APPENDIX 4D AND HALF-YEAR REPORT
Released
Released
Announcement PDF
Aeris Resources Limited
Appendix 4D
Half-year report
1. Company details
Name of entity:
ABN:
Reporting period:
Previous period:
Aeris Resources Limited
30 147 131 977
For the half-year ended 31 December 2023
For the half-year ended 31 December 2022
2. Results for announcement to the market
31 Dec 2023
$'000
31 Dec 2022
$'000
$'000
Change
%
Revenues from ordinary activities
Down
286,309
309,980
(23,671)
(8%)
Adjusted Earnings Before Interest, Tax,
Depreciation and Amortisation (Adjusted
EBITDA)*
Up
44,573
24,226
20,347
84%
Loss from ordinary activities after tax
attributable to the owners of Aeris Resources
Limited
Down
(18,761)
(49,776)
31,015
(62%)
Loss for the half-year attributable to the
owners of Aeris Resources Limited
Down
(18,761)
(49,776)
31,015
(62%)
31 Dec 2023
Cents
31 Dec 2022
Cents
(1.9)
(1.9)
(7.2)
(7.2)
*
Refer to the Directors' Report for a reconciliation of Adjusted EBITDA
Earnings per share
Basic earnings per share
Diluted earnings per share
Dividends
There were no dividends paid, recommended or declared during the current financial period.
Comments
The loss for the consolidated entity after providing for income tax amounted to $18,761,000 (31 December 2022:
$49,776,000).
3. Net tangible assets
Reporting
period
Cents
Net tangible assets per ordinary security
28.8
4. Control gained over entities
Not applicable.
1
Previous
period
Cents
38.6
Aeris Resources Limited
Appendix 4D
Half-year report
5. Loss of control over entities
Not applicable.
6. Dividends
Current period
There were no dividends paid, recommended or declared during the current financial period.
Previous period
There were no dividends paid, recommended or declared during the previous financial period.
7. Dividend reinvestment plans
Not applicable.
8. Details of associates and joint venture entities
Not applicable.
9. Foreign entities
Details of origin of accounting standards used in compiling the report
Not applicable.
10. Audit qualification or review
Details of audit/review dispute or qualification (if any)
The financial statements were subject to review by PricewaterhouseCoopers and the review report is attached as part of
the Interim Financial Report.
11. Attachments
Details of attachments (if any)
The Interim Financial Report of Aeris Resources Limited for the half-year ended 31 December 2023 is attached.
2
Aeris Resources Limited
Directors' Report
31 December 2023
The Directors present their report, together with the consolidated financial report of the Aeris Resources
Limited Group (‘consolidated entity’ or 'Group'), consisting of Aeris Resources Limited (‘Aeris’
or ‘Company’) and the entities it controlled at the end of, or during, the half-year ended 31 December
2023 (‘half-year’).
DIRECTORS
The following persons were directors of Aeris Resources Limited during the whole of the half-year and up to
the date of this report, unless otherwise stated:
Andre Labuschagne
Michele Muscillo
Colin Moorhead
Robert Millner
Sylvia Wiggins (resigned 31 December 2023)
DIVIDENDS
The directors do not recommend payment of a dividend for the period to 31 December 2023. No dividend was
paid during the half-year.
PRINCIPAL ACTIVITIES
The principal activities of the consolidated entity for the half-year were the production, sale and exploration of
copper, zinc, gold, and silver. Other than matters referred to in the “Significant Changes in State of Affairs”
and “Operating Review” sections of this Directors’ Report, there were no other significant changes in those
activities during the half-year.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
JAGUAR OPERATIONS AND NEW DEBT FINANCING
On 2 August 2023, Aeris announced that it would be placing the Jaguar Zinc/Copper Operations (Jaguar)
in Western Australia on care and maintenance, which took place in September 2023. Pre-feasibility
activities commenced during the half-year, to review the scope definition and options to restart Jaguar,
particularly focusing on increasing ore production rates; maximising mill throughput; improving metal
recovery; and enhancing product quality. A care and maintenance team of 8 people are on site to manage
ongoing activities including mine dewatering at the Bentley and Jaguar underground mines.
