Quarterly Activities Report | For the period ended 30 June 2023
Quarterly Activities Report
For the period ended 30 June 2023
Highlights
•
Copper equivalent production of 13.1kt for the quarter and 51.5kt for full year
•
Group operating and capital costs within or below revised guidance for full year
•
Tritton had best quarter for FY23, with 5.4kt of copper produced – higher grade and
tonnes from Avoca Tank. Avoca Tank and Budgerygar to ramp up across FY24
•
Cracow had strong production quarter. Met FY23 production and cost guidance
•
Mt Colin tonnes mined for quarter on plan but copper production delayed by thirdparty toll processor, resulting in large stockpile of mined ore at quarter end
•
Updated Mineral Resource at Barbara deposit and maiden mineral resource at
Kurrajong deposit. Study on potential underground mine at Barbara to commence
•
Seismic events at Jaguar severely impacted production during the quarter – FY24
operating plan options for Jaguar are under review
Sep-22
Dec-22
Mar-23
Jun-23
Total
FY23 Rev.
Guidance
/mmhrs
2.06
2.06
2.03
1.33
1.66
N/A
Copper produced
kt
6.8
6.7
6.0
7.9
27.4
28 - 32
Zinc produced
kt
8.1
7.3
4.2
2.9
22.5
24 - 29
Gold produced
koz
13.8
13.9
15.4
16.5
59.6
60 - 78
Silver produced
Moz
0.4
0.2
0.1
0.1
0.9
1.1 - 1.3
Cu eq production
kt
14.2
13.1
11.1
13.1
51.5
53 - 63
Mining
A$M
60.2
66.5
65.0
67.5
259.2
229 - 277
Processing
A$M
26.3
25.5
28.0
24.8
104.6
98 - 120
Site & G&A
A$M
18.4
15.0
16.4
19.7
69.4
69 - 83
TC/RCs
A$M
7.5
11.7
10.3
10.2
39.6
37 - 45
Product handling
A$M
11.5
12.0
5.0
7.5
36.0
41 - 49
Sustaining
A$M
19.3
19.0
16.5
27.8
82.7
75 - 95
Growth
A$M
10.1
11.9
15.6
7.1
44.7
39 - 51
Exploration
A$M
4.8
3.9
2.9
3.4
15.0
16 - 23
Projects inc. Stockman
A$M
0.5
2.3
0.9
2.7
6.3
9 - 11
AISC
A$M
147.6
156.3
143.7
176.5
624.1
N/A
AISC
$/lb Cu eq
4.72
5.42
5.87
6.11
5.50
N/A
Unit
LTIFR
Operating Costs
Capital Costs
Aeris Resources Limited
1
Group Safety, Environment and Community
Aeris recorded one lost time injury during the June quarter bringing the Q4 12 month
rolling LTIFR to 1.66 1.
The Total Recordable Injury Frequency Rate (TRIFR) for Aeris at the end of the June
quarter was 12.5. Early injury prevention programs are now imbedded into our sites’
injury management processes, ensuring that management of injuries and
consultations with medical personnel are completed within the first critical 24 hours.
The development of the Aeris Risk Management Framework has been completed and
approved by the Audit and Risk Committee.
There were no Significant Environmental Incidents recorded in the June quarter.
Figure 1 – Group LTIFR
3
2
No of LTI
LTIFR
1
0
1 One additional LTI has also been retrospectively recorded for the March quarter
2
Tritton Operations (NSW)
Key points for quarter:
•
Copper production of 5.4kt Cu at AISC of A$5.68/lb
•
Increased contribution from the high-grade Avoca Tank and Budgerygar mines
•
Operating costs in line with plan and lower on a unit basis due to higher metal
production
•
Growth capital declined quarter on quarter as Avoca Tank and Budgerygar
development was completed
•
Significant de-risking events for FY24 production occurred with raisebores at
Budgerygar (30 June) and Avoca Tank (22 July) being completed
Production Summary
Unit
Sep 22
Dec 22
Mar 23
Jun 23
Qtr
Qtr
Qtr
Qtr
FY23 Total
FY23 Rev.
