STRATEGIC ACQUISITION OF PEEL MINING PRESENTATION
Released
Released
Announcement PDF
Strategic Acquisition of
Peel Mining
February 2026
Reinforcing Aeris as a leading Australian mid-tier
copper and gold producer
Not for release to US wire services or distribution in the United States
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”) and Peel Mining Limited (“Peel”). By
attending an investor presentation or briefing, or accepting, accessing
or reviewing this presentation, you acknowledge and agree to the terms
set out below.
This presentation has been prepared in relation to the proposed
acquisition by Aeris of all of the issued capital of Peel by way of a
Scheme of Arrangement (“Scheme”) and a proposed demerger
(“Demerger”) of certain Peel assets into a newly formed company.
Further information on the Scheme and the Demerger (together, the
“Transaction”) is included in this presentation and in the announcement
of today’s date released by Aeris on the Australian Securities Exchange
(“ASX”) Market Announcements Platform.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris and Peel with the ASX in connection with its continuous
disclosure obligations. This presentation does not purport to contain all of
the information that an investor should consider when making an
investment decision nor does it contain all of the information which
would be required in a product disclosure statement or prospectus
prepared in accordance with the requirements of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, neither Aeris nor Peel have an obligation to update
the information contained in this presentation. An investment in securities
is subject to known and unknown risks, some of which are beyond the
control of Aeris and Peel. Investors should consult with their own legal,
tax, business and/or financial advisors in connection with any acquisition
of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing non-
IFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris and Peel believe the non-IFRS financial information and
non-GAAP financial measures provide useful information to users in
measuring the financial performance and condition of Aeris or Peel.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris, Peel and their officers.
This includes statements about market and industry trends, which are
based on pretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “aiming”, “estimate”,
“intend”, “believe”, “guidance”, “should”, “could”, “may”, “will”,
“predict”, “plan” and other similar expressions.
Forward-looking statements are based on information available to Aeris
and Peel as at the date of this presentation and should not be relied
upon as an indication or guarantee of future performance. Except as
required by law or regulation (including the ASX Listing Rules), none of
Aeris, Peel their representatives or advisers undertakes any obligation to
provide any additional or updated information whether as a result of a
change in expectations or assumptions, new information, future events
or results or otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
world events such as the COVID-19 pandemic and national hostilities
and associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
2
Disclaimer
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which neither Aeris nor Peel has an obligation to do or to procure) or
are offered or sold pursuant to an exemption from, or in a transaction
not subject to, the registration requirements of the US Securities Act and
any applicable securities laws of any state or other jurisdiction of the
United States.
JORC Code
This presentation is a public report as defined by The JORC Code (2012)
Edition (“JORC Code”) and has been prepared in accordance with the
JORC Code and the ASX Listing Rules. The presentation contains
references to previously reported Mineral Resources, Ore Reserves and
Exploration Results of Aeris and Peel. No new Mineral Resources, Ore
Reserves or Exploration results are reported in this presentation.
NO NEW INFORMATION STATEMENT - Aeris
This presentation refers to Exploration Results, estimates of Mineral
Resources and Ore Reserves contained in the Group Mineral Resource
and Ore Reserve Statement as at 31 December 2024 (announced on 22
July 2025 “Group Mineral Resource and Ore Reserve Statement”), as well
as an Ore Reserve Estimate for Constellation (announced on 28 October
2025, “Maiden Open Pit Ore Reserve Estimate for Constellation Project”)
and prior market announcements released by Aeris, (“Prior
Reports”). The Prior Reports are footnote referenced in this presentation
and available from: https://www.aerisresources.com.au/investor.
Aeris confirms that it is not aware of any new information or data that
materially affects the information included in the Prior Reports and, in the
case of Exploration Results, estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters
underpinning the results or estimates in the Prior Reports continue to
apply and have not materially changed. Aeris confirms that the form
and context in which the Competent Person’s findings are presented in
this document have not been materially modified from the Prior Reports.
