Highlights
•
Copper equivalent production of 10.2kt for the quarter at AISC of A$5.45/lb
•
Tritton performed well with production and grades higher on increased ore
volumes from Avoca Tank and Budgerygar mines
•
Strong gold production at Cracow and costs in line with plan
•
Mt Colin mining again ahead of plan but lack of toll processing capacity resulted
in lower copper production
•
Jaguar on care and maintenance with study on restart options well advanced
•
Stockman feasibility work on the Albion process continues
•
Production and cost guidance achieved for FY24 at the group level and at Tritton
and Cracow. Mt Colin production below guidance due to toll processing
LTIFR
Copper produced
Unit
Sep 23
Qtr
Dec 23
Qtr
Mar 24
Qtr
Jun 24
Qtr
FY24
YTD
FY24
Guidance
/mmhrs
1.04
1.72
1.10
1.19
-
-
kt
8.1
6.4
5.9
6.7
27.2
28 - 35
Zinc produced
kt
3.1
-
-
-
3.1
1.2 - 1.5
Gold produced
koz
15.2
13.2
12.7
14.2
55.3
48 - 60
Silver produced
koz
121.3
39.2
37.3
42.6
240.4
181 - 227
Cu eq production
kt
12.9
9.7
9.1
10.2
42.0
40 - 50
Mining
A$M
60.1
48.7
41.8
54.0
204.6
202 - 243
Processing
A$M
28.9
18.2
20.7
23.3
91.1
84 - 101
Operating Costs
Site & G&A
A$M
12.9
10.4
10.1
11.2
44.6
43 - 52
TC/RCs
A$M
11.4
3.7
5.1
5.2
25.4
28 - 34
Product handling
A$M
7.3
5.2
4.2
5.9
22.4
24 - 29
Capital Costs
Sustaining
A$M
21.8
16.3
20.8
15.8
74.7
76 - 91
Growth
A$M
10.1
9.5
(0.3)
2.2
21.5
34 - 41
Exploration
A$M
2.6
1.7
1.9
2.6
8.8
12 - 15
Projects
A$M
1.1
0.6
0.4
0.4
2.5
2-3
AISC
A$M
154.4
115.4
107.1
123.0
499.9
-
AISC
$/lb Cu eq
5.44
5.40
5.31
5.45
5.40
-
1
Group Safety, Environment and Community
Aeris recorded one lost time injury throughout the last quarter, bringing the 12-month
rolling LTIFR to 1.19. There were two Reportable Environmental Incidents recorded in
the quarter. Incidents related to issues with recording of water flows at Tritton and the
camp sewage treatment plant at Cracow.
Figure 1: Group LTIFR
3
No of LTI
LTIFR
2
1
0
2
Tritton Operations (NSW)
Key points for quarter:
•
Copper production of 5.4kt at AISC of $5.23/lb on improved ore volumes from
Avoca Tank and Budgerygar
•
Operating and capital costs below plan
•
Full year copper production guidance achieved. Capital and operating costs at
the low end or below guidance.
