QUARTERLY ACTIVITIES REPORT - MARCH 2025
Released
Released
Announcement PDF
Quarterly Activities Report
Quarterly Activities Report
For the period ended 31 March 2025
Highlights
Increased group copper equivalent (Cu eq) production of 10.7kt1 for the quarter
at improved AISC of A$4.91/lb Cu eq
Cash and receivables at end of quarter of $33.6M after $10M cash backing of ANZ
guarantee facility
Strong cash flow from operations of $45.4M, up 37% quarter on quarter (Dec 24:
$33.2M)
Tritton production improved - 4.3kt Cu produced at lower AISC of A$6.16/lb
Cracow delivers significant cash flows above budget at current gold prices despite
planned lower gold production of 9.0koz and increased AISC of A$3,473/oz.
Final stockpiles processed at Mt Colin - 2.6kt Cu produced at AISC A$1.64/lb. FY25
production of 5.5kt Cu and 4koz Au improves overall Group Cu eq production.
Constellation updated Mineral Resource Estimate increased contained copper
metal by 24% and contained gold metal by 29%2
Aeris remains on track for group copper equivalent production guidance
Unit
Safety – LTIFR
Sep 24
Qtr
Dec 24
Qtr
Mar 25
Qtr
YTD
FY25
Guidance
/mmhrs
1.4
1.6
1.9
Copper produced
kt
6.0
5.8
7.0
18.7
27 – 32
-
Gold produced
koz
15.2
15.1
11.9
42.1
50 – 62
Silver produced
koz
43.9
35.2
45.2
124.3
200 – 240
Cu eq production1
kt
10.21
10.21
10.7
31.2
40 – 48
A$M
49.1
45.0
44.5
138.5
172 – 210
Processing
A$M
21.5
19.2
21.1
61.8
69 – 85
Site & G&A
A$M
9.3
10.8
9.6
29.7
35 – 42
TC/RCs
A$M
4.9
4.8
1.3
11.0
17 – 21
Operating Costs
Mining
Product handling
A$M
4.5
4.8
5.5
14.7
19 – 23
Care and maintenance
A$M
2.3
2.4
2.9
7.7
3–5
A$M
15.1
19.5
17.6
52.3
64 – 79
Growth
A$M
3.0
4.1
13.0
20.2
38 – 49
Exploration
A$M
3.0
1.7
2.2
6.9
5–8
Projects
A$M
0.5
0.4
0.5
1.4
1–2
116.2
349.6
-
4.91
5.08
-
Capital Costs
Sustaining
AISC
A$M
119.7
113.83
AISC
A$/lb Cu eq
5.32
5.04
1 Formula for Copper Equivalent (Cu eq) = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t).
Produced quantities are after recovery, Commodity prices for Sep Quarter: US$9,210/t Cu, US$2,474/oz Au and US$29/oz Ag,
Commodity prices for Dec Quarter: US$9,193/t Cu, US$2,663/oz Au and US$31/oz Ag and Commodity prices for Mar Quarter:
US$9,345/t Cu, US$2,861/oz Au and US$32/oz Ag.
2 See ASX announcement “Material Increase in Copper and Gold at Constellation”, dated 31 March 2025.
3 Corrected number. Dec report incorrectly excluded care and maintenance costs.
Aeris Resources Limited
1
Group Safety, Environment and Community
Pleasingly, Aeris recorded no lost time injuries for the quarter with Group LTIFR at 1.9 for
the quarter1.
There was one environmental incident reported to the regulator at Cracow when two
site water storages overtopped after 110mm of rainfall. Environmental monitoring
indicated no release of mine affected water offsite.
Figure 1: Group LTIFR
3
No of LTI
LTIFR
2
1
-
1 During the quarter, a reconciliation of working hours over the last 12 months occurred. The Group LTIFR of 1.9 in
March quarter reflects the accumulated adjustments from this reconciliation and therefore notes an increase on the
December quarter reported Group LTIFR of 1.6.