Guidance
Ore Mined
tonnes
309.2
333.2
333.2
393.8
1,369.4
N/A
Mined Grade
Cu (%)
1.27%
1.31%
1.24%
1.57%
1.36%
N/A
Ore Milled
tonnes
314.7
330.6
334.5
372.6
1,352.4
N/A
Milled Grade
Cu (%)
1.26%
1.31%
1.25%
1.53%
1.34%
N/A
Recovery
Cu (%)
95.20%
93.8%
93.9%
95.3%
94.6%
N/A
Copper Produced
kt
3.8
4.1
3.9
5.4
17.2
17 - 18
Gold Produced
koz
1.1
1.1
1.0
1.4
4.6
5-7
Silver Produced
koz
26.7
39.0
29.6
39.3
134.6
160 - 200
Mining
A$M
25.1
26.7
25.9
32.7
110.4
106 - 129
Processing
A$M
8.1
7.4
7.6
7.5
30.6
29 - 35
Site & G&A
A$M
5.3
5.0
4.1
5.1
19.5
20 - 24
TC/RCs
A$M
3.0
2.7
4.0
4.7
14.4
13 - 16
Product Handling
A$M
4.4
4.0
2.4
3.9
14.7
17 - 20
By-Product Credit
A$M
(3.4)
(2.8)
(4.6)
(4.5)
(15.3)
N/A
Royalties
A$M
0.6
1.5
1.4
1.3
4.8
N/A
Corporate G&A1
A$M
0.7
0.7
0.7
0.5
2.6
N/A
Inventory Movements
A$M
3.6
(5.2)
0.0
0.4
(1.2)
N/A
Sustaining Capital2
A$M
10.1
9.7
10.0
16.4
46.2
43 - 52
A$M
57.5
49.5
51.5
68.1
226.7
N/A
A$/lb
6.89
5.52
5.96
5.68
5.98
N/A
Growth Capital
A$M
9.3
10.4
13.8
5.6
39.1
37 - 45
Exploration
A$M
1.4
0.5
1.3
2.4
5.6
6-7
A$M
68.2
60.5
66.5
76.1
271.3
N/A
A$/lb
8.17
6.75
7.71
6.35
7.15
N/A
Cost Summary
All-In Sustaining Costs3
All-In Costs3
1.
Includes Share Based Payments
2.
Includes sustaining capital, capitalised mine development and financing payments (Principal and Interest) on
leased assets
3.
All-In Sustaining and All-In Costs are based on copper produced
3
Operations
Total ore mined for the quarter was strong at 393.8kt. Production was primarily from
the Tritton and Murrawombie underground mines with an increased contribution from
the higher grade Avoca Tank and Budgerygar mines in June. These higher grade ore
sources also resulted in an average mined copper grade of 1.57%.
Raise boring of the Budgerygar ventilation shaft was completed at the end of the
quarter and with the fan now installed, the Budgerygar production rates are
scheduled to increase across FY24. The raise boring of the ventilation shaft at Avoca
Tank was completed on 22 July. Completion of the ventilation shafts significantly derisks production from these ore sources for FY24.
Figure 2 – Completed Budgerygar ventilation shaft
The Tritton mill continued to perform well with Q4 FY23 mill throughput and copper
recovery being the highest in FY23. The Jameson cell installation is progressing well
with commissioning scheduled for Q1 FY24 – installation of the Jameson cell is
expected to improve the copper grade in concentrate across FY24. Improved
copper grade in concentrate results in cost benefits from lower treatment and refining
charges and product handling costs. Payback on the capital investment in the
Jameson cell is expected to be less than 12 months.
Feasibility work also continued on the Constellation Project during the quarter.
4
Costs
All-in-sustaining costs reduced quarter on quarter to A$5.68/lb, driven by improved
ore production rates and higher copper production. Growth capital for the quarter
decreased as the underground access development for Avoca Tank was completed.
Tritton finished the financial year with operating and capital costs in line with FY23
guidance.
Greenfields Exploration
During the quarter, assay results were received from the three hole diamond drill
program completed at the 5M7 prospect in the prior quarter. The drill program
targeted evidence of sulphide mineralisation down-dip from recent multi-element
surface geochemistry and shallow low-grade copper mineralisation reported from
historical RC drilling completed in the 1990s. All three diamond drill holes completed
in the prior quarter intersected sulphide mineralisation at or near the target horizon.
