GROUP MINERAL RESOURCE AND ORE RESERVE STATEMENT
Released
Released
Announcement PDF
Mineral Resource and Ore Reserves Statement 30 June 2026
1
ASX RELEASE
30 JULY 2026
GROUP MINERAL RESOURCE AND
ORE RESERVE STATEMENT as at 30 June 2026
• Group Mineral Resource is now estimated at 61Mt (up 24%) containing 950kt
of copper, 1,400koz of gold, 1,100kt of zinc and 43Moz of silver1 including:
o Incorporation of Resources at the recently acquired Mallee Bull and
Wirlong deposits
• Group Ore Reserve is now estimated at 21Mt (up 50%), containing 350kt of
copper, 470koz of gold, 340kt of zinc and 13Moz of silver including:
o More than doubling of the Cracow Ore Reserve after depletion
o Maiden Underground Ore Reserves at Constellation and Mallee Bull
o Updated Stockman Ore Reserve
Australian mid-tier copper and gold producer, Aeris Resources Limited (ASX:AIS) (Aeris or the
Company) is pleased to release its 30 June 2026 Group Mineral Resource and Ore Reserve
Statement for its 100% owned Tritton and Cracow Operations and Stockman and Jaguar
Projects.
Aeris’s Executive Chairman, Andre Labuschagne said “this Group Mineral Resource and Ore
Reserve Statement demonstrates successful implementation of Aeris’s strategy to grow
through exploration and strategic M&A. The inclusion of the Mallee Bull and Wirlong projects
from the acquisition of Peel Mining Limited has made a material contribution to the increase
in reserves and resources. Likewise, highly successful exploration programs at both Cracow
and Tritton has resulted in significant increases at both operations.”
Forward Work Plan
Aeris remains focused on growing and sustaining high-quality Mineral Resources and Ore
Reserves across its core asset portfolio. During FY27, the Company will progress resource
definition and exploration drilling, together with targeted technical and feasibility studies
across Tritton, Cracow (the Golden Plateau Mineral Resource figures were reported in January
2023. Drill hole results from the current drill program will be included in an updated Mineral
Resource estimate scheduled for FY27 Q1), Stockman and Jaguar. These activities are
expected to support further Mineral Resource and Ore Reserve additions, extend mine life,
advance key development projects and strengthen the long-term value of the Company's
operations and project portfolio.
1 Mineral Resource estimates are inclusive of reported Ore Reserve estimates
Mineral Resource and Ore Reserves Statement 30 June 2026
2
Group Mineral Resource and Ore Reserve Estimates
Group Mineral Resource and Ore Reserve Estimates are presented in Table 1 and Table 2. The
Mineral Resource and Ore Reserve estimates are reported in accordance with the guidelines
of the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves (the “JORC Code 2012”). Competent Persons’ statements for the
estimates are included at the end of this statement, and JORC Code Table 1 disclosures are
included in the Appendices to this document.