2
Tritton Operations (NSW)
Key points for quarter:
Improved production of 4.3kt Cu at AISC of A$6.16/lb
Mining improvement project delivering increased development, backfill and
diamond drilling rates
Murrawombie Open Pit production commenced, delivering ore to the mill
No change to annual guidance
Constellation updated Mineral Resource Estimate (MRE) material increase
contained copper metal by 24% and contained gold metal by 29%
Sep 24
Dec 24
Mar 25
Qtr
Qtr
Qtr
kt
269.1
243.6
218.6
731.2
% Cu
1.87
1.78
2.03
1.89
Ore Milled
kt
273.9
239.3
238.7
751.9
Milled Grade
% Cu
1.90
1.69
1.90
1.83
Recovery
Cu
95.9%
95.4%
95.7%
95.7%
Copper Produced
kt
5.0
3.9
4.3
13.2
21 – 25
Gold Produced
koz
1.5
1.1
1.4
4.0
7–9
Silver Produced
koz
43.9
35.2
45.2
124.3
200 – 240
Mining
A$M
27.4
24.9
28.1
80.4
105 – 128
Processing
A$M
7.4
7.8
7.5
22.7
29 – 36
Site G&A
A$M
5.2
6.5
6.4
18.1
21 – 25
TC/RCs
A$M
4.2
3.4
0.8
8.4
13 – 16
Product Handling
A$M
3.7
3.2
3.4
10.2
14 – 17
By-Product Credit
A$M
(7.1)
(6.3)
(9.1)
(22.5)
Royalties
A$M
2.0
1.8
2.7
6.5
Corporate G&A
A$M
0.5
0.5
0.5
1.6
Inventory Movements
A$M
0.8
0.6
5.0
6.4
Sustaining Capital1
A$M
11.5
14.8
13.8
40.0
A$M
55.6
57.3
59.0
171.8
A$/lb
5.06
6.75
6.16
5.91
Growth Capital
A$M
2.7
4.0
12.2
18.9
37 – 45
Exploration
A$M
0.5
0.2
0.9
1.6
1–2
A$M
58.7
61.5
69.4
189.6
A$/lb
5.35
7.24
7.24
6.52
Production Summary
Unit
Ore Mined
Mined Grade
YTD
FY25
Guidance
Cost Summary
All-In Sustaining Costs2
All-In Costs2
51 – 63
1.
Includes sustaining capital, capitalised mine development, rehabilitation and financing payments (principal
and interest) on leased assets
2.
All-In Sustaining and All-In Costs are based on copper produced
3
Operations
Underground ore production was impacted by delays to stope filling at Budgerygar
due to a failure of the newly commissioned paste pump. The paste pump was
repaired by the OEM under warranty. Backfill performance returned to scheduled
rates at the end of Q3 and will continue to be a priority for the remainder of FY25.
Along with backfill returning to scheduled rates, the mining improvement project
initiated last quarter is now delivering meaningful gains in underground development
and diamond drilling performance. Full manning of jumbos, enabled by the
recruitment of additional operators, has driven an approximate 50% uplift in
development metres quarter on quarter. The focus on the mining improvement
project is expected to have an ongoing positive impact on production rates and
operational efficiency in Q4.
Murrawombie Pit operations commenced in the quarter, with first successful blast
delivering ore to the mill in early March. Ramp up to full production was slower than
expected due to the contractor having difficulty securing skilled operators, which has
now been resolved. With the pit operations ramp up now in full swing, the
Murrawombie Pit is planned to deliver a significant proportion of mill feed in Q4 and
FY26.
Figure 2: Murrawombie Pit operations
Progressive mine rehabilitation activities using clean (non-acid forming) waste rock
from the pit cutback to cover the historic Murrawombie heap leach pads, have also
commenced in the quarter.
4
Figure 3: Progressive mine rehabilitation of old heap leach pads underway using clean waste
rock from Murrawombie Pit
The processing plant continued to perform well for the quarter with metallurgical
recovery above plan at 95.7%. The ramp up of ore mining from Murrawombie Pit will
enable the mill to reach full capacity during Q4, significantly increasing copper
production.
