FY25 PRODUCTION UPDATE
Released
Released
Announcement PDF
11 July 2025
ASX/MEDIA RELEASE
FY25 PRODUCTION UPDATE
Highlights
Copper equivalent production of 42.1kt1, within guidance
Copper produced for group at 24.9kt below guidance
Gold produced for group at 55.2koz at mid-point of guidance
Cracow delivered another strong quarter producing 11koz of gold to
achieve 45.1koz for FY25
Tritton finished the quarterly with record milling rates (>2Mtpa)
towards the end of June, producing 6.2kt to achieve 19.4kt for FY25 –
below guidance
Slow ramp up of Murrawombie Pit resulting in 77kt stockpiles at the
end of FY25 impacting copper production.
Closing cash and receivables increased to $49.5 million
Established Australian copper-gold producer and explorer, Aeris Resources Limited
(ASX: AIS) (Aeris or the Company) is pleased to provide this update on production
results for FY25. The following table shows group level production for the June quarter
and the total for the financial year compared to guidance.
Group Production
Unit
Sep 24
Qtr
Dec 24
Qtr
Mar 25
Qtr
Jun 25
Qtr
FY25
FY25
Guidance
Copper produced
kt
6.0
5.8
7.0
6.2
24.9
27 – 32
Gold produced
koz
15.2
15.1
11.9
13.1
55.2
50 – 62
Silver produced
koz
43.9
35.2
45.2
60.8
185.2
200 – 240
Cu eq production1
kt
10.2
10.2
10.7
10.9
42.1
40 – 48
1 Formula for Copper Equivalent (Cu eq) = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t).
Produced quantities are after recovery. Commodity prices – Sep quarter: US$9,210/t Cu, US$2,474/oz Au and US$29/oz Ag, Dec quarter:
US$9,193/t Cu, US$2,663/oz Au and US$31/oz Ag, Mar quarter: US$9,345/t Cu, US$2,861/oz Au and US$32/oz Ag, Jun quarter: US$9,524/t
Cu, US$3,281/oz Au and US$34/oz Ag
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane QLD 4000 Australia
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
Aeris’ Executive Chairman, Andre Labuschagne said “The FY25 results were pleasing
with group copper equivalent production totalling 42.1kt, within the guidance
range. Cracow delivered strong gold production improving the group’s overall
results amid record-high gold prices. At Tritton, production increased quarter on
quarter with the introduction of tonnes from Murrawombie Pit. The shortfall on
copper guidance was primarily due to production delays at Tritton and reduced
recoveries from Mt Colin earlier in the year.“
Tritton
Tritton achieved production of 6.2kt Cu in the June quarter, a 44% increase on the
previous quarter. Copper production for the year was 19.4kt, below the guidance
range. Delays to underground production through the year and to the Stage 1
production ramp up from Murrawombie Pit in Q4 resulted in lower copper tonnes
than forecast, although mining is now proceeding as planned. Stockpiles of 77kt of
mined ore at the end of the quarter is available for processing in FY26. The build-up
of ore stockpiles has enabled the mill to run above nameplate capacity, with an
annualised rate of >2Mtpa achieved in the final weeks of June.
Production Summary
Unit
Sep 24
Qtr
Dec 24
Qtr
Mar 25
Qtr
Jun 25
Qtr
FY25
FY25
Guidance
Ore Mined
kt
269.1
243.6
218.6
455.8
1,187.0
Mined Grade
% Cu
1.87
1.78
2.03
1.49
1.74
Ore Milled
kt
273.9
239.3
238.7
382.1
1,134.0
Milled Grade
% Cu
1.90
1.69
1.90
1.70
1.79
Recovery
Cu
95.9%
95.4%
95.7%
95.6%
95.7%
Copper Produced
kt
5.0
3.9
4.3
6.2
19.4
21 – 25
Gold Produced
koz
1.5
1.1
1.4
2.0
6.1
7–9
Silver Produced
koz
43.9
35.2
45.2
60.8
185.2
200 – 240
Cracow
Cracow performed well in the June quarter with gold production of 11.0koz, 22%
higher quarter on quarter due to improved mining rates and recoveries. Gold
production for the year was 45.1koz, higher than plan and above midpoint of
guidance.
2|P a g e
Unit
Sep 24
Qtr
Dec 24
Qtr
Mar 25
Qtr
Jun 25
Qtr
FY25
Ore Mined
kt
126.8
130.4
115.6
133.8
506.6
Mined Grade
g/t
3.30
3.08
2.47
2.68
2.89
Ore Milled
kt
157.6
156.8
143.5
159.6
617.6
Milled Grade
g/t
2.80
2.68
2.19
2.36
2.51
Recovery
Au
91.1%
90.4%
88.9%
91.1%
90.5%
Gold Produced
koz
12.9
12.2
9.0
11.0
45.1
Gold Sold
koz
12.6
12.4
9.4
10.8
45.3
Production Summary
FY25
Guidance
40 – 49
North Queensland
There were no changes to the North Queensland production numbers reported last
quarter.
Production Summary
Unit
Sep 24
Qtr
Dec 24
Qtr
Mar 25
Qtr
Jun 25
Qtr
FY25
FY25
Guidance
Ore Mined
kt
106.4
70.6
-
-
176.9
Mined Grade
% Cu
2.51
2.28
-
-
2.42
Ore Milled
kt
101.8
106.6
154.1
-
362.5
Milled Grade
% Cu
1.57
2.11
2.06
-
1.94
Recovery
Cu
62.3%
85.1%
82.0%
-
78.5%
Copper Produced
kt
1.0
1.9
2.6
-
5.5
6–7
Gold Produced
koz
0.8
1.8
1.5
-
4.0
3–4
Cash and Receivables
Aeris finished the quarter with cash and receivables of $49.5 million 2, up from
$33.6 million the previous quarter. Cash includes the ~$10 million of restricted cash
released upon drawdown of the Guarantee Facility on 30 June 2025.
Further information will be available in the quarterly report to be released later this
month.
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
2 The cash and receivables balance are unaudited and as a result could change upon outcome from the FY25 audit
3|P a g e
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper dominant portfolio
comprises two operating assets, a mine on care and maintenance, a long-life development project
and a highly prospective exploration portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration program and
continues to investigate strategic merger and acquisition opportunities. The Company’s experienced
board and management team bring significant corporate and technical expertise to a lean
operating model. Aeris is committed to building strong partnerships with its key community,
investment and workforce stakeholders.
4|P a g e
Share your feedback
Discover