The best intersection was returned from drill hole TEXD003, reporting 0.86m @ 1.29% Cu,
0.18g/t Au and 7g/t Ag. Data collected from the drill program is currently being
processed and interpreted. 5M7 is still considered a prospective target and
geological work is ongoing.
Figure 3 – Plan View of the 5M7 prospect highlighting the multi-element geochemical anomalism and
completed drill holes
5
On-ground assessment of the 14 priority airborne electromagnetic (VTEM) targets
identified from the 2022 VTEM survey commenced during the quarter. The assessment
includes completing moving loop electromagnetic (MLTEM) traverses across each
anomaly to confirm whether the VTEM response is associated with a bedrock
conductor or noise/conductive cover related. The MLTEM survey program will
continue in the current quarter.
Figure 4 – Tritton Tenement package including priority targets (VTEM) in the northern most extent.
6
Cracow Operations (QLD)
Key points for quarter:
•
Best quarter for the year with gold production of 13.8koz on increased ore mined
and ore grades. Full year gold production of 48.2koz was within guidance
•
Q4 all-in sustaining costs of $2,187/oz, driven by higher gold sales and good cost
management
•
Total operating and capital costs for FY23 within revised full year guidance
Sep 22
Dec 22
Mar 23
Jun 23
Qtr
Qtr
Qtr
Qtr
kt
127.1
147.7
147.8
g/t
2.63
2.60
Ore Milled
kt
154.6
Milled Grade
g/t
2.31
Recovery
%
Gold Produced
koz
Gold Sold
FY23 Total
FY23 Rev.
Guidance
152.7
575.3
N/A
2.82
2.92
2.75
N/A
170.4
168.6
173.3
667.0
N/A
2.28
2.65
2.74
2.50
N/A
90.1%
88.3%
90.6%
90.7%
90.0%
N/A
10.4
11.0
13.0
13.8
48.2
48 - 59
koz
10.1
10.8
13.3
13.6
47.8
N/A
Mining
A$M
11.7
14.5
15.1
15.8
57.1
46 - 56
Processing
A$M
6.0
6.2
7.2
6.7
26.1
23 - 28
Site & G&A
A$M
3.0
2.7
2.5
3.2
11.4
12 - 14
By-Product Credit
A$M
(0.2)
(0.3)
(0.3)
(0.3)
(1.1)
N/A
Royalties
A$M
1.4
1.6
2.1
2.2
7.3
N/A
Production Summary
Unit
Ore Mined
Mined Grade
Cost Summary
Corporate G&A1
A$M
0.5
0.5
0.5
0.4
1.9
N/A
Inventory Movements
A$M
(0.3)
(2.0)
0.0
(0.2)
(2.5)
N/A
Sustaining Capital2
A$M
3.8
2.7
2.6
2.1
11.2
9 - 13
A$M
25.9
25.9
29.7
29.8
111.3
N/A
A$/oz
2,567
2,397
2,229
2,187
2,326
N/A
Growth Capital
A$M
0.9
0.7
1.2
1.5
4.3
2-5
Exploration
A$M
2.0
1.4
0.7
0.4
4.5
5-8
A$M
28.8
28.0
31.6
31.7
120.1
N/A
A$/oz
2,855
2,593
2,372
2,328
2,511
N/A
All-In Sustaining Costs3
All-In Costs3
1.
Includes Share Based Payments
2.
Includes sustaining capital, capitalised mine development and financing payments (Principal and Interest) on
leased assets
3.
All-In Sustaining and All-In Costs are based on gold sold
Operations
Cracow performed well for the quarter with very strong ore production of 152.7kt at
gold grade of 2.92g/t Au. Development rates were above plan, improving access to
mining areas.
The mill also performed well, processing the increased mined ore and additional
stockpiled material. Recovery of 90.7% was in line with plan. Total gold production was
13.8koz for the quarter and 48.2koz for FY23.
7
Costs
All-in sustaining costs were lower quarter on quarter driven by higher gold sales and
steady costs.
