CONSTELLATION PROJECT UPDATE
Released
Released
Announcement PDF
22 JANUARY 2025
ASX/MEDIA RELEASE
CONSTELLATION PROJECT UPDATE
• 70-hole resource definition drill program completed
• Further high-grade copper intercepts returned, including:
o TAKD133
3.40m @ 15.20% Cu, 3.83g/t Au, 45.5g/t Ag1
o TAKD126
7.65m @ 5.46% Cu, 1.03g/t Au and 13.5g/t Ag1
o TAKD127
2.50m @ 5.02% Cu, 0.84g/t Au and 11.0g/t Ag1
o TAKD132
27.90m @ 4.04% Cu, 0.87g/t Au, 8.0g/t Ag 1
• Updated Mineral Resource Estimate to be delivered this quarter
targeting an upgrade of 2 – 3Mt of material to Indicated Resource
to support a detailed mining study
• Constellation Mine EIS and permitting process on track to be
completed in Q4 FY25
Established Australian copper-gold producer and explorer, Aeris Resources Limited
(ASX: AIS) (Aeris or the Company) is pleased to provide an update on activities at
the Constellation deposit, located within the Company’s 100% owned Tritton
tenement package in New South Wales.
Aeris’ Executive Chairman, Andre Labuschagne, said “We are excited with the
progress at Constellation. The diamond drill program continues to deliver high-grade
copper intercepts supporting the targeted Mineral Resource upgrade within the
upper portion of the deposit. The site team have done an excellent job delivering
the drill program on time and within budget. Along with strong progress on the EIS
and mine permitting, we remain on track to release an updated Mineral Resource
Estimate in Q3 FY25, which will support a detailed mining study and maiden Ore
Reserve Estimate.”
1 Drill hole true width lengths are between 60% to 85% of reported interval lengths.
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane QLD 4000 Australia
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
Diamond Drill Program – Technical Discussion
The resource definition drill program at the Constellation deposit has been
completed. The drill program was focused on achieving two key objectives:
•
Targeting conversion of 2Mt – 3Mt Inferred Mineral Resource from the previous
Mineral Resource Estimate 2 to an Indicated Mineral Resource within the upper
250m of the deposit 3 (nominal –150mRL); and
•
Testing the geometry and continuity of the interpreted sub-vertical
mineralised zone along the northern margin of the deposit referred to as the
stand-up zone.
A total of seventy (70) drill holes were drilled in the program, which commenced in
May 2024.
Since the last update on the program 4 , a further 34 drill holes have been completed
– 18 holes into the main zone, 13 holes into the stand-up zone (see figures 1 and 2
respectively), and three holes for collection of samples for metallurgical testing.
Assay results have been received from twenty-three (23) drill holes since the last
update. High-grade copper intersections returned include:
•
TAKD122
20.85m @ 3.50% Cu, 0.96g/t Au and 7.8g/t Ag (from 196.15m) 5
•
TAKD126
7.65m @ 5.46% Cu, 1.03g/t Au, 13.5g/t Ag (from 166.2m)5
•
TAKD127
2.50m @ 5.02% Cu, 0.84g/t Au, 11.0g/t Ag (from 218.6m)5
•
TAKD132
27.90m @ 4.04% Cu, 0.87g/t Au, 8.0g/t Ag (from 256.1m)5
•
TAKD133
3.40m @ 15.20% Cu, 3.83g/t Au, 45.5g/t Ag (from 324.1m)5
•
TAKD143
7.35m @ 3.10% Cu, 0.81g/t Au, 7.5g/t Ag (from 342.75m)5
A full list of significant intersections is summarised in Appendix A.
Drill results from the 2024-25 drill program align with expectations, with sulphide
intersections correlating well with the modelled copper lodes used for the previous
Mineral Resource Estimate 6 within both the main zone and stand-up zone. Drilling
has confirmed the presence of the stand-up zone mineralisation, which will be
included in the revised geological model and mine plan.
The higher-grade copper intersections reported above (nominally >5% Cu) are
commonly associated with structurally remobilised zones of mineralisation, which is
2 Refer to ASX Announcement “Constellation Mineral Resource Update” dated 18 th August 2022.
3 Excludes the oxide copper Mineral Resource, which is reported at an Indicated classification.
4 Refer to ASX Announcement “Quarterly Activities Report – Sept 2024” dated 30 th October 2024.
5 Drill hole true width lengths
are between 60% to 85% of the reported interval lengths.6 Refer to ASX Announcement
“Constellation Mineral Resource Update” dated 18 th August 2022.