The Company also announced on 2 August 2023 that it had entered into a new $50 million, 2-year Debt
Facility (WHSP Facility) with its major shareholder, Washington H. Soul Pattinson (WHSP). The
WHSP Facility provided working capital liquidity to enable the Company to deliver on its FY2024 plans, whilst
also facilitating an orderly suspension of activities at Jaguar. The WHSP Facility replaced the ANZ $20
million Working Capital Facility and has second ranking security to the remaining ANZ facilities. The ANZ
Contingent Instrument Facility has been increased to $50m and extended to 30 August 2024.
Financial covenants apply to the WHSP Facility and include Net Tangible Assets balance; a ratio of Debt
to EBITDA; and an Interest Cover ratio. A breach of a financial covenant will result in an event of default.
The Company complied with these ratios throughout the reporting period.
COMPLETION OF EQUITY RAISE
In November 2023, the Company undertook a $30 million fully underwritten equity raise, comprising a
$13.9 million institutional placement and a $16.2 million accelerated non-renounceable entitlement
offer. Net proceeds from the equity raise were used to provide general working capital and increased
financial flexibility. This capital raise will support the three operating mines, following the successful
transition of Jaguar onto care and maintenance, and to progress our key growth opportunities in the portfolio
namely Stockman, Constellation, and Jaguar by providing additional working capital flexibility.
3
Aeris Resources Limited
Directors' Report
31 December 2023
OPERATING REVIEW
TRITTON COPPER OPERATIONS (TRITTON)
Operations
During the half-year Tritton produced 9,986 tonnes of copper, compared to 7,851 tonnes of copper in the prior
corresponding period. Production during the half-year was impacted by skilled labour shortages; mining
equipment availability and delayed ramp up of production from the Avoca Tank mine.
The ramp-up of production from the Avoca Tank mine has been slowed due to increased grade control drilling
required in the early stages of the mine life. The Avoca Tank Mineral Resource is high grade but with complex
shapes and requires good geological information before stope design. Drilling and data collection requirements
will reduce with improved ore body knowledge over time. Significantly higher contributions from the high-grade
Avoca Tank and Budgerygar mine are expected in the second half of the FY24 financial year.
Ore processed during the period was 647,696 tonnes at 1.62% compared to 645,341 tonnes at 1.29% in the
prior corresponding period. Recovery for the period of 95.35% also improved from the prior corresponding
period of 94.4%. The Jameson Cell, was successfully commissioned during the half-year and has resulted in an
increase in the copper grade in concentrate.
Exploration
Exploration activities at Tritton during the half-year focused on extending known deposits and identifying
greenfield targets for new resources.
At the Constellation deposit, located 45km north of the Tritton mill, a six-hole diamond drill program was
completed. High-grade copper was intercepted in multiple drill holes including:
•
TAKD095 25.95m @ 3.81% Cu, 1.12g/t Au and 10.3g/t Ag
•
TAKD094 5.85m @ 2.23% Cu, 1.14g/t Au and 3.2g/t Ag.
The drill program successfully extended the known mineralisation 100m along strike and 200m down-plunge
from the current Mineral Resource Estimate (MRE). A follow-up drill program is being planned for early
calendar 2024. This program will aim to increase the proportion of the Mineral Resource in the Indicated
category, as well as expand the overall Mineral Resource.
In addition, an updated MRE was released for the Avoca Tank deposit. The updated MRE resulted in a 35%
increase in copper grade and 16% increase in contained copper metal. High-grade copper is associated with
massive sulphide lenses, of which eight have been modelled and incorporated into the MRE figures. The MRE
has been classified as Indicated and Inferred. The Avoca Tank mineralised system remains open down-plunge
and mineralisation has been traced 340m down-plunge and there remains significant potential to increase the
MRE with further drilling. Underground diamond drilling will continue at Avoca Tank, initially focused on further
grade control drilling to de-risk upcoming mining fronts. Resource extension drilling will commence toward the
end of FY2024, targeting mineralisation below the base of the current MRE.