Sep 23
Dec 23
Mar 24
Jun 24
FY24
Qtr
Qtr
Qtr
Qtr
YTD
kt
301.2
319.5
260.0
314.6
1,195.4
% Cu
1.59
1.57
1.71
1.89
1.69
Ore Milled
kt
332.1
315.6
260.6
307.4
1,215.7
Milled Grade
% Cu
1.63
1.60
1.75
1.88
1.71
Recovery
Cu
95.3%
95.2%
95.2%
94.28%
95.02%
Copper Produced
kt
5.2
4.8
4.3
5.4
19.7
19 – 24
Gold Produced
koz
1.0
1.2
1.2
1.5
4.9
6–7
Silver Produced
koz
36.9
39.2
37.3
42.6
156.0
148 – 185
Mining
A$M
25.3
25.1
23.9
30.7
104.9
113 – 136
Processing
A$M
8.7
6.8
7.0
8.2
30.7
31 – 37
Site G&A
A$M
5.1
3.9
5.2
5.7
19.9
22 – 27
TC/RCs
A$M
5.4
4.6
4.0
4.3
18.3
19 – 23
Product Handling
A$M
3.3
3.8
2.9
4.8
14.8
16 – 20
By-Product Credit
A$M
(4.1)
(4.6)
(5.2)
(5.8)
(19.7)
Royalties
A$M
1.6
1.6
1.6
2.9
7.7
Corporate G&A
A$M
0.5
0.5
0.5
0.5
2.2
Inventory Movements
A$M
1.7
1.8
1.7
(1.1)
4.1
Sustaining Capital1
A$M
17.2
13.5
13.9
12.6
57.2
A$M
64.7
57.0
55.5
62.9
240.0
A$/lb
5.68
5.37
5.81
5.23
5.51
Growth Capital
A$M
3.0
1.3
(1.0)3
2.1
5.4
10 – 12
Exploration
A$M
0.6
0.7
0.3
0.2
1.8
7–9
A$M
68.3
59.0
54.8
65.2
247.3
A$/lb
5.99
5.55
5.74
5.43
5.68
Production Summary
Unit
Ore Mined
Mined Grade
FY24
Guidance
Cost Summary
All-In Sustaining Costs2
All-In Costs2
1.
Includes sustaining capital, capitalised mine development and financing payments (principal and interest) on
leased assets
2.
3.
All-In Sustaining and All-In Costs are based on copper produced
Accounting reversal of a prior accrual
57 – 69
3
Operations
Mining operations performed well for the quarter with ore production up 20% on the
previous quarter. Mined grade improved from 1.71% Cu to 1.89% Cu on higher
volumes from Avoca Tank and Budgerygar mines. Capital development also
increased significantly for the quarter.
Mining at Murrawombie underground mine continued to be prioritised ahead of the
planned mine closure prior to commencing the Murrawombie pit cutback.
Mill throughput was higher on increased mine tonnes however metallurgical
recoveries were impacted slightly by sericite-clay material in the Budgerygar ore.
For the full year, copper production at Tritton was 19.7kt, within the published
guidance range.
The Murrawombie pit cutback project has been approved by the Aeris Board. Tenders
for the open pit mining contract are currently being submitted for an expected start
date in November 2024. The pit will be mined in two phases, with 1.2Mt ore supplied
to the mill over FY25 and FY26.
Costs
All-in sustaining costs for the quarter were higher on increased production volumes
but improved on a unit cost basis. Over the full year, all operating and capital costs
were at or below the low end of guidance ranges.
Exploration
Drilling recommenced at the Constellation deposit during the quarter. By quarter
end, seven drill holes had been completed, targeting the interpreted sub-vertical
mineralised zone along the northern margin of the deposit, referred to as the “standup zone”. All seven drill holes targeted the upper portions of the stand-up zone
within and surrounding the current reported Inferred Mineral Resource (refer to
Figure 2).
Assay results have been received for three drill holes, TAKD101, TAKD102, and
TAKD104. Reportable high-grade copper intersections include:
•
TAKD101 - 25.0m @ 2.29% Cu, 0.42g/t Au, 4.61g/t Ag (from 134.0m) 1
- 6.5m @ 2.72% Cu, 1.09g/t Au, 1.03g/t Ag (from 163.0m) 1
•
TAKD102 - 2.2m @ 5.93% Cu, 1.23g/t Au, 18.33g/t Ag (from 134.3m)1
- 15.0m @ 1.24% Cu, 0.72g/t Au, 2.88g/t Ag (from 218.0m)1
The drill program will continue throughout H1 FY25.