6 Refer to ASX Announcement “Constellation Mineral Resource Update” dated 18 th August 2022.
2|P a ge
characteristic of this deposit style. Although these zones exhibit high copper grades,
they tend to occur over a relatively small area.
EIS and Mine Permitting Update
Aeris lodged the State Significant Development application with the NSW
government in August 2024, accompanied by an Environmental Impact Statement
(EIS). The EIS was publicly exhibited between 15 August 2024 and 11 September
2024. A Response to Submissions Report is currently being prepared to address the
matters raised in the submissions received from NSW government agencies, local
councils, and the community. Further cultural heritage assessments are planned for
Q3 FY25 prior to the assessment and determination of the EIS anticipated in Q4 FY25.
An Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act)
Referral was submitted in September 2024. A decision on the Referral is expected
after submission of additional information in Q3 FY25.
The Mine Lease Application for Constellation Mine will occur in parallel and will be
supported by the final approval of the EIS anticipated in Q4 FY25.
Next Steps
With the drill program now complete, the focus will shift to completing an updated
Mineral Resource Estimate, to be completed in Q3 FY25. The updated Mineral
Resource plus results from the current metallurgical test work program will be used
to complete the mine design, schedule and maiden Ore Reserve Estimate to
support the final investment decision by the Aeris Board on the development of the
project.
3|P a ge
Figure 1 – Long section view looking west showing drill hole pierce points through the Main Zone
sulphide body at the Constellation deposit.
4|P a ge
Figure 2 – Long section view looking north showing drill hole pierce points through the Stand-Up Zone sulphide body at the Constellation deposit.
ABN 30 147
5|P a ge
131 977
ABN 30 147 131 | Page1 977
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper dominant portfolio
comprises three operating assets, a mine on care and maintenance, a long-life development project
and a highly prospective exploration portfolio. Aeris has a strong pipeline of organic growth projects
and an aggressive exploration program and continues to investigate strategic merger and
acquisition opportunities. The Company’s experienced board and management team bring
significant corporate and technical expertise to a lean operating model. Aeris is committed to
building strong partnerships with its key community, investment and workforce stakeholders.
Previous Information
The information in this announcement that relates to previously reported exploration results for the
Constellation deposit is extracted from ASX announcements all of which are referenced in the
footnotes and available on the company’s website at www.aerisresources.com.au. The company
confirms that it is not aware of any new information or data that materially affects the exploration
results included in the relevant original market announcements. The Company confirms that the form
and context in which the Competent Person's findings are presented have not been materially
modified from the relevant original market announcements.
ABN 30 147
6|P a ge
131 977
ABN 30 147 131 | Page1 977
Competent Persons Statement – Exploration Results
The information in this announcement that relates to Exploration Results is based on and fairly reflects the
information and supported documentation prepared by Mr Chris Raymond. Mr Raymond confirms that he is the
Competent Person for all Exploration Results at the Tritton Operation, and he has read and understood the
requirements of the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves (JORC Code, 2012 Edition). Mr Raymond is a Competent Person as defined by the JORC
Code, 2012 Edition, having relevant experience to the style of mineralisation and type of deposit described in
the Report and to the activity for which he is accepting responsibility. Mr Raymond is a Member of the Australian
Institute of Geoscientists (MAIG No. 6045). Mr Raymond has reviewed the Report to which this Consent
Statement applies and consents to the inclusion in the Report of the matters based on his information in the form
and context in which it appears. Mr Raymond is a full-time employee of Aeris Resources Limited.
