QUARTERLY ACTIVITIES REPORT - SEPT 2025
Released
Released
Announcement PDF
Aeris Resources Limited 1
Quarterly Activities Report
Quarterly Activities Report
For the period ended 30 September 2025
Highlights
Group copper equivalent production of 10.3kt1 for the quarter at AISC of A$4.64/lb
Cu eq
Cash and receivables at end of quarter of $46.4 million
Solid production from both Tritton and Cracow operations, in line with plan
Costs well managed within plan
$25 million growth capital invested in waste stripping at Murrawombie Pit with ore
to be delivered over H2 FY26
Encouraging exploration at Avoca Tank with mineralisation intersected 400m
down plunge of the current Mineral Resource
Grade model2 developed for the Golden Plateau deposit at Cracow to assist with
next phase of exploration
Unit
Jun 25
Qtr
Sep 25
Qtr
FY26
Guidance
Safety – LTIFR /mmhr 1.3 1.3
Copper produced kt 6.2 6.1 24 – 29
Gold produced koz 13.1 10.9 44 – 56
Silver produced koz 60.8 72.2 240 – 293
Cu eq production1 kt 10.9 10.3 40 – 49
Operating Costs
Total mine operations A$M 89.2 79.0 302 – 369
Corporate A$M 5.9 6.4 21 – 26
Care & maintenance A$M 3.1 2.6 6 – 7
Capital Costs
Sustaining A$M 17.3 16.6 57 – 70
Growth & projects A$M 13.6 31.6 65 – 80
Exploration A$M 2.9 3.4 18 – 23
AISC3 A$M 108.6 105.0
AISC
A$/lb
Cu eq
4.50 4.64
1 Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Q1 prices:
US$9,792/t Cu, US$3,454/oz Au, US$39/oz Ag. Aeris confirms that it is the Company’s opinion that all the
elements included in the metal equivalents calculation have a reasonable potential to be recovered and
sold.
2 Grade model developed for internal planning only. The grade model is not JORC 2012 compliant and
does not represent either a Mineral Resource or Ore Reserve.
3 AISC from Sep 2025 excludes care and maintenance costs
2
Group Safety, Environment and Community
Pleasingly, Aeris recorded another quarter with zero lost time injuries, with the Group
LTIFR remaining steady at 1.3.
There were no reportable environmental incidents during the quarter.
Figure 1: Group LTIFR1
1 Some changes to historic data following a reconciliation of working hours records
-
1
2
3
Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25
LTI LTIFR
3
Tritton Operations (NSW)
Key points for quarter:
Production of 6.1kt Cu at AISC of A$4.24/lb, consistent with the previous quarter
Murrawombie Pit Stage 1 ore processing complete and Stage 2 waste stripping
underway
$25 million growth capital invested in waste stripping at Murrawombie Pit with ore
to be delivered over H2 FY26
Avoca Tank mineralisation intersected 400m down plunge of the current Mineral
Resource
Production Summary Unit
Jun 25
Qtr
Sep 25
Qtr
FY26
Guidance
Ore Mined kt 455.8 284.7
Mined Grade % Cu 1.49 1.98
Ore Milled kt 382.1 358.3
Milled Grade % Cu 1.70 1.80
Recovery % Cu 95.6 95.0
Copper Produced kt 6.2 6.1 24 – 29
Gold Produced koz 2.0 2.0 8 – 10
Silver Produced koz 60.8 72.2 215 – 263
Cost Summary
Mining A$M 41.8 28.0
Processing A$M 7.7 8.6
Site G&A A$M 5.7 6.1
TC/RCs A$M 1.9 1.5
Product Handling A$M 5.3 5.3
Total mine operations A$M 62.4 49.5 207 – 253
By-Product Credit A$M (12.9) (14.8)