1 Drill hole true width lengths are between 60% to 85% of reported interval lengths.
4
Figure 2: Long section view looking north showing drill hole pierce points through Constellation Stand-Up Zone
5
Cracow Operations (QLD)
Key points for quarter:
•
Strong gold production of 11.6koz at AISC of A$2,533/oz
•
Operating and capital costs as per plan
•
Annual production guidance achieved and all costs at the bottom end of
guidance range
Sep 23
Dec 23
Mar 24
Jun 24
FY24
Qtr
Qtr
Qtr
Qtr
YTD
kt
115.6
106.1
109.4
120.0
451.0
Mined Grade
g/t
3.29
3.28
2.90
3.06
3.13
Ore Milled
kt
149.4
135.0
144.9
155.7
585.3
Milled Grade
g/t
2.84
2.80
2.39
2.58
2.65
Recovery
Au
93.3%
91.9%
91.4%
89.8%
91.6%
Gold Produced
koz
12.7
11.1
10.2
11.6
45.7
Gold Sold
koz
12.8
11.4
10.1
11.6
45.9
Mining
A$M
15.0
13.0
9.3
14.0
51.3
50 - 60
Processing
A$M
6.4
5.9
6.5
6.9
25.6
26 - 31
Site G&A
A$M
2.7
3.0
2.7
3.2
11.7
12 - 15
By-Product Credit
A$M
(0.3)
(0.3)
(0.2)
(0.3)
(1.1)
Royalties
A$M
2.1
2.0
1.8
2.3
8.1
Corporate G&A
A$M
0.4
0.4
0.4
0.4
1.7
Inventory Movements
A$M
2.4
0.7
(0.4)
(0.2)
2.5
Sustaining Capital1
A$M
2.0
2.8
6.8
3.2
14.8
A$M
30.7
27.5
27.1
29.5
114.7
A$/oz
2,398
2,407
2,679
2,533
2,496
Growth Capital
A$M
7.1
8.2
0.7
0.0
16.0
23 - 28
Exploration
A$M
1.1
0.7
1.3
1.8
4.9
4-5
A$M
38.9
36.4
29.1
31.3
135.6
A$/oz
3,038
3,191
2,877
2,688
2,952
Production Summary
Unit
Ore Mined
FY24
Guidance
38 - 48
Cost Summary
All-In Sustaining Costs2
All-In Costs2
1.
Includes sustaining capital, capitalised mine development and financing payments (principal and interest) on
leased assets
2.
All-In Sustaining and All-In Costs are based on gold sold
18 - 22
Operations
Ore mined for the quarter was ahead of plan, with grades up on the previous quarter.
Mill throughput was higher on increased mined tonnes and stockpile feed. Recovery
was down slightly due to the nature of the underground ore sources mined this
quarter.
6
For the full year, ore tonnages were ahead of forecast and gold production was
towards the upper end of the guidance range.
Costs
All-in sustaining costs were higher quarter-on-quarter due to increased production
rates but lower on a unit basis with more ounces produced. Over the full year, all
operating costs were at the low end of guidance ranges. Capital costs were well
contained and lower than guidance.
Exploration
Western Vein Field
Underground exploration drilling continued during the quarter, targeting the Apollo
(formerly Killarney Deeps) and Coronation West structures in the Western Vein Field.
At the Apollo structure, a further six drill holes were completed within the quarter,
targeting extensions to the high-grade mineralisation intersected from previous drilling
(KLU213 3.7m @ 11.2g/t Au and KLU279 0.8m @ 4.1g/t Au) 1.
Drilling to date has defined a high-grade gold lode characterised by varying amounts
of epithermal veining, including either breccia or quartz lode (refer to Figure 3). Drilling
elsewhere along the Apollo structure has intersected the structure however there is
an absence of veining. Further drilling is planned for the next quarter targeting
prospective areas up dip and along strike from the currently defined mineralised lode.
Figure 3: Oblique view looking northwest showing drill hole pierce points through the Apollo
structure at the Western Vein Field
1 Refer to ASX Announcement “Quarterly Activities Report – March 2024” dated 30th April 2024
7
A drilling program targeting the Coronation West structure has commenced, aiming
to identify high-grade gold zones similar to the nearby Sterling deposit. Five drill holes
were completed during the quarter, testing the structure surrounding the initial drill
intercept (IMU148 1.7m @ 2.8g/t Au). Assay results are pending for all five drill holes.
Figure 4: Plan view of the Cracow Western Vein Field showing the position of the Apollo and
Coronation West structures
8
Golden Plateau
During the quarter, exploration drilling at the Golden Plateau deposit was completed.
