2. Results for announcement to the market
2026 2025 Change
$'000 $'000 $'000 %
Revenues from ordinary activities ↑ 702,769 577,058 125,711 22%
Adjusted Earnings Before Interest, Tax,
Depreciation and Amortisation (Adjusted
EBITDA)* ↑ 318,192 179,599 138,593 77%
Profit from ordinary activities after tax
attributable to the owners of Aeris Resources
Limited ↑ 178,539 45,202 133,337 295%
Profit for the year attributable to the owners of
Aeris Resources Limited ↑ 178,539 45,202 133,337 295%
* Refer to the Directors' Report for a reconciliation of Non-IFRS Adjusted EBITDA
Earnings per share
2026 2025
Cents Cents
Basic earnings per share 16.1 4.7
Diluted earnings per share 15.6 4.6
Dividends
There were no dividends paid, recommended or declared during the current financial period.
Comments
The profit for the consolidated entity after providing for income tax amounted to $178,539,000 (30 June
2025: $45,202,000).
3. Net tangible assets
Reporting
period
Previous
period
Cents Cents
Net tangible assets per ordinary security 49.8 32.6
Aeris Resources Limited
Appendix 4E
Preliminary final report
4. Control gained over entities
Not applicable.
5. Loss of control over entities
Not applicable.
6. Dividends
Current period
There were no dividends paid, recommended or declared during the current financial period.
Previous period
There were no dividends paid, recommended or declared during the previous financial period.
7. Dividend reinvestment plans
Not applicable.
8. Details of associates and joint venture entities
Not applicable.
9. Foreign entities
Details of origin of accounting standards used in compiling the report:
Not applicable.
10. Audit qualification or review
Details of audit/review dispute or qualification (if any):
The financial statements have been audited by PricewaterhouseCoopers and provide an unqualified
opinion.
11. Attachments
Details of attachments (if any):
The Annual Financial Report of Aeris Resources Limited for the year ended 30 June 2026 is attached.
Aeris Resources Limited
ABN 30 147 131 977
Annual Financial Report - 30 June 2026
Aeris Resources Limited
Corporate directory
30 June 2026
1
Directors Andre Labuschagne - Executive Chairman
Michele Muscillo - Non-executive Director
Colin Moorhead - Non-executive Director
Carmen Letton - Non-executive Director (appointed 13 July 2026)
Company secretaries Dane van Heerden
Sally McDow
Registered office and
principal
Level 6
place of business 120 Edward Street
Brisbane
QLD 4000
Phone: (07) 3034 6200
Share register Automic
Level 5
126 Phillip Street
Sydney
NSW 2000
Phone: 1300 288 664 (within Australia)
+61 2 9698 5414 (outside Australia)
Auditor PricewaterhouseCoopers
Level 23
480 Queen Street
Brisbane
QLD 4000
Solicitors HopgoodGanim Lawyers
Level 10
360 Queen Street
Brisbane
QLD 4000
Stock exchange listing Aeris Resources Limited shares are listed on the Australian Securities
Exchange (ASX code: AIS)
Website www.aerisresources.com.au
Corporate Governance
Statement
www.aerisresources.com.au/about/corporate-governance/
Directors’ Report
30 June 2026
Aeris Resources Limited
Directors’ Report
30 June 2026
2
The Directors present their report, together with the consolidated financial report of the Aeris Resources
Limited Group (‘consolidated entity’), consisting of Aeris Resources Limited (‘Aeris’ or ‘Company’) and the
entities it controlled at the end of, or during, the year ended 30 June 2026.
DIRECTORS
The Directors of the Company in office during the financial year and up to the date of this report were:
Name, experience and other directorships
Special
Responsibilities
Appointed /
Resigned
Andre Labuschagne – Executive Chairman
Mr Labuschagne is an experienced mining executive with a
career spanning over 30 years across operations in Australia,
Indonesia, South Africa, PNG and Fiji. Mr Labuschagne has
held various corporate and operational roles in companies
including Norton Gold Fields, Emperor Gold Mines, DRD Gold
and AngloGold Ashanti. Mr Labuschagne holds a Bachelor
of Commerce from Potchefstroom University in South Africa.
