UPDATED SEPTEMBER QUARTERLY REPORT PRESENTATION
Released
Released
Announcement PDF
4 November 2024
ASX/MEDIA RELEASE
UPDATED “SEPTEMBER QUARTERLY REPORT PRESENTATION”
Aeris Resources Limited (ASX:AIS) would like to provide this replacement version of
the presentation released to the ASX on 30 October 2024 (Original Presentation).
This presentation does not materially change the contents of the Original Presentation and
has been released to include a number of cross references relating to Exploration Results,
Mineral Resources and Ore Reserves as well as other regulatory disclosures as set out on
slide 3 of the presentation.
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper dominant portfolio
comprises three operating assets, a mine on care and maintenance, a long-life development project
and a highly prospective exploration portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration program and
continues to investigate strategic merger and acquisition opportunities. The Company’s experienced
board and management team bring significant corporate and technical expertise to a lean
operating model. Aeris is committed to building strong partnerships with its key community,
investment and workforce stakeholders.
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane QLD 4000 Australia
Post: GPO Box 2460, Brisbane, QLD 4001
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 | Page1 977
Q1 FY25 Results
30 October 2024
Presented by: Andre Labuschagne
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”). By attending an investor presentation or
briefing, or accepting, accessing or reviewing this presentation, you
acknowledge and agree to the terms set out below.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris with the Australian Securities Exchange (“ASX”) in
connection with its continuous disclosure obligations. This presentation
does not purport to contain all of the information that an investor should
consider when making an investment decision nor does it contain all of
the information which would be required in a product disclosure
statement or prospectus prepared in accordance with the requirements
of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, Aeris has no obligation to update the information
contained in this presentation. An investment in securities is subject to
known and unknown risks, some of which are beyond the control of
Aeris. Investors should consult with their own legal, tax, business and/or
financial advisors in connection with any acquisition of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing nonIFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris believes the non-IFRS financial information and non-GAAP
financial measures provide useful information to users in measuring the
financial performance and condition of Aeris.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris and its officers. This
includes statements about market and industry trends, which are based
on interpretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “estimate”, “intend”,
“believe”, “guidance”, “should”, “could”, “may”, “will”, “predict”, “plan”
and other similar expressions.
Forward-looking statements are based on information available to Aeris
as at the date of this presentation and should not be relied upon as an
indication or guarantee of future performance. Except as required by
law or regulation (including the ASX Listing Rules), none of Aeris, its
representatives or advisers undertakes any obligation to provide any
additional or updated information whether as a result of a change in
expectations or assumptions, new information, future events or results or
otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
recent world events such as the COVID-19 pandemic and international
hostilities and associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which Aeris has no obligation to do or to procure) or are offered or sold
pursuant to an exemption from, or in a transaction not subject to, the
2
registration requirements of the US Securities Act and any applicable
securities laws of any state or other jurisdiction of the United States.
Disclaimer
NO NEW INFORMATION STATEMENT
This presentation refers to Exploration Results, estimates of Mineral
Resources and Ore Reserves contained in the Group Mineral Resource
and Ore Reserve Statement as at 31 December 2023 which was
announced on 17 June 2024 (2024 MROR Group Statement) and prior
market announcements released by Aeris, (Prior Reports). The Prior
Reports are footnote referenced in this presentation and available from:
https://www.aerisresources.com.au/investor.
Aeris confirms that it is not aware of any new information or data that
materially affects the information included in the Prior Reports and, in the
case of Exploration Results, estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters
underpinning the results or estimates in the Prior Reports continue to
apply and have not materially changed. Aeris confirms that the form
and context in which the Competent Person’s findings are presented in
this document have not been materially modified from the Prior Reports.