APPENDIX A:
Table 1 – Summary of drill hole collar and survey details for drill holes referenced in the body
of this report as part of the Constellation resource definition drill program
Easting1
(m)
Northing1 RL
(m)
(m)
6560919
164
TAKD137
TAKD138
499049
498825
6561093
6560901
TAKD139
498932
TAKD140
TAKD141
Hole ID
TAKD136
498727
Total Depth
Azimuth 2 Dip
(m)
249.5
309.0
-70.0
161
164
373.4
324.4
270.0
309.0
-65.0
-69.5
6561041
161
330.0
310.5
-69.5
498872
499002
6560917
6561075
163
161
344.2
351.0
310.0
308.5
-70.0
-69.0
TAKD142
498935
6560929
162
363.2
309.5
-70.0
TAKD143
TAKD144
499026
498969
6561062
6560931
161
162
402.8
411.6
270.0
308.5
-70.0
-70.0
TAKD145
498907
6561129
161
296.1
301.5
-70.5
TAKD146
TAKD147
498942
498553
6561075
6561207
161
163
336.4
148.8
310.5
337.0
-70.5
-54.0
TAKD148
498525
6561247
163
144.2
280.5
-61.0
TAKD149
TAKD150
498553
498487
6561176
6561236
163
163
197.9
125.7
6.5
284.0
-60.0
-61.5
TAKD151
498439
6561221
163
123.2
269.5
-61.5
TAKD152
498586
6561188
163
170.6
352.0
-55.5
TAKD153
TAKD154
498568
498612
6561123
6561209
163
163
264.7
150.1
354.0
1.0
-55.0
-60.5
TAKD155
498613
6561097
163
294.7
0.5
-55.5
TAKD156
TAKD157
498608
498632
6561133
6561101
162
163
224.1
164.1
353.5
310.0
-55.5
-70.5
TAKD158
498639
6561123
162
257.3
0.0
-55.5
TAKD159
TAKD160
498420
498510
6561185
6561003
163
165
70.0
160.5
261.5
279.0
-69.0
-70.5
TAKD161
498500
6561039
165
153.6
278.0
-69.5
TAKD162
498436
6561044
165
121.0
278.0
-70.0
Comments
7|P a ge
Easting1
(m)
Northing1 RL
(m)
(m)
6561268
163
TAKD164
498598
6561274
TAKD165
TAKD166
498803
498589
TAKD167
Hole ID
TAKD163
498425
Total Depth
Azimuth 2 Dip
(m)
Comments
45.3
349.5
-90.0
163
59.8
258.0
-70.0
6561098
6561052
162
164
299.7
76.4
351.5
310.5
-55.5
-70.5
Hole abandoned
498595
6561045
164
165.4
311.5
-71.0
Redrill of TAKD166
TAKD168
498856
6561101
162
165.0
349.0
-53.0
TAKD169
498563
6561031
164
245.3
278.5
-70.0
TAKD170
498945
6561042
161
329.1
278.0
-70.0
Easting and northing coordinates are reported in GDA2020 Zone 55.
Azimuth is recorded as a magnetic azimuth reading.
1
2
Table 2 – Summary of significant copper intersections returned during the quarter from the
Constellation resource definition drill programs.
Hole ID
Type
TAKD120
No significant assay result
TAKD121
DD
160.0
163.6
3.6
1.42
0.28
3.37
Primary
DD
196.15
217.0
20.85
3.50
0.96
7.77
Primary
DD
222.0
225.0
3.0
3.60
1.32
8.53
Primary
TAKD123
DD
375.85
382.0
6.15
3.49
0.63
6.32
Primary
TAKD124
DD
199.0
210.0
11.0
2.66
0.48
5.71
Primary
DD
152.0
163.0
11.0
1.92
0.53
3.57
Primary
DD
168.0
174.75
6.75
2.43
0.56
4.85
Primary
DD
186.0
188.0
2.0
1.96
0.40
3.00
Primary
TAKD126
DD
166.2
173.85
7.65
5.46
1.03
13.48
Primary
TAKD127
DD
218.6
221.1
2.5
5.02
0.84
11.04
Primary
DD
190.0
191.0
1.0
0.97
0.19
1.00
Primary
DD
195.0
211.45
16.45
1.31
0.54
4.57
Primary
DD
220.0
224.0
4.0
0.52
0.47
1.63
Primary
DD
220.65
234.8
14.15
2.58
0.73
4.55
Primary
DD
238.0
240.6
2.6
1.52
0.11
2.38
Primary
DD
252.7
259.0
6.3
1.70
0.59
2.41
Primary
DD
266.1
267.0
0.9
1.04
0.39
1.00
Primary
DD
271.0
285.55
14.55
2.55
0.54
4.84
Primary
DD
284.6
293.6
9.0
2.30
0.47
6.93
Primary
TAKD122
TAKD125
TAKD128
TAKD129
TAKD130
TAKD131
From
(m)
To (m)
Interval1 Cu (%)2 Au (g/t) Ag (g/t) Cu Type
(m)
8|P a ge
Hole ID
Type
From
(m)
To (m)
Interval1 Cu (%)2 Au (g/t) Ag (g/t) Cu Type
(m)
TAKD132
DD
256.1
284.0
27.9
4.04
0.87
7.96
Primary
TAKD133
DD
324.1
327.5
3.4
15.20
3.83
45.53
Primary
TAKD134
DD
162.45
165.2
2.75
1.44
1.48
2.64
Primary
TAKD135
No significant assay result
TAKD136
DD
191.0
199.4
8.4
1.45
3.89
27.03
Primary
DD
325.8
337.2
11.4
2.04
0.73
5.19
Primary
DD
340.8
345.9
5.1
1.55
0.31
3.82
Primary
DD
266.9
267.4
0.5
1.83
0.39
11.05
Primary
DD
291.25
298.5
7.25
1.50
0.34
3.18
Primary
DD
303.6
304.2
0.6
7.63
1.57
21.00
Primary
DD
290.0
292.7
2.7
1.14
1.72
6.76
Primary
DD
306.0
307.0
1.0
0.53
0.10
0.50
Primary
DD
311.4
320.5
9.1
2.05
0.49
3.44
Primary
DD
342.75
350.1
7.35
3.10
0.81
7.54
Primary
DD
356.0
357.0
1.0
0.76
0.07
2.00
Primary
DD
360.8
363.0
2.2
0.58
0.17
1.00
Primary
TAKD137
TAKD138
TAKD139
TAKD140
TAKD141
TAKD143
Drill hole true width lengths are between 60% to 85% of reported interval lengths.