Other current directorships (ASX listed entities): Magontec
Limited (ASX:MGL) and Australian Resources & Energy
Employer Association (AREEA).
Former directorships in the past 3 years (ASX listed entities):
None.
Executive
Chairman
Appointed
20-Dec-
2012
Michele Muscillo – Independent Non-Executive Director
Mr Muscillo is a Partner specialising in corporate law with
HopgoodGanim Lawyers. Mr Muscillo is an admitted Solicitor
and has a practice focussed almost exclusively on mergers &
acquisitions and capital raising. Mr Muscillo has acted on a
variety of corporate transactions including initial public
offerings, takeovers and acquisitions. Mr Muscillo has a
Bachelor of Laws from Queensland University of Technology
and was a recipient of the QUT University Medal.
Other current directorships (ASX listed entities): MB Gold
Limited (ASX:MBG) and Northwind Exploration Inc (unlisted).
Former directorships in the past 3 years (ASX listed entities):
Xanadu Mines Limited (ASX:XAM).
Chairman of the
Audit and Risk
Committee and
member of the
Remuneration
and Nomination
Committee and
the Sustainability
Committee
Appointed
2-May-2013
Colin Moorhead – Independent Non-Executive Director
Mr Moorhead is an experienced industry executive with a
demonstrated track record over three decades of building
value in mining companies through innovation, discovery,
project development and safe, efficient operations.
A geologist by training, Mr Moorhead is also known for strong
leadership, strategy and execution. Mr Moorhead’s career has
involved both operational and corporate executive
responsibilities including global responsibility for exploration
and resource development at Newcrest Mining and CEO of PT
Merdeka Copper Gold (IDX:MDKA), where he built and led the
team that constructed and commissioned the highly
successful Tujuh Bukit Gold Mine. Colin is also currently Non-
Executive Director of Mineral Resources Ltd (ASX: MIN), Non-
Executive Director of Ramelius Resources Limited (ASX:RMS)
and Non-Executive Director of VHM Limited (ASX:VHM).
Chairman of the
Remuneration
and Nomination
Committee and
Sustainability
Committee
Member of the
Audit and Risk
Committee
Appointed
27-July-2020
Aeris Resources Limited
Directors’ Report
30 June 2026
3
Name, experience and other directorships
Special
Responsibilities
Appointed /
Resigned
Former directorships in the past 3 years (ASX listed entities):
Xanadu Mines (ASX:XAM); Sihayo Gold Limited (ASX: SIH), and
Coda Minerals (ASX:COD)
Robert Millner – Non-Executive Director
Mr Millner is the Chairman of Australian investment house
Washington H Soul Pattinson (ASX:SOL). Mr Millner has extensive
experience in the investment industry, and is the Chairman of
Brickworks Limited (ASX: BKW), BKI Investment Co Ltd and New
Hope Corporation Limited (ASX:NHC) and a Non-Executive
Director of Apex Healthcare Berhad and TPG Telecom Ltd
(ASX:TPG).
Former directorships in the past 3 years (ASX listed entities):
Milton Corporation Limited (delisted from ASX on 5 October
2021) and Tuas Limited (ASX:TUA).
Appointed
1-July-2022
Resigned
1-
December-
2025
Dr Carmen Letton – Non-Executive Director
Dr Letton is a mining engineer and mineral economist with
more than 35 years of international mining experience
spanning the Americas, Australia, Asia, Europe and Africa. She
holds a PhD in Mineral Economics from the University of
Queensland and a Bachelor of Engineering (Mining) (Honours)
from the Western Australian School of Mines, Kalgoorlie.
Dr Letton holds a directorship at TSX listed CanaGold.
Former directorships in the past 3 years (ASX Listed entities):
Magnetite Mines (ASX:MGT) and Technology Metals Australia
Limited (ASX:TMT)
Member of the
Audit and Risk
Committee and
Sustainability
Committee and
Remuneration
and Nomination
Committee
Appointed
13 July 2026
COMPANY SECRETARIES
Dane van Heerden CA
Ms van Heerden is a seasoned finance executive, with over 20 years’ experience in the resource sector,
both in Australia and internationally.