Royalties A$M 3.1 3.6
Corporate G&A A$M 0.5 0.5
Inventory Movements A$M (7.6) 4.0
Sustaining Capital1 A$M 12.4 14.3 39 – 48
All-In Sustaining Costs2
A$M 57.9 57.3
A$/lb 4.22 4.24
Growth Capital A$M 13.1 25.6 58 – 71
Exploration A$M 1.3 1.8 10 – 12
All-In Costs
A$M 72.3 84.7
A$/lb 5.27 6.27
1. Includes sustaining capital, capitalised mine development, rehabilitation and financing payments (principal
and interest) on leased assets
2. All-In Sustaining and All-In Costs are based on copper produced.
4
Operations
Tritton achieved production of 6.1kt Cu in the September quarter, in line with the
previous quarter. Underground production (predominantly from Avoca Tank and
Budgerygar) was largely to plan although grades were lower than plan due to a
change in mining sequence.
The processing plant continued to perform well in July/Aug, supplemented with
stockpiled ore from Murrawombie Pit. All Stage 1 ore from Murrawombie Pit has now
been processed. Avoca and Budgerygar underground ore will continue to feed the
mill whilst Stage 2 development activities is underway.
Stage 2 development commenced in the quarter, with a third excavator mobilised to
lift production rates. Stage 2 ore is expected to be delivered to the mill in Q3 FY26.
Figure 2: Waste stripping at Murrawombie Pit
At the Constellation project, technical work continued on open cut and underground
mine design, metallurgical test work on oxide and sulphide ore and finalisation of
infrastructure designs. Permitting activities also progressed as planned with the
relevant regulators and government bodies. Work is being finalised on the open pit
portion of the studies, which will result in an early Ore Reserve Estimate and the
development of initial site execution plans, while studies on the underground
component continue.
Construction of the next lift of the TSF also commenced during the quarter.
5
Costs
Costs at Tritton were in line with plan. Mining cost for September quarter was
significantly lower than the previous quarter as it reflected operating costs incurred at
both Avoca and Budgerygar underground operations. By comparison the prior period
also included Stage 1 open pit costs. All costs currently incurred in relation to
development activities of Stage 2 is capitalised until commercial production is
achieved.
Exploration
During the quarter, over 17,000 metres of underground diamond drilling was
completed, with a majority focused on grade control drilling at Avoca Tank and
Budgerygar.
Resource definition and exploration drilling was limited to a number of drill holes at
Avoca Tank focused on down-plunge extensions to the known mineralised corridor.
Two drill holes returned similar promising results intersecting sulphide mineralisation
between 250 and 400 metres down plunge from the base of the reported Mineral
Resource1 (refer to Figure 3).
A down-hole electromagnetic survey (DHEM) is planned for early Q2. DHEM will be
completed on two holes drilled below the current reported Mineral Resource to assist
with vectoring toward thicker sulphide mineralisation down-plunge.
Significant Intercepts:
ATEL083 337.0 - 359.8m @ 1.41% Cu (approx. 8.0m true width)
ATEL092 375.0 - 385.0m @ 1.94% Cu (approx. 7.4m true width)
ATEL083 604.8 - 608.2m @ 3.32% Cu (approx. 1.8m true width)
In the upcoming quarter, a significantly greater portion of exploration and resource
definition drilling will be completed at Budgerygar and Avoca Tank with the
establishment of drill drives to facilitate deeper drilling down-plunge. A fourth drill rig is
planned to commence drilling in December.
1 Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22nd July 2025.