CRACOW GOLD OPERATIONS (CRACOW)
Operations
Cracow produced 23,870oz during the half-year, compared to 21,374 ounces in the prior corresponding period.
Ore processed in the half-year of 284,592 tonnes was lower than the 325,054 tonnes in the prior
corresponding period, however the gold head grade of 2.82g/t was significantly higher (2.29g/t in the prior
corresponding period). Gold recovery of 92.6% was higher than the prior corresponding period (89.2%), with
the higher gold head grade being a key driver of the higher recovery. Stocks of low-grade stockpiled
material, from historical open pit mining at the site, continue to be used to supplement ore from the
underground mine.
During the half-year construction of the tailings dam lift commenced and was completed in early January ahead
of schedule and under budget, adding approximately 1 million cubic metres of tailings capacity, to extend the
mine life.
Exploration
Exploration activities during the half-year focused on drill testing of targets within the current mining areas at
the Western Vein Field.
4
Aeris Resources Limited
Directors' Report
31 December 2023
Updated geological interpretations across the Western Vein Field has identified opportunities to discover
additional gold mineralisation, either along new structures or isolated “pockets” along known structures. Five
drill targets were tested via a first-pass drill program. In most cases, drilling successfully intersected the
interpreted structures, exceeding expectations. Follow-up drilling is planned for the third quarter of FY2024.
NORTH QUEENSLAND OPERATIONS
Operations
Mt Colin mined 231,172 ore tonnes, an increase on the prior corresponding period (205,277 tonnes). During the
half-year, mining of the cave section in the upper levels of mine commenced and has performed to
expectations.
During the half-year 208,405 tonnes of ore at a copper recovery of 87.0% was processed, via toll processing at
a regional Processing Facility, and compares to 181,100 tonnes at a copper recovery of 91.3% processed in
the prior corresponding period. Metallurgical recovery was impacted by higher levels of transitional material
from the cave zone being processed. Copper produced was 3,942 tonnes, compared to 3,560 tonnes in
the prior corresponding period.
Scheduling of processing runs were a challenge in the half-year. To ensure smooth running of operations and to
assist with managing working capital requirements of the operations, the Company has entered into
an agreement with Glencore to undertake monthly part-payment for ore stockpiles, in between processing
runs. At the end of the half-year, there were ore stockpiles available for processing of ~133,000 tonnes,
situated at the mine site and the toll processing facility. Provisional payment on 84kt of these stocks was
received through the ore sale agreement with Glencore, with final payment to be received following
processing of the stockpiles.
Exploration
No material exploration activities were undertaken in North Queensland during the half-year.
JAGUAR OPERATIONS (JAGUAR)
Operations
Jaguar ceased operations and the mine was put on care and maintenance due to forecast operating losses in
FY2024. The decision preserves the in-ground value of the significant Mineral Resources across the Jaguar
tenements.
Mining and ore processing at Jaguar finished in September 2023. Total tonnes mined in the half-year were
55,228 tonnes at a zinc grade of 7.05% zinc, producing 3,090 tonnes of zinc in concentrate and was significantly
above guidance. Following completion of the mining and milling activities the site was transitioned to care
and maintenance. A team of 8 people remain on-site to manage ongoing activities, including mine dewatering
at the Bentley and Jaguar underground mines.
During the half-year, pre-feasibility study work commenced to review the scope definition and options to
restart Jaguar Operations, focusing on increasing ore production rates; maximising mill throughput;
improving metal recovery; and enhancing product quality.