UPDATES TO PRESENTATION
This is an updated investor presentation dated 4 November 2024 which
has been provided to update and replace the version of the investor
presentation released on the ASX Market Announcements Platform on
30 October 2024 (Original Presentation). This presentation does not
materially change the contents of the Original Presentation and has
been released to include a number of technical ASX Listing Rule
references and other regulatory disclosures, namely: (a) Slide 2, insertion
of the “Not for Distribution or Release in the United States” section (b)
Slide 3, insertion of the “No New Information Statement;” (c) Slides 4, 5, 7,
8, 10, 11 and 15, insertion of footnotes referring to the original reports
underlying the Exploration Results, Mineral Resource or Ore Reserves
included on these slides (as applicable); (d) Slides 20 and 22, insertion of
a footnote explaining the calculation of Cu equivalent and (e) Insertion
of slides 24 and 25 to include Group Mineral Resource and Ore Reserve
(MRE) as published on ASX on 17 June 2024 to provide clarity on the MRE
Category tonnes and grade.
3
Key points for Q1 FY25
Another good quarter from operations
Group copper equivalent production of 10.2kt for the quarter at an
improved AISC of A$5.32/lb
28 holes drilled at Constellation (Tritton) to test the subvertical standup zone and infill main zone to improve resource confidence1
Tritton performed well with production ahead of plan at 5.0kt Cu
Jaguar on care and maintenance – preferred restart scenario to be
presented to the Board this quarter
Cracow well ahead of plan at 12.9koz Au
Stockman feasibility work continues
Mt Colin mining in line with plan but high oxidised mill feed
impacted recovery and production
Cash and receivables increased from $33.4M to $39.1M
1. Refer to ASX Announcement “Quarterly Activities Report – Sept 2024” released on 30 October 2024
4
Aeris Resources
Australian mid-tier, base and precious metals producer
Mt Colin Mine (100%)
Mine Type
FY25 Guidance
U/G Cu, Au
6 - 7kt Cu
Cracow Operations (100%)
Mine Type
U/G Au
FY25 Guidance
40 - 49koz Au
Barbara Project (100%) – Development
Mine Type
Resource1
U/G Cu, Au
45kt Cu
Jaguar Operations (100%) – Care and Maintenance
Mine Type
Resource2
North Queensland
U/G Zn, Cu, Ag, Au
455kt Zn, 97kt Cu
Cracow
Jaguar
Tritton
Stockman Project (100%) – Development
Mine Type
Resource2
Tritton Operations (100%)
U/G Zn, Cu, Au
624kt Zn, 315kt Cu
Stockman
1.
2.
Refer to ASX Announcement “Barbara Mineral Resource Update” released on 28 June 2023. MRE comprises Indicated resource of
1.98Mt at 2.0% Cu, 0.2g/t Au, 3.3g/t Ag and Inferred resource of 0.26Mt at 1.8% Cu, 0.1g/t Au, 3.5g/t Ag
See Appendix for Mineral Resource tables and ASX announcement “Group Mineral Resource and Ore Reserve Statement” released on
17 June 2024
Mine Type
FY25 Guidance
U/G Cu
21 - 25kt Cu
5
Tritton
NSW
Q1 results
Another strong quarter from Tritton
Copper production of 5.0kt at AISC of $5.06/lb, ahead of plan
Increased production from high grade Avoca Tank stopes
AISC decreased quarter on quarter, demonstrating good cost
controls
28 holes drilled at Constellation, focusing on infill drilling of the
main zone resource and better defining the subvertical standup zone1
Jun 24
Sep 24
FY25
Qtr
Qtr
YTD
FY25
Guidance
kt
5.4
5.0
5.0
21 - 25
Gold Produced
koz
1.5
1.5
1.5
7-9
Silver Produced
koz
42.6
43.9
43.9
200 - 240
Mining
A$M
30.7
27.4
27.4
105 - 128
Processing
A$M
8.2
7.4
7.4
29 - 36
Site G&A
A$M
5.7
5.2
5.2
21 - 25
TC/RCs
A$M
4.3
4.2
4.2
13 - 16
Product Handling
A$M
4.8
3.7
3.7
14 - 17
Sustaining Capital
A$M
12.6
11.5
11.5
51 - 63
Growth Capital
A$M
2.1
2.7
2.7
37 - 45
Exploration
A$M
0.2
0.5
0.5
1-2
Production
Summary
Unit
Copper Produced
Cost Summary
1. Refer to ASX Announcement “Quarterly Activities Report – Sept 2024” released on 30 October 2024
7
Constellation exploration
28 holes drilled to test subvertical stand-up zone and infill main zone resource1
Drill hole true width lengths are between 60% to 85% of reported interval lengths.