6
Figure 3: Long section looking east at the Avoca Tank deposit. Resource definition drill holes
targeting down plunge extensions to mineralisation below the known Mineral Resource
(green and blue solid wireframes) are shown
7
Cracow Operations (QLD)
Key points for quarter:
Gold production 8.9koz in line with plan at AISC of A$3,692/oz
Costs well managed and on plan
Review of remnant mineralisation in the Western Vein Field has brought an
additional 20koz Au into the mine plan
TSF lift construction progressing ahead of schedule
Grade model1 developed for the Golden Plateau deposit
Regional airborne magnetic and radiometric survey completed over the entire
tenement package
Production Summary Unit
Jun 25
Qtr
Sep 25
Qtr
FY26
Guidance
Ore Mined kt 133.8 142.3
Mined Grade g/t 2.68 2.16
Ore Milled kt 159.6 154.3
Milled Grade g/t 2.36 1.98
Recovery Au 91.1% 90.4%
Gold Produced koz 11.0 8.9 36 – 46
Gold Sold koz 10.8 8.8
Cost Summary
Mining A$M 16.3 19.6
Processing A$M 7.2 7.2
Site G&A A$M 2.9 2.8
Total mine operations A$M 26.5 29.6 95 – 116
By-Product Credit A$M (0.5) (0.5)
Royalties A$M 3.0 2.6
Corporate G&A A$M 0.4 0.4
Inventory Movements A$M (1.0) (1.9)
Sustaining Capital1 A$M 4.9 2.3 18 – 22
All-In Sustaining Costs2
A$M 33.3 32.5
A$/oz 3,075 3,692
Growth Capital A$M - 5.5 6 – 8
Exploration A$M 1.2 1.0 5 – 7
All-In Costs2
A$M 34.5 39.0
A$/oz 3,187 4,437
1. Includes sustaining capital, capitalised mine development, rehabilitation and financing payments (principal
and interest) on leased assets
2. All-In Sustaining and All-In Costs are based on gold sold
1 Grade model developed for internal planning only. The grade model is not JORC 2012 compliant and
does not represent either a Mineral Resource or Ore Reserve.
8
Operations
Cracow performed well for the quarter, delivering 8.9koz Au despite being impacted
by a 48 hour power outage and equipment issues. Grades were lower than plan due
to prioritisation of operating development, which delivered lower grade material than
stope ore. Development metres were significantly ahead of plan for the quarter.
Grade is forecast to improve in Q2 with increased stope tonnes.
A review of remnant mineralisation close to existing mine infrastructure has resulted in
a further +20koz Au being brought into the mine plan. This additional material further
extends the life of the Western Vein Field operations.
Construction of the TSF lift is progressing well and is currently ahead of schedule.
Costs
AISC was in line with plan and lower quarter-on-quarter, although the lower grade
mined resulted in fewer ounces produced and hence high costs on a unit rate basis.
The focus on operating development resulted in recognising additional operational
mining costs rather than capitalised development, increasing mining cost.
Growth capital reported relates to TSF lift costs incurred in quarter with construction
underway.
Exploration
Golden Plateau Deposit
During the quarter, an internal and internal grade model1 was developed for the
Golden Plateau deposit to generate prospective target areas for follow-up drilling
underneath the existing open pit (Figure 4). Please refer to ASX announcement
“Golden Plateau Project Update” dated 29 September 2025 for the full details.
In summary, the unclassified grade model highlighted a large volume of mineralisation
around the historical underground workings extending approximately 150m below the
bottom of the pit. The follow-up drill program of approximately 7,000m is planned to
start in November 2025 and is designed to address the gaps in the unclassified grade
model by:
Collecting representative samples through mineralised lodes, including
twinning historical high-grade intersections
Collecting geological information to further refine and improve the geology
model/ understanding
Confirm/validate the current void model
Collecting geotechnical information as inputs to geotechnical design
parameters
Collecting representative samples for metallurgical test work to support the
determination of recovery factors applicable to the Cracow process plant.
1 The grade model does not represent a Mineral Resource or Ore Reserve under JORC 2012.
9
Figure 4: Plan view of the Golden Plateau deposit and drill traces, pending availability of drill
sites
Regional Magnetics Survey
During the quarter, a regional airborne magnetic and radiometric survey was
completed. This survey covered the entire 890 square kilometre exploration lease
package and consisted of almost 8,000 line kilometres of data. There were two
configurations for the survey parameters:
100 metre line spacing and 50 metre sensor height
200 metre line spacing and 300 metre sensor height.
Data collected from the survey will be used to assist in defining the regional structural
architecture and identifying prospective areas for on-ground exploration, including
refining first-pass drill targets at the priority Southern Vein Field exploration target.
10
Figure 5: Regional Airborne Magnetics Survey (Reduced To Pole or RTP) across Exploration and
Mining Leases at Cracow
11
North Queensland (QLD)
Key points for quarter:
Operations on care and maintenance
Options for divestment are being advanced
Jaguar (WA)
Key points for quarter:
Operation in care and maintenance, incurring reduced costs of $2.1 million for
the quarter. Costs planned to be further reduced in Q2.