Exploration
An updated Mineral Resource Estimate (MRE) was completed for the Jaguar deposit following the
completion of an updated geological interpretation. The updated Jaguar deposit MRE totals 840kt @ 2.28%
Cu, 4.66% Zn and 61g/t Ag, for 19kt Cu metal, 39kt Zn metal and 1.65Moz Ag metal. Significant potential
remains to increase the Jaguar deposit mineralised footprint with further drilling, most notably downplunge from the current Mineral Resource. In addition, there is potential to define mineralisation
along two parallel favourable stratigraphic horizons, one of which contains the mined “Farside” copper
sulphide lens.
The Jaguar exploration tenement package is also highly prospective for gold mineralisation. The regional
gold endowment is in excess of 25Moz, with several multi-million-ounce deposits located within 50km of the
Jaguar tenement package. Towards the end of the half-year, exploration efforts shifted focus toward gold
prospectivity. The vast majority of the exploration over the tenement package to-date has focused primarily
on base metal mineralisation, although some early-stage gold focused exploration has also previously been
undertaken.
The notable stand-out exploration target is a 2km long gold anomaly referred to as the “Heather Bore”
prospect. This gold anomaly is interpreted to occur along the structural corridor that hosts Northern Star’s
Thunderbox deposit, 8km to the north.
5
Aeris Resources Limited
Directors' Report
31 December 2023
The broader Jaguar tenements are considered highly prospective for both base metals and gold mineralisation,
with numerous targets identified. An exploration project plan is being prepared to test the attractive gold targets
and, later, the base metals targets.
FINANCIAL REVIEW
Financial Results
The half-year results were primarily impacted by the Jaguar Zinc/Copper Operation being placed into care and
maintenance in September 2023. The results from the half-year were further influenced by the following:
•
Revenue from contracts with customers was A$286.31 million, compared to A$309.98 million for the
previous corresponding period, impacted by:
o Revenue from the Tritton Copper Operations was comparatively higher as a result of higher
production achieved (9,986t compared to 7,851t in the prior corresponding period), supported by
higher copper prices ($12,412/t compared to $10,557/t in the prior corresponding period);
o Revenue from the Cracow Gold Operations was comparatively higher due to increased gold
production, supported by a higher sales price of $2,997/oz, when compared to the prior
corresponding period of $2,595/oz;
o Revenue from North Queensland Operations was comparatively higher as a result of higher copper
production achieved (3,942t compared to 3,563t in the prior corresponding period), supported by
higher copper prices realized; and
o The Jaguar operations contributed $23.38 million in revenue prior to being put on care and
maintenance in September 2023.
•
Cost of goods sold decreased to $272.98 million from $331.76 million in the prior corresponding period,
with costs at all operations being in line with plan;
•
Care and maintenance costs of $2.69 million, for Jaguar operations, were recognised for the half-year;
•
Employee separation costs amounting to $5.82 million were incurred by placing Jaguar onto care and
maintenance;
•
A foreign exchange loss of $1.17 million was recognised for the half-year (31 December 2022: $1.49
million);
•
Finance costs of $8.63 million were significantly higher when compared to $4.63 million in the prior
corresponding period due to the interest paid on the WHSP Facility.
The following table contains a reconciliation of profit before income tax to EBITDA (earnings before income tax
and depreciation and amortisation) and Adjusted EBITDA.
31 Dec 2023
$'000
31 Dec 2022
$'000
(18,761)
44,574
8,632
34,445
(49,744)
61,149
4,637
16,042
Transaction expense
Care & maintenance
Separation costs
Net foreign exchange loss/(gain)
Movement in financial assets at fair value through profit or loss
2,697
5,824
1,176
431
10,333
(1,492)
(657)
Adjusted EBITDA
44,573
24,226
Profit/(loss) before income tax expense
Depreciation and amortisation
Finance costs
EBITDA
EBITDA and adjusted EBITDA are non-IFRS earnings measures that do not have any standardised meaning
prescribed by IFRS and therefore may not be comparable to EBITDA presented by other companies. These
measures, which are unaudited, are important to management as an additional way to evaluate the consolidated
entity's performance.
