INVESTOR PRESENTATION - NOOSA MINING INVESTOR CONFERENCE
Released
Released
Announcement PDF
Noosa Mining conference
Presentation
July 2024
Presented by: Andre Labuschagne
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”). By attending an investor presentation or
briefing, or accepting, accessing or reviewing this presentation, you
acknowledge and agree to the terms set out below.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris with the Australian Securities Exchange (“ASX”) in
connection with its continuous disclosure obligations. This presentation
does not purport to contain all of the information that an investor should
consider when making an investment decision nor does it contain all of
the information which would be required in a product disclosure
statement or prospectus prepared in accordance with the requirements
of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, Aeris has no obligation to update the information
contained in this presentation. An investment in securities is subject to
known and unknown risks, some of which are beyond the control of
Aeris. Investors should consult with their own legal, tax, business and/or
financial advisors in connection with any acquisition of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing nonIFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris believes the non-IFRS financial information and non-GAAP
financial measures provide useful information to users in measuring the
financial performance and condition of Aeris.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris and its officers. This
includes statements about market and industry trends, which are based
on interpretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “estimate”, “intend”,
“believe”, “guidance”, “should”, “could”, “may”, “will”, “predict”, “plan”
and other similar expressions.
Forward-looking statements are based on information available to Aeris
as at the date of this presentation and should not be relied upon as an
indication or guarantee of future performance. Except as required by
law or regulation (including the ASX Listing Rules), none of Aeris, its
representatives or advisers undertakes any obligation to provide any
additional or updated information whether as a result of a change in
expectations or assumptions, new information, future events or results or
otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
recent world events such as the COVID-19 pandemic and international
hostilities and associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which Aeris has no obligation to do or to procure) or are offered or sold
pursuant to an exemption from, or in a transaction not subject to, the
registration requirements of the US Securities Act and any applicable
2
securities laws of any state or other jurisdiction of the United States.
Aeris Resources
Australian mid-tier, base and precious metals
producer
Weighted to copper FY24 production
29
Cu
3 producing operations
30
Zn
Copper
Zinc
27.1 kt
3.1kt
79
Au
47
Ag
Gold
Silver
55.3koz
240.4koz
3 development projects
All sites prospective for further discoveries
Substantial copper metal inventory
Excellent platform for growth
3
Corporate overview
Board of Directors
AIS SHARE PRICE
0.4
0.35
0.3
0.25
0.2
Andre
Labuschagne
Colin
Moorhead
Michele
Muscillo
0.15
Executive Chairman
Non-Executive
Director
Non-Executive
Director
0.1
Robert Millner
Non-Executive
Director
Senior Executives
0.05
0
17-Jul-23 17-Aug-23 17-Sep-23 17-Oct-23 17-Nov-23 17-Dec-23 17-Jan-24 17-Feb-24 17-Mar-24 17-Apr-24 17-May-24 17-Jun-24
CAPITALISATION
Market capitalisation1
A$218 million
Cash2
A$25 million
Debt2
A$40 million
Enterprise value
A$233 million
Rob Brainsbury
CFO
Paul Harris
COO
Ian Sheppard
CTO
Larnie Roberts
GM HR
BROKER COVERAGE
MAJOR SHAREHOLDERS
1.
2.