Planning for the next phase of exploration is underway
Options for advancing gold exploration also being investigated
Exploration
Work during Q1 FY26 at the Jaguar Project focused on assessing geochemical
responses around the Triumph area, advancing gravity-defined drill targets, and
undertaking soil-sampling programs at the Halloween gold prospect. Mitre
Geophysics also completed a review of the Jaguar downhole-EM survey data. A
detailed assessment of geochemical pathfinders for volcanic-hosted massive
sulphide (VMS) mineralisation at the Triumph Deposit identified antimony (Sb) and
thallium (Tl), in combination with arsenic (As), zinc (Zn) and lead (Pb), as the most
effective indicators. These elements define broad lateral halos, 50–100 metres wide,
extending for more than 500 metres along strike, providing valuable vectors for future
exploration.
Approximately 370 surface rock samples were collected across eight gravity-defined
targets with encouraging multi-element responses recorded at Cerberus, Minerva
and Herminia. The Cerberus target, in particular, shows a strong elemental association
including Ag, As, Bi, Co, Cu, In, Ni, S, Sb, Tl, W and Zn, suggesting proximity to a massive
sulphide source. At the Halloween prospect, around 360 soil samples – comprising
various fractions and sample sizes – were collected to determine optimal parameters
for future DetectORE soil programs, with analytical results expected in early Q2 FY26.
Stockman Project (VIC)
Key points for quarter:
Comprehensive metallurgical test work on the Albion leach process
completed this quarter.
Ongoing assessments of various processing options, including detailed capital
and operating cost estimates were finalised during the quarter. Management
is assessing next steps.
Project holding costs remain low
Stockman maintained its commitment to the local community, providing
grants to several regional organisations.
12
Corporate
Cash and Receivables
At the end of the quarter, Aeris had useable cash and receivables of $46.4 million with
a closing unrestricted cash balance of $32.0 million. Total restricted cash held against
bonds remains $17 million.
(A$ Million)
Jun 25 Sep 25
QTR QTR
Closing Cash 28.2 32.0
Receivables
Cracow - -
Tritton 21.3 14.4
Useable Cash and Receivables 49.5 46.4
Cash flow from operations at $53 million was significantly higher than the previous
quarter due to timing of receipt of receivables (Tritton copper concentrate) and
improved commodity prices.
(A$ Million)
Jun 25 Sep 25
QTR QTR
Opening cash 22.4 28.2
Cash flow from operations 34.0 53.1
Cash flow from capital expenditure (24.9) (46.6)
Cash flow from financing (3.2) (2.7)
Closing cash 28.2 32.0
Figure 6: Sep Quarter Cash Flow (A$M)
13
Debt and Hedging
During the quarter the company entered into unsecured gold hedges for
approximately 20koz at a forward price of A$5,145.75/oz. At the end of quarter,
roughly 16.4koz is still to be delivered into the hedge .
Debt on the balance sheet remained unchanged with $40 million drawn on the WHSP
facility.
Authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Andre Labuschagne Stefan Edelman
Executive Chairman General Manager – Corporate Development
Tel: +61 7 3034 6200 investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper dominant portfolio
comprises two operating assets, multiple development projects and a highly prospective
exploration portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration program and
continues to investigate strategic merger and acquisition opportunities. The Company’s
experienced board and management team bring significant corporate and technical
expertise to a lean operating model. Aeris is committed to building strong partnerships with its
key community, investment and workforce stakeholders.
