CORRECTION - DIGGERS AND DEALERS PRESENTATION
Released
Released
Announcement PDF
7 August 2024
ASX/MEDIA RELEASE
CORRECTION TO ASX ANNOUNCEMENT DATED 5 AUGUST 2024
– “AERIS RESOURCES - DIGGERS AND DEALERS PRESENTATION”
Aeris Resources Limited (ASX:AIS) would like to provide a corrected version of
the presentation released to the ASX on 5 August 2024.
A number of changes have been affected summarized as follows:
Slide 3 and 21 – Addition of Footnote on calculation of Cu equivalent – to ensure
compliant with Clause 50 or JORC 2012
Slide 5,7,8,10,18 and 19 – Included references to a newly added appendix
referencing the Group Ore Reserves and Group Mineral Resources as published on
ASX on 17 June 2024 to provide clarity on the MRE Category tonnes and grades and
where not addressed in the tables it was separately disclosed
Slide 9 (to be retracted and replaced) – this slide included the mill feed and strip ratio
anticipated at Murrawombie Pit, based on studies commissioned by the Company
by reputable third parties but which have not previously been announced to the
market in accordance with JORC Code 2012. The Company would like to retract
slide 9 of the Presentation on the basis that it does not comply with the JORC Code
2012. Accordingly, slide 9 the Presentation should be disregarded, and investors are
advised not to rely on the information contained in the retracted statements for their
investment decisions.
A replacement and corrected slide 9 is set out in the updated Presentation attached
to this announcement.
Slide 13 and 14 – Added references to the disclosed exploration result and no new
information statement
Slide 20 - Added references to the disclosed exploration result and no new
information statement
The updated version of the presentation is attached to this announcement.
Yours sincerely
Dane van Heerden
Company Secretary
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane QLD 4000 Australia
Post: GPO Box 2460, Brisbane, QLD 4001
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 | Page1 977
Diggers and Dealers
Presentation
August 2024
Presented by: Andre Labuschagne
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”). By attending an investor presentation or
briefing, or accepting, accessing or reviewing this presentation, you
acknowledge and agree to the terms set out below.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris with the Australian Securities Exchange (“ASX”) in
connection with its continuous disclosure obligations. This presentation
does not purport to contain all of the information that an investor should
consider when making an investment decision nor does it contain all of
the information which would be required in a product disclosure
statement or prospectus prepared in accordance with the requirements
of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, Aeris has no obligation to update the information
contained in this presentation. An investment in securities is subject to
known and unknown risks, some of which are beyond the control of
Aeris. Investors should consult with their own legal, tax, business and/or
financial advisors in connection with any acquisition of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing nonIFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris believes the non-IFRS financial information and non-GAAP
financial measures provide useful information to users in measuring the
financial performance and condition of Aeris.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris and its officers. This
includes statements about market and industry trends, which are based
on interpretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “estimate”, “intend”,
“believe”, “guidance”, “should”, “could”, “may”, “will”, “predict”, “plan”
and other similar expressions.
Forward-looking statements are based on information available to Aeris
as at the date of this presentation and should not be relied upon as an
indication or guarantee of future performance. Except as required by
law or regulation (including the ASX Listing Rules), none of Aeris, its
representatives or advisers undertakes any obligation to provide any
additional or updated information whether as a result of a change in
expectations or assumptions, new information, future events or results or
otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
recent world events such as the COVID-19 pandemic and international
hostilities and associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which Aeris has no obligation to do or to procure) or are offered or sold
pursuant to an exemption from, or in a transaction not subject to, the
registration requirements of the US Securities Act and any applicable
2
securities laws of any state or other jurisdiction of the United States.
Aeris Resources
Australian mid-tier, base and precious metals
producer
Weighted to copper
FY25 production guidance
29
Cu
3 producing operations (40-48kt copper eq.)1
79
Au
Copper
Gold
27-32 kt
50-62koz
47
Ag
Silver
200-240koz
3 development projects
All sites prospective for further discoveries
Substantial copper metal inventory
Excellent platform for growth
1. Copper Equivalent (CuEq) values – Requirements under the JORC Code
•
Assumed commodity prices for the calculation of Copper Equivalent (CuEq) is US$9,620/t Cu, US$2,341/oz Au and
US$29.43/oz Ag
•
Formula: CuEq = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
•
Aeris Resources confirms that it is the Company’s opinion that all the elements included in the metal equivalents
calculation have a reasonable potential to be recovered and sold.
