QUARTERLY ACTIVITIES REPORT - SEPT 2024
Released
Released
Announcement PDF
Quarterly Activities Report | For the period ended 30 September 2024
Quarterly Activities Report
For the period ended 30 September 2024
Highlights
Another good quarter from operations
Copper equivalent production of 10.2kt for the quarter at improved AISC of
A$5.32/lb
Tritton performed well with production ahead of plan at 5.0kt copper
Cracow well ahead of plan at 12.9koz gold
Mt Colin mining in line with plan but high oxidised mill feed impacted recovery
and production
Jaguar on care and maintenance. Preferred restart scenario to be presented to
the Board this current quarter
Stockman feasibility work continues
Cash and receivables increased from $33.4M to $39.1M
Unit
Jun 24
Qtr
Sep 24
Qtr
FY25
Guidance
/mmhrs
1.19
1.41
-
Copper produced
kt
6.7
6.0
27 – 32
Gold produced
koz
14.2
15.2
50 – 62
Silver produced
koz
42.6
43.9
200 – 240
Cu eq production
kt
10.2
10.2
40 – 48
A$M
54.0
49.1
172 – 210
Processing
A$M
23.3
21.5
69 – 85
Site & G&A
A$M
11.2
9.3
35 – 42
TC/RCs
A$M
5.2
4.9
17 – 21
Product handling
A$M
5.9
4.5
19 – 23
Care and maintenance.
A$M
-
2.3
3–5
Sustaining
A$M
15.8
15.1
64 – 79
Growth
A$M
2.2
3.0
38 – 49
Exploration
A$M
2.6
3.0
5–8
Projects
A$M
0.4
0.5
1–2
AISC
A$M
123.0
119.7
-
AISC
A$/lb Cu eq
5.45
5.32
-
LTIFR
Operating Costs
Mining
Capital Costs
1
Group Safety, Environment and Community
Aeris recorded no lost time injuries in the last quarter, bringing the 12-month rolling
LTIFR to 1.41. There was one Reportable Environmental Incident recorded in the
quarter related to poor water quality, potentially from mine-affected water, in a
diversion drain at Mt Colin. Drainage controls around the mine embankment have
been upgraded to prevent a reoccurrence.
Figure 1: Group LTIFR
3
No of LTI
LTIFR
2
1
0
2
Tritton Operations (NSW)
Key points for quarter:
Copper production of 5.0kt at AISC of $5.06/lb, ahead of plan
Increased production from high-grade Avoca Tank stopes
AISC costs decreased, quarter on quarter
28 holes drilled at Constellation, focusing on infill drilling of the main zone resource
and better defining the subvertical stand-up zone
Jun 24
Sep 24
Qtr
Qtr
kt
314.6
269.1
% Cu
1.89
1.87
Ore Milled
kt
307.4
273.9
Milled Grade
% Cu
1.88
1.90
Recovery
Cu
94.3%
95.9%
Copper Produced
kt
5.4
5.0
21 – 25
Gold Produced
koz
1.5
1.5
7–9
Silver Produced
koz
42.6
43.9
200 – 240
Mining
A$M
30.7
27.4
105 – 128
Processing
A$M
8.2
7.4
29 – 36
Site G&A
A$M
5.7
5.2
21 – 25
TC/RCs
A$M
4.3
4.2
13 – 16
Product Handling
A$M
4.8
3.7
14 – 17
By-Product Credit
A$M
(5.8)
(7.1)
Royalties
A$M
2.9
2.0
Corporate G&A
A$M
0.5
0.5
Inventory Movements
A$M
(1.1)
0.8
Sustaining Capital1
A$M
12.6
11.5
A$M
62.9
55.6
A$/lb
5.23
5.06
Growth Capital
A$M
2.1
2.7
37 – 45
Exploration
A$M
0.2
0.5
1–2
A$M
65.2
58.7
A$/lb
5.43
5.35
Production Summary
Unit
Ore Mined
Mined Grade
FY25
Guidance
Cost Summary
All-In Sustaining Costs2
All-In Costs2
51 – 63
1.