Table 1: Group Mineral Resource Estimates at 30 June 2026
BASE
METALS
Category
Tonnes Grade Contained Metal
Asset (Mt)
Cu
(%)
Zn
(%)
Au
(g/t)
Ag
(g/t)
Cu
(kt)
Zn
(kt)
Au
(koz)
Ag
(koz)
Tritton
Measured 1.8 1.4 - 0.2 4 25 - 11 260
Indicated 19 1.6 0.4 0.4 12 310 37 230 7,300
Inferred 12 1.8 0.1 0.3 5 210 2.0 100 2,100
Total 33 1.7 0.3 0.3 9 540 39 340 9,600
Jaguar
Measured 0.50 1.6 5.0 0.3 63 8.0 25 4.0 1,000
Indicated 4.2 1.4 6.4 0.4 67 59 270 53 9,000
Inferred 2.0 1.1 6.5 1.0 83 23 130 62 5,300
Total 6.6 1.4 6.3 0.6 71 90 420 120 15,000
North Qld
Measured - - - - - - - - -
Indicated - - - - - - - - -
Inferred - - - - - - - - -
Total - - - - - - - - -
Stockman
Measured - - - - - - - - -
Indicated 15 2.0 3.9 0.9 35 290 570 420 16,000
Inferred 2.5 1.1 2.3 1.1 28 28 57 88 2,200
Total 17 1.9 3.7 0.9 34 320 630 510 19,000
Total
Measured 2.3 1.4 1.1 0.2 17 33 25 15 1,300
Indicated 38 1.7 2.4 0.6 27 660 880 700 33,000
Inferred 17 1.6 1.2 0.5 17 260 190 250 9,500
Grand Total 56 1.7 2.0 0.5 24 950 1,100 970 43,000
GOLD
Category
Tonnes Grade Contained Metal
Asset (Mt)
Cu
(%)
Zn
(%)
Au
(g/t)
Ag
(g/t)
Cu
(kt)
Zn
(kt)
Au
(koz)
Ag
(koz)
Cracow
Measured 0.30 - - 3.3 3 - - 34 30
Indicated 2.1 - - 3.1 3 - - 210 220
Inferred 2.6 - - 2.1 4 - - 180 340
Total Grand Total 5.0 - - 2.6 4 - - 430 590
Notes:
• Mineral Resource tonnes and contained metal are reported to two significant figures; grades are reported to
one decimal place (Cu, Zn, Au), and to the nearest whole number (Ag). Figures are rounded, and rounded
figures may not sum precisely to reported totals or reconcile exactly between tonnes, grade and contained
metal.
• Mineral Resource estimates are reported using a variety of cut-off criteria (NSR, copper or gold) depending on
which is best suited to each deposit.
• A detailed description for each Mineral Resource estimate is included in the Appendices (apart from the
Budgery resource model, which is JORC 2004 compliant).
• The Tritton Mineral Resources include the Mallee Bull and Wirlong deposits that were acquired on 1 July 2026.
Mineral Resource and Ore Reserves Statement 30 June 2026
3
Table 2: Group Ore Reserve Estimates at 30 June 2026
BASE
METALS
Category
Tonnes Grade Contained Metal
Asset (Mt)
Cu
(%)
Zn
(%)
Au
(g/t)
Ag
(g/t)
Cu
(kt)
Zn
(kt)
Au
(koz)
Ag
(koz)
Tritton
Proved 0.75 1.2 - 0.1 3 9.2 - 2.4 63
Probable 9.4 1.8 - 0.4 11 170 - 120 3,200
Total 10 1.7 - 0.4 10 180 - 130 3,200
North Qld
Proved - - - - - - - - -
Probable - - - - - - - - -
Total - - - - - - - - -
Stockman
Proved - - - - - - - - -
Probable 9.8 1.8 3.5 0.8 31 180 340 260 9,800
Total 9.8 1.8 3.5 0.8 31 180 340 260 9,800
Total
Proved 0.75 1.2 - 0.1 3 9.0 - 2.4 60
Probable 19 1.8 1.8 0.6 21 340 340 380 13,000
Grand Total 20 1.7 1.7 0.6 20 350 340 390 13,000
GOLD
Category
Tonnes Grade Contained Metal
Asset (Mt)
Cu
(%)
Zn
(%)
Au
(g/t)
Ag
(g/t)
Cu
(kt)
Zn
(kt)
Au
(koz)
Ag
(koz)
Cracow
Proved 0.19 - - 2.3 2 - - 14 12
Probable 1.0 - - 2.1 2 - - 68 62
Total 1.2 - - 2.1 2 - - 82 74
Notes:
• Ore Reserve tonnes and contained metal are reported to two significant figures; grades are reported to one
decimal place (Cu, Zn, Au), and to the nearest whole number (Ag). Figures are rounded, and rounded figures
may not sum precisely to reported totals or reconcile exactly between tonnes, grade and contained metal.
• Ore Reserve estimates are reported using a variety of cut-off criteria suitable for each deposit.
• Mineral Resource figures are inclusive of Ore Reserves.
• A detailed description for each Ore Reserve estimate is included in the Appendices.
• The Tritton Ore Reserves include the Mallee Bull deposit that was acquired on 1 July 2026.
