits. Within this area, 21 gravity
anomalies have been identified within prospective rock sequences, including two coincident gravity/BOH AC geochemistry
anomalies. The geochemistry dataset has defined 19 anomalies (some new and others previously identified) with strike
extents exceeding 100m.
7
Aeris Resources Limited
Directors' Report
30 June 2023
FINANCIAL REVIEW
Financial Results
Primarily due to operational issues at the Tritton Copper Operation and Jaguar Zinc/Copper Operation resulting in lower
production than planned, the consolidated entity recorded a loss after tax for the financial reporting year to 30 June 2023
of A$139.754 million, compared with a profit after tax for the year ended 30 June 2022 of A$6.010 million. The results for
year were influenced by a number of key factors, which included:
•
•
•
•
•
Revenue from contracts with customers was A$612.490 million, compared to A$386.587 million for the previous
corresponding period. This reflects the following factors:
o Contributions from the Mt Colin operation ($107.698 million) and Jaguar operation ($166.007 million);
o Tritton revenue of $208.659 million was lower than the prior corresponding period ($246.104 million)
due to lower copper production (17,205 tonnes vs 19,032 tonnes in 2022) and lower copper price
received (A$11,045/t vs $12,931/t);
o Cracow revenue of $130.120 million compared to $140.480 million in FY2022, due to lower gold
produced (48,221oz vs 53,920oz) and partially offset by higher gold prices (A$2,698/oz vs A$2,539/oz).
Cost of goods sold increased to $705.464 million from $353.435 million in the prior corresponding period due
largely to the inclusion of the Mt Colin and Jaguar assets for the first time, which contributed $303.5 million.
Transaction costs of A$11.580 million were recognised for the year ended 30 June 2023 in relation to the
acquisition of the Round Oak Minerals Group;
An impairment of A$1.700 million was recognised in relation to the Torrens Exploration Project; and
A foreign exchange gain of A$1.969 million was recognised for the year ended 30 June 2023 (30 June 2020: A$0.4
million).
The following table contains a reconciliation of profit before income tax to EBITDA (earnings before income tax
and depreciation and amortisation) and Adjusted EBITDA.
Reconciliation of profit before income tax to EBITDA and Adjusted EBITDA:
2023
$'000
2022
$'000
(139,754)
150,571
8,511
19,328
6,010
74,334
5,987
86,331
Impairment of assets
Transaction expense
Net foreign exchange gain
Movement in financial assets at fair value through profit or loss
1,700
11,580
(1,969)
1,375
4,349
1,951
(418)
1,439
Adjusted EBITDA
32,014
93,652
Profit/(loss) before income tax expense
Depreciation and amortisation
Finance costs
EBITDA
EBITDA and adjusted EBITDA are non-IFRS earnings measures that do not have any standardised meaning prescribed by
IFRS and therefore may not be comparable to EBITDA presented by other companies. These measures, which are
unaudited, are important to management as an additional way to evaluate the consolidated entity's performance.
Financial Position
At 30 June 2023, the consolidated entity had a positive net asset position of A$266.369 million (30 June 2022: A$293.497
million). The June 2023 net asset position for the consolidated entity was impacted by a number of key factors, including:
•
•
•
On 1 July 2022, Round Oak Minerals Pty Ltd was acquired for a net purchase consideration of $149.06 million.
Investments of $59.784 million into new mining projects, including exploration for the financial year ended 30
June 2023.
Working capital deficit of $55.706 million, compared to a working capital surplus in th
Share your feedback