Assay intervals have been reported at a 0.5% Cu cut-off grade with a maximum internal dilution of
3.0m.
1
2
9|P a ge
APPENDIX B:
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Constellation drill program
Criteria
Commentary
Sampling
techniques
Drilling
techniques
1. All samples are collected from diamond drill core.
2. Samples are taken across intervals with visible sulphides. Samples
are collected between 0.25m to 1.4m in length. Sample lengths
take into consideration geology.
1. Drilling results reported are via diamond drill core (HQ diameter).
Drill sample
recovery
1. Core recoveries are recorded by the drillers on site at the drill rig.
Core recoveries are checked and verified by an Aeris Resources
field technician and/or geologist.
2. Diamond drill core is pieced together as part of the core orientation
process. During this process depth intervals are recorded on the
core and checked against downhole depths recorded by drillers
on core blocks within the core trays.
3. Historically core recoveries are very high within and outside zones
of mineralisation across each of the known deposits. All drill holes
completed at the Constellation deposit report good core
recoveries through the primary sulphide mineralised horizon.
Logging
1. All diamond drill core is logged by an Aeris Resources geologist or
a fully trained contract geologist under Aeris supervision. Diamond
core is logged to an appropriate level of detail to increase the level
of geological knowledge and increase the geological
understanding at the Constellation deposit.
2. All diamond core is geologically logged, recording lithology,
presence/concentration of sulphides, alteration, and structure.
3. All geological data recorded during the core logging process is
stored in Aeris Resources’ AcQuire database.
4. All diamond drill core is photographed and digitally stored on the
Company network.
5. Core is stored in core trays and labelled with downhole meterage
intervals and drill hole ID.
Sub-sampling
techniques and
sample
preparation
1. All samples are collected in a consistent manner. Samples are cut
via an automatic core saw, and half core samples are collected
between sample lengths from 0.25m and a maximum length of 1.4
metres.
2. No field duplicates have been collected.
3. The sample size is considered appropriate for the style of
mineralisation and grain size of the material being sampled.
Quality of assay
data and
laboratory tests
1. All samples have been sent to ALS Laboratory Services at their
Orange facility.
2. Samples within the main zone undergo multi-element analysis by a
3-stage aqua regia digestion with an ICP-AES finish (suitable for Cu,
0.01-50%) – ALS method ME-OG46.
3. Samples within the stand-up zone are analysed by a 4-stage ‘neartotal’ digestion with an ICP-MS finish (suitable for Cu grades
10 | P a g e
Criteria
Commentary
between 0.02 – 1% Cu) – ALS method ME-MS61. If a sample records
a Cu grade above 1% a second sample will be re-submitted for
another 4 -stage digest with ICP finish using ALS method
Cu_CuOG62 (0.001 – 50% Cu).
4. All samples are analysed for Au utilising a 50g fire assay fusion with
an AAS finish (suitable for Au grades between 0.001-10ppm) – ALS
method Au-AA22. If a sample records an Au grade above 1ppm a
second sample will be re-submitted for another 50g fire assay
charge using ALS method AuAA26 (0.01-100ppm).
5. QA/QC protocols include the use of blanks, duplicates, and
standards (commercial certified reference materials used). The
frequency rate for each QA/QC sample type is 5%.