Six holes were completed in the current quarter, totalling fifteen drill holes for the
program; excluding four that were abandoned prior to reaching target depth.
Previous drill programs completed by Aeris to inform the maiden Mineral Resource
were focused on the Harry’s, Chaz and King north-south structures only. The current
drill program was designed to test the remaining interpreted north-south trending
structures south of the historic workings and test for strike extensions to Harry’s, Chaz
and King lodes.
The drill program successfully intersected the interpreted north-south structures,
however, they failed to host epithermal quartz veining/gold mineralisation. The
prospectivity along these structures has been downgraded. Several minor splays/flat
makes were intersected and reported gold mineralisation (refer to Appendix).
Although further drilling is required to understand the significance of these structures,
they are not expected to represent significant drill targets.
Five drill holes targeted strike extensions (up to 100m) beyond the modelled Chaz and
King lodes. Drilling intersected epithermal quartz veining however drill intercepts
returned modest Au grades (<3g/t Au – refer to Appendix). It is possible with additional
drilling higher gold grades will be intersected.
An updated Mineral Resource estimate is in progress and expected to be completed
early in Q1 FY25.
Figure 5: Plan view of the Golden Plateau deposit showing current Mineral Resource,
historical underground workings (grey wireframes), drill holes used to inform the 2023 Mineral
Resource (grey lines) and current drill program (blue lines)
9
North Queensland Operations (QLD)
Key points for quarter:
•
Continued strong mining performance with ore tonnes ahead of plan
•
Ore processing again below forecast due to lack of available toll processing
windows resulting in 1.3kt Cu produced
•
Significant stockpiles ~200kt of mined ore at Mt Colin and Ernest Henry mill
available for processing in the following quarter
•
For the full year, copper production was below guidance although operating
costs were within guidance ranges
•
Mining activities now expected to continue until early Q2 FY25 (previously late Q4
FY24)
Production Summary
Unit
Ore Mined
kt
Mined Grade
Sep 23
Dec 23
Mar 24
Jun 24
FY24
Qtr
Qtr
Qtr
Qtr
YTD
106.9
124.3
140.3
139.0
510.5
FY24
Guidance
% Cu
2.01
2.26
2.08
2.22
2.15
Ore Milled
kt
127.4
81.0
97.5
104.9
410.9
Milled Grade
% Cu
1.96
2.52
2.15
1.96
2.11
Recovery
Cu
95.2%
77.0%
76.1%
61.5%
78.3%
Copper Produced
kt
2.4
1.6
1.6
1.3
6.8
8 - 10
Gold Produced
koz
1.1
0.8
1.3
1.2
4.3
4-5
Mining
A$M
10.9
9.2
8.1
8.5
36.7
34 - 41
Processing
A$M
5.9
5.8
5.8
7.7
25.2
25 - 30
Site G&A
A$M
1.7
1.1
1.5
1.2
5.5
7-8
TC/RCs
A$M
1.8
1.2
1.1
0.9
5.0
7-9
Product Handling
A$M
1.9
1.2
1.3
1.1
5.5
7-9
By-Product Credit
A$M
(1.3)
(5.9)
(1.8)
(5.0)
(14.0)
Royalties
A$M
1.3
0.9
0.5
0.9
3.7
Corporate G&A
A$M
0.3
0.3
0.3
0.3
1.3
Inventory Movements
A$M
(3.4)
4.7
(2.1)
1.6
0.8
Sustaining Capital1
A$M
(0.1)
-
-
(0.1)
(0.1)
A$M
19.0
18.6
14.6
17.2
69.6
A$/lb
3.66
5.38
4.16
6.17
4.64
A$M
0.5
0.2
0.0
0.3
0.9
A$M
19.5
18.8
14.7
17.4
70.5
A$/lb
3.75
5.44
4.16
6.26
4.70
Cost Summary
All-In Sustaining Costs2
Exploration
All-In Costs2
1.
2.