Includes sustaining capital, capitalised mine development and financing payments (principal and interest) on
leased assets
2.
All-In Sustaining and All-In Costs are based on copper produced
3
Operations
Mining operations performed well for the quarter. Total mined tonnes were slightly
lower than plan but were compensated by higher grades resulting in produced
copper ahead of plan.
Mining was impacted by unplanned absenteeism, so activities were focused at the
Avoca Tank mine where mined grades were better than expected. Avoca Tank
production was prioritised ahead of mining from Budgerygar and Murrawombie.
Mined tonnes are forecast to increase in the second half of the financial year as the
paste fill line to Budgerygar is completed in January, allowing increased production
from the mine, and as the Murrawombie pit cut back starts delivering ore to the mill.
The processing plant performed well, with metallurgical recovery ahead of plan.
Costs
All-in sustaining costs were well contained, decreasing quarter on quarter to $5.06/lb.
Exploration
Drilling has continued at Constellation deposit throughout the quarter with 28
diamond drill holes completed. Most of the drill holes (21) were associated with the
resource definition drill program targeting the shallow dipping “main zone” which
defines most of the known deposit (refer to Figure 2).
The remaining drill holes (7) targeted the interpreted sub-vertical mineralised zone
along the northern margin of the deposit, referred to as the stand-up zone (refer to
Figure 3).
The stand-up zone drill program has progressively moved from targeting within the
existing Inferred Mineral Resource to testing down-plunge extensions. Drill results within
the projected down-plunge position have been variable. Further work is required to
understand the potential of down-plunge extensions along the stand-up zone.
High-grade copper intersections within the stand-up zone include:
TAKD105 - 28.2m @ 7.50% Cu, 0.88g/t Au, 4.43g/t Ag (from 86.0m)1
TAKD106 - 9.0m @ 3.24% Cu, 1.10g/t Au, 6.36g/t Ag (from 146.5m)1
TAKD108 - 11.9m @ 2.35% Cu, 0.78g/t Au, 3.41g/t Ag (from 196.8m)1
High-grade copper intersections within the main zone include:
TAKD111 - 2.1m @ 3.91% Cu, 2.42g/t Au, 22.12g/t Ag (from 236.4m)1
TAKD118 - 9.2m @ 3.76% Cu, 0.82g/t Au, 6.32g/t Ag (from 145.6m)1
TAKD118 - 9.55m @ 2.43% Cu, 1.31g/t Au, 5.31g/t Ag (from 159.55m)1
TAKD119 - 9.1m @ 4.81% Cu, 1.31g/t Au, 15.6g/t Ag (from 176.5m)1
The drill program will continue throughout Q2 FY25.
1 Drill hole true width lengths are between 60% to 85% of reported interval lengths.
4
Figure 2: Long section view looking west showing drill hole pierce points through the
Constellation Main zone
5
Figure 3: Long section view looking north showing drill hole pierce points through the Constellation Stand-Up zone
6
Cracow Operations (QLD)
Key points for quarter:
Increased gold production for the quarter of 12.9koz due to the availability of
higher grade stopes
AISC lower quarter on quarter at $2,352/oz driven by lower mining costs and higher
gold production
Exploration drilling continued in the Western Vein Field with five holes intersecting
the Apollo structure and awaiting assay results
Jun 24
Sep 24
Qtr
Qtr
kt
120.0
126.8
Mined Grade
g/t
3.06
3.30
Ore Milled
kt
155.7
157.6
Milled Grade
g/t
2.58
2.80
Recovery
Au
89.8%
91.1%
Gold Produced
koz
11.6
12.9
Gold Sold
koz
11.6
12.6
Mining
A$M
14.0
14.0
57 – 70
Processing
A$M
6.9
6.5
24 – 30
Site G&A
A$M
3.2
2.7
11 – 13
By-Product Credit
A$M
(0.3)
(0.2)
Royalties
A$M
2.3
2.6
Corporate G&A
A$M
0.4
0.4
Inventory Movements
A$M
(0.2)
0.2
Sustaining Capital1
A$M
3.2
3.6
A$M
29.5
29.7
A$/oz
2,533
2,352
Growth Capital
A$M
0.0
0.0
0–1
Exploration
A$M
1.8
2.0
3–4
A$M
31.3
31.7
A$/oz
2,688
2,509
Production Summary
Unit
Ore Mined
FY25
Guidance
40 – 49
Cost Summary
All-In Sustaining Costs2
All-In Costs2
13 – 16
1.