Changes in Group Mineral Resources Estimates
Group Mineral Resource estimate, net of mining depletion, represent a net increase of 170kt
in contained copper, 33koz in contained gold, 7.3Moz in contained silver and 41kt in
contained zinc relative to estimates at 31 December 2024, as shown by asset in Figure 1 to
Figure 4.
Mineral Resource and Ore Reserves Statement 30 June 2026
4
Figure 1: Changes in Group Mineral Resource tonnage relative to 31 December 20242
Figure 2: Changes in Group Mineral Resource copper metal content relative to 31 December
20242
2 A reconciled breakdown of the changes in the Mineral Resource Estimate covering the 12-month period
from December 2024 to December 2025 and the subsequent 6-month period to June 2026 is presented
in Figures 12–15 for Tritton and Figures 37–39 for Cracow.
780
950
-64
+230
+5.6
-
200
400
600
800
1,000
1,200
Dec 2024
MRE
Tritton Jaguar North QLD Stockman Cracow June 2026
MRE
Contained
Copper
(kt)
49
61
-3.2
+14
+1.2 +0.6
-
10
20
30
40
50
60
70
Dec 2024
MRE
Tritton Jaguar North QLD Stockman Cracow June 2026
MRE
Tonnes
(Mt)
Mineral Resource and Ore Reserves Statement 30 June 2026
5
Figure 3: Changes in Group Mineral Resource gold metal content relative to 31 December
20242
Figure 4: Changes in Group Mineral Resource silver metal content relative to 31 December
20242
1,400 1,400
-21 -25 -25
+100
-
200
400
600
800
1,000
1,200
1,400
1,600
Dec 2024
MRE
Tritton Jaguar North QLD Stockman Cracow June 2026
MRE
Contained
Gold
(koz)
37,000
44,000
-240
7,500
+94 +20
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
45,000
50,000
Dec 2024
MRE
Tritton Jaguar North QLD Stockman Cracow June 2026
MRE
Contained
Silver
(koz)
Mineral Resource and Ore Reserves Statement 30 June 2026
6
Figure 5: Changes in Group Mineral Resource zinc metal content relative to 31 December
20242
Mineral Resource changes at each operation are summarised below.
• Tritton Operations Mineral Resource tonnage increased by 14Mt and 230kt Cu metal
over the reporting period, driven primarily by the acquisition of the Mallee Bull and
Wirlong deposits, which contributed 11Mt and 200kt Cu metal. Exploration and
resource extension drill programs at the Avoca Tank and Budgerygar deposits
contributed a further 2.7Mt and 51kt Cu metal. These increases were partially offset by
mine depletion over the reporting period, which reduced Mineral Resource by 1.4Mt
and 33kt Cu metal.
• Cracow Operations Mineral Resource tonnage increased by approximately 640kt over
the reporting period, while contained gold metal decreased by 25koz and silver metal
increased by 20koz. The increase in tonnage was driven by resource additions from
drilling and updated reporting parameters, including the application of a revised 1.0g/t
Au cut-off grade. These increases were partially offset by mine depletion over the 18-
month reporting period, updated geological modelling, and revised spatial constraints
based on Stope Optimiser shapes used to constrain reportable Mineral Resource.
• Jaguar Projects Mineral Resource has not changed since the previous reporting period.
• North Queensland Project was divested during the reporting period. The transaction
included the sale of all MRE deposits.
• Stockman Project Mineral Resource marginally increased in response to updated
metal price assumptions and a change to the reporting methodology.
1,000 1,100
+39 +3.0
-
200
400
600
800
1,000
1,200
Dec 2024
MRE
Tritton Jaguar North QLD Stockman Cracow June 2026
MRE
Contained
Zinc
(kt)
Mineral Resource and Ore Reserves Statement 30 June 2026
7
Changes in Group Ore Reserves Estimates
The Group Ore Reserve tonnage, net of mining depletion, has grown 1.5 times, with increases
of approximately 100kt of contained copper, 70koz of contained gold, 1,100koz of contained
silver, and a decrease of 73kt of contained zinc, relative to estimates at 31 December 2024.