-
-
Includes sustaining capital, capitalised mine development and financing payments (principal and
interest) on leased assets
All-In Sustaining and All-In Costs are based on copper produced
Operations
Ore mined at Mt Colin was again strong for the quarter. Over 510kt of ore was mined
for the year, significantly above plan. Mining of the cave zone was completed just
after quarter end. Ore mined in Q1 FY25 will be solely fresh material from sill pillars.
10
Processed tonnes were up on the previous quarter but still below forecast due to the
lack of available toll processing windows. Metallurgical recoveries were impacted by
the high proportion of oxidised cave material in the mill feed. Copper production was
below plan for the quarter and below guidance for the full year.
At the end of the quarter, 53kt of mined ore was stockpiled at Mt Colin with a further
stockpile of 150kt at an estimated grade of 2.2% Cu at Ernest Henry available for
processing. Ore haulage from the mine site to Ernest Henry was ahead of plan.
Costs
Operating costs for the quarter were in line with plan. Processing costs were higher
due to increased volumes crushed and hauled. For the full year, operating costs were
within or lower than guidance ranges.
Exploration
No material exploration activities were undertaken in North Queensland during the
quarter.
Barbara Project
The Feasibility Study for the Barbara underground mining project is well advanced and
is expected to be completed in Q1 FY25. Discussions continue with the Queensland
Government environmental regulators about the modification of the Barbara site
environmental authority (EA) required for the proposed underground mining project.
11
Jaguar Operations (WA)
Key points for quarter:
•
Operation on care and maintenance
•
Pre-feasibility work on restart options continues
•
Exploration undertaken to test high-priority Heather Bore for gold mineralisation in
fresh rock and to understand structural settings
Sep 23
Dec 23
Mar 24
Jun 24
FY24
Qtr
Qtr
Qtr
Qtr
YTD
FY24
Guidance
kt
% Zn
kt
% Zn
Zn
kt
kt
koz
koz
55.2
7.05
66.8
5.92
78.2%
3.1
0.6
0.4
84
-
-
-
55.2
7.05
66.8
5.92
78.2%
3.1
0.6
0.4
84
1.2 - 1.5
0.2 - 0.3
0.2 - 0.3
33 - 42
Mining
Processing
Site G&A
TC/RCs
Product Handling
By-Product Credit
Royalties
Corporate G&A
Inventory Movements
Sustaining Capital1
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
8.8
7.8
3.4
4.3
2.0
(12.6)
1.0
0.0
4.2
2.7
1.5
(0.2)
2.4
(2.2)
0.1
1.4
-
0.6
1.4
0.7
0.1
0.7
0.5
1.0
0.1
11.6
9.5
7.5
2.1
2.1
5-6
3-4
2-3
2-3
1-2
(11.2)
0.9
0.0
4.2
2.8
1–2
All-In Sustaining
Costs2,3
A$M
21.6
2.9
2.7
2.4
29.6
A$/lb
3.17
-
-
-
4.34
Growth Capital
Exploration
A$M
A$M
0.0
0.5
0.1
0.2
0.5
0.0
1.2
A$M
22.1
3.0
2.9
2.9
30.8
A$/lb
3.24
-
-
-
4.52
Production Summary
Unit
Ore Mined
Mined Grade
Ore Milled
Milled Grade
Recovery
Zinc Produced
Copper Produced
Gold Produced
Silver Produced
Cost Summary
All-In Costs2
1.
2.
3.
1–2
1–2
Includes sustaining capital, capitalised mine development and financing payments (principal and interest) on
leased assets
All-In Sustaining and All-In Costs are based on zinc produced
Costs after the Sep quarter related to care and maintenance activities
Care and Maintenance
A team of 8 people are on site to manage ongoing care and maintenance activities,
including mine dewatering. Care and maintenance costs totalled $2.4M for the
quarter but are forecast to reduce in FY25.
Pre-Feasibility Study
Aeris continues the pre-feasibility study on options to restart the Jaguar Operations
including studies on mining strategy, process plant configuration, site infrastructure
and services, permitting and workforce strategy.