Includes sustaining capital, capitalised mine development and financing payments (principal and interest) on
leased assets
2.
All-In Sustaining and All-In Costs are based on gold sold
7
Operations
Cracow performed well for the quarter with mined tonnes and grade both higher
quarter on quarter and compared to plan. High-grade stopes at Coronation
contributed to the improved results.
The processing plant also performed well with recovery slightly above plan. Mill feed
from underground ore was supplemented with low grade stockpiles.
Costs
Gross mining costs were lower than plan due to good cost management and
reduced ground support requirements for the stopes scheduled. All-in sustaining costs
were also reduced on a unit basis due to increased gold production.
Exploration
Western Vein Field
Underground exploration drilling continued during the quarter, targeting the Apollo
and Coronation West structures in the Western Vein Field.
The Apollo structure is the priority exploration target and a further six drill holes were
completed within the quarter. The drill holes targeted extensions to the high-grade
mineralisation intersected from previous drilling (KLU213 3.7m @ 11.2g/t Au and KLU279
0.8m @ 4.1g/t Au)1. Three additional drill holes did not achieve target depth due to
poor ground conditions and were abandoned.
Drilling to date has defined a high-grade gold lode characterised by varying amounts
of epithermal veining, including either breccia or quartz lode (refer to Figure 4). Drilling
down dip of historic high-grade intercepts has shown quartz breccia lodes and
stockwork veining displaying epithermal textures. Drilling elsewhere along the Apollo
structure has intersected the structure, however there is an absence of veining and
gold mineralisation. At the end of the quarter, five drill holes which intersected the
Apollo structure are awaiting assay results.
1 Refer to ASX Announcement “Quarterly Activities Report – March 2024” dated 30th April 2024
8
Figure 4: Oblique view looking northwest showing drill hole pierce points through the Apollo
structure at the Western Vein Field
A drilling program targeting the Coronation West and Kilkenny West structures has
commenced, aiming to identify high-grade gold zones similar to the nearby Sterling
deposit. Eight drill holes were completed during the quarter, testing the structure along
strike to the initial drill intercept (IMU148 1.7m @ 2.8g/t Au). Assay results were returned
from seven drill holes during the quarter. No significant intersections were reported.
Drilling has continued into the next quarter, targeting the remaining extensions to
anomalous quartz lode intercepts between the Coronation West and Kilkenny West
targets (refer to Figure 5).
9
Figure 5: Plan view of the Cracow Western Vein Field showing the position of the Apollo and
Coronation West structures
10
Golden Plateau
Within the quarter an updated Mineral Resource estimate (MRE) was completed for
the Golden Plateau deposit1. The updated MRE was based on incorporating five drill
holes2 targeting extensions to several mineralised lodes completed in the prior
quarter3. The updated MRE did not result in a material change to the reported Mineral
Resource figures (refer to Table 1 below).