Verification of
sampling and
assaying
Location of data
points
1. Logged drill holes are reviewed by the logging geologist and a
senior geologist. All geological data is logged directly into Aeris
Resources’ logging computers following the standard Aeris
Resources geology codes. Data is transferred to the AcQuire
database and validated on entry.
2. Upon receipt of the assay data no adjustments are made to the
assay values.
1. Drill hole collar locations have been collected by an Aeris mine
surveyor utilising a RTK Leica GPS GS16, with an accuracy of
approximately +/- 8mm horizontally and +/-15mm vertically.
2. Mine site surveyors collect drill hole locations in Map Grid of
Australia 2020 zone 55 (MGA2020).
3. The quality and accuracy of the drill collars are suitable for
exploration results.
4. Downhole surveys are completed by the drill contractor. All surveys
were reported using an Axis Mining Technology gyroscopic tool,
measuring azimuth and dip orientations every 30m, or shorter
intervals if required.
Data spacing
and distribution
1. Drilling completed at the Constellation deposit is initially designed
on a nominal 80m x 160m drill pattern.
2. A nominal 80m x 80m drill spacing is considered sufficient to
understand the spatial distribution of copper mineralisation for
eventual conversion to an Inferred Mineral Resource.
3. A nominal 40m x 40m drill spacing is considered sufficient for
eventual conversion to an indicated Mineral Resource.
Orientation of
data in relation to
geological
structure
1. All drill holes are designed to intersect the target at, or near right
angles.
2. A majority of drill holes completed have not deviated significantly
from the planned drill hole path.
3. Drill hole intersections through the target zone(s) are not biased.
Sample security
1. Drill holes sampled at the Constellation deposit are not sampled in
their entirety.
2. Sample security protocols follow current procedures which include:
samples are secured within calico bags and transported to the
laboratory in Orange, NSW via a courier service or with Company
personnel.
1. Data is validated when uploading into the Company’s AcQuire
database.
Audits or reviews
11 | P a g e
Criteria
Commentary
2. No formal audit has been conducted.
Section 2 Reporting of Exploration Results
Constellation drill program
Criteria
Commentary
Mineral tenement
and land tenure
status
1. The Tritton Regional Tenement package is located approximately
45km northwest of the township of Nyngan in central western New
South Wales.
2. The Tritton Regional Tenement package consists of 8 Exploration
Licences and 4 Mining Leases. The mineral and mining rights are
owned 100% by the Company’s subsidiary, Tritton Resources Pty
Ltd.
3. The Constellation deposit is located within EL6126, EL8084 and
EL8987. All three exploration licences are in good standing, and no
known impediments exist.
Exploration done
by other parties
1. There has not been a significant amount of exploration completed
over and around the Constellation deposit. Burdett Exploration NL
held the ground between May 1971 – May 1972 however
conducted no work over the area. Nord Pacific Limited (Nord) held
the ground under EL3930 between 1991 – 2002 and identified
several GeoTEM EM anomalies further north beyond the
Constellation deposit. Nord completed two lines of surface
geochemistry sampling over each GeoTEM EM anomaly. No further
work was completed following the geochemical sampling
program. The Geochem results did not warrant any further work. No
on-ground exploration has been completed over the area since
2002.
Geology
1. Regionally, mineralisation is hosted within early to mid-Ordovician
turbidite sediments, forming part of the Girilambone group.
Mineralisation is hosted within greenschist facies, ductile deformed
pelitic to psammitic sediments, and sparse zones of courser
sandstones.
2. Sulphide mineralisation within the Tritton tenement package is
dominated by banded to stringer pyrite – chalcopyrite, with a
massive pyrite-chalcopyrite unit along the hanging wall
contact. Alteration assemblages adjacent to mineralisation is
characterised by an ankerite footwall and silica sericite hanging
wall.
1. All relevant information pertaining to each drill hole has been
provided.
Drill hole
information
Data aggregation
methods
1. N/A
Relationship
between
mineralisation
1. Drill holes are designed to intersect the target horizon across strike
at or near right angles.
12 | P a g e
Criteria
Commentary
widths and
intercept lengths
Diagrams
1. Relevant diagrams are included in the body of the report.
Balanced
reporting
1. The reporting is considered balanced and all material information
associated with the electromagnetic surveys has been disclosed.
Other substantive
exploration data
1. There is no other relevant substantive exploration data to report.
Further work
1. With the completion of the drill program work will now shift to an
updated geological interpretation to inform the updated Mineral
Resource Estimate that is targeted for completion in FY25 Q3.
13 | P a g e
Share your feedback
Discover