12
Exploration
During the quarter a two-hole diamond drill program was completed at the Heather
Bore gold prospect. The program, totalling 745.6m was designed to test for the
presence of primary gold mineralisation in fresh rock, below an extensive shallow
+0.5g/t gold anomaly within the weathered rock profile 1. The diamond drill holes will
also assist with understanding the structural setting and controls on mineralisation to
aid and refine future drill programs at the prospect.
The drill holes intersected similar lithological sequences, dominated by alternating
volcanic sequences (andesite flows, andesite crystal tuff, and dolerite) with minor
graphitic shale and volcaniclastic units in between.
A range of different alteration assemblages were observed throughout each hole, the
most prolific including hematite, sericite, silica and pyrite with lesser quantities of albite
and chlorite (refer to Figure 6). The alteration packages are encouraging indicating
hydrothermal fluids have passed through the rock sequences. The Company cautions
no correlation is being drawn between the observed alteration assemblages and
potential gold tenor. Samples have been submitted for assay with results expected
early in the following quarter.
A
B
C
D
E
F
Figure 6: Various alteration styles observed from the Heather Bore diamond drill program
A) Hematite-sericite-silica-pyrite (<2%); B) Sericite-hematite-silica-pyrite (3-5%); C) sericitesilica-pyrite (5-8%); D) silica-sericite-pyrite (8-10%); E) albite-silica-pyrite (≤1%); F) hematitesilica-chlorite-albite-sericite-pyrite (5-8%).
1 Refer to ASX Announcement “Exploration and Resource Drilling Update” dated 17th June 2024
13
Figure 7: Plan view of the Heather Bore prospect
14
Stockman Project (VIC)
Key points for quarter:
•
Metallurgical test work (proof of concept) in combination with engineering
studies were completed for the modified flotation flowsheet in combination with
a downstream Albion process treatment. The results showed a step change
improvement in metal recoveries with potential to enhance the overall
economics of the Stockman Project.
•
Detailed test work and engineering of a simplified flotation plant at the mine site
and downstream Albion processing plant is now proceeding
•
Independent technical review signed off the groundwater environmental quality
report for submission to the regulators
•
Stage 1 of the Benambra school capital improvement works are near completion
Corporate
Cash and Receivables
At the end of the quarter, Aeris had useable cash and receivables of $33.4 million with
a closing cash balance of $24.8 million.
(A$ Million)
Sep
2023
Qtr
Dec
2023
Qtr
Mar
2024
Qtr
Jun
2024
Qtr
Closing cash
Jaguar - concentrate receivables
Mt Colin
Cracow - gold dore
Tritton - concentrate receivables
21.9
11.5
1.6
0.3
8.1
22.7
5.5
0.1
16.4
19.4
2.0
0.3
6.6
24.8
1.2
0.0
7.5
Useable Cash and Receivables
43.4
44.7
28.3
33.4
Sep
Dec
Mar
Jun
2023
2023
2024
2024
Qtr
Qtr
Qtr
Qtr
Opening cash
Cash flows from operations
Cash flows from investment
19.5
0.1
(32.0)
21.9
(0.3)
(26.1)
22.7
29.2
(29.0)
19.4
35.3
(26.6)
Cash flows from financing 1
34.3
27.1
(3.4)
(3.4)
Closing cash
21.9
22.7
19.4
24.8
(A$ Million) (Unaudited)
1 Cash flows from investment includes payments for environmental bonding (the March quarter has been
adjusted by $3.0 million which was previously presented in cash flows from financing)
15
A further $7 million during the quarter was applied to restricted cash for environmental
bonding obligations (taking the total to $10 million) which is not included in the closing
cash balance. During the quarter, the Trade Payable and Other Creditors balance
was steady at $73.2 million.
Debt and Hedging
At the end of the quarter, the Company’s debt position remained unchanged with
$40 million drawn on the WHSP facility. The Company had no hedges in place at the
end of the quarter.
Aeris has engaged Burnvoir Corporate Finance to advise on a process to refinance
the company’s debt and bonding facilities. The processed is well advanced with a
number of term sheets received.
Authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper dominant
portfolio comprises three operating assets, a mine on care and maintenance, a longlife development project and a highly prospective exploration portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition opportunities.