Total operating and capital costs for the full year were within revised FY23 guidance
ranges.
Exploration – Southern Vein Field
Greenfield exploration activities were focused on the Southern Vein Field, a 5km x 4km
corridor located directly south of the current mine infrastructure. The Southern Vein
Field is considered the priority greenfield exploration search space at the Cracow
Operation.
The prospective geology, with the potential to host new gold deposits at the Southern
Vein Field, is overlain by several hundreds of metres of post-mineralisation cover. This
area has been underexplored but is considered to hold very significant conceptual
potential for new high-grade gold discoveries.
The Company has been considering a range of different remote sensing geophysical
methods to assist with interpreting the regional structural architecture and
stratigraphic units. A trial magnetotelluric geophysical survey and subsequent in-fill
survey were completed over the Southern Vein Field between 2021 and 2022. Results
from the surveys were encouraging, aiding in the interpretation of a broad-scale
structural lineament interpretation.
An alternate geophysical method was sought to assist with generating robust
geological interpretations for first-pass drill testing. The Company trialed an ambient
noise tomography (ANT) geophysical technique, which maps density contrasts below
the surface. Density differences at Cracow could relate to different rock units and/or
structures, both of which are important controls on mineralisation at the known
Cracow goldfield.
The ANT survey was completed over the Southern Vein Field during the quarter. Data
outputs have been received, enabling a preliminary interpretation to commence
(Figure 5). A series of structural lineaments have been interpreted from the dataset,
which is highly encouraging. The ANT and MT datasets will be used in conjunction, as
the primary tools to identify prospective areas with the potential to host gold
mineralisation. Target areas defined from the geophysical surveys would form the
basis for a first-pass drill program at the Southern Vein Field.
8
Figure 5 – Plan View of the Cracow goldfield showing an output from the ANT survey over the Southern
Vein Field, including preliminary structural lineaments interpreted from the survey.
9
North Queensland Operations (QLD)
Key points for quarter:
•
Copper production of 2.0kt at AISC of A$4.71/lb, impacted by processing delays
at toll processor, Ernest Henry Mining (EHM)
•
Ore stockpiled at EHM at quarter end available for processing was over 100kt
•
Operating and capital costs for FY23 were within or below revised full-year
guidance ranges
•
Updated Mineral Resource estimate released for the Barbara project – study to
commence on potential underground mine
Sep 22
Dec 22
Mar 23
Jun 23
Qtr
Qtr
Qtr
Qtr
kt
110.7
94.6
116.7
104.1
Production Summary
Unit
Ore Mined
Mined Grade
FY23 Total
FY23 Rev.
Guidance
426.1
N/A
Cu (%)
2.30
2.56
2.70
2.02
2.39
N/A
Ore Milled
kt
98.9
82.2
76.2
105.6
362.9
N/A
Milled Grade
Cu (%)
2.17
2.12
2.28
2.18
2.18
N/A
Recovery
Cu (%)
94.0%
88.5%
90.2%
86.2%
89.8%
N/A
Copper Produced
kt
2.0
1.5
1.6
2.0
7.1
8-9
Gold Produced
koz
1.1
1.0
0.9
0.9
3.9
4-5
A$M
11.0
10.6
11.3
10.7
43.6
40 - 48
Cost Summary
Mining
Processing
A$M
5.0
4.6
4.5
5.5
19.6
20 - 25
Site & G&A
A$M
1.7
1.5
1.2
2.9
7.3
6-7
TC/RCs
A$M
1.1
1.5
2.4
1.5
6.5
5-6
Product Handling
A$M
1.2
0.8
0.5
1.8
4.3
5-6
By-Product Credit
A$M
(3.1)
(2.8)
(1.1)
(3.8)
(10.8)
N/A
Royalties
A$M
1.0
1.1
0.7
1.5
4.3
N/A
Corporate G&A1
A$M
0.3
0.3
0.4
0.3
1.3
N/A
Inventory Movements
A$M
(2.0)
(1.5)
(5.2)
0.1
(8.6)
N/A
Sustaining Capital2
A$M
0.9
0.1
0.0
0.0
1.0
2-3
A$M
17.1
16.3
14.6
20.6
68.6
N/A
A$/lb
3.84
4.79
4.23
4.71
4.38
N/A
A$M
0.2
1.5
0.4
0.2
2.3
3-4
A$M
17.3
17.8
15.0
20.8
70.9
N/A
A$/lb
3.89
5.24
4.34
4.76
4.52
N/A
All-In Sustaining Costs3
Exploration
All-In Costs3
1.