The changes by asset are shown in Figure 6 to Figure 10. The main reasons for the material
changes to the Ore Reserve estimates at each asset are:
• Tritton Operation increased due to the maiden estimates for Constellation open pit and
underground, and the acquisition of the Mallee Bull project.
• Cracow Operation increased due to mine planning additions.
• Stockman Project decreased following completion of Feasibility Study-level studies based
on the current Mineral Resource models used for this Mineral Resource Estimate. The
previous Ore Reserve Estimate was based on Pre-Feasibility Study-level studies using earlier
versions of the Mineral Resource models.
• North Queensland Project was divested during the reporting period. The transaction
included the sale of all ORE deposits.
• Jaguar Project. There is no Ore Reserve estimate. The completion of technical studies in
the previous reporting period concluded that additional mineable Mineral Resources are
required to support a restart. Technical Studies have been paused while further exploration
drilling is undertaken.
Figure 6: Changes in Group Ore Reserve tonnage relative to 31 December 20243
3 A reconciled breakdown of the changes in the Ore Reserve Estimate, covering the 12-month period
from December 2024 to December 2025 and the subsequent 6-month period to June 2026, is presented
in Figures 28 - 31 for Tritton and Figures 41-42 for Cracow.
14
21
-1.6
+7.8
+0.1 +0.7
-
5
10
15
20
25
Dec 2024
ORE
Tritton Jaguar North QLD Stockman Cracow June 2026
ORE
Tonnes
(Mt)
Mineral Resource and Ore Reserves Statement 30 June 2026
8
Figure 7: Changes in Group Ore Reserve contained copper relative to 31 December 20243
Figure 8: Changes in Group Ore Reserve contained gold relative to 31 December 20243
250
350
-30
-4
+140
-
50
100
150
200
250
300
350
400
450
Dec 2024
ORE
Tritton Jaguar North QLD Stockman Cracow June 2026
ORE
Contained
Copper
(kt)
400
470
-10
-55
+100 +34
-
100
200
300
400
500
600
Dec 2024
ORE
Tritton Jaguar North QLD Stockman Cracow June 2026
ORE
Contained
Gold
(koz)
Mineral Resource and Ore Reserves Statement 30 June 2026
9
Figure 9: Changes in Group Ore Reserve contained silver relative to 31 December 20243
Figure 10: Changes in Group Ore Reserve contained zinc relative to 31 December 20243
11,900
13,000
-1,600
+2,800
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Dec 2024
ORE
Tritton Jaguar North QLD Stockman Cracow June 2026
ORE
Contained
Silver
(koz)
410
340
-73
-
50
100
150
200
250
300
350
400
450
Dec 2024
ORE
Tritton Jaguar North QLD Stockman Cracow June 2026
ORE
Contained
Zinc
(kt)
Mineral Resource and Ore Reserves Statement 30 June 2026
10
This announcement authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
Investor enquiries: Stefan Edelman, General Manager Corporate Development
investorrelations@aerisresources.com.au
Follow Aeris Resources: Subscribe to email announcements and join our Investor Hub to stay
up to date and connect to Aeris leaders.
About Aeris
Aeris Resources Limited (ASX:AIS) is an Australian mid-tier copper and gold producer. Aeris
owns and operates two producing assets, Tritton Copper Operations (NSW) and Cracow Gold
Operations (Qld), along with a strong pipeline of growth projects and a highly prospective
exploration portfolio. Its experienced board and management have significant corporate
and technical expertise to drive an efficient operating model. Aeris continues to investigate
strategic mergers and acquisitions to build value for its stakeholders. Find out more at
www.aerisresources.com.au and follow Aeris on LinkedIn.
Mineral Resource and Ore Reserves Statement 30 June 2026
11
Competent Persons Statements
The information in this announcement that relates to Ore Reserve Estimates has been compiled
by Cam Schubert, Chief Technical Officer of Aeris Resources Limited and a Fellow of the
Australasian Institute of Mining and Metallurgy (FAusIMM No. 111663). Mr Schubert has sufficient
experience relevant to the styles of mineralisation, the types of deposit under consideration
and the activities undertaken to qualify as a Competent Person as defined in the JORC Code
(2012 Edition), and consents to the inclusion in this announcement of the matters based on
their information in the form and context in which they appear.