3
Corporate overview
Board of Directors
AIS SHARE PRICE
0.50
0.40
0.30
Andre
Labuschagne
0.20
Executive Chairman
0.10
Colin
Moorhead
Non-Executive
Director
Michele
Muscillo
Robert
Millner
Non-Executive
Director
Non-Executive
Director
Ian Sheppard
Larnie Roberts
Senior Executives
0.00
CAPITALISATION
Market capitalisation1
A$203 million
Cash2
A$25 million
Debt2
A$40 million
Enterprise value
A$218 million
Dane van Heerden
Acting CFO
Paul Harris
COO
CTO
GM HR
BROKER COVERAGE
MAJOR SHAREHOLDERS
1.
2.
As at 22 July 2024
As at 30 June 2024
Washington H. Soul Pattinson
31.40%
Tudor Court
8.47%
4
Mining Portfolio: large Mineral Resource inventory
Production Assets
Asset
Tritton
Cracow
Development Projects
North Queensland
Jaguar
Stockman
~820,000t copper metal, ~1,000,000t zinc metal, ~1,400,000oz gold 1
Ownership
100%
100%
100%
100%
100%
Primary
commodity
Copper / Gold
Gold
Copper / Gold
Copper / Zinc
Copper / Zinc
Mineral
Resource1
342kt Cu @1.5% Cu
232koz Au @ 0.3g/t Au
519koz Au @ 3.4g/t Au
65kt Cu @ 2.1% Cu
21koz Au @ 0.2g/t Au
100kt Cu @ 1.3% Cu
442kt Zn @ 5.6% Zn
315kt Cu @ 2.0% Cu
623kt Zn @ 4.0% Zn
Plant capacity
1.80 Mtpa
0.57 Mtpa
N/A
0.60 Mtpa
0.80 – 1.00 Mtpa
design
FY25 production
guidance
Copper: 21 - 25kt
Gold: 7 - 9koz
Silver: 200 - 240koz
Gold: 40 – 49koz
Copper: 6 – 7kt
Gold: 3 – 4koz
-
-
Tritton, Budgerygar, Avoca
Tank, Constellation
Western Vein Field, Golden
Plateau
Mt Colin, Barbara
Bentley, Triumph, Jaguar,
Teutonic Bore
Currawong, Wilga
Constellation resource
extension drilling and
permitting
Resource extension drilling at
Western Vein Field
and Golden Plateau
Barbara Feasibility study
Dewatering,
exploration drilling, re-start
optimisation studies
Feasibility study,
final permitting and license
approvals
Key
deposits
Next 12 months
focus / catalysts
1. Refer to Appendix for categories of each Mineral Resource.
5
Production assets
Tritton
New South Wales
Tritton
Our cornerstone asset
100% owned, high-grade underground copper mines located in
central NSW
430kt copper produced since operations began in 2005
2,330km prospective tenement package
Mineral Resource1 of 22.5Mt at 1.5% Cu, 0.3g/t Au
Ore Reserve2,3 of 2.8Mt at 1.5% Cu, 0.3g/t Au
FY25 guidance of 21 – 25kt copper
Improving production with ramp up of higher grade Avoca tank
and Buderygar deposits
1.
2.
3.
Refer to Appendix for categories of the Mineral Resource; see also ASX announcements "Group Mineral Resource
and Ore Reserve Statement" dated 17 June 2024.
Refer to Appendix for categories of the Ore Reserve; see also ASX announcements "Group Mineral Resource and
Ore Reserve Statement" dated 17 June 2024.
The Mineral Resource is inclusive of the Ore Reserve.
Aeris confirms that it is not aware of any new information or data that materially affects the information included in the relevant
announcement and that all material assumptions and technical parameters underpinning the production target in the relevant
announcement continue to apply and have not materially changed.