The Company’s experienced board and management team bring significant
corporate and technical expertise to a lean operating model. Aeris is committed to
building strong partnerships with its key community, investment and workforce
stakeholders.
16
Competent Persons Statements
Mr Chris Raymond confirms that he is the Competent Person for all Exploration Results at the Tritton
Operation, and he has read and understood the requirements of the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012
Edition). Mr Raymond is a Competent Person as defined by the JORC Code, 2012 Edition, having relevant
experience to the style of mineralisation and type of deposit described in the Report and to the activity
for which he is accepting responsibility. Mr Raymond is a Member of the Australian Institute of Geoscience
(MAIG No. 6045). Mr Raymond has reviewed the Report to which this Consent Statement applies and
consents to the inclusion in the Report of the matters based on his information in the form and context in
which it appears. Mr Raymond is a full-time employee of Aeris Resources Limited.
The information in this report that relates to Exploration Targets or Exploration Results at the Cracow
Operation is based on information compiled by Craig Judson. Mr Judson confirms that he is the
Competent Person for all Exploration Results, summarised in this Report and he has read and understood
the requirements of the 2012 Edition of the Australasian Code for Reporting of Exploration Targets,
Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012 Edition). Mr Judson is a
Competent Person as defined by the JORC Code, 2012 Edition, having relevant experience to the style
of mineralisation and type of deposit described in the Report and to the activity for which he is accepting
responsibility. Mr Judson is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM No.
325510). Mr Judson has reviewed the Report to which this Consent Statement applies and consents to
the inclusion in the Report of the matters based on his information in the form and context in which it
appears. Mr Judson is a full-time employee of Aeris Resources Limited.
The information in this report that relates to Exploration Targets or Exploration Results at the Jaguar
Operation is based on information compiled by Alain Cotnoir. Mr Cotnoir confirms that he is the
Competent Person for all Exploration Results, summarised in this Report and he has read and understood
the requirements of the 2012 Edition of the Australasian Code for Reporting of Exploration Targets,
Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012 Edition). Mr Cotnoir is a
Competent Person as defined by the JORC Code, 2012 Edition, having relevant experience to the style
of mineralisation and type of deposit described in the Report and to the activity for which he is accepting
responsibility. Mr Cotnoir is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM No.
315017). Mr Cotnoir has reviewed the Report to which this Consent Statement applies and consents to
the inclusion in the Report of the matters based on his information in the form and context in which it
appears. Mr Cotnoir is a full-time employee of Aeris Resources Limited.
17
APPENDIX A: Summary of drill hole collar and survey details for holes completed
during the quarter as part of the Constellation resource definition drill program
TAKD101
Easting1
(m)
498,419
Northing1
(m)
6,560,986
163
Total
Depth (m)
219.8
TAKD102
498,467
6,560,931
163
282.8
1.0
-55.0
Complete
TAKD103
498,431
6,561,054
163
111.1
6.5
-57.0
Failed
TAKD104
498,430
6,561,049
163
119.3
6.0
-57.0
Complete
TAKD105
498,369
6,561,027
163
166.7
19.5
-53.5
Complete
TAKD106
498,508
6,560,984
163
205.1
1.5
-54.0
Complete
TAKD107
498,524
6,561,019
163
154.2
3.5
-54.5
Complete
Hole ID
RL (m)
Azimuth2
Dip
Type
0.5
-56.0
Complete
1 Easting and northing coordinates are reported in AGD66 Zone 55.
2 Azimuth is recorded as a magnetic azimuth reading.
APPENDIX B: Summary of significant copper intersections returned during the quarter
from the Constellation resource definition drill program
Hole ID
Type
From (m)
TAKD101
TAKD101
TAKD102
TAKD102
TAKD103
TAKD104
DD
DD
DD
DD
134.0
163.0
134.3
218.0
To (m)
Interval1
Cu (%)2
Au (g/t)
(m)
159.0
25.0
2.29
0.42
169.5
6.5
2.72
1.09
136.5
2.2
5.93
1.23
233.0
15
1.24
0.72
Drill hole failed, redrilled as TAKD104
No significant assay result
Ag (g/t)
Cu Type
4.61
1.03
18.33
2.88
Primary
Primary
Primary
Primary
1 Drill hole true width lengths are between 60% to 85% of reported interval lengths.
2 Assay intervals have been reported at a 0.5% Cu cut-off grade with a maximum internal
dilution of 3.0 m.