Includes Share Based Payments
2.
Includes sustaining capital, capitalised mine development and financing payments (Principal and Interest) on
leased assets
All-In Sustaining and All-In Costs are based on copper produced
3.
Operations
Ore mined was in line with plan although grade was lower due to scheduling of lower
grade stopes in the mining sequence.
Ore milled was significantly below budget due to the scheduled processing run at
EHM schedule for June being deferred until Q1 FY24. As a result of the toll processing
delays, Aeris held an ore stockpile of over 100kt at EHM at the end of the quarter.
10
Costs
All-in sustaining costs were higher quarter on quarter at A$4.71/lb. Operating and
capital costs for FY23 were within or below the revised full-year guidance ranges.
Approximately 86kt of stockpiled ore at EHM was pre-sold (provisional payment
received) at the end of the quarter and will be processed in Q1 FY24.
Exploration
An updated Barbara Mineral Resource Estimate (MRE) was completed during the
quarter 1. The reported Barbara MRE totals 2.2Mt at 2.0% Cu and 0.2g/t Au for 45kt Cu
metal and 12koz Au metal. The updated MRE incorporates results from the recent
resource definition drill program completed at the deposit in the prior quarters.
Mineralisation at Barbara has been traced approximately 700m along-strike with 400m
vertical extent in the deepest southern portion of the deposit and remains open downplunge. There remains significant potential to increase the MRE with further drilling.
Table 1: June 2023 Barbara Mineral Resource 2345
JUNE 2023 MINERAL RESOURCE ESTIMATE
Resource
Category
Cut-off
grade
Measured
Indicated
Inferred
Total
$100 NSR
Tonnage
(kt)
Cu (%)
Au (g/t)
Ag (g/t)
Cu metal
(kt)
Au metal
(koz)
Ag metal
(koz)
-
-
-
-
-
-
-
1,980
2.0
0.2
3.3
40
11
210
260
1.8
0.1
3.5
5
1
30
2,230
2.0
0.2
3.4
45
12
240
Figure 6 – Long section view looking east showing the current Barbara Mineral Resource estimate
displaying Cu grade estimates and drill hole intercepts.
1 Refer to ASX announcement “Barbara Mineral Resource Update” dated 28th June 2023.
2 Dr Andrew Fowler MAusIMM CP (Geo) takes Competent Person responsibility for this Mineral Resource
Estimate in accordance with the JORC Code (2012).
3 The cut-off grade applied to the MRE has been derived from the Net Smelter Return (NSR) calculation.
4 The Competent Person considers that the Mineral Resource has reasonable prospects for eventual
economic extraction at the cut-off grade.
5 Numbers may not sum due to rounding.
11
Jaguar Operations (WA)
Key points for quarter:
•
Zinc production of 2.9kt Zn at AISC of A$6.21/lb with seismic events severely
impacting mining activities
•
All-in sustaining costs high on reduced metal production
•
FY24 operating plans for Jaguar are under review
Production Summary
Unit
Sep 22
Dec 22
Mar 23
Jun 23
Qtr
Qtr
Qtr
Qtr
FY23
Total
FY23 Rev.