As at 28 June 2024
As at 30 June 2024
Washington H. Soul Pattinson
31.40%
Tudor Court
8.47%
4
Mining Portfolio: large Mineral Resource inventory
Production Assets
Asset
Tritton
Cracow
Development Projects
North Queensland
Jaguar
Stockman
~820,000t copper metal, ~1,000,000t zinc metal, ~1,400,000oz gold 1
Ownership
100%
100%
100%
100%
100%
Primary
commodity
Copper / Gold
Gold
Copper / Gold
Copper / Zinc
Copper / Zinc
Mineral
Resource1
342kt Cu @1.5% Cu
232koz Au @ 0.3g/t Au
519koz Au @ 3.4g/t Au
65kt Cu @ 2.1% Cu
21koz Au @ 0.2g/t Au
100kt Cu @ 1.3% Cu
442kt Zn @ 5.6% Zn
315kt Cu @ 2.0% Cu
623kt Zn @ 4.0% Zn
Plant capacity
1.80 Mtpa
0.57 Mtpa
N/A
0.60 Mtpa
0.80 – 1.00 Mtpa
design
FY24 production
guidance
Copper: 19 – 24kt
Gold: 6 – 7koz
Silver: 148 – 185koz
Gold: 38 – 48koz
Copper: 8 – 10Kt
Gold: 4 – 5koz
-
-
Tritton, Budgerygar, Avoca
Tank, Constellation
Western Vein Field, Golden
Plateau
Mt Colin, Barbara
(development)
Bentley, Triumph, Jaguar,
Teutonic Bore
Currawong, Wilga
Constellation resource
extension drilling and
permitting
Resource extension drilling at
Western Vein Field
and Golden Plateau
Barbara Feasibility study
Dewatering,
exploration drilling, re-start
optimisation studies
Feasibility study,
final permitting and license
approvals
Key
deposits
Next 12 months
focus / catalysts
1. Refer to ASX announcements "Group Mineral Resource and Ore Reserve Statement" dated 17 June 2024
5
Production assets
Tritton
New South Wales
Tritton
Our cornerstone asset
100% owned, high-grade underground copper mines located in
central NSW
430kt copper produced since operations began in 2005
2,330km prospective tenement package
Mineral Resource1 of 22.5Mt at 1.5% Cu, 0.3g/t Au
Ore Reserve1 of 2.8Mt at 1.5% Cu, 0.6g/t Au
Targeted production of 19 – 24 kt copper in FY24 (actual 19.7kt)
Improving production with ramp up of higher grade Avoca tank
and Buderygar deposits
1. Refer to ASX announcements "Group Mineral Resource and Ore Reserve Statement" dated 17 June 2024.
7
Tritton
A long life copper operation now producing from multiple deposits
Production
Tritton
• Mature mine at depth,
• Targeting high-grade extensions
Murrawombie
• Production declining
• EM plates identified 250m below
current MRE
Development Ready
Murrawombie Pit
• Cut back of old pit,
• Fully permitted for development
• Facilitates rehab of old leach pads
Study Phase
Constellation
• Potential future baseload mill feed
• 6.7Mt @ 1.9% Cu resource1
• Mining studies underway
Exploration
Kurrajong
• High grade deposit
• Maiden MRE in 2023
• Still open at depth
• Remains open at depth
Budgery
• Potential future open pit
• Target for further exploration
Avoca Tank
• High-grade mine
• Exploration upside
Budgerygar
• Near surface, adjacent to Tritton
• Reserve grading 1.6% Cu1
8
1. Refer to ASX announcements "Group Mineral Resource and Ore Reserve Statement" dated 17 June 2024.
Murrawombie Pit
Cut back on old pit also provides major rehab saving
Stripping expected to commence in Q2 FY25 with contract miner
First ore to mill late FY25
Strip ratio 9.6
Mill feed of ~1.2Mt ore @ 1.2%Cu
Waste from cut back used to cap old heap leach pads, saving c.$8M
rehabilitation costs
9
Constellation deposit
Potential future baseload feed for Tritton mill
Located 45km northeast of the Tritton plant
Mineral Resource1 of 6.7Mt at 1.9% Cu and 0.6g/t Au
Drill program commenced in May with two key objectives:
1. Target conversion of 2Mt – 3Mt of Inferred Mineral Resource to an
Indicated category within the upper 250m of the deposit
2. Test the Stand-up-zone mineralisation along the northern margin
Updated Mineral Resource Q3 FY25
Drill program targeting Mineral
Resource upgrade
Drill program testing
Stand-up-zone
Mining study on underground, open pit and heap leach to be
completed following resource update
Advancing EIS and permitting activities for a future mining operation
1.
Refer to ASX release “Group Mineral Resource and Ore Reserve Statement” 17 June 2024
10
Cracow
Queensland
Cracow
Mature, high-grade gold mine
Low-sulphidation epithermal underground gold mine located 500km
northwest of Brisbane
Conventional crush and grind CIP processing plant
Produced +1.5Moz gold since first production in 2004
FY24 production guidance of 38 – 48koz Au (Actual 46)
Strong history of reserve replacement in the Western Vein Field with
current exploration on 5 priority high-grade targets
91
89
90
81
504
522
511
454
FY16
FY17
FY18
FY19
Total production
(Au koz)
93
88
74
345
390
54
455
48
38 - 48
526
FY24
FY23
FY22
FY21
FY20
FY15
707
Mineral Resource
(Au koz)
Tailings dam lift completed providing 3 year production runway
History of production and resource replacement
12
Near mine exploration
Defining new mineralised structures
Two new near-mine structures discovered (Apollo / Coronation West)
Apollo traced 180m (strike) x 60m (down-plunge)
•
•
•
•
KLU213 3.7m1 @ 11.2g/t Au2
KLU279 0.8m1 @ 4.1g/t Au3
KLU281 2.7m1 @ 2.4g/t Au3
KLU282 1.6m1 @ 5.8g/t Au3
Coronation West
• Emerging structure based on limited data
• IMU148 1.7m1 @ 2.8g/t Au2
Further drilling planned at both structures in FY25
Western Frontier
• Potential new structural corridor based on interpretation of
geophysical datasets
1.