The information in this announcement that relates to the Mineral Resource Estimates has been
compiled by Brad Cox, Executive General Manager Exploration of Aeris Resources Limited and
a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM No. 220544). Mr
Cox has sufficient experience relevant to the styles of mineralisation, the types of deposit under
consideration and the activities undertaken to qualify as a Competent Person as defined in
the JORC Code (2012 Edition), and consents to the inclusion in this announcement of the
matters based on their information in the form and context in which they appear. Table 3
Identifies the Competent Persons responsible for each of the Mineral Resources and Ore
Reserves reported in this announcement.
Table 3: Competent Persons for 30 June 2026 Mineral Resources and Ore Reserves estimates
Deposit Mineral Resource Estimate (MRE)
and
Deposit Ore Reserve Estimate (ORE)
Competent
Person
Membership Status Member
Number
Tritton MRE: Constellation, Kurrajong,
Budgery
Brad Cox AusIMM Member 220544
Tritton MRE: Tritton, Murrawombie,
Budgerygar, South Wing, Avoca Tank
Osvaldo
Gonzalez
AusIMM Member 3175947
Tritton MRE: Mallee Bull and Wirlong
(estimation)
Tritton MRE: Mallee Bull and Wirlong
(interpretation / informing
information)
Jonathon
Abbott4
Rob Tyson4
AIG
AusIMM
Member
Member
4835
203414
Tritton ORE: Tritton, Budgerygar,
Avoca Tank, Mallee Bull
Tim Brettell AusIMM Member 200052
Tritton ORE: Murrawombie Open Pit,
Constellation Open Pit
Tyler Benson AusIMM Member 307475
Tritton ORE: Constellation
Underground
Max McInnis AusIMM Member 3003564
Tritton ORE: Murrawombie Open Pit Tyler Benson AusIMM Member 307475
Cracow MRE: Western Vein Field Liam Machin AUSIMM Member 320276
Cracow MRE: Golden Plateau Brad Cox AusIMM Member 220544
Cracow ORE: Western Vein Field Matt Gray AusIMM Member 225170
Jaguar MRE: Bentley, Jaguar,
Teutonic Bore, Triumph
Andrew Fowler AusIMM Member 301401
Stockman MRE: Currawong, Wilga,
Eureka and Bigfoot
Brad Cox AusIMM Member 220544
Stockman ORE: Currawong, Wilga Tim Brettell AusIMM Member 200052
4 Mr Abbott is the Competent Person for the estimation of the Mallee Bull and Wirlong Mineral Resource
Estimates. Mr Tyson is Competent Person for the geological interpretation and information informing the
Mallee Bull and Wirlong Mineral Resource Estimates.
Mineral Resource and Ore Reserves Statement 30 June 2026
12
The information in this statement that relates to the Mineral Resource and Ore Reserve
estimates listed in Table 3 is based on, and fairly represents, information and supporting
documentation prepared by the Competent Person whose name appears in the same row.
Each Competent Person is a full-time employee of Aeris Resources Limited, with the exception
of Jonathon Abbott, a director of Matrix Resource Consultants Pty Ltd, Rob Tyson, a full-time
employee of Spectre Metals Limited, Andrew Fowler, a full-time employee of Gold Fields
Australia, and Matt Gray, a director of Vantage Mining Solutions.
All are Members or Fellows of either the Australasian Institute of Mining and Metallurgy
(AusIMM) or Australian Institute of Geoscientists (AIG) and have sufficient relevant experience
to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the JORC Code. Each of these Competent Persons consents to the inclusion in the
report of the matters based on their information in the form and context in which it appears.