Costs
Gross mining costs increased quarter on quarter due to additional costs associated
with Murrawombie Pit activities, however AISC reduced to A$6.16/lb on higher copper
production. Growth capital expenditure increased as planned with the capitalised
stripping costs associated with the Murrawombie open pit activities.
Exploration
During the March quarter an updated Mineral Resource Estimate (MRE) was
completed at the Constellation deposit. The MRE update incorporates results from an
additional 91 drill holes (264 in total). The majority of the drill holes formed part of a
resource definition drill program aimed at converting Inferred material to an Indicated
classification.
5
The updated MRE now totals 7.6 million tonnes @ 2.01% Cu, 0.66 g/t Au and 2.5 g/t Ag,
containing 153kt Cu metal, 161koz Au metal, and 608koz Ag metal1. This represents a
24% increase in contained copper metal and a 29% increase in contained gold metal
compared to the previous August 2022 estimate2.
The Indicated Mineral Resource component has increased significantly to 5.3Mt @
1.75% Cu, 0.66 g/t Au and 2.7 g/t Ag, representing a 279% increase in contained
copper metal and a 333% increase in contained gold metal. This provides a strong
platform for conversion to a Probable Ore Reserve as part of the ongoing feasibility
study.
Work at Constellation will now focus on the completion of the feasibility study on an
open pit and underground operation with ancillary surface infrastructure. The
feasibility study is expected to be complete in Q2 FY26 and will inform the release of
a maiden Ore Reserve estimate.
The Environmental Impact Statement (EIS) for Constellation development has been
lodged with the NSW Department of Planning and Environment, with determination,
and the granting of the Mining Lease expected within CY25.
1 See ASX announcement “Material Increase in Copper and Gold at Constellation”, dated 31 March 2025
2 Refer to ASX announcement “Constellation Mineral Resource Update” dated 18 August 2022
6
Figure 4: Constellation Deposit Long Section Showing 2025 Pit Shell
7
Cracow Operations (QLD)
Key points for quarter:
Gold production slightly lower than plan producing 9.0koz at increased AISC of
$3,473/oz
Sustaining capital spend includes investment in the secondary cyclone project to
improve recoveries
Cracow generating free cash flow significantly above budget at current gold
prices
Cracow remains on track to achieve annual production guidance
Sep 24
Dec 24
Mar 25
Qtr
Qtr
Qtr
kt
126.8
130.4
115.6
372.8
Mined Grade
g/t
3.30
3.08
2.47
2.96
Ore Milled
kt
157.6
156.8
143.5
458.0
Milled Grade
g/t
2.80
2.68
2.19
2.57
Recovery
Au
91.1%
90.4%
88.9%
90.3%
Gold Produced
koz
12.9
12.2
9.0
34.1
Gold Sold
koz
12.6
12.4
9.4
34.5
Mining
A$M
14.0
14.5
16.4
44.9
57 – 70
Processing
A$M
6.5
6.6
6.8
19.9
24 – 30
Site G&A
A$M
2.7
2.8
2.7
8.1
11 – 13
By-Product Credit
A$M
(0.2)
(0.3)
(0.3)
(0.9)
Royalties
A$M
2.6
2.7
2.4
7.7
Corporate G&A
A$M
0.4
0.4
0.4
1.3
Inventory Movements
A$M
0.2
(0.4)
0.7
0.5
Sustaining Capital1
A$M
3.6
4.6
3.5
11.8
A$M
29.7
30.9
32.7
93.3
A$/oz
2,352
2,488
3,473
2,707
Growth Capital
A$M
-
-
-
-
0–1
Exploration
A$M
2.0
1.2
0.9
4.1
3–4
A$M
31.7
32.1
33.5
97.4
A$/oz
2,509
2,587
3,567
2,826
Production Summary
Unit
Ore Mined
YTD
FY25
Guidance
40 – 49
Cost Summary
All-In Sustaining Costs2
All-In Costs2
13 – 16
1.