7
Tritton
A long life copper operation now producing from multiple deposits
Production
Tritton
• Mature mine at depth
• Targeting high-grade extensions
Murrawombie
• Production declining
• EM plates identified 250m below
current MRE
Development Ready
Study Phase
Exploration
Murrawombie Pit
• Cut back of old pit
Constellation
• Potential future baseload mill feed
Kurrajong
• High grade deposit
• Fully permitted for development
• Facilitates rehab of old leach pads
• 6.7Mt @ 1.9% Cu resource2
• Mining studies underway
• Maiden MRE in 2023
• Still open at depth
• Remains open at depth
Budgery
• Potential future open pit
• Target for further exploration
Avoca Tank
• High-grade mine
• Exploration upside
Budgerygar
• Near surface, adjacent to Tritton
• Reserve grading 1.6% Cu1
1.
2.
Reserve grading is represented by Ore Reserve 0.5Mt (Probable) at 1.6% Cu and 0.2g/t Au. See also ASX release “Group Mineral Resource and Ore Reserve Statement” 17 June 2024
Mineral Resource of 6.7Mt represents Indicated 2.3Mt at 1.1% Cu and 0.4g/t Au and Inferred 4.4Mt at 2.3% Cu and 0.7g/t Au. See also ASX release “Group Mineral Resource and Ore Reserve Statement” 17 June 2024
Aeris confirms that it is not aware of any new information or data that materially affects the information included in the relevant announcement and that all material assumptions and technical parameters underpinning the production target in the relevant announcement continue to apply and
have not materially changed.
8
Murrawombie Pit
Cut back on old pit also provides major rehab saving
Stripping expected to commence in Q2 FY25 with contract miner
First ore to mill mid FY25
Ore Reserve of 1.3Mt ore @ 1.3%Cu, 0.2g/t Au1
Waste from cut back used to cap old heap leach pads, saving c.$8M
rehabilitation costs
1.
Ore Reserve 1.3Mt (Probable) at 1.3% Cu and 0.2g/t Au. See also ASX release “Group Mineral Resource and Ore
Reserve Statement” 17 June 2024
Aeris confirms that it is not aware of any new information or data that materially affects the information included in the relevant
announcement and that all material assumptions and technical parameters underpinning the production target in the relevant
announcement continue to apply and have not materially changed.
9
Constellation deposit
Potential future baseload feed for Tritton mill
Located 45km northeast of the Tritton plant
Mineral Resource1 of 6.7Mt at 1.9% Cu and 0.6g/t Au
Drill program commenced in May with two key objectives:
1. Target conversion of 2Mt – 3Mt of Inferred Mineral Resource to an
Indicated category within the upper 250m of the deposit
2. Test the stand-up-zone mineralisation along the northern margin
Updated Mineral Resource Q3 FY25
Mining study on underground, open pit and heap leach to be
completed following resource update
Advancing EIS and permitting activities for a future mining operation
1.
Mineral Resource of 6.7Mt represents Indicated 2.3Mt at 1.1% Cu and 0.4g/t Au and Inferred 4.4Mt at 2.3% Cu
and 0.7g/t Au. See also ASX release “Group Mineral Resource and Ore Reserve Statement” 17 June 2024
Aeris confirms that it is not aware of any new information or data that materially affects the information included in the relevant
announcement and that all material assumptions and technical parameters underpinning the production target in the relevant
announcement continue to apply and have not materially changed.
10
Cracow
Queensland
Cracow
Mature, high-grade gold mine
Low-sulphidation epithermal underground gold mine located 500km
northwest of Brisbane
Conventional crush and grind CIP processing plant
Produced +1.5Moz gold since first production in 2004
FY25 guidance 40 – 49koz Au
Strong history of reserve replacement in the Western Vein Field with
current exploration on multiple high-grade targets
Production and Resource Replacement Under Aeris Ownership
800
700
Tailings dam lift completed providing 3 year production runway
koz Au
600
500
400
300
200
100
0
FY21
Annual Production
FY22
FY23
Cum. Production
FY24
Resource
12
Near mine exploration
Defining new mineralised structures
Two new near-mine structures discovered (Apollo / Coronation West)
Apollo traced 180m (strike) x 60m (down-plunge) – awaiting assays
from latest drilling
Coronation West drill program underway targeting high grade gold
zones similar to the nearby Stirling deposit
Golden Plateau resource update expected in Q1 FY25
Western Frontier represents a potential new structural corridor based
on interpretation of geophysical datasets
1.