14
Competent Persons Statement
The information in this report that relates to Exploration Targets or Exploration Results at the
Cracow Operation is based on information compiled by Craig Judson. Mr Judson confirms that
he is the Competent Person for all Exploration Results, summarised in this Report and he has
read and understood the requirements of the 2012 Edition of the Australasian Code for
Reporting of Exploration Targets, Exploration Results, Mineral Resources and Ore Reserves
(JORC Code, 2012 Edition). Mr Judson is a Competent Person as defined by the JORC Code,
2012 Edition, having relevant experience to the style of mineralisation and type of deposit
described in the Report and to the activity for which he is accepting responsibility. Mr Judson
is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM No. 325510). Mr
Judson has reviewed the Report to which this Consent Statement applies and consents to the
inclusion in the Report of the matters based on his information in the form and context in which
it appears. Mr Judson is a full-time employee of Aeris Resources Limited.
The information in this report that relates to Exploration Targets or Exploration Results at the
Jaguar Operation is based on information compiled by Alain Cotnoir. Mr Cotnoir confirms that
he is the Competent Person for all Exploration Results, summarised in this Report, and he has
read and understood the requirements of the 2012 Edition of the Australasian Code for
Reporting of Exploration Targets, Exploration Results, Mineral Resources and Ore Reserves
(JORC Code, 2012 Edition). Mr Cotnoir is a Competent Person as defined by the JORC Code,
2012 Edition, having relevant experience to the style of mineralisation and type of deposit
described in the Report and to the activity for which he is accepting responsibility. Mr Cotnoir
is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM No. 315017). Mr
Cotnoir has reviewed the Report to which this Consent Statement applies and consents to the
inclusion in the Report of the matters based on his information in the form and context in which
it appears. Mr Cotnoir is a full-time employee of Aeris Resources Limited.
The information in this report that relates to Exploration Targets or Exploration Results at the
Tritton Operation is based on information compiled by Osvaldo Gonzalez. Mr Gonzalez
confirms that he is the Competent Person for all Exploration Results, summarised in this Report,
and he has read and understood the requirements of the 2012 Edition of the Australasian Code
for Reporting of Exploration Targets, Exploration Results, Mineral Resources and Ore Reserves
(JORC Code, 2012 Edition). Mr Gonzalez is a Competent Person as defined by the JORC Code,
2012 Edition, having relevant experience to the style of mineralisation and type of deposit
described in the Report and to the activity for which he is accepting responsibility. Mr Gonzalez
has reviewed the Report to which this Consent Statement applies and consents to the inclusion
in the Report of the matters based on his information in the form and context in which it
appears. Mr Gonzalez is a full-time employee of Aeris Resources Limited.
15
APPENDIX A: Summary of Avoca Tank resource definition drill holes
Hole ID Easting1 (m) Northing1 (m) RL (m) Total Depth (m) Azimuth1 Dip
ATEL083 17,689.89 25,704.88 4,821.369 659.8 73.5 -66.5
ATEL089 17,689.89 25,704.88 4,821.369 329.6 110.0 -51.05
ATEL090 17,725.18 25,547.8 4,812.475 557.6 73.5 -67.25
ATEL092 17,747.97 25,538.17 4,812.423 433.6 33.5 -57.75
1 Easting and Northing coordinates are reported in the North East mine grid.
2 Azimuth is recorded as a magnetic azimuth reading.
APPENDIX B: Summary of Avoca Tank significant resource definition drill
intercepts.
Hole From To
Interval
(m)
True thickness
(m)
Cu (%) Au (g/t)
Ag
(g/t)
ATEL083 335.8 359.8 24.0 8.0 1.41 0.7 12.3
414.7 422.0 7.3 3.5 0.91 0.3 4.0
428.0 433.4 5.4 2.5 0.85 0.5 6.2
604.8 608.2 3.4 1.8 3.32 0.6 8.5
ATEL092 357.0 367.0 10.0 6.9 0.87 0.6 8.8
374.0 385.0 11.0 7.4 1.94 0.9 12.4
1 All grades are length-weighted
2 Significant intersections were generated by compositing over the full width of the
mineralised interval at a 0.5% copper cut-off with a maximum of 3.0m of internal dilution.
APPENDIX C
JORC Code, 2012 Edition – Tritton Underground Resource Definition Drill Program
Table 1 Section 1 - Sampling Techniques and Data
Criteria Commentary
Sampling techniques 1. All drill core samples have been collected from longitudinally cut, half
diamond drill core.