NO NEW INFORMATION STATEMENT - Peel
Previous results referred to herein have been extracted from previously
released ASX announcements included in footnote references. Previous
announcements and reports are available to view on
www.peelmining.com.au and www.asx.com.au. In the case of estimates
of mineral resources or ore reserves, Peel confirms that all material
assumptions and technical parameters underpinning the estimates in the
relevant market announcements continue to apply and have not
materially changed. Peel confirms that it is not aware of any new
information or data that materially affects the information included in
the original market announcements. Peel confirms that the form and
context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcement.
AGGREGATION OF ESTIMATES
This presentation contains pro-forma combined Mineral Resource and
Ore Reserve estimates which represent an aggregation of estimates
(with rounding) of Aeris and Peel. These pro-forma estimates do not
represent new or independent estimates. The aggregated figures are
presented for illustrative and comparative purposes only, are not
representative of any individual deposit and should be read in
conjunction with the individual project-level Mineral Resource and Ore
Reserve estimate statements included in Appendix Supporting
Information.
3
Acquiring Peel to Deliver
Aeris’ Growth Strategy
5
314
122
75 511
Tritton Mallee Bull Wirlong Total Combined
5
Strategic Acquisition to Transform Tritton
Enlarges Tritton’s Cobar region resource base to over 500kt contained copper(2)
Measured & Indicated Resources (Contained Cu kt)
Inferred Resources (Contained Cu kt)
Grade (Cu %)
+63%
Total
Contained
Copper
1.7%
1.9%
1.8%
1.7%
+85%
Indicated
Contained
Copper
1. This vision is an aspirational statement (and not a production target). Refer to the Forward Looking Statements section of the Disclaimer.
2. Pro-forma combined Mineral Resources and Ore Reserves for Tritton and South Cobar Copper Project, refer to the Appendix for a breakdown of the underlying Mineral Resource and Ore Reserve Statements. Mineral Resources are inclusive of Ore Reserve.
Positions Aeris’ flagship Tritton Operations
for a +10 year mine life(1)
Significant growth upside for Aeris and Peel
shareholders, with both projects open at depth
Peel assets to benefit from Aeris’ operational skills
and existing Tritton mill and infrastructure
Mallee Bull to be prioritised as a near term,
high-grade base load ore source
Aeris to acquire Peel’s South Cobar Copper Project
(Mallee Bull + Wirlong) via Scheme of Arrangement
6
Two large, high-grade copper deposits within trucking distance
from Tritton, creating a combined 3,822km2 tenement package
Mallee Bull resource with c. 88% Indicated status(1) and
preliminary mine design – will facilitate release of Ore Reserve
within 6 months of completion
Metallurgical test work confirms suitability for processing at Tritton
Aeris team has reviewed Mallee Bull development plans with a
study on an integrated Tritton operation to be completed within
the next 6 months
Wirlong is a highly prospective exploration project with future
development potential
Exploration declines approved at both projects, de-risks and
accelerates development potential
6
1. Refer to the Appendix for a breakdown of the underlying Mineral Resource.
Acquisition of advanced Mallee Bull and Wirlong
resources
Logical Consolidation Within the Cobar Region
Tritton
tenements:
2,343km2
Tenements
acquired:
1,479km2
100km
100km
Wirlong Project
Mallee Bull
Project
Tritton
Operations
Tritton mine life to be underpinned by base load feed from
Constellation and Mallee Bull
Mallee Bull expected to be fully permitted for stoping and ore
transport in H2 FY29(2)
Aeris to release integrated life of mine plan aiming for a +10 year
mine life within the next 6 months(1)
Potential cost benefits from increased throughput and maximising
mill capacity
Wirlong has potential to become another future ore source –
following further resource definition drilling and studies
Positioning Tritton for a +10
Year Mine Life(1)
7
Increasing mine life by combining Tritton’s processing
capacity with Mallee Bull high-grade ore
1. This vision is an aspirational statement (and not a production target). Refer to the Forward Looking Statements section
of the Disclaimer.