Guidance
Ore Mined
tonnes
127.7
107.9
98.0
69.0
402.6
N/A
Mined Grade
Zn
7.55%
6.73%
4.45%
3.91%
5.95%
N/A
tonnes
117.0
124.1
98.2
93.3
432.6
N/A
Milled Grade
Zn
7.84%
6.70%
5.03%
3.64%
5.97%
N/A
Recovery
Zn
87.9%
87.9%
85.7%
85.0%
87.1%
N/A
Zinc Produced
kt
8.1
7.3
4.2
2.9
22.5
24 - 29
Copper Produced
kt
1.0
1.1
0.5
0.5
3.1
3-5
Gold Produced
koz
1.2
0.8
0.6
0.4
3.0
5-7
Silver Produced
koz
312
206
109
91
718
900 - 1,100
Mining
A$M
12.4
14.7
12.7
8.3
48.1
37 - 44
Processing
A$M
7.3
7.3
8.6
5.1
28.3
26 - 32
Site & G&A
A$M
8.4
5.8
8.6
8.5
31.3
31 - 38
TC/RCs
A$M
3.4
7.5
3.9
4.0
18.8
19 - 23
Product Handling
A$M
5.9
7.2
2.1
1.8
17.0
19 - 23
By-Product Credit
A$M
(16.6)
(34.4)
(12.7)
(9.7)
(73.4)
N/A
Royalties
A$M
2.0
2.0
0.7
0.4
5.1
N/A
Corporate G&A1
A$M
0.7
0.7
0.6
0.7
2.7
N/A
Inventory Movements
A$M
(1.8)
9.2
0.6
11.3
19.3
N/A
Sustaining Capital2
A$M
4.5
6.5
4.1
9.2
24.3
21 - 27
A$M
26.0
26.6
29.3
39.6
121.5
N/A
A$/lb
1.47
1.65
3.14
6.21
2.45
N/A
Growth Capital
A$M
0.0
0.8
0.5
0.1
1.4
0-1
Exploration
A$M
1.2
0.4
0.6
0.4
2.6
2-4
A$M
27.2
27.8
30.5
40.1
125.5
N/A
A$/lb
1.53
1.73
3.26
6.29
2.53
N/A
Ore Milled
Cost Summary
All-In Sustaining Costs3
All-In Costs3
1.
Includes Share Based Payments
2.
Includes sustaining capital, capitalised mine development and financing payments (Principal and Interest) on
leased assets
All-In Sustaining and All-In Costs are based on zinc produced
3.
12
Operations
Ore mined for the quarter at 69.0kt was significantly lower than plan and the previous
quarter. As disclosed in the ASX release “FY23 Production Guidance Update” dated
7 July 2023, Bentley has experienced three separate mining induced seismic events in
the lower levels of the mine in recent months. These seismic events delayed
production and required a cessation of operations in the Bentayga mining area.
Mined grades for the quarter was impacted by the exclusion of the high-grade
Bentayga stopes.
The operating strategy for Jaguar, including safe sustainable production rates at the
Bentley mine is currently under review.
Costs
All-in sustaining costs were high on a unit cost basis driven by lower metal production.
Inventory movement costs were also high as mined ore stockpiles were utilised.
Operating and capital costs for FY23 were within revised full-year guidance ranges.
Note: Maintenance costs were included in the Site & G&A section in the guidance
calculation, but actual reported maintenance costs are included in the Mining and
Processing costs.
Greenfield Exploration
During Q4 FY23, surface exploration at the Jaguar Operation focused on an extensive
re-assay campaign of approximately 2,500 historical bottom-of-hole (BOH) air-core
(AC) drill holes along the known prospective volcanic hosted massive sulphide (VHMS)
trend. The re-assay program was designed to improve the understanding of
geochemical vectors associated with VHMS deposits. In tandem with this project, the
recently acquired gravity data combined with ongoing detailed regional mapping is
providing an improved understanding of the geology along the prospective corridor.
The initial focus has been an 8 km strike corridor between the Jaguar and Triumph
deposits. Within this area, 21 gravity anomalies have been identified within
prospective rock sequences, including two coincident gravity/BOH AC geochemistry
anomalies. The geochemistry dataset has defined 19 anomalies (some new and
others previously identified) with strike extents exceeding 100m. The newly acquired
geochemistry and gravity datasets, coupled with a regional mapping exercise,
collectively highlight significantly greater prospectivity along the known VHMS
prospective corridor than previously interpreted.
Figure 7 below displays the gravity and geochemical anomalies along the northern
half of the current focus area, between the Teutonic Bore and Triumph deposits.
13
Figure 7 – Plan view showing gravity and geochemical anomalies along the prospective VHMS trend
between the Teutonic Bore and Triumph deposits. Note that the underlying image is a reprocessed
gravity (1VD) image incorporating recently acquired infill gravity data with existing broader spaced
data.