2.
3.
True thickness.
Refer to January 2024 Quarterly Report.
Refer to March 2024 Quarterly Report.
13
Southern Vein Field
Could be the game-changer for Cracow
Approx. 2.5Moz gold produced to date from the WVF and
850koz gold from Golden Plateau
Structures with the potential to host WVF style ore shoots
interpreted under cover in the Southern Vein Field
Southern Vein Field has had very limited exploration to date
Preparing foundation geophysical data sets to identify drill
targets
Future drill program to target for high-grade ore shoots
analogous to key WVF shoots, like Crown and Royal
14
North Queensland
Queensland
Mt Colin
Harvesting cash to fund group capital developments
Mine production ahead of plan but delays in toll processing
result in significant buildup of ore stockpiles
Increased ore recovery from cave zone and pillars means
Mt Colin mine life extended into October 2024
Toll processing to continue into Q2 FY25
16
Development projects
Barbara project
Potential follow-on operation to Mt Colin
Updated resource of 2.2Mt at 2.0% Cu and 0.2g/t Au1 completed
Resource remains open down-plunge
Feasibility studies underway on a potential underground operation
Toll treatment options with regional mills
Low capital development utilising infrastructure from Mt Colin
Situated on a mining lease; EIS update submitted
1.
Refer to ASX announcement “Barbara Mineral Resource Update” dated 28 June 2023
18
Jaguar
Brownfield copper/zinc restart opportunity
Mineral Resource1 8Mt @ 1.1% Cu, 5.6% Zn, 1.3g/t Au and
215g/t Ag across 4 deposits:
̶ Bentley
̶ Jaguar
̶ Triumph
̶ Teutonic Bore
Transitioned to care and maintenance in Q1 FY24
Restart study update due Q1 FY25
Tenement package highly prospective for base metals and
gold with numerous targets identified
1. See ASX announcements “Group Mineral Resource and Ore Reserve Statement” dated 17 June 2024
Source: IGO Limited
19
Jaguar gold exploration
Focus on five prospective areas
①
⑤
1. Heather Bore Shear – 12km structure including 2km
shallow gold anomaly along strike from Northern Star’s
Thunderbox operation
2. Aesop – Halloween Trend – 6km structural corridor with
some historical drilling & surface samples at +0.5g/t Au
②
⑤
3. Pterodactyl – South Possie Well – 10km orogenic
structure including a historical drill intersection of 35m at
1.0g/t Au
4. Southern Boundary – interpreted extension of the
orogenic structure between Pterodactyl and South
Possie Well
5. Granite Margin – structural complexity within and along
the margins of large granite bodies
③
⑤
5. Multi million ounce deposits to the north (Thunderbox)
and south (King of the Hills)
④
20
Stockman
Long life, Cu-Zn-Au-Ag project with all primary permits
Feasibility Study well advanced
12 year mine plan producing at up to 850ktpa1 from a single deposit
(Currawong)
Potential to extend mine life with other known deposits
Currawong mine plan
Leaching technology being investigated to improve recoveries
impacted by complex metallurgy – very positive initial results1
Potential to produce a high-grade Cu concentrate on the mine site
and a bulk Cu/Zn/Au/Ag concentrate for further treatment using the
Albion Process at an offsite location
Metallurgical test work, engineering design for Albion Process
underway with FS completion targeted in second half 2024
All key project consents in place for mining and onsite processing
1.
Refer to ASX announcement “Stockman Feasibility Study Update" dated 2 July 2024
21
Investment highlights
Company set for growth
Diversified production from 3 operations
Significant internal growth opportunities to lift
production and extend mine lives
All sites located in tier 1 mining jurisdiction
Leveraged to copper, critical to electrification
Strengthened balance sheet
22
Share your feedback
Discover