6
Aeris Resources Limited
Directors' Report
31 December 2023
Financial Position
At 31 December 2023, the consolidated entity had a positive net asset position of $278.27 million (30 June 2023:
A$266.37 million). The 31 December 2023 net asset position for the consolidated entity was impacted by a
number of key factors, including:
• On 2 August the Company announced entering into a new $50 million WHSP Facility. At 31
December 2023 $40 million was drawn;
• In November 2023, the Company undertook a $30 million fully underwritten equity raise, to provide
general working capital and increased financial flexibility; and
• Investments of $39 million into new mining projects, including exploration for the half-year, compared
to $33 million in the corresponding period.
The consolidated entity’s net cash inflow from operating activities during the First Half was $0.12 million, with
net cash outflows from investing activities of $58.09 million and net cash inflows from financing activities of
$61.37 million. The cash inflows from operating activities were impacted by additional payments made during
the half-year to reduce the balance of trade creditors. The Group has been able to continue to meet its working
capital requirements principally as a result of positive operating cashflows generated by the three operating
mines (Tritton, Cracow and Mt Colin), utilisation of the $50 million WHSP Facility, the $30 million equity
raise undertaken and management of the timing of cashflows to meet obligations as and when due. At
31 December 2023 $10 million of the WHSP Facility remains undrawn. The WHSP Facility has a 2-year term,
expiring on 1 August 2025.
Included in the interim financial report for the half-year ended 31 December 2023 is an independent auditor’s
review report that includes a statement on “Material uncertainty relating to going concern”. For further
information, refer to Note 1 in the interim financial report, together with the auditor’s report.
MATTERS SUBSEQUENT TO THE END OF THE FINANCIAL HALF-YEAR
No other matter or circumstance has arisen in the interval between the end of the financial period and the date
of this report that has significantly affected or may significantly affect the operations of the consolidated entity;
the results of those operations; or the state of affairs of the consolidated entity in subsequent financial years.
ROUNDING OF AMOUNTS
The Company is of a kind referred to in Corporations Instrument 2016/191, issued by the Australian Securities
and Investments Commission, relating to 'rounding-off'. Amounts in this report have been rounded off in
accordance with that Corporations Instrument to the nearest thousand dollars, or in certain cases, the nearest
dollar.
AUDITOR’S INDEPENDENCE DECLARATION
A copy of the auditor's independence declaration as required under section 307C of the Corporations Act 2001
is set out immediately after this directors' report.
This report is made in accordance with a resolution of directors, pursuant to section 306(3)(a) of the
Corporations Act 2001.
On behalf of the directors
Andre Labuschagne
Executive Chairman
29 February 2024
Brisbane
7
Aeris Resources Limited
ABN 30 147 131 977
Interim Financial Report - 31 December 2023
8
Aeris Resources Limited
Corporate directory
31 December 2023
Directors
Andre Labuschagne - Chairman and Managing Director
Michele Muscillo - Non-executive Director
Colin Moorhead - Non-executive Director
Sylvia Wiggins (resigned 31 December 2023)
Robert Millner - Non-executive Director
Company Secretaries
Robert Brainsbury
Dane van Heerden
Registered office and principal
place of business
Level 6
120 Edward Street
Brisbane
QLD 4000
Phone: (07) 3034 6200
Share register
Automic
Level 5
126 Phillip Street
Sydney
NSW 2000
Phone: 1300 288 664 (within Australia)
+61 2 9698 5414 (outside Australia)
Auditor
PricewaterhouseCoopers
Level 23
480 Queen Street
Brisbane
QLD 4000
Solicitors
HopgoodGanim Lawyers
Level 8
1 Waterfront Place
Brisbane
QLD 4000
Stock exchange listing
Aeris Resources Limited shares are listed on the Australian Securities Exchange (ASX
code: AIS)
Website
www.aerisresources.com.au
9
Auditor’s Independence Declaration
As lead auditor for the review of Aeris Resources Limited for the half-year ended 31 December 2023, I
declare that to the best of my knowledge and belief, there have been:
(a)
no contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
(b)
no contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Aeris Resources Limited and the entities it controlled during the
period.