14
Brownfield Exploration - Bentley Mine
At the Bentley Mine, underground resource definition and grade control drilling
continued throughout the quarter. Resource definition drilling focused on extending
the known high-grade Bacalar and Flying Spur Deeps massive sulphide lenses 1.
Drilling results at the Bacalar lens continued to intersect high-grade mineralisation,
including:
o
23BUDD012
9.3m @ 2.04% Cu, 7.56% Zn, 65g/t Ag, 0.74g/t Au (7.5m2)
o
23BUDD013
18.6m @ 1.80% Cu, 6.85% Zn, 75g/t Ag, 1.49g/t Au (15.6m2)
o
23BUDD019
3.0m @ 6.35% Cu, 1.04% Zn, 143g/t Ag, 1.35g/t Au (2.8m2)
The drill program has defined the extent of the Bacalar lens at 70m along strike and
120m down-plunge.
The Java Deeps massive sulphide lens footprint has grown considerably since the initial
three holes reported last year. The Java Deeps massive sulphide lens is high tenor, rich
in zinc, copper, silver and gold and is up to 3m true thickness, striking up to 100m across
and 140m down plunge. It remains open at depth. High-grade mineralisation
intersected from recent drilling includes:
o
23BUDD026
2.9m @ 2.22% Cu, 11.5% Zn, 343g/t Ag, 6.57g/t Au (1.4m2)
o
23BUDD030
1.7m @ 1.66% Cu, 20.5% Zn, 443g/t Ag, 3.66g/t Au (1.1m2)
o
23BUDD033
3.9m @ 2.35% Cu, 13.5% Zn, 165g/t Ag, 1.80g/t Au (1.1m2)
Figure 8 – Long section looking east showing the massive sulphide Bacalar lens and drill hole
intersections.
1 Refer to ASX announcement “Drilling Update at Jaguar Operations – High Grade Intersections at Turbo
Lens and Java Deeps Target” dated 26th July 2022.
2 True thickness (m)
15
Figure 9 – Long section looking east showing the massive sulphide Java Deeps lens and drill hole
intersections.
Stockman Project (VIC)
Key points for quarter:
Feasibility study and permitting activities continued during the quarter, including:
― Drilling at Wilga and Currawong ore bodies to provide fresh ore for additional
metallurgical testing
― Granting of surface water permits by Southern Rural Water
― Updated biological management plans submitted
― Mining License extension approved by Earth Resources Regulator.
Aeris expects to be in a position to update the market on feasibility results in the
September quarter.
16
Other Projects
Canbelego Joint Venture (Aeris 30%)
Aeris, through subsidiary Tritton Resources Pty Ltd, holds a 30% interest in the
Canbelego Project (EL 6105) in NSW, a joint venture (JV) with Oxley Resources (70%
interest), a subsidiary of Helix Resources (ASX:HLX). Exploration activities and
management of the exploration licence are undertaken by our JV partner.
An updated Mineral Resource Estimate (MRE) for the Canbelego deposit was
completed during the quarter. The reported Canbelego MRE totals 1.83Mt at 1.74%
Cu for 32kt Cu metal 1 (Table 2). The updated MRE incorporates results from recent drill
programs at the Canbelego deposit between 2021 to 2023, targeting extensions to
the known mineralised system down-plunge and infill drilling within shallower levels of
the known deposit.
The Canbelego mineralised system has been traced 350m along strike and
approximately 600m down-plunge. The deposit remains open at depth.
Table 2: June 2023 Canbelego Mineral Resource 2,3,4
JUNE 2023 MINERAL RESOURCE ESTIMATE
Resource Category
Cut-off grade
(Cu%)
Tonnage (kt)
Cu (%)
Cu metal (kt)
-
-
100
1.28
1.3
282
1.21
3.4
377
1.23
4.6
-
-
-
241
1.81
4.4
1,211
1.88
22.8
1,453
1.87
27.2
-
-
-
341
1.65
5.6
1,494
1.75
26.1
1,830
1.74
31.8
Potential open pit (O/P) MRE
Measured
Indicated
Inferred
0.3
Sub total (O/P)
Potential underground (U/G) MRE
Measured
Indicated
Inferred
0.8
Sub total (U/G)
Total (Combined O/P & U/G) MRE
Measured
Indicated
Inferred
Total: O/P & U/G
various
1 Refer to ASX announcement “Canbelego Resource Increases 77% in Contained Copper” dated 14th June
2023.