2. Samples taken over a mineralised interval are collected to ensure a
majority are 1.0 m in length, and that the hangingwall (HW) and footwall
(FW) samples are between 0.4 m and 1.2 m.
Drilling techniques 1. Diamond drill holes are collared NQ diameter core (47.6 mm) for the
entire hole via diamond drilling.
Drill sample recovery 1. Core recoveries are recorded by the drillers on site at the drill rig. Core
recoveries are checked and verified by an Aeris Resources field
technician and/or geologist.
2. Diamond drill core is pieced together as part of the core orientation
process. During this process, depth intervals are recorded on the core
and checked against downhole depths recorded by drillers on core
blocks within the core trays.
3. Diamond core drilled to date by Aeris Resources have recorded very
high drilling recoveries.
Logging 1. All diamond drill core is logged by an Aeris Resources geologist or
contract geologist. Drill core is logged to a sufficient level of detail to
16
Criteria Commentary
increase the geological knowledge and understanding at each
prospect.
2. All geological logs record lithology, presence/concentration of
sulphides, alteration, and structure.
3. All geological data recorded during the core logging process is stored
in the Aeris Resources AcQuire database.
4. All diamond drill core is photographed and digitally stored on the
company network.
5. Core is stored in core trays, labelled with downhole meterage intervals
and drill hole “hole ID”.
Sub-sampling
techniques and
sample preparation
1. All diamond drill core was halved longitudinally with a core saw, with
one half dispatched for analysis and the other half retained.
2. Half core samples were sent to a certified sample preparation and
assay laboratory.
3. Upon arrival at the laboratory, each sample weight was recorded.
Samples greater than 3kgs were crushed via a Boyd crusher (90%
passing 2mm) and rotary split to a sub-sample between 2 and 3kg.
4. The sub-sample was pulverised via a LM5 to 80% passing 75 µm. A 300g
sample was taken from the pulverised material for assaying. Samples
less than 3kg were crushed via a jaw crusher to 70% passing 6 mm and
the whole sub-sample was pulverised in a LM5 with a 300g sub-sample
taken for assaying.
5. No field duplicates have been collected.
6. The sample size is considered appropriate for the style of mineralisation
and grain size of the material being sampled.
Quality of assay data
and laboratory tests
1. All samples are sent to ALS Laboratory Services at their Orange facility.
2. Samples are analysed by a 3-stage aqua regia digestion with an ICP
finish (suitable for Cu 0.01-1%) – ALS method ME-ICP41.
3. Samples with Cu assays exceeding 1% are re-submitted for an aqua
regia digest using ICP-AES analysis – ALS method ME-OC46.
4. Au analysis is performed from a 30g fire assay fusion with an AAS finish
(suitable for Au grades between 0.01-100ppm) – ALS method Au-AA22.
If a sample records an Au grade above 100ppm another sample is re-
submitted for another 30g fire assay charge using ALS method Au-AA25.
5. QA/QC protocols include the use of blanks, duplicates and standards
(commercial certified reference materials used). The nominal insertion
rate for each QA/QC sample type is 5%.
Verification of
sampling and
assaying
1. Logged drill holes are reviewed by the logging geologist and a Aeris
geologist. All geological data is logged directly into Aeris Resources
logging computers following the standard Aeris Resources geology
codes. Data is transferred to the AcQuire database and validated on
entry.
2. Upon receipt of the assay data, no adjustments are made to the assay
values.
Location of data
points
1. Historical surface holes completed have collar locations surveyed by
using a handheld GPS unit with an approximate horizontal accuracy of
approximately +/- 5 m.
2. Due to the uncertainty in the vertical reading from handheld GPS units,
the collars have been projected onto the surveyed topographical
surface.
3. All drill hole locations are collected in Australian Geodetic Datum 66
zone 55.
4. Diamond holes drilled from underground have been collected using
standard survey methods carried out by the site Survey team.
5. One surface drill hole was found to materially disagree with the
mineralisation interpretation based on numerous and much shorter
17
Criteria Commentary
underground drill holes. Therefore, that surface drill hole was moved to
match the higher confidence underground holes.