APPENDIX C: Summary of drill hole collar and survey details for holes completed
during the quarter as part of the Western Vein Field near-mine exploration and Golden
Plateau resource definition programs
Hole ID
Easting1
(m)
Northing1
(m)
RL (m)
Total Depth
(m)
Azimuth2
Dip
Comments
GPS123
227,837
7,200,550
454
452.2
265.1
-32.3
Complete
GPS124
227,837
7,200,549
454
457.9
252.3
-30.2
Complete
GPS125
227,292
7,200,386
411
293.2
329.5
-41.4
Complete
GPS126
227,286.69
7,200,383
411
395.1
279.4
-35.4
Complete
GPS127
227,288.25
7,200,385
411
312.3
306
-40.2
Complete
GPS128
227,286.92
7,200,382
411
434.0
260.2
-40.8
Complete
KLU282
-446.65
5325.0
1524
521.7
33.95
-41.6
Complete
KLU283
-445.31
5324.2
1524
392.8
17.45
-36.5
Complete
KLU284
-447.37
5325.0
1523
13.0
346.25
-54.9
Complete
KLU284A
-447.37
5325.0
1523
314.6
346.25
-54.9
Abandoned
KLU285
-447.42
5325.3
1523
347.1
344.25
-46.7
Complete
KLU286
-447.19
5325.1
1523
338.7
350.15
-62.9
Complete
KLU287
-264.18
5380.0
1733
360.0
303.55
-31.8
Abandoned
KLU287W1
-264.18
5380.0
1733
410.5
303.55
-31.8
Abandoned
STU162
667
6386
1672
395.8
250.7
-56.3
Complete
18
Hole ID
Easting1
(m)
Northing1
(m)
RL (m)
Total Depth
(m)
Azimuth2
Dip
Comments
STU163
667
6386
1672
167.7
206.8
5.6
Complete
STU164
667
6386
1672
326.8
260.6
-56
Complete
STU165
667
6386
1672
289.8
210.7
-47.5
Complete
STU166
667
6386
1672
421.8
229.9
-37.3
Complete
1 Easting and northing coordinates are reported in MGA94 Zone 53 grid for Golden Plateau,
Klondyke Local grid for Western Vein Field.
2 All down hole surveys are reported in MGA94 Zone 53 grid for Golden Plateau drill holes and
Klondyke local grid for Western Vein Field drill holes.
APPENDIX D: Summary of significant gold intercepts returned during the quarter from
the Western Vein Field near-mine exploration and Golden Plateau resource definition
drill programs
Hole ID
From
(m)
To (m)
Interval
(m)
GPS115
281.4
282.5
1.1
Est. true
Width
(m)
0.8
GPS115
386.0
387.0
1.0
GPS118A
355.0
357.0
GPS118A
429.1
GPS120B
Domain
Au g/t 1
Ag g/t1
Comment
CZ
2.1
3
0.8
KG
2.2
5
2.0
1.5
CZ
0.8
3
430.0
0.9
0.7
KG
2.8
78
179.8
182.8
3.0
2.5
HY
2.0
55
GPS123
384.7
385.5
0.8
0.6
KGS
9.6
2
GPS125
229.6
230.4
0.8
0.7
FM
7.3
10
GPS125
241.7
243.9
2.2
1.7
FM
3.4
5
GPS127
230.7
237.0
6.7
4.9
GCS
1.0
6
GPS127
249.8
251.7
1.9
1.3
GCS
2.4
13
GPS128
411.1
412.0
0.9
0.7
HY
2.7
23
KLU282
257.1
258.9
1.8
1.6
AP
5.8
N/A
Apollo target
KLU282
261.1
262.42
1.32
1.2
AP
2.4
N/A
Share your feedback
Discover