2. Subject to feasibility study, NSW Government Mining Activity Approval and FID.
Tritton Copper Production (kt)
24
17
20 19
29
FY23
FY24
FY25
FY26
Guidance
Constellation
Other Tritton
Mallee Bull
Wirlong
Current Producing Deposits
M+I: 65kt
Inferred: 26kt
Contained
Copper
Resources(3)
M+I: 94kt
Inferred: 60kt
M+I: 108kt
Inferred: 14kt
M+I: 21kt
Inferred: 44kt
M+I: 44kt
Inferred: 31kt
Guidance
Range
3. Refer to the Appendix for a breakdown of the underlying Mineral Resource and Ore Reserve Statements. Mineral
Resources are inclusive of Ore Reserve. Current Producing Deposits include Tritton, Avoca Tank, Murrawombie and
Budgerygar. Other Tritton includes South Wing, Tritton Remnants, Budgery, Kurrajong and ROM Stockpiles.
8
1,812
851
760
533
475
138
Capstone
Sandfire
Develop
Aeris PF
29Metals
Aurelia
AIC
Peel
2,166
981
563
435
373
235
Capstone
Sandfire
29Metals
Aeris PF
AIC
Aurelia
Develop
Peel
8
Enhanced Market Position
Market Capitalisation
(A$M)
Mineral Resources
(kt Cu)
Copper Production
(FY26 guidance)(4)
1. Calculated based on Aeris closing share price at 0.565 multiplied by the expected 1,505,674,571 Aeris shares on issue following implementation of the Scheme (assuming a 0.3363 exchange ratio).
2. Pro-forma combined Mineral Resources and Ore Reserves for Aeris and the South Cobar Copper Project, refer to the Appendix for a breakdown of the underlying Mineral Resource and Ore Reserve Statements. Mineral Resources are inclusive of Ore Reserve.
3. Total Global contained copper Mineral resources for Peel.
4. Taken as midpoint of FY26 guidance.
5. 29Metals guidance for CY26
6. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t). Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag, US$2,827/t Zn, US$2,029/t Pb. Aeris confirms that it is the Company’s
opinion that all the elements included in its metal equivalents calculation have a reasonable potential to be recovered and sold.
All other metrics obtained from publicly accessible data as at 11-Feb-26.
Pro-forma
12,738
9,023
Pro-forma
14,251
159
45
44
30
15
Sandfire
Aeris
29Metals
Aurelia
AIC
(5)
(1) (2)
3,499
Copper Production (Cu kt)
Copper Equivalent(6) (Cu Eq kt)
(3)
9
Continuing to Deliver on Aeris’ FY26 Strategy
9
Realise
value for
shareholders
01
Sell non-core assets
02 Divesting North Queensland
exploration assets for total
consideration up to $15.5M(1)
• Completion Q3 FY26
Operational Delivery
Tritton
• Murrawombie Pit
• Constellation on time
• Resource extension
• LOM
Cracow
• Golden Plateau
• Resource extension
• LOM
05
Growth
• Focus on life extensions
through greenfield exploration
• Consider external
opportunities
Balance Sheet
06
Repay debt
Assets sales
Consider hedging strategy
Unlock Stockman
04
Finalise Albion test work
• Update feasibility study
Concept study on acid
production
03 Jaguar strategy
Focus on +10 year life
• Reduce care and maintenance
• Test base metals targets
1. Refer to ASX release “Agreement to Divest North Queensland Copper Assets”, 27 October 2025.
Peel’s South Cobar
Copper Project
(Mallee Bull and
Wirlong)
11
11
Note: The conceptual Exploration Decline has been designed for the purposes of a Review of Environmental Factors
(REF) submission to the NSW Resources Regulator. No economic studies have been completed as part of its design.