Table 1: Golden Plateau MRE tonnage and grade comparison between the current and
previous MRE
MRE
Jan 2023
Mt
Open Pit
0.5
Underground
1.5
Total
July 2024
Indicated
Au
cutoff
Mine
Method
Au
Ag
Inferred
Au
Ag
Au
Ag
Total
Au
Ag
Mt
g/t
g/t
koz
koz
0.12
3.1
18.4
11.4
71.0
0.01
5.9
9.4
2.6
0.13
3.4
17.5
Au
Ag
Au
Ag
g/t
g/t
koz
koz
Mt
g/t
g/t
koz
koz
0.05
2.4
16.5
3.7
26.5
0.16
2.9
17.9
15.1
97.5
3.0
0.44
3.1
14.3
43.9
202.3
0.45
3.2
14.1
46.5
205.3
14
73.1
0.49
3.0
14.5
47.6
228.4
0.62
3.1
15.1
61.6
301.6
Open Pit
0.5
0.11
3.2
16.2
11.2
56.9
0.04
1.9
9.9
2.7
14.1
0.15
2.9
14.9
13.9
71.0
Underground
1.5
0.01
5.5
5.3
2.5
2.4
0.47
3.1
11.3
47.0
172.0
0.49
3.3
11.5
49.5
174.4
0.12
3.4
14.9
13.7
59.3
0.52
3.0
11.2
49.8
186.1
0.64
3.2
12.3
63.4
245.4
-5.0%
1.3%
-14.7%
-2.3%
-18.9%
5.6%
-0.4%
-22.9%
4.5%
-18.5%
3.4%
2.6%
-18.5%
3.0%
-18.6%
Total
Percentage Differences
1 The updated July 2024 Golden Plateau deposit applied the same parameters and assumptions used for
the maiden MRE for the Golden Plateau deposit that require disclosure under JORC 2012 reporting
requirements. Please refer to ASX announcement “Maiden Mineral Resource for Golden Plateau” dated
25th January 2023 for a full description of the parameters and assumptions used. Aeris is not aware of
any new information or data that materially affects the information included in the relevant market
announcement and that all material assumptions and technical parameters underpinning the estimates in
the relevant market announcement continue to apply and have not materially changed.
2 A total of 92 drill holes inform the updated July 2024 Golden Plateau MRE.
3 Refer to ASX announcement “Quarterly activities statement – June 2024” dated 30th July 2024.
11
North Queensland Operations (QLD)
Key points for quarter:
Mining performance in line with plan as final stopes are extracted
Cost well maintained within plan
Processing underperformed due to increased levels of oxidised material
impacting recovery
Significant stockpiles of 175kt of ore at Ernest Henry mill available for processing in
the following quarter
Mining activities now expected to be completed in late November
Jun 24
Sep 24
Qtr
Qtr
kt
139.0
106.4
% Cu
2.22
2.51
Ore Milled
kt
104.9
101.8
Milled Grade
% Cu
1.96
1.57
Recovery
Cu
61.5%
62.3%
Copper Produced
kt
1.3
1.0
6–7
Gold Produced
koz
1.2
0.8
3–4
A$M
8.5
7.7
10 – 12
Production Summary
Unit
Ore Mined
Mined Grade
FY25
Guidance
Cost Summary
Mining
Processing
A$M
7.7
7.6
16 – 19
Site G&A
A$M
1.2
1.3
3–4
TC/RCs
A$M
0.9
0.7
4–5
Product Handling
A$M
1.1
0.8
5–6
By-Product Credit
A$M
(5.0)
(5.4)
Royalties
A$M
0.9
1.6
Corporate G&A
A$M
0.3
0.3
Inventory Movements
A$M
1.6
4.6
Sustaining Capital1
A$M
(0.1)
0.0
A$M
17.2
19.4
A$/lb
6.17
8.81
Growth
A$M
0
0.2
1–3
Exploration
A$M
0.3
0.1
0–1
A$M
17.4
19.6
A$/lb
6.26
8.94
All-In Sustaining Costs2
All-In Costs2
0
1.
Includes sustaining capital, capitalised mine development and financing payments (principal and
2.
interest) on leased assets
All-In Sustaining and All-In Costs are based on copper produced
12
Operations
Mining rates at Mt Colin are declining as the final stopes are taken, however tonnes
mined were in line with plan. Mined grade improved quarter on quarter as more
higher grade pillars were extracted. Mining activities are expected to be completed
by late November 2024.
A single processing run at EHM was completed, although performance was poor. A
high proportion of low-grade oxidised material resulted in low milled grade and
metallurgical recovery. Metal produced was significantly below plan for the quarter.
For the remaining processing runs (in Q2 and Q3), increased monitoring of the mill
feed material and proportions of oxidised to fresh ore will be undertaken to improve
performance. Also, as mining of the cave zone has been completed, the remaining
ore to be mined will be sulphide material.