1. Refer to ASX Announcement “Quarterly Activities Report – Sept 2024” released on 30 October 2024
8
Cracow
Queensland
Q1 results
Strong quarter with higher gold production
Gold production of 12.9koz at AISC of A$2,352/oz
Improved production due to the availability of high-grade
stopes
Jun 24
Sep 24
FY25
Qtr
Qtr
YTD
FY25
Guidance
koz
11.6
12.9
12.9
40 - 49
koz
11.6
12.6
12.6
Production
Summary
Unit
Gold Produced
Gold Sold
Cost Summary
AISC lower quarter on quarter driven by lower mining costs
and higher gold production
Mining
A$M
14.0
14.0
14.0
57 - 70
Processing
A$M
6.9
6.5
6.5
24 - 30
Exploration drilling continued in the Western Vein Field with
five holes intersecting the Apollo structure, awaiting assay1
Site G&A
A$M
3.2
2.7
2.7
11 - 13
Sustaining Capital
A$M
3.2
3.6
3.6
13 - 16
Growth Capital
A$M
0.0
0.0
0.0
0-1
Exploration
A$M
1.8
2.0
2.0
3-4
1. Refer to ASX Announcement “Quarterly Activities Report – Sept 2024” released on 30 October 2024
10
Near mine exploration
Defining new mineralised structure at Apollo
Further 6 drill holes completed at Apollo targeting high grade
mineralisation
While the Apollo target has been reduced, potential exists to
extend mineralisation down dip with further drilling
Assays returned from 7 holes in the Coronation West and Kilkenny
West structures did not return significant intersections. Drilling is
continuing into the current quarter1
Updated Mineral Resource Estimate for the Golden Plateau deposit
based on new drilling did not result in a material change1
Oblique view looking northwest showing drill hole pierce points through the Apollo
structure at the Western Vein Field1
1. Refer to ASX Announcement “Quarterly Activities Report – Sept 2024” released on 30 October 2024
11
Mt Colin
North Queensland
Q1 results
Mt Colin underperformed due to processing of
oxidised material
Mining performance in line with plan as final stopes are
extracted
Processing underperformed due to increased levels of
oxidised material
Significant stockpiles of 175kt of ore at Ernest Henry mill
available for processing
Mining activities now expected to be completed in late
November
Minor EA amendment granted to enable mining activities
at Barbara; feasibility study being finalised for presentation
to the Board
Jun 24
Jun 24
FY25
Qtr
Qtr
YTD
FY25
Guidance
kt
1.3
1.0
1.0
6 -7
koz
1.2
0.8
0.8
3-4
Mining
A$M
8.5
7.7
7.7
10 - 12
Processing
A$M
7.7
7.6
7.6
16 - 19
Site G&A
A$M
1.2
1.3
1.3
3-4
TC/RCs
A$M
0.9
0.7
0.7
4-5
Product Handling
A$M
1.1
0.8
0.8
5-6
Sustaining Capital
A$M
(0.1)
0.0
0.0
0
Growth
A$M
-
0.2
0.2
1-3
Exploration
A$M
0.3
0.1
0.1
0-1
Production
Summary
Unit
Copper Produced
Gold Produced
Cost Summary
13
Jaguar
Western Australia
Q1 activities
Jaguar now focused on restart studies and
exploration
Operation on care and maintenance
Care and maintenance costs of $2.4M
Multiple restart scenarios have been assessed and a preferred
option will be presented to the Aeris board for approval this quarter
Drilling at Heather Bore prospect intersected gold mineralisation and
will be used to develop a structural model to inform further
exploration1
Long section view of the Heather Bore gold prospect showing the position of the recently
completed diamond drill holes, historical drill holes and anomalous gold mineralisation1
1. Refer to ASX Announcement “Quarterly Activities Report – Sept 2024” released on 30 October 2024