1. Refer to Appendix for Mallee Bull Mineral Resource.
Advanced copper project expected to become a near term, high-grade ore source for Tritton
Mallee Bull
Pre-Development Milestones & Next Steps
Preliminary mine design / scheduling
completed
Metallurgical testwork, geotechnical
engineering, project design
Construction of exploration decline and surface
infrastructure approved by NSW Resources
Regulator
Extensive flora, fauna and heritage studies
Ownership of land over the project site
Preliminary feasibility study well progressed
Integration study with Tritton commenced,
expected to be completed within 6 months
Development of exploration decline and
resource definition drilling
Location
Stage
Resource(1)
Approvals
Status
South of Cobar
New South Wales
c. 130km from Tritton
Development ready
6.3Mt
@ 1.92% Cu, 0.35g/t Au
for 122kt Cu, 71koz Au
Exploration Decline
Approved
Mallee Bull Summary
Deposit open
at depth
12
12
1. Refer to Appendix for Wirlong Mineral Resource.
2. Refer to Peel ASX announcement released on 9 January 2023.
Highly prospective exploration project
Wirlong
Location
Stage
Resource(1)
Approvals
Status
South of Cobar
New South Wales
c. 100km from Tritton
Resource Definition
4.3Mt
@ 1.75% Cu
for 75kt Cu
Exploration Decline
Approved
Wirlong Summary Exploration Milestones & Next Steps
Proven high-grade copper resource
commencing at ~200m depth, remains open
along strike
Previous drill program completed – totalling
66,092m of RC and diamond drilling(2)
Extensive flora, fauna and heritage surveys
completed, REF permit for exploration decline
has been approved
Ownership of land over the project site
Preliminary mine design and scheduling
previously completed by Peel, Aeris to review
Aeris planning additional drilling to further build
the geological model
Mining studies to be undertaken following
update of model
Deposit open
at depth
Transaction Overview
14
14
1. See the ASX announcement of today’s date for further information on the Scheme and the Scheme Implementation Deed.
2. Subject to no superior proposal emerging and an Independent Expert concluding (and continuing to conclude) that the Scheme is in the best interests of Peel shareholders.
3. As at the date of this announcement, Peel Directors have a Relevant Interest in certain Peel shares, options and performance rights which will be affected by the Scheme. See the ASX announcement of today’s date “Aeris Resource to Acquire Peel
Mining” for further information on the interests of the Peel directors.
4. Based on the last closing price of Aeris of $0.565 at 11 February 2026.
5. Refer to Peel’s ASX announcement “Landmark Sale of South Cobar Copper Project to Aeris Resources and Creation of a New ASX-listed Precious and Base Metals Explorer” lodged on 12 February 2026.
6. Investors are cautioned that although the application for admission of NewCo to the official list of ASX is intended to occur after implementation of the Scheme, there can be no certainty as to the timing of when such application will be made or
that any such application will be successful. Any application by NewCo to admission of the official list of ASX will be subject to satisfying the requirements of ASX.
7. Perth Capital Pty Ltd and its associates control 139,017,840 shares in Peel.
Key Transaction Details
Scheme Structure
• Aeris has entered into a Scheme Implementation Deed for an all-scrip acquisition of Peel Mining Limited (Peel), by way of a Scheme of
Arrangement (Scheme)(1)
• The Scheme has been unanimously recommended by the Peel Board(2,3)
• The Scheme is subject to certain customary conditions, including, among other things, the entry into a demerger implementation deed and
approval by Peel shareholders and the Court(1)
• The Scheme is subject to an Independent Expert concluding the Scheme is in the best interests of Peel shareholders
Offer Consideration
• In exchange for their shares, Peel shareholders will receive:
• 0.3363 Aeris shares for every one (1) Peel share held, valuing the South Cobar Copper Project and associated tenements at $0.19 per
share(4); and
• Indicatively one (1) NewCo share for every 4.6 Peel shares held, valued at $0.044 per share(5)
• The Transaction values Peel at A$0.234 per share (based on the closing price of Aeris on 11 February 2026), and A$214 million on a diluted equity