Sally McDow
Ms McDow has 20+ years’ experience as a company secretary managing a portfolio of ASX listed and
private companies across multiple sectors.
MEETINGS OF DIRECTORS
The attendance of Directors at Board and Committee meetings during the financial year were as
follows:
Directors Board ARC Sustainability Remuneration
A B A B A B A B
Andre Labuschagne 11 11 - - - - - -
Michele Muscillo 11 10 6 6 3 3 4 4
Colin Moorhead 11 11 6 6 3 3 4 4
Robert Millner 3 2 - - - - - -
A = Number of meetings held during the time the Director was a member of the Board and/or Committee
B = Number of meetings attended during the time the Director was a member of the Board and/or Committee
Aeris Resources Limited
Directors’ Report
30 June 2026
4
CORPORATE GOVERNANCE
The Company’s Corporate Governance Statement for the year ended 30 June 2026 may be accessed
from the Company’s website at https://www.aerisresources.com.au/about/corporate-governance.
PRINCIPAL ACTIVITIES
The principal activities of the consolidated entity for the year ended 30 June 2026 were the production,
sale and exploration of copper, gold and silver. Other than as referred to on pages 4 to 7, there were
no significant changes in those activities during the financial year.
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
COMPLETION OF EQUITY RAISE AND SPP
In November 2025, the Company raised $80 million via an institutional placement (transaction costs of
$4.71 million). Under the placement, the company issued 177.8 million new fully paid ordinary shares at
an offer price of $0.45 per new share.
In addition to the placement, the company undertook a $10 million share purchase plan (SPP). Shares
were offered under the SPP to existing eligible shareholders at the same price as under the placement
being $0.45 per share. The SPP, completed on 19 December 2025, was oversubscribed and raised $21.6
million.
REPAYMENT OF WHSP LOAN
On 6 November 2025, post completion of the Placement, the Company fully repaid and cancelled the
$50 million (drawn to $40 million) loan facility with Washington H. Soul Pattison (WHSP).
DIVESTMENT OF NORTH QUEENSLAND COPPER ASSETS
On 24 October 2025, Aeris Resources Limited (ASX: AIS) (Company or Aeris) subsidiaries Exco Resources
Pty Ltd, Exco Resources (Qld) Pty Ltd and Round Oak Minerals Pty Ltd (Sellers) entered into a binding
agreement with Dingo Minerals Pty Ltd (Dingo Minerals) for the sale of the Company’s North
Queensland copper assets.
Dingo Minerals have purchased all of Aeris’ controlled tenements and real property in North
Queensland comprised of:
• the release of cash-backed environmental bonds worth ~$6.5 million
• $5 million paid in full on completion.
• a deferred cash payment of $3 million payable within three months of Dingo Minerals achieving
commercial production at the Barbara site. Commercial production is defined as the production of
50,000 tonnes of ore.
OPERATING REVIEW
TRITTON COPPER OPERATIONS
Operations
Tritton Copper Operations (Tritton) produced 22,999 tonnes of copper and 8,387 ounces of gold for
the year ended 30 June 2026, representing year-on-year increases of 19% and 39%, respectively.
Units 30 June 2026 30 June 2025 30 June 2024
Ore mined Tonnes 1,538,302 1,186,975 1,195,375
Grade mined % Cu 1.68 1.74 1.69
Ore milled tonnes 1,387,139 1,133,999 1,215,692
Grade milled % Cu 1.77 1.79 1.71
Recovery % 93.5 95.7 95.0
Copper produced Tonnes 22,999 19,398 19,749
Gold produced Ounces 8,387 6,053 4,899
Aeris Resources Limited
Directors’ Report
30 June 2026
5
Mining from the underground operations, exceeded the planned tonnes by approximately 10%,
supported by mining from the Avoca Tank and Budgerygar mines.