Includes sustaining capital, capitalised mine development, rehabilitation and financing payments (principal
and interest) on leased assets
2.
All-In Sustaining and All-In Costs are based on gold sold
Operations
Cracow mining operations were focussed on increasing development rates in the
quarter noting a considerable improvement, despite the production performing
slightly below plan due to variability in mined stope grades on the margin of the
deposit. Operations were also impacted by disruption to flights caused by Cyclone
Alfred, resulting in reduced available manning impacting mining activities.
8
The secondary cyclone circuit was installed at the processing plant during the quarter
with commissioning to be completed in Q4. The circuit will improve grinding capacity
and is forecast to improve gold recovery by 1% once commissioned.
Production is forecast to improve in Q4. Gold production at Cracow remains on track
to meet midpoint of the production guidance range.
Figure 5: Secondary cyclone circuit being installed
Costs
AISC costs increased during the quarter, due to increased development activities
undertaken in the quarter, impacting mining operating cost. Sustaining capital costs
include costs associated with installation of the secondary cyclone circuit and was
lower in quarter due to less mining development being capitalised. On a unit cost
basis, AISC increased considerably on lower gold production.
Exploration
Re-processing of historic two-dimensional and three-dimensional seismic surveys was
completed during the quarter. The re-processed datasets have shown a substantial
improvement in image resolution that will aid in an improved geological interpretation
within the Western Vein Field underground mine footprint. Once complete, the
updated interpretation will assist with refining geological interpretations across the key
greenfield targets at Southern Vein Field and Western Frontier.
9
North Queensland Operations (QLD)
Key points for quarter:
Final stockpiled material processing was completed and Mt Colin operations
moved into care and maintenance
2.6kt Cu produced at AISC of A$1.64/lb
FY25 production of 5.5kt Cu and 4koz Au improves overall Group Cu eq production
Options for divestment of North Queensland assets are being considered
Production Summary
Unit
Ore Mined
kt
Mined Grade
Sep 24
Dec 24
Mar 25
Qtr
Qtr
Qtr
106.4
70.6
-
YTD
FY25
Guidance
176.9
% Cu
2.51
2.28
-
2.42
Ore Milled
kt
101.8
106.6
154.1
362.5
Milled Grade
% Cu
1.57
2.11
2.06
1.94
Recovery
Cu
62.3%
85.1%
82.0%
78.5%
Copper Produced
kt
1.0
1.9
2.6
5.5
6–7
Gold Produced
koz
0.8
1.8
1.5
4.0
3–4
A$M
7.7
5.5
-
13.2
10 – 12
Processing
A$M
7.6
4.8
6.9
19.3
16 – 19
Site G&A
A$M
1.3
1.6
0.5
3.4
3–4
TC/RCs
A$M
0.7
1.3
0.6
2.6
4–5
5–6
Cost Summary
Mining
Product Handling
A$M
0.8
1.6
2.1
4.5
By-Product Credit
A$M
(5.4)
(4.4)
(2.7)
(12.4)
Royalties
A$M
1.6
0.3
1.5
3.4
Corporate G&A
A$M
0.3
0.3
0.3
1.0
Inventory Movements
A$M
4.6
0.9
0.0
5.5
Sustaining Capital1
A$M
-
-
0.3
0.3
A$M
19.4
12.0
9.4
40.8
A$/lb
8.81
2.84
1.64
3.35
Growth
A$M
0.2
0.2
0.0
0.4
1–3
Exploration
A$M
0.1
0.0
0.0
0.1
0–1
A$M
19.6
12.2
9.5
41.3
A$/lb
8.94
2.89
1.65
3.40
All-In Sustaining Costs2
All-In Costs2
1.
Includes sustaining capital, capitalised mine development, rehabilitation a nd financing payments
2.
(principal and interest) on leased assets
All-In Sustaining and All-In Costs are based on copper produced
Operations
Processing of the final stockpiled ore was completed during the quarter. 154.1kt of ore
was processed at Ernest Henry, producing 2.6kt Cu and 1.5koz Au, with gold being
higher than planned, improving the overall Group Cu eq production for the quarter.