15
Stockman Project
Victoria
Q1 activities
Feasibility study progressing
Preparing for further detailed metallurgical test work to support the
Albion process and confirm product qualities
Further investigation into sites for the Albion plant construction
Groundwater environmental quality report submitted to the EPA
Benambra School capital improvements works completed
Benambra school upgrades
17
Corporate
Closing cash and receivables of $39.1 million with cash of $25.5 million
Jun
Sep
2024
2024
QTR
QTR
24.8
25.5
Mt Colin
1.2
3.6
Cracow
0.0
0.0
Tritton
7.5
10.0
33.4
39.1
(A$ Million)
Cash balance excludes additional $12 million restricted cash applied
to environmental bonding
Closing cash
Debt position of $40 million unchanged
Process to refinance debt and bonding facilities well advanced
Receivables
Useable Cash and Receivables
18
Focus for next quarter
Paste fill line at Budgerygar, to enable increased production from
the mine
Completion of Barbara feasibility study and investment decision
Continuation of Constellation drill program at Tritton to improve
resource confidence
Presentation of preferred restart scenario for Jaguar
Exploration results from Apollo and Coronation West prospects at
Cracow
Refinancing of debt and bonding facilities
Completion of mining at Mt Colin in late November
19
Aeris Resources
Australian mid-tier, base and precious metals
producer
3 producing operations
3 development / re-start projects
Highly prospective for further discoveries
FY25 production guidance of 40-48kt Cu eq1
Substantial copper metal inventory
Excellent platform for growth
1.
Copper Equivalent (CuEq) values – Requirements under the JORC Code
Assumed commodity prices for the calculation of Copper Equivalent (CuEq) is US$9,620/t Cu, US$2,341/oz Au and
US$29.43/oz Ag
•
Formula: CuEq = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
•
Aeris Resources confirms that it is the Company’s opinion that all the elements included in the metal equivalents
calculation have a reasonable potential to be recovered and sold.
•
20
Appendix
FY25 guidance
Group
Production
Copper
Gold
Silver
Copper equivalent1
Operating Costs
Mining
Processing
Site G&A
TC/RCs
Product handling
1.
2.
kt
koz
koz
kt
FY25
Guidance
FY24
Actual
27 – 32
50 - 62
200 - 240
40 - 48
27.2
55.3
240.4
42.0
Care and maintenance2
$M
$M
$M
$M
$M
$M
172 - 210
69 - 85
35 - 42
17 - 21
19 - 23
3-5
204.6
91.1
44.6
25.4
22.4
n/a
Capital Costs
Sustaining
Growth
Exploration
Projects
$M
$M
$M
$M
64 - 79
38 - 49
5-8
1-2
74.7
21.5
8.8
2.5
Tritton
FY25
Guidance
FY24
Actual
Production
Copper
Gold
Silver
kt
koz
koz
21 - 25
7-9
200 - 240
19.7
4.9
156
Operating Costs
Mining
Processing
Site G&A
TC/RCs
Product handling
$M
$M
$M
$M
$M
105 - 128
29 - 36
21 - 25
13 - 16
14 - 17
104.9
30.7
19.9
18.3
14.8
Capital Costs
Sustaining
Growth
Exploration
$M
$M
$M
51 - 63
37 - 45
1 -2
57.2
5.4
1.8
Copper Equivalent (CuEq) values – Requirements under the JORC Code
Assumed commodity prices for the calculation of Copper Equivalent (CuEq) is US$9,620/t Cu, US$2,341/oz Au
and US$29.43/oz Ag
•
Formula: CuEq = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
•
Aeris Resources confirms that it is the Company’s opinion that all the elements included in the metal equivalents
calculation have a reasonable potential to be recovered and sold.