value basis (including the indicative additional A$0.044 of value received by Peel shareholders from their shareholding in NewCo), representing:
• 46.0% premium to Peel’s closing share price; and
• 49.1% premium to Peel’s one-month VWAP
Pro-Forma Ownership • Aeris shareholders to hold 79.5% of the combined entity, while Peel shareholders to hold 20.5%
NewCo In-Specie
Distribution
• Peel to undertake an inter-conditional demerger of Peel’s remaining precious and base metals tenements in the Cobar Basin, plus remaining
cash on completion (net of transaction costs and completion adjustments) into a NewCo, which intends to apply to list on the ASX (Demerger)(6)
• Peel and NewCo are proposing to enter into a Demerger Implementation Deed, under which Peel will demerge NewCo via a capital reduction
• Demerger will require Peel shareholder approval, and certain other items necessary to prepare NewCo for its eventual listing
Peel Board Support
• Peel directors have confirmed that they each intend to vote any Peel shares in which they have a relevant interest in favour of the Scheme and
Demerger(2). At the time of announcement, Peel directors hold approximately 4.9% of Peel ordinary shares(2,3)
Peel Major Shareholder
Support
• Perth Capital Pty Ltd and its associates, that currently control a 16.1% interest in Peel(7), have provided a Voting Intention Statement, confirming
that they intend to vote, or cause to be voted, those shares in favour of the Scheme and Demerger(2)
Advisors
• Aeris Resources has appointed Jefferies Australia as financial advisor and HopgoodGanim Lawyers as legal advisor
• Peel has appointed Euroz Hartleys and Sternship Advisers as financial advisors and Hamilton Locke as legal advisor
15
15
1. This vision is an aspirational statement (and not a production target). Refer to the Forward Looking Statements section of the Disclaimer.
2. Based on Aeris’ close price of $0.565 per share on 11 February 2026, the Consideration (including additional NewCo value) implies a value of $0.234 per Peel share, which represents a 46% premium to Peel’s closing share price. Pro-forma
ownership assumes full vesting and exercise of Peel’s performance rights and options. Refer to Peel’s ASX announcement “Landmark Sale of South Cobar Copper Project to Aeris Resources and Creation of a New ASX-listed Precious and
Base Metals Explorer” lodged on 12 February 2026.
Compelling Transaction Rationale
Value to Aeris Shareholders
Enhances the quality, scale and grade of the existing Tritton Operations
Stable, long-life operation with increased operational flexibility
Positions Tritton for a +10 year mine life(1)
Platform to consider further consolidation in the Cobar Region
Larger, more liquid and investable copper and gold producer
Value to Peel Shareholders
46% premium to Peel’s closing share price (including the indicative
additional value of $0.044 per share received from NewCo
shareholding)(2) and 20% ownership(2) in the combined group
Logical consolidation to utilise Aeris’ established mining and processing
infrastructure, reducing unit costs and eliminating significant capital
Ownership of a larger, more liquid ASX-listed copper and gold
producer
Strong NewCo foundation asset portfolio, comprising high-grade
Southern Nights Complex and Cobar Basin exploration portfolio
Renewed growth strategy at NewCo, led by members of Peel’s existing
management team and Board
Highly synergistic acquisition to secure long term, high-grade base load mill feed for Tritton
16
16
Pro-forma Snapshot
Aeris Peel(5) Pro-forma
Share price / offer price(1) A$/sh 0.565 0.190 0.565
Shares outstanding(2) M 1,197.2 917.4 1,505.7
Market capitalisation A$M 676.4 174.3 850.7
Cash and concentrate receivables (31 Dec 2025)(3) A$M 106.4 Nil 106.4
Debt (31 Dec 2025) A$M - - -
Enterprise value A$M 570.0 174.3 744.3
Pro-forma Group – Copper Mineral Resources(4) Cu (kt) 784 197 981
Pro-forma Group – Gold Mineral Resources(4) Au (koz) 1,362 74 1,436
Pro-forma Group – Silver Mineral Resources(4) Ag (Moz) 37 6 43
1. Aeris share price as at 11 February 2026. Offer consideration of $0.19/sh in Aeris shares based on Aeris’ closing share price at 11 February 2026.