Metallurgical recovery averaged 82.0%.
The FY25 copper production of 5.5kt, was just shy of the lower end guidance range of
6 – 7kt, offset by achieving the upper range of FY25 gold production of 4.0koz due to
higher gold grades achieved than planned.
10
Rehabilitation activities have commenced at Mt Colin with contractor buildings and
surface infrastructure removed from site, relocation of potentially acid forming waste
(PAF) to the underground workings and reprofiling and seeding of areas no longer in
use.
Costs
AISC costs reduced to $9.4M (A$1.64/lb Cu) as no mining activities were undertaken
and the site moved to care and maintenance. Total operating costs for FY25 were
within guidance.
Exploration
No material exploration activities were undertaken in North Queensland during the
quarter.
Jaguar Operations (WA)
Key points for quarter:
Operation in care and maintenance, incurring costs of $2.9 million
Advancing restart studies to feasibility level – focus on technical review of
ventilation and ground control requirements.
Infrastructure review of power supply and distribution options to meet revised
mine design requirements.
Exploration
During the January to March 2025 quarter, exploration activities focused on field
mapping, gravity modelling, and rock sampling within the broader Jaguar–Triumph
VMS corridor. Several prospective areas were identified for further work, with key
targets outlined based on gravity anomalies, surface alteration and geochemical
pathfinders. Mapping efforts also included assessment of smaller anomalies, with
collected samples pending analysis. No drilling was undertaken during the period. The
Jaguar tenements remain highly prospective for both base metals and gold
exploration.
Stockman Project (VIC)
Key points for quarter:
Detailed Albion leach metallurgical test work underway; estimated completion
in Q4
Further investigation of off-mine site locations for the downstream ore
processing facility with access to power, water and rail infrastructure.
Reviewing options for metal products and qualities that can be produced from
Stockman. The choice of metal product will also dictate final processing
flowsheet design.
11
Corporate
Cash and Receivables
At the end of the quarter, Aeris had useable cash and receivables to $33.6 million with
a closing unrestricted cash balance of $22.4 million. A further $10 million was added
to restricted cash during the quarter (required to cash back a portion of the ANZ
guarantee facility) taking total restricted cash to $28.9 million.
Cash flow from operations continued to improve to $45.4 million on stronger
commodity prices received.
Sep
2024
QTR
Dec
2024
QTR
Mar
2025
QTR
Closing cash
Receivables
Mt Colin
Cracow
Tritton
25.5
26.4
22.4
3.6
10.0
0.3
0.1
6.2
11.2
Useable Cash and Receivables
39.1
33.0
33.6
Sep
Dec
Mar
2024
2024
2025
QTR
QTR
QTR
Opening cash
Cash flow from operations
Cash flow from capital expenditure
24.8
25.4
(19.4)
25.5
33.2
(25.9)
26.4
45.4
(31.5)
Cash flow from financing
(5.2)
(6.4)
(17.8)
Closing cash
25.5
26.4
22.4
(A$ Million)
(A$ Million)
Figure 6: March Quarter Cash Flow ($M)
17
6
35
(32)
26
(2)
(10)
(14)
22
(4)
12
Figure 7: YTD Cash Flow (A$M)
16
59
60
(74)
(7)
(23)
25
(19)
22
(14)
Debt and Hedging
At the end of the quarter, the Company’s debt position remained unchanged with
$40 million drawn on the WHSP facility. During the quarter, the ANZ guarantee facility
was extended to 31 July 2025. The Company had no hedges in place at the end of
the quarter.
The process to refinance the company’s facilities is nearing completion and Aeris
expects to be able to make an announcement on this soon.
Authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper dominant portfolio
comprises two operating assets, a mine on care and maintenance, a long-life development
project and a highly prospective exploration portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration program and
continues to investigate strategic merger and acquisition opportunities. The Company’s
experienced board and management team bring significant corporate and technical