6. The locational accuracy of the drill collars are considered by the
Competent Person to be adequate for the reporting of an Indicated
and Inferred MRE.
7. Downhole surveys taken are completed by the drill contractor using a
Reflex gyroscopic tool measuring azimuth and dip orientations every 30
m, or shorter intervals if required.
8. All drill hole locations at Avoca Tank are referenced in a North East local
mine grid. The North East mine grid origin (0E, 0N) = 482601.87mE,
6517252.09mN (AGD66). Grid North = 329.095.
Data spacing and
distribution
1. Drill spacing at the Avoca tank deposit is spaced between <20 m to 80
m. Drill hole spacing along strike and down dip is similar.
2. The better drilled portion of the deposit has a drill spacing of <20 m x 20
m, which was considered by the Competent Person to be sufficient to
estimate an Indicated Mineral Resource.
Orientation of data in
relation to geological
structure
1. All drill holes are designed to intersect the target at, or near right angles.
2. Each drill hole has not deviated significantly from the planned drill hole
path.
3. The true thickness of the mineralisation in 3D is correctly accounted for
during the interpretation and estimation process.
Sample security 1. Sample security protocols follow standard Tritton Operations
procedures whereby samples are secured within calico bags and
transported to the sample processing laboratory in Orange NSW via a
courier service or with company personnel. Samples received by the
laboratory are confirmed on arrival and any discrepancies are
immediately resolved through consultation with Aeris Resources.
Audits or reviews 1. Data is validated when uploading into the company AcQuire
database.
2. Aeris conducts regular reviews of the database. Any inconsistencies
were resolved to the Competent Person’s satisfaction.
JORC Code, 2012 Edition – Tritton Underground Resource Definition Drill Program
Table 1 Section 2 - Reporting of Exploration Results
Criteria Commentary
Mineral tenement and
land tenure status
1. The Tritton Regional Tenement package is located approximately 45km
northwest of the township of Nyngan in central western New South
Wales.
2. The Tritton Regional Tenement package consists of 6 Exploration
Licences and 3 Mining Leases. The mineral and mining rights are owned
100% by the company.
3. The Avoca Tank deposit is located within ML1818, which is in good
standing with no known impediments.
Exploration done by
other parties
1. None
Geology 1. Regionally, mineralisation is hosted within early to mid-Ordovician
turbidite sediments, forming part of the Girilambone Group.
Mineralisation is hosted within greenschist facies, ductile deformed
pelitic to psammitic sediments, and sparse zones of coarser sandstones.
2. A total of nine sulphide lenses have been modelled to date. Of these,
seven have had recent diamond drilling and five have had level
18
Criteria Commentary
development since mineralisation was first intersected in December
2022. Mineralised lodes generally strike north north-west and steeply dip
to the east at 80 degrees, except where controlled by mafic volcanics.
All mineralised lodes are defined by a >0.5% copper grade shell, with
diamond drill core photos, structural and geological mapping, wall
sampling and sludge/production hole logging used to further define the
geometry of the lodes, where assay data was not available at time of
interpretation. Interpreted mineralised lenses are all in fresh rock below
the base of weathering. The top of the currently defined mineralisation
is approximately 80 m below surface (5125 mRL). Potential economic
mineralisation occurs in the weathered zone, however, modelling in this
zone has yet to be completed.
Drill hole information 1. All relevant information pertaining to each drill hole has been provided
in the tables with this announcement.
Data aggregation
methods
1. All assay results reported represent length-weighted composited assays.
2. Mineralised intercepts for Cu are averaged within a contiguous interval
above a 0.5% Cu cut-off grade with a maximum of 3m of internal
dilution.
Relationship between
mineralisation widths
and intercept lengths
1. Drill holes are designed to intersect the target horizon across strike at or
near right angles.
2. The true thickness of the mineralisation in 3D is correctly accounted for
based on current orebody orientations
Diagrams 1. Relevant diagrams are included in the body of the report.
Balanced reporting 1. The reporting is considered balanced and all associated material
information has been disclosed.
Other substantive
exploration data
1. There