•
Includes Jaguar and Mt Colin post completion of mining
22
FY25 guidance
Cracow
FY25
Guidance
FY24
Actual
Production
Gold
koz
40 - 49
45.7
Operating Costs
Mining
Processing
Site G&A
$M
$M
$M
57 - 70
24 - 30
11 - 13
51.3
25.6
11.7
Capital Costs
Sustaining
Growth
Exploration
$M
$M
$M
13 - 16
0-1
3-4
14.8
16.0
4.9
North Queensland
FY25
Guidance
FY24
Actual
Production
Copper
Gold
kt
koz
6 -7
3-4
6.8
4.3
Operating Costs
Mining
Processing
Site G&A
TC/RCs
Product handling
$M
$M
$M
$M
$M
10 - 12
16 - 19
3-4
4-5
5-6
36.7
25.2
5.5
5.0
5.5
Capital Costs
Sustaining
Growth
Exploration
$M
$M
$M
0-0
1-3
0-1
(0.1)
0.0
0.9
23
Group Mineral Resources
PROJECT
CATEGORY
TONNES (‘000)
Base Metals
Tritton
Jaguar
North Queensland
CONTAINED METAL
% Cu
% Zn
g/t Au
g/t Ag
kt Cu
kt Zn
koz Au
koz Ag
Measured
1,300
1.0
-
0.1
3
13
-
4
120
Indicated
11,200
1.4
-
0.3
4
145
-
91
1,280
Inferred
10,000
1.7
-
0.3
4
183
-
137
1,440
Total
22,500
1.5
-
0.3
4
342
-
232
2,840
Measured
500
1.6
5.0
0.3
63
8
25
4
1,030
Indicated
3,400
1.3
7.6
0.5
75
45
256
51
8,170
Inferred
4,000
1.2
4.0
0.5
56
47
161
68
7,270
Total
7,900
1.3
5.6
0.5
65
100
442
123
16,460
Measured
300
2.8
-
0.6
-
9
-
6
-
Indicated
2,200
2.0
-
0.2
3
44
-
13
210
Inferred
600
2.0
-
0.1
2
11
-
2
30
3,100
2.1
-
0.2
2
65
-
21
240
Measured
-
-
-
-
-
-
-
-
-
Indicated
13,400
2.1
4.2
1.0
37
288
561
420
16,000
Inferred
2,400
1.1
2.6
1.5
32
27
62
117
2,440
Total
15,800
2.0
4.0
1.1
36
315
623
537
18,450
49,300
1.7
2.2
0.6
24
882
1,065
913
37,990
Measured
400
-
-
3.9
3
-
-
52
39
Indicated
2,100
-
-
3.4
4
-
-
259
249
Inferred
2,400
-
-
2.9
4
-
-
208
376
Grand Total
4,900
-
-
3.4
4
-
-
519
664
Total
Stockman
GRADE
Grand Total
GOLD
Cracow
As at December 2023. Refer to ASX Announcement “Group Mineral Resource And Ore Reserve Statement” dated 17 June 2024
24
Group Ore Reserves
PROJECT
CATEGORY
TONNES (‘000)
Base Metals
Tritton
Jaguar
North Queensland
Stockman
GRADE
CONTAINED METAL
% Cu
% Zn
g/t Au
g/t Ag
kt Cu
kt Zn
koz Au
koz Ag
5
1.8
-
-
-
0.1
-
-
-
Probable
2,790
1.5
-
0.3
5
41
-
23
451
Total
2,790
1.5
-
0.3
5
41
-
23
451
Proved
90
1.4
8.7
0.8
74
1
8
2
225
Probable
1,060
1.4
8.3
0.6
45
16
87
21
1,534
Total
1,150
1.5
8.3
0.6
48
17
95
23
1,759
Proved
90
2.4
-
0.5
-
2
-
1
-
Probable
80
2.1
-
0.4
-
2
-
1
-
Total
170
2.3
-
0.4
-
2
-
2
-
-
-
-
-
-
-
-
-
Proved
Proved
Probable
9,640
1.9
4.3
1.0
36
183
413
318
11,409
Total
9,640
1.9
4.3
1.0
36
183
413
318
11,409
13,750
1.8
3.7
0.8
30
245
508
367
13,619
Proved
100
-
-
3.5
-
-
-
12
-
Probable
250
-
-
3.4
-
-
-
28
-
Grand Total
360
-
-
3.4
-
-
-
39
-
Grand Total
Gold
Cracow
As at December 2023. Refer to ASX Announcement “Group Mineral Resource And Ore Reserve Statement” dated 17 June 2024
25