At the end of the quarter, 175kt of stockpiled ore remained at EHM available for
processing.
Costs
Cash operating costs for the quarter were in line with plan although the lower grade
and metallurgical recovery impacted all-in sustaining costs. Increased inventory
movement costs reflect the drawdown of stockpiles on the Mt Colin site.
Exploration
No material exploration activities were undertaken in North Queensland during the
quarter.
Barbara Project
The minor amendment to the environmental authority required to commence mining
at Barbara was granted by the regulator. The feasibility study on the underground
mining project is nearly complete, at which point the project will be presented to the
Board for final investment decision.
13
Jaguar Operations (WA)
Key points for quarter:
Operation on care and maintenance
Care and maintenance costs of $2.4M, in line with the previous quarter
A number of restart scenarios for Jaguar Operations have been assessed,
incorporating resources from the various deposits and exploration targets. A
preferred option will be presented to the Aeris board for approval this quarter.
Drilling at Heather Bore prospect intersected gold mineralisation and will be used
to develop an updated geology model to inform further exploration
Exploration
Assay results from the two-hole diamond drill program at the Heather Bore gold
prospect have been received. The drill program was designed to enhance the
geological understanding of the area by focusing on stratigraphy, structural features,
and the broader litho-structural setting. Additionally, it aimed to assess the presence
of primary gold mineralisation within the fresh rock, targeting depths below an
extensive shallow gold anomaly of +0.5 g/t Au identified within the weathered rock
profile.
Both drill holes returned multiple low-grade gold anomalies (>0.1 g/t Au) within
predominantly andesitic host rocks, exhibiting variable silica-sericite-pyrite alteration.
A notable high-grade interval was intersected in drill hole 24HBDD001, reporting 0.79m
@ 1.99 g/t Au, contained within a broader interval of 3.0m @ 0.65 g/t Au.
The results have enhanced the understanding of the stratigraphy and structural
framework at the Heather Bore prospect. Ongoing work is focused on using the
geological data from both drill holes to develop a more detailed stratigraphic and
structural model across the prospect, providing a foundation for refining target areas
for future exploration. The Heather Bore prospect continues to be regarded as a highpriority gold target.
14
Figure 6: Long section view of the Heather Bore gold prospect showing the position of the
recently completed diamond drill holes, historical drill holes and anomalous gold
mineralisation
Stockman Project (VIC)
Key points for quarter:
Following the successful completion of the “proof of concept” metallurgical test
work on the modified flotation plant (at the mine site) and downstream Albion
processing plant, the project commenced preparation for the next phase which
will include detailed metallurgical test work and preliminary engineering.
Groundwater environmental quality objective methodology report was submitted
to Environmental Protection Authority (EPA). Feedback from EPA was received
with Stockman’s response submitted. Water quality monitoring is on-going for the
project.
Planned capital improvement works for the Benambra school have been
completed
Stockman continues to support the local area with community grants provided to
several regional groups
15
Corporate
Cash and Receivables
At the end of the quarter, Aeris increased useable cash and receivables to $39.1
million with a closing unrestricted cash balance of $25.5 million.
A further $2 million during the quarter was applied to restricted cash for environmental
bonding obligations (taking the total to $12 million) which is not included in the closing
cash balance.
Jun
2024
QTR
Sep
2024
QTR
Closing cash
Receivables
Mt Colin
Cracow
Tritton
24.8
25.5
1.2
0.0
7.5
3.6
0.0
10.0
Useable Cash and Receivables
33.4
39.1
Jun
Sep
2024
2024
QTR
QTR
Opening cash
Cash flow from operations
Cash flow from capital expenditure
19.4
35.3
(26.6)
24.8
25.4
(19.4)
Cash flow from financing
(3.4)
(5.2)
Closing cash
24.8
25.5
(A$ Million)
(A$ Million)
Debt and Hedging
At the end of the quarter, the Company’s debt position remained unchanged with
$40 million drawn on the WHSP facility. The Company had no hedges in place at the
end of the quarter.