Aeris Resources employees acting as a Competent Person may hold equity in Aeris Resources
Limited and may be entitled to participate in Aeris's executive equity long-term incentive plan,
details of which are included in Aeris's annual Remuneration Report. Annual replacement of
depleted Mineral Resources and Ore Reserves is one of the performance measures of Aeris’s
long-term incentive plans.
Mallee Bull and Wirlong Mineral Resource Estimates
The Mineral Resource estimates for the Mallee Bull and Wirlong deposits were first reported by
Peel Mining Limited in its ASX announcement titled "20Mt Resource Base for South Cobar
Project" dated 9 January 2023. Aeris acquired these deposits through its acquisition of Peel
Mining Limited, completed on 1 July 2026, and the estimates are reported by Aeris in this
announcement without re-estimation.
Aeris confirms that it is not aware of any new information or data that materially affects the
Mineral Resource estimates for the Mallee Bull and Wirlong deposits, and that all material
assumptions and technical parameters underpinning the estimates continue to apply and
have not materially changed. The Competent Persons responsible for the estimates, Mr
Jonathon Abbott (estimation) and Mr Rob Tyson (geological interpretation and informing
information), have reviewed the estimates and confirm they continue to comply with the
JORC Code (2012 Edition). Aeris confirms that the form and context in which the Competent
Persons' findings are presented have not been materially modified from the original
announcement.
Mineral Resource and Ore Reserves Statement 30 June 2026
13
Mineral Resource and
Ore Reserves Statement
30 June 2026
Mineral Resource and Ore Reserves Statement 30 June 2026
14
Table of Contents
GROUP MINERAL RESOURCE AND ORE RESERVE STATEMENT as at 30 June 2026...........................1
Group Mineral Resource and Ore Reserve Estimates..................................................................2
Changes in Group Mineral Resources Estimates......................................................................3
Changes in Group Ore Reserves Estimates...............................................................................7
Competent Persons Statements...................................................................................................11
Table of Contents...........................................................................................................................14
Tritton Operation Mineral Resources & Ore Reserves ...................................................................17
Introduction.....................................................................................................................................18
Mineral Resource Estimate ............................................................................................................19
Changes from prior reported MRE...........................................................................................21
Material assumptions for Mineral Resource Estimate ............................................................23
Ore Reserve Estimate.....................................................................................................................30
Ore Reserve Classification ........................................................................................................31
Changes from prior Ore Reserve Estimate..............................................................................34
Material assumptions for Ore Reserve Estimate – Tritton, Budgerygar, Avoca Tank,
Murrawombie .............................................................................................................................37
Material assumptions for Ore Reserve Estimate – Constellation ..........................................40
Material assumptions for Ore Reserve Estimate – Mallee Bull...............................................48
Cracow Operation Mineral Resources & Ore Reserves................................................................56
Introduction.....................................................................................................................................57
Mineral Resource Estimate ............................................................................................................58
Changes from prior Mineral Resource Estimate.....................................................................60
Material Assumptions for Mineral Resource Estimate ............................................................62
Ore Reserve Estimate.....................................................................................................................65
Ore Reserve Classification ........................................................................................................66
Changes from prior Ore Reserve Estimate..............................................................................66
Material Assumptions for Ore Reserve Estimate .....................................................................67
Jaguar Project Mineral Resources & Ore Reserves.......................................................................71
Introduction.....................................................................................................................................72
Mineral Resource Estimate ............................................................................................................73
Changes from prior Mineral Resource Estimate.....................................................................74
Material Assumptions for Mineral Resource Estimate ............................................................74
Ore Reserve Estimate.....................................................................................................................78