Refer to ASX announcement “Quarterly Activities Report – June 2024” dated 30 July 2024. Aeris confirms that it is
not aware of any new information or data that materially affects the information included in the relevant
announcement and that all material assumptions and technical parameters underpinning the exploration results
in the relevant announcement continue to apply and have not materially changed.”
13
Southern Vein Field
1
Could be the game-changer for Cracow
Approx. 2.5Moz gold produced to date from the WVF and
850koz gold from Golden Plateau
Structures with the potential to host WVF style ore shoots
interpreted under cover in the Southern Vein Field
Southern Vein Field has had very limited exploration to date
Preparing foundation geophysical data sets to identify drill
targets
Future drill program to target for high-grade ore shoots
analogous to key WVF shoots
14
North Queensland
Queensland
Mt Colin
Harvesting cash to fund group capital developments
Mine in final stages of life
FY25 guidance of 6 – 7kt Cu
Production to continue through to Q2 FY25
Significant stockpiles of mined ore available for toll
processing
16
Development projects
Barbara project
Potential follow-on operation to Mt Colin
Updated resource of 2.2Mt at 2.0% Cu and 0.2g/t Au1 completed
Resource remains open down-plunge
Feasibility studies underway on a potential underground operation
Toll treatment options with regional mills
Low capital development utilising infrastructure from Mt Colin
Situated on a mining lease; EIS update submitted
1.
Mineral Resource is represented by Indicated 2Mt at 2.0% Cu and 0.2g/t Au and Inferred 0.3Mt at 1.8% Cu and
0.1g/t Au. See also ASX release “Group Mineral Resource and Ore Reserve Statement” 17 June 2024
Aeris confirms that it is not aware of any new information or data that materially affects the information included in the relevant
announcement and that all material assumptions and technical parameters underpinning the production target in the relevant
announcement continue to apply and have not materially changed.
18
Jaguar
Brownfield copper/zinc restart opportunity
Mineral Resource1 8Mt @ 1.3% Cu, 5.6% Zn, 0.5g/t Au and
65g/t Ag across 4 deposits
Transitioned to care and maintenance in Q1 FY24
Restart study update due Q1 FY25
Tenement package highly prospective for base metals and
gold with numerous targets identified
Currently exploring the Heather Bore gold prospect nearby
Northern Star’s Thunderbox mine – awaiting assays on two
diamond drill holes
1.
Refer to Appendix for categories of Mineral Resource; see also ASX announcements “Group Mineral Resource
and Ore Reserve Statement” dated 17 June 2024
Aeris confirms that it is not aware of any new information or data that materially affects the information included in the relevant
announcement and that all material assumptions and technical parameters underpinning the production target in the relevant
announcement continue to apply and have not materially changed.
19
Stockman
Long life, Cu-Zn-Au-Ag project with all primary permits
Feasibility Study well advanced
12 year mine plan producing at up to 850ktpa1 from a single deposit
(Currawong)
Potential to extend mine life with other known deposits
Currawong mine plan
Albion leaching technology being investigated to improve recoveries
impacted by complex metallurgy – very positive initial results1
Potential to make a high-grade Cu concentrate on the mine site and
a bulk polymetallic concentrate for leaching at an offsite location
Metallurgical test work, engineering design for Albion Process
underway with FS completion targeted in second half 2024
All key project consents in place for mining and onsite processing
1.
Refer to ASX announcement “Stockman Feasibility Study Update” dated 24 January 2024.