Marcus Goddard
Partner
PricewaterhouseCoopers
Brisbane
29 February 2024
PricewaterhouseCoopers, ABN 52 780 433 757
480 Queen Street, BRISBANE QLD 4000, GPO Box 150, BRISBANE QLD 4001
T: +61 7 3257 5000, F: +61 7 3257 5999, www.pwc.com.au
Liability limited by a scheme approved under Professional Standards Legislation.
10
Aeris Resources Limited
Contents
31 December 2023
Condensed consolidated statement of profit or loss and other comprehensive income
Condensed consolidated statement of financial position
Condensed consolidated statement of changes in equity
Condensed consolidated statement of cash flows
Notes to the condensed consolidated financial statements
Directors' declaration
Independent auditor's review report to the members of Aeris Resources Limited
12
13
14
15
16
28
29
General information
The consolidated financial statements cover Aeris Resources Limited as a consolidated entity, consisting of Aeris Resources
Limited ('Aeris', or the ‘Company’ or ‘parent entity’) and the entities it controlled at the end of, or during, the half year.
Aeris Resources Limited and its subsidiaries together are referred to in these financial statements as the ‘consolidated
entity’. The financial statements are presented in Australian dollars, which is Aeris Resources Limited's functional and
presentation currency.
Aeris Resources Limited is a listed public company limited by shares, incorporated and domiciled in Australia. Its registered
office and principal place of business is:
Level 6
120 Edward Street
Brisbane
QLD 4000
A description of the nature of the consolidated entity's operations and its principal activities are included in the directors'
report, which is not part of the financial statements.
The financial statements were authorised for issue, in accordance with a resolution of directors, on 29 February 2024. The
directors have the power to amend and reissue the financial statements.
11
Aeris Resources Limited
Condensed consolidated statement of profit or loss and other comprehensive income
For the half-year ended 31 December 2023
Note
Revenue
Cost of goods sold
3
4
Gross profit/(loss)
Administration
Care and maintenance
Net foreign exchange (losses)/gains
Transaction expense
Other (expenses)/income
4
4
4
Loss before net finance costs
Net finance costs
4
Loss before income tax expense
31 Dec 2023
$'000
31 Dec 2022
$'000
286,309
(272,981)
309,980
(331,763)
13,328
(21,783)
(13,315)
(2,697)
(1,176)
(6,269)
(15,172)
1,492
(10,333)
657
(10,129)
(45,139)
(8,632)
(4,637)
(18,761)
(49,776)
-
-
(18,761)
(49,776)
-
32
-
32
(18,761)
(49,744)
Cents
Cents
Income tax expense
Loss after income tax expense for the half-year attributable to the owners of
Aeris Resources Limited
Other comprehensive income
Items that may be reclassified subsequently to profit or loss
Cash flow hedges transferred to profit or loss, net of tax
12
Other comprehensive income for the half-year, net of tax
Total comprehensive income for the half-year attributable to the owners of Aeris
Resources Limited
Basic earnings per share
Diluted earnings per share
16
16
(1.9)
(1.9)
(7.2)
(7.2)
The above condensed consolidated statement of profit or loss and other comprehensive income should be read in
conjunction with the accompanying notes
12
Aeris Resources Limited
Condensed consolidated statement of financial position
As at 31 December 2023
Note
31 Dec 2023
$'000
30 Jun 2023
$'000
22,658
27,586
43,247
298
4,001
97,790
19,533
18,129
63,458
729
3,828
105,677
44
131,004
229,836
121,249
482,133
45
124,767
227,661
112,354
464,827
579,923
570,504
85,151
40
10,387
21,124
6,100
122,802
120,807
39
10,253
24,884
5,400
161,383
39,089
13,040
113,215
13,506
178,850
281
14,238
111,387
16,846
142,752
Total liabilities
301,652
304,135
Net assets
278,271
266,369
748,042
1,277
(471,048)
719,474
(818)
(452,287)
278,271
266,369
Assets
Current assets
Cash and cash equivalents