2 Numbers may not sum due to rounding.
3 Potential open pit MRE is reported down to the 240mRL at a 0.3% Cu cut-off grade.
4 Potential underground MRE is reported below 240mRL at a 0.8% Cu cut-off grade.
17
Torrens Joint Venture (Aeris 70%)
During the quarter Aeris entered into an agreement to divest its interest in the Torrens
Project to Keleray Pty Ltd, a subsidiary of Argonaut Resources NL in return for a 2.5%
net smelter royalty. The transaction is subject to conditions precedent including
ministerial approval of the tenement transfer.
As a result of the transaction, the carrying value of Torrens will be fully written off,
resulting in an impairment of $1.7 million.
Corporate
Cash and Receivables
At the end of the quarter, Aeris had useable cash and receivables of $29.5m and a
closing cash balance of $19.5m. Cash flow from operations was impacted by lower
metal production and sales from Jaguar and Mt Colin.
(A$ Million)
Sep
2022
Qtr
Dec
2022
Qtr
Mar
2023
Qtr
Jun
2023
Qtr
Closing cash
Jaguar - zinc concentrate receivable
Mt Colin
Cracow - gold dore
Tritton - copper concentrate receivables
51.8
0.0
0.0
0.1
3.0
67.2
5.0
0.0
0.1
9.2
45.3
1.1
0.0
0.1
9.5
19.5
0.8
0.0
0.1
9.1
Useable Cash and Receivables
54.9
81.6
56.0
29.5
Sep
Dec
Mar
Jun
2022
2022
2023
2023
Qtr
Qtr
Qtr
Qtr
Opening cash
Cash flow from operations
Cash flow from capital expenditure
138.1
11.7
(35.1)
51.8
20.9
(34.1)
67.2
15.0
(36.9)
45.3
18.5
(44.3)
Net cash flow for acquisition of Round Oak
(80.0)
28.7
0.0
0.0
Net proceeds from equity raise
Closing cash
17.1
51.8
0.0
67.2
0.0
45.3
0.0
19.5
(A$ Million)
Hedging
The Company had no hedges in place at the end of the quarter.
18
Authorised for lodgment by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Mr. Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200, or visit our website at www.aerisresources.com.au
Media:
Ayla Djonlagic
Tel: 0402 763 968
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper dominant
portfolio comprises four operating assets, a long-life development project and a highly
prospective exploration portfolio, spanning Queensland, Western Australia, New
South Wales and Victoria, with headquarters in Brisbane.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition opportunities.
The Company’s experienced board and management team bring significant
corporate and technical expertise to a lean operating model. Aeris is committed to
building strong partnerships with its key community, investment and workforce
stakeholders.
References in this report to “Aeris Resources Limited”, “Aeris” and “Company” include, where applicable,
its subsidiaries.
Competent Persons Statement – Exploration Results
The information in this report that relates to Exploration Results is based on information compiled by Mr
Brad Cox. Mr Cox confirms that he is the Competent Person for all Exploration Results summarised in this
Report and he has read and understood the requirements of the 2012 Edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012 Edition). Mr
Cox is a Competent Person as defined by the JORC Code, 2012 Edition, having relevant experience to
the style of mineralisation and type of deposit described in the Report and to the activity for which he is
accepting responsibility. Mr Cox is a Member of the Australasian Institute of Mining and Metallurgy
(MAusIMM No. 220544). Mr Cox has reviewed the Report to which this Consent Statement applies and
consents to the inclusion in the Report of the matters based on his information in the form and context in
which it appears. Mr Cox is a full-time employee of Aeris Resources Limited.
Mr Cox has disclosed to the reporting company the full nature of the relationship between himself and
the company, including any issue that could be perceived by investors as a conflict of interest.