The process to refinance the company’s debt and bonding facilities is in the final
stages and to allow additional time to complete the process, ANZ has agreed to
extend its bonding facility to 15 November 2024.
Authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
16
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper dominant
portfolio comprises three operating assets, a mine on care and maintenance, a longlife development project and a highly prospective exploration portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition opportunities.
The Company’s experienced board and management team bring significant
corporate and technical expertise to a lean operating model. Aeris is committed to
building strong partnerships with its key community, investment and workforce
stakeholders.
17
Competent Persons Statements
Mr Chris Raymond confirms that he is the Competent Person for all Exploration Results at the Tritton
Operation, and he has read and understood the requirements of the 2012 Edition of the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012
Edition). Mr Raymond is a Competent Person as defined by the JORC Code, 2012 Edition, having
relevant experience to the style of mineralisation and type of deposit described in the Report and to
the activity for which he is accepting responsibility. Mr Raymond is a Member of the Australian Institute
of Geoscientists (MAIG No. 6045). Mr Raymond has reviewed the Report to which this Consent
Statement applies and consents to the inclusion in the Report of the matters based on his information in
the form and context in which it appears. Mr Raymond is a full-time employee of Aeris Resources
Limited.
The information in this report that relates to Exploration Targets or Exploration Results at the Cracow
Operation is based on information compiled by Craig Judson. Mr Judson confirms that he is the
Competent Person for all Exploration Results, summarised in this Report and he has read and
understood the requirements of the 2012 Edition of the Australasian Code for Reporting of Exploration
Targets, Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012 Edition). Mr Judson
is a Competent Person as defined by the JORC Code, 2012 Edition, having relevant experience to the
style of mineralisation and type of deposit described in the Report and to the activity for which he is
accepting responsibility. Mr Judson is a Member of the Australasian Institute of Mining and Metallurgy
(MAusIMM No. 325510). Mr Judson has reviewed the Report to which this Consent Statement applies
and consents to the inclusion in the Report of the matters based on his information in the form and
context in which it appears. Mr Judson is a full-time employee of Aeris Resources Limited.
The information in this report that relates to Exploration Targets or Exploration Results at the Jaguar
Operation is based on information compiled by Alain Cotnoir. Mr Cotnoir confirms that he is the
Competent Person for all Exploration Results, summarised in this Report and he has read and
understood the requirements of the 2012 Edition of the Australasian Code for Reporting of Exploration
Targets, Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012 Edition). Mr Cotnoir
is a Competent Person as defined by the JORC Code, 2012 Edition, having relevant experience to the
style of mineralisation and type of deposit described in the Report and to the activity for which he is
accepting responsibility. Mr Cotnoir is a Member of the Australasian Institute of Mining and Metallurgy
(MAusIMM No. 315017). Mr Cotnoir has reviewed the Report to which this Consent Statement applies
and consents to the inclusion in the Report of the matters based on his information in the form and
context in which it appears. Mr Cotnoir is a full-time employee of Aeris Resources Limited.