Trade and other receivables
Inventories
Financial assets at fair value through profit or loss
Other current assets
Total current assets
5
6
Non-current assets
Trade and other receivables
Property, plant and equipment
Mine properties
Exploration and evaluation
Total non-current assets
5
Total assets
Liabilities
Current liabilities
Trade and other payables
Borrowings
Lease liabilities
Provisions
Other liabilities
Total current liabilities
7
8
9
10
Non-current liabilities
Borrowings
Lease liabilities
Provisions
Other liabilities
Total non-current liabilities
8
9
10
Equity
Issued capital
Reserves
Accumulated losses
11
12
Total equity
The above condensed consolidated statement of financial position should be read in conjunction with the accompanying
notes
13
Aeris Resources Limited
Condensed consolidated statement of changes in equity
For the half-year ended 31 December 2023
Issued
capital
$'000
Balance at 1 July 2022
Accumulated
losses
Total equity
$'000
$'000
Reserves
$'000
604,910
(4,439)
(312,533)
287,938
Loss after income tax expense for the half-year
Other comprehensive income for the half-year, net of tax
-
32
(49,776)
-
(49,776)
32
Total comprehensive income for the half-year
-
32
(49,776)
(49,744)
Transactions with owners in their capacity as owners:
Contributions of equity, net of transaction costs
Share-based payments
114,564
-
1,179
-
114,564
1,179
Balance at 31 December 2022
719,474
(3,228)
(362,309)
353,937
Issued
capital
$'000
Balance at 1 July 2023
Accumulated
losses
Total equity
$'000
$'000
Reserves
$'000
719,474
(818)
(452,287)
266,369
Loss after income tax expense for the half-year
Other comprehensive income for the half-year, net of tax
-
-
(18,761)
-
(18,761)
-
Total comprehensive income for the half-year
-
-
(18,761)
(18,761)
Transactions with owners in their capacity as owners:
Contributions of equity, net of transaction costs (note 11)
Share-based payments
28,568
-
2,095
-
28,568
2,095
Balance at 31 December 2023
748,042
1,277
(471,048)
278,271
The above condensed consolidated statement of changes in equity should be read in conjunction with the accompanying
notes
14
Aeris Resources Limited
Condensed consolidated statement of cash flows
For the half-year ended 31 December 2023
31 Dec 2023
$'000
31 Dec 2022
$'000
277,093
(271,687)
(5,282)
303,890
(277,487)
(2,131)
124
24,272
Cash flows from investing activities
Payment for purchase of subsidiary, net of cash acquired
Payments for Net Value Royalty
Payments for property, plant and equipment and mine properties
Payments for exploration and evaluation
(2,640)
(46,587)
(8,862)
(33,888)
(59,197)
(13,717)
Net cash used in investing activities
(58,089)
(106,802)
Cash flows from financing activities
Proceeds from issue of shares
Proceeds from borrowings
Share issue transaction costs
Repayment of borrowings
Repayment of lease liabilities
30,033
37,712
(1,465)
(22)
(4,885)
17,092
(794)
(20)
(4,529)
Net cash from financing activities
61,373
11,749
Net increase/(decrease) in cash and cash equivalents
Cash and cash equivalents at the beginning of the financial half-year
Effects of exchange rate changes on cash and cash equivalents
3,408
19,533
(283)
(70,781)
138,050
(34)
Cash and cash equivalents at the end of the financial half-year
22,658
67,235
Cash flows from operating activities
Receipts from customers
Payments to suppliers and employees
Interest and other finance costs paid
Net cash from operating activities
The above condensed consolidated statement of cash flows should be read in conjunction with the accompanying notes
15
Aeris Resources Limited
Notes to the condensed consolidated financial statements
31 December 2023
Note 1. Material accounting policy information
This condensed consolidated interim financial report for the half-year reporting period ended 31 December 2023 has been
prepared in accordance with Australian Accounting Standard A
Share your feedback
Discover