Stockman Project Mineral Resources & Ore Reserves..................................................................79
Introduction.....................................................................................................................................80
Mineral Resource Estimate ............................................................................................................81
Changes from prior Mineral Resource Estimate.....................................................................82
Mineral Resource and Ore Reserves Statement 30 June 2026
15
Material Assumptions for Mineral Resource Estimate ............................................................85
Ore Reserve Estimate.....................................................................................................................87
Ore Reserve Classification ........................................................................................................87
Changes from prior Ore Reserve Estimate..............................................................................90
Material Assumptions for Ore Reserve Estimate .....................................................................94
Appendix JORC Code 2012, Table 1...........................................................................................102
Tritton Operation - JORC Code 2012, Table 1...........................................................................103
Tritton/South Wing Deposit - Section 1 Sampling Techniques and Data ..........................104
Tritton/South Wing Deposit - Section 2 Reporting of Exploration Results ...........................108
Tritton/South Wing Deposit - Section 3 Estimation and Reporting of Mineral Resources 109
Tritton Underground - Section 4 Estimation and Reporting of Ore Reserves ....................113
Budgerygar Deposit - Section 1 Sampling Techniques and Data......................................120
Budgerygar Deposit - Section 2 Reporting of Exploration Results ......................................123
Budgerygar Deposit - Section 3 Estimation and Reporting of Mineral Resources ...........124
Budgerygar Underground - Section 4 Estimation and Reporting of Ore Reserves ..........127
Avoca Tank Deposit - Section 1 Sampling Techniques and Data .....................................133
Avoca Tank Deposit - Section 2 Reporting of Exploration Results......................................135
Avoca Tank Deposit - Section 3 Estimation and Reporting of Mineral Resources ...........137
Avoca Tank Deposit – Section 4 Estimation and Reporting of Ore Reserves ...................140
Murrawombie Deposit – Section 1 Sampling Techniques and Data.................................146
Murrawombie Deposit – Section 2 Reporting of Exploration Results..................................148
Murrawombie Deposit – Section 3 Estimation and Reporting of Mineral Resources.......149
Murrawombie Open Pit – Section 4 Estimation and Reporting of Ore Reserves..............150
Constellation Deposit – Section 1 Sampling Techniques and Data...................................154
Constellation Deposit – Section 2 Reporting of Exploration Results ...................................158
Constellation Deposit – Section 3 Estimation and Reporting of Mineral Resources.........160
Constellation Open Pit – Section 4 Estimation and Reporting of Ore Reserves ...............164
Constellation Underground – Section 4 Estimation and Reporting of Ore Reserves .......169
Kurrajong Deposit – Section 1 Sampling Techniques and Data.........................................174
Kurrajong Deposit – Section 2 Reporting of Exploration Results .........................................176
Kurrajong Deposit – Section 3 Estimation and Reporting of Mineral Resources...............176
Mallee Bull and Wirlong Deposits – Section 1 Sampling Techniques and Data ...............180
Mallee Bull and Wirlong Deposits – Section 2 Reporting of Exploration Results................184
Mallee Bull Deposit – Section 3 Estimation and Reporting of Mineral Resources.............186
Wirlong Deposit – Section 3 Estimation and Reporting of Mineral Resources ..................190
Mallee Bull Underground – Section 4 Estimation and Reporting of Ore Reserves............194
Cracow Operation - JORC Code 2012, Edition Table 1..........................................................199
Western Vein Field – Section 1 Sampling Techniques and Data........................................200
Western Vein Field – Section 2 Reporting of Exploration Results ........................................204
Western Vein Field – Section 3 Estimation and Reporting of Mineral Resources..............205
Western Vein Field – Section 4 Estimation and Reporting of Ore Reserves.......................209
Golden Plateau Deposit – Section 1 Sampling Techniques and Data..............................215
Golden Plateau Deposit – Section 2 Reporting of Exploration Results ..............................218
Golden Plateau Deposit – Section 3 Estimation and Reporting of Mineral Resources....220
Jaguar Project - JORC Code, 2012, Table 1 .............................................................................224
Teutonic Bore Deposit – Section 1 Sampling Techniques and Data..................................225
Mineral Resource and Ore Reserves Statement 30 June 2026
16
Teutonic Bore Deposit – Section 2 Reporting of Exploration Results ..................................228
Teutonic Bore Deposit – Section 3 Estimation and Reporting of Mineral Resources........229
Jaguar Deposit – Section 1 Sampling Techniques and Data.............................................232
Jaguar Deposit – Section 2 Reporting of Exploration Results..............................................235
Jaguar Deposit – Section 3 Estimation and Reporting of Mineral Resources..............