18
APPENDIX A: Summary of drill hole collar and survey details for holes completed
during the quarter as part of the Constellation resource definition drill program
TAKD108
Easting1
(m)
498,621
Northing1
(m)
6,561,134
163
Total
Depth (m)
256
TAKD109
498,724
6,561,200
162
171.2
1.0
-56.0
Complete
TAKD110
498,857
6,561,072
162
315.2
1.0
-59.5
Complete
TAKD111
498,825
6,561,004
162
262.3
268.0
-70.0
Complete
TAKD112
498,616
6,560,991
164
132.1
309.5
-70.0
Complete
TAKD113
498,662
6,561,030
163
159.3
312.0
-70.0
Complete
TAKD114
498,672
6,561,159
162
200
0.5
-52.5
Complete
TAKD115
498,688
6,560,976
164
179.9
303.0
-71.5
Complete
TAKD116
498,667
6,561,114
163
156.5
308.5
-70.5
Complete
TAKD117
498,894
6,561,158
161
190.6
3.5
-64.0
Complete
TAKD118
498,716
6,561,054
163
197.7
310.5
-69.5
Complete
TAKD119
498,735
6,560,992
163
210.3
311.0
-70.5
Complete
TAKD120
499,021
6,561,049
161
344.3
357.5
-58.5
Complete
TAKD121
498,712
6,561,127
162
186.3
308.0
-70.1
Complete
TAKD122
498,782
6,561,008
163
248
307.5
-70.0
Complete
TAKD123
498,996
6,560,960
162
422.5
352.5
-55.0
Complete
TAKD124
498,803
6,561,089
162
239.5
311.0
-69.5
Complete
TAKD125
498,777
6,561,158
162
213.5
310.0
-71.0
Complete
TAKD126
498,750
6,561,079
162
195.4
309.5
-70.0
Complete
TAKD127
498,826
6,561,027
162
239.5
310.5
-70.0
Complete
TAKD128
498,836
6,561,168
162
253.6
301.0
-70.5
Complete
TAKD129
498,855
6,561,102
162
264.5
312.0
-67.5
Complete
TAKD130
498,892
6,561,053
161
305.6
312.0
-70.0
Complete
TAKD131
498,951
6,561,040
161
311.8
271.0
-70.0
Complete
TAKD132
498,895
6,561,025
162
304.4
269.5
-71.0
Complete
TAKD133
498,978
6,561,065
161
350.5
269.0
-69.5
In Progress
TAKD134
498,683
6,560,890
164
222.3
309.5
-70.0
Complete
TAKD135
498,724
6,560,861
165
248
310.0
-70.0
In Progress
Hole ID
RL (m)
Azimuth2
Dip
Comments
1.5
-55.0
Complete
1 Easting and northing coordinates are reported in GDA2020 Zone 55.
2 Azimuth is recorded as a magnetic azimuth reading.
APPENDIX B: Summary of significant copper intersections returned during the quarter
from the Constellation resource definition drill program
Hole ID
Type
From (m)
To (m)
Cu (%)2
Au (g/t)
Ag (g/t)
Cu Type
53.0
Interval1
(m)
1.0
TAKD105
DD
52.0
0.96
0.00
0.1
86.0
114.2
28.2
7.50
0.88
4.4
DD
DD
DD
146.5
82.4
196.8
155.5
84.4
208.7
6.4
0.4
3.4
DD
DD
DD
264.85
212.0
225.0
267.5
219.2
226.8
9.0
3.24
1.10
2.0
0.73
0.07
11.9
2.35
0.78
No significant assay result
2.65
4.59
0.56
7.2
0.90
0.55
1.8
3.40
2.06
Oxide
Supergene,
Primary
Primary
Primary
Primary
TAKD105
DD
TAKD106
TAKD107
TAKD108
TAKD109
TAKD110
TAKD111
TAKD111
9.5
1.9
11.5
Primary
Primary
Primary
19
Hole ID
Type
From (m)
To (m)
TAKD111
TAKD112
TAKD113
TAKD114
TAKD115
TAKD116
TAKD117
TAKD118
TAKD118
TAKD119
DD
DD
DD
236.4
98.55
124.0
238.5
99.55
134.0
DD
DD
DD
DD
DD
DD
150.0
116.0
171.0
145.6
159.55
176.5
158.2
120.4
174.0
154.8
169.1
185.6
Interval1
Cu (%)2
Au (g/t)
(m)
2.1
3.91
2.42
1.0
0.92
0.65
10.0
2.03
0.83
No significant assay result
8.2
0.61
1.80
4.4
0.58
0.15
3.0
0.82
0.11
9.2
3.76
0.82
9.55
2.43
1.31
9.1
4.81
1.31
Ag (g/t)
Cu Type
22.1
0.5
8.9
Primary
Primary
Primary
7.1
1.4
1.8
6.3
5.3
15.7
Primary
Primary
Primary
Primary
Primary
Primary
1 Drill hole true width lengths are between 60% to 85% of reported interval lengths.
2 Assay intervals have been reported at a 0.5% Cu cut-off grade with a maximum internal
dilution of 3.0 m.