2. Pro-forma ordinary shares on issue and market capitalisation based on Aeris’ share price as at 11 February 2026.
3. Pro-forma cash and receivables based on Aeris’ balance sheet as at 31 December 2025 excluding transaction costs.
4. Pro-forma combined Mineral Resources and Ore Reserves for Aeris and the South Cobar Copper Project, refer to the Appendix for a breakdown of the underlying Mineral Resource and Ore Reserve Statements. Mineral Resources are inclusive of Ore
Reserve.
5. Represents Peel excluding assets to be demerged to NewCo. Pro forma based on Peel’s diluted shares and assumes full vesting and exercise of Peel’s performance rights and option. Remaining cash in Peel (net of transaction costs and completion
adjustments) will be demerged to NewCo.
All other metrics obtained from publicly accessible data as at 11 February 2026.
Creating a ~A$850M copper and gold company
17
NewCo Highlights
As part of the proposed transaction, Peel shareholders will retain full exposure to the precious and base metals
exploration and development potential of NewCo
Peel to undertake a demerger of Peel’s remaining precious and base
metals assets in the Cobar Basin, plus remaining cash on completion
(net of transaction costs and completion adjustments) into NewCo,
which intends to apply to list on the ASX(1)
Peel shareholders are indicatively anticipated to receive one (1)
share in NewCo for every 4.6 Peel shares they hold, valued at $0.044
per Peel share(2)
NewCo asset base underpinned by the high-grade Southern Nights
Complex (Wagga Tank and Southern Nights Projects), hosting 10Mt
polymetallic resource base(3) with significant exploration upside
~1,375km2 of 100% owned highly prospective exploration tenure in
the Cobar Basin
NewCo will assess further M&A growth opportunities in the base and
precious metals space
1. Investors are cautioned that although the application for admission of NewCo to the official list of ASX is intended to occur after
implementation of the Scheme, there can be no certainty as to the timing of when such application will be made or that any such
application will be successful. Any application by NewCo to admission of the official list of ASX will be subject to satisfying the
requirements of ASX.
2. Refer to Peel’s ASX announcement “Landmark Sale of South Cobar Copper Project to Aeris Resources and Creation of a New ASX-listed
Precious and Base Metals Explorer” lodged on 12 February 2026.
3. Refer to Appendix for Southern Nights Mineral Resource.
18
18
Indicative Transaction Timeline
Timeline Indicative Date
Scheme and Demerger Timeline
First Court Date for Scheme Early May 2026
Scheme Booklet sent to Peel shareholders Early May 2026
Scheme Meeting of Peel Shareholders to approve Scheme and Demerger Mid June 2026
If the Scheme and Demerger are approved by Peel shareholders
Second Court Date Mid to late June 2026
Effective Date Mid to late June 2026
Scheme and Demerger Record Date Late June 2026
Demerger implementation (transfer of NewCo shares) Late June 2026
Implementation Date for Scheme Early July 2026
Proposed NewCo ASX listing (subject to ASX and other required approvals) Q3 CY26
Scheme Booklet expected to be dispatched to Peel shareholders in early May 2026, ahead of a Scheme Meeting
in mid June 2026 and transaction completion by early July 2026
Note: The dates referred to above are indicative and may change.
Aeris Overview
Australian mid-tier, base and precious metals producer
Aeris Resources
2 producing operations (FY26: 40-49kt copper Eq)1
Multiple development projects
Investing in exploration
Substantial copper production and metal inventory
Excellent platform for growth
20
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Aeris confirms that it is the
Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to
be recovered and sold.
1. As at 11 Feb 2026
2. As at 31 Dec 2025
3. As at 30 June 2025
Corporate overview
21
CAPITALISATION
Market capitalisation1 $676 million
Cash2 $86 million
Debt -
Tax Losses3 $434 million
Michele
Muscillo
Non-Executive
Director
Colin
Moorhead
Non-Executive
Director
Senior Executives
Board of Directors
Andre
Labuschagne
Executive
Chairman
MAJOR SHAREHOLDERS
Washington H. Soul Pattinson 19.5%
Tudor Court 7.1%
AIS SHARE PRICE
BROKER COVERAGE
Paul Harris
COO
Cameron Schubert
CTO
Larnie Roberts
CPO
Dane v
Share your feedback
Discover