Aeris confirms that it is not aware of any new information or data that materially affects the information included in the
relevant announcement and that all material assumptions and technical parameters underpinning the production target
in the relevant announcement continue to apply and have not materially changed
20
Investment highlights
Company set for growth
Diversified production from 3 operations
Significant internal growth opportunities to lift
production and extend mine lives
All sites located in tier 1 mining jurisdiction
Leveraged to copper, critical to electrification
FY25 production guidance of 40 – 48kt Cu eq1
1. Copper Equivalent (CuEq) values – Requirements under the JORC Code
•
Assumed commodity prices for the calculation of Copper Equivalent (CuEq) is US$9,620/t Cu, US$2,341/oz Au and
US$29.43/oz Ag
•
Formula: CuEq = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
•
Aeris Resources confirms that it is the Company’s opinion that all the elements included in the metal equivalents
calculation have a reasonable potential to be recovered and sold.
21
Appendix
Group Ore Reserves
PROJECT
CATEGORY
TONNES (‘000)
Base Metals
Tritton
Jaguar
North Queensland
Stockman
GRADE
CONTAINED METAL
% Cu
% Zn
g/t Au
g/t Ag
kt Cu
kt Zn
koz Au
koz Ag
5
1.8
-
-
-
0.1
-
-
-
Probable
2,790
1.5
-
0.3
5
41
-
23
451
Total
2,790
1.5
-
0.3
5
41
-
23
451
Proved
90
1.4
8.7
0.8
74
1
8
2
225
Probable
1,060
1.4
8.3
0.6
45
16
87
21
1,534
Total
1,150
1.5
8.3
0.6
48
17
95
23
1,759
Proved
90
2.4
-
0.5
-
2
-
1
-
Probable
80
2.1
-
0.4
-
2
-
1
-
Total
170
2.3
-
0.4
-
2
-
2
-
-
-
-
-
-
-
-
-
Proved
Proved
Probable
9,640
1.9
4.3
1.0
36
183
413
318
11,409
Total
9,640
1.9
4.3
1.0
36
183
413
318
11,409
13,750
1.8
3.7
0.8
30
245
508
367
13,619
Proved
100
-
-
3.5
-
-
-
12
-
Probable
250
-
-
3.4
-
-
-
28
-
Grand Total
360
-
-
3.4
-
-
-
39
-
Grand Total
Gold
Cracow
As at December 2023.
23
Group Mineral Resources
PROJECT
CATEGORY
TONNES (‘000)
Base Metals
Tritton
Jaguar
North Queensland
CONTAINED METAL
% Cu
% Zn
g/t Au
g/t Ag
kt Cu
kt Zn
koz Au
koz Ag
Measured
1,300
1.0
-
0.1
3
13
-
4
120
Indicated
11,200
1.4
-
0.3
4
145
-
91
1,280
Inferred
10,000
1.7
-
0.3
4
183
-
137
1,440
Total
22,500
1.5
-
0.3
4
342
-
232
2,840
Measured
500
1.6
5.0
0.3
63
8
25
4
1,030
Indicated
3,400
1.3
7.6
0.5
75
45
256
51
8,170
Inferred
4,000
1.2
4.0
0.5
56
47
161
68
7,270
Total
7,900
1.3
5.6
0.5
65
100
442
123
16,460
Measured
300
2.8
-
0.6
-
9
-
6
-
Indicated
2,200
2.0
-
0.2
3
44
-
13
210
Inferred
600
2.0
-
0.1
2
11
-
2
30
3,100
2.1
-
0.2
2
65
-
21
240
Measured
-
-
-
-
-
-
-
-
-
Indicated
13,400
2.1
4.2
1.0
37
288
561
420
16,000
Inferred
2,400
1.1
2.6
1.5
32
27
62
117
2,440
Total
15,800
2.0
4.0
1.1
36
315
623
537
18,450
49,300
1.7
2.2
0.6
24
882
1,065
913
37,990
Measured
400
-
-
3.9
3
-
-
52
39
Indicated
2,100
-
-
3.4
4
-
-
259
249
Inferred
2,400
-
-
2.9
4
-
-
208
376
Grand Total
4,900
-
-
3.4
4
-
-
519
664
Total
Stockman
GRADE
Grand Total
GOLD
Cracow
As at December 2023
24
Share your feedback
Discover