APPENDIX C: Summary of drill hole collar and survey details for holes completed
during the quarter as part of the Western Vein Field near-mine exploration program
Hole ID
Easting1
(m)
Northing1
(m)
RL (m)
Total Depth
(m)
Azimuth2
Dip
Comments
KEU017
13.8
5501.7
1650.2
539.8
277.0
-48.0
Complete
KEU018
14.0
5502.7
1650.4
495.0
292.5
-50.5
Complete
KEU019
14.1
5502.8
1650.2
494.8
309.9
-55.5
Complete
KKU722
300.5
5795.0
1560.8
51.2
302.5
-19.5
Abandoned
KKU722A
300.5
5794.9
1560.5
219.0
302.4
-19.5
Complete
KKU723
300.8
5795.3
1560.1
276.0
313.4
-36.3
Complete
KKU724
300.3
5794.0
1560.3
275.9
282.7
-30.3
Complete
KKU725
506.5
6003.8
1639.6
422.1
249.5
-38.1
Complete
KLU288
-394.9
5377.9
1626.5
261.0
336.1
-46.9
Complete
KLU289
-356.8
5352.2
1630.9
293.9
4.9
-49.5
Complete
KLU290
-357.7
5351.8
1630.7
130.7
303.7
-30.4
Abandoned
KLU290A
-358.8
5351.3
1630.6
192.7
303.6
-30.4
Abandoned
KLU291
-469.9
5276.3
1529.5
178.8
318.7
-37.3
Abandoned
KLU292
-469.2
5276.7
1529.1
362.8
334.6
-56.2
Complete
KLU293
-460.9
5283.6
1528.5
370.4
18.9
-57.1
Complete
KLU294
-164.3
5412.4
1609.9
449.8
290.2
-58.6
Complete
KLU295
-164
5412.2
1610.2
359.9
310.0
-55.4
Complete
STU166
666.6
6380.6
1672.3
421.8
230.0
-37.3
Complete
STU167
667
6383.1
1672.2
251.5
277.5
-50.4
Complete
STU168
667.2
6383.7
1672.3
251.5
325.3
-44.9
Complete
1 Easting and northing coordinates are reported in Klondyke Local grid for Western Vein Field.
2 All down hole surveys are reported in Klondyke local grid for Western Vein Field drill holes.
20
APPENDIX D: Summary of significant gold intercepts returned during the quarter from
the Western Vein Field near-mine exploration drill program
Hole ID
From
(m)
To (m)
Interval
(m)
Est. true
Width
(m)
Domain
Au g/t 1
Ag g/t1
Comment
KEU017
453.4
454.0
0.6
0.4
AP
1.5
N/A
Apollo target
KEU018
280.0
281.0
1.0
0.7
KE
1.3
13
Kenneth
KEU018
390.4
391.4
1.0
0.7
AP
1.5
1
Apollo target
STU167
120.0
122.5
2.5
1.5
CW
2.9
2
Coro West target
1 Reported significant intervals are based on a minimum width of 0.4m, minimum Au grade
1g/t Au and a maximum of 1m of below cut-off material (<1g/t Au).
APPENDIX E: Summary of significant gold intercepts returned during the quarter from
the Heather Bore exploration drill program
Hole ID
From (m)
To (m)
Interval (m)
Au g/t 1
24HBDD001
193.0
194.0
1.0
0.66
24HBDD001
207.0
210.0
3.0
0.65
24HBDD001
231.9
232.38
0.48
0.55
24HBDD001
252.0
252.31
0.31
0.12
24HBDD002
167.0
168.0
1.0
0.89
24HBDD002
212.0
213.0
1.0
0.11
24HBDD002
246.5
247.21
0.71
0.16
24HBDD002
254.0
255.0
1.0
0.44
24HBDD002
265.9
268.0
2.1
0.14
24HBDD002
283.0
284.0
1.0
0.11
24HBDD002
335.0
336.0
1.0
0.13
24HBDD002
357.0
358.0
1.0
0.26
24HBDD002
361