Open Pit ore tonnes were delivered from the Stage 2 Murrawombie Open Pit, development
commenced in Q1FY26 with ore delivered to the mill in the last quarter of the financial year ended 30
June 2026. The Murrawombie Open Pit mine experienced geotechnical issues in the upper portion of
the Murrawombie Pit delaying access to ore. Lower tonnes delivered from the open pit was offset by
the increased tonnes supplied by underground mining.
High mining rates in the second half of the financial year enabled the mill to run at full 1.8Mtpa capacity
for the final quarter. At the end of the year, a stockpile of 232kt of mined ore remained, derisking FY27
production.
Operating costs were well managed through the year despite the inflationary environment, particularly
with increases in diesel prices in the second half of the year.
Maiden open cut and underground Ore Reserves were declared on the Constellation deposit,
demonstrating a long-life project. Construction commenced late in the year, with capital expenditure
brought forward from FY27 to derisk the development timeline. Construction activities included
earthworks on the haul road to the project site, and on the installation of water lines and fibre optical
cables along the 29km services corridor.
The Mining Lease for Constellation was granted in July 2026, enabling mining to commence in FY27.
Exploration
Exploration activities ramped up considerably in FY26 with approximately 77,000m of diamond drilling
undertaken at Tritton, a threefold increase from the previous year. Drilling was focused on the
Budgerygar and Avoca Tank deposits, upgrading Inferred resources and testing extensions of the
mineralisation at depth and along strike.
A new mineralised trend was discovered at Avoca Tank, significantly increasing the interpreted strike
length of the deposit while also extending the mineralisation at depth below the current mining levels.
Mineral Resources grew by 180% compared to the previous estimate at 31 Dec 2024.
At Budgerygar, resource definition drilling demonstrated thicker mineralised intersections than
previously modelled and also increased the deposit at depth. The larger Mineral Resource enabled a
300% increase in Ore Reserves after mining depletion compared to the previous estimate at 31 Dec
2024.
Overall, Tritton Operations reported a fourfold increase in Ore Reserves and a 70% increase in Mineral
Resources compared to the previous estimate at 31 December 20241. This increase includes the Mallee
Bull and Wirlong deposits acquired on 1 July 2026.
Peel Mining Acquisition
In FY26 Aeris entered into an agreement to acquire Peel Mining Limited, which owns the Mallee Bull
and Wirlong deposits in the southern Cobar Basin. Mallee Bull and Wirlong are high-grade copper
deposits with potential to become long-term ore sources for the Tritton mill.
Mallee Bull is the more advanced project, with a well-defined Mineral Resource (88% in Indicated status)
and permits in place for construction of an exploration decline and surface facilities. Mine designs have
been completed and a maiden underground Ore Reserve was declared for Mallee Bull in the 30 June
2026 estimate. Metallurgical test work confirms the suitability of processing Mallee Bull ore through the
Tritton plant. Aeris is progressing technical studies and permitting activities to accelerate the potential
development of the project.
1 Refer to ASX announcement “Major Increase in Tritton Mineral Resources and Ore Reserves”, 21 July 2026
Aeris Resources Limited
Directors’ Report
30 June 2026
6
Wirlong is a highly prospective exploration project with a significant Mineral Resource. Further
exploration is planned at Wirlong to better understand the geology and assess the development
potential. A 1,479km2 package of prospective exploration tenements was also acquired along with the
two deposits.
The transaction completed on 1 July 2026.
CRACOW GOLD OPERATIONS
Operations
Cracow Operations (Cracow) produced 40,599 ounces of gold for the year ended 30 June 2026, lower
compared to prior year due to lower grades mined.
Cracow continued to perform well in FY26, meeting production and cost targets. Underground mining
operations continued in the Western Vein Field. Mined grades decline year on year as operations focus
on the margins of the known deposits. Ore milled of 633,958 increased from prior year and was
supplemented with lower grade surface stockpiles.
Cracow Operations Mineral Resource tonnage increased by approximately 640kt over the reporting
period, while contained gold metal decreased by 25koz and silver metal increased by 20koz. The
increase in tonnage was driven by resource additions from drilling and updated reporting parameters,
including the application of a revised 1.0g/t Au cut-off grade. These increases were partially offset by
mine depletion, updated geological modelling, and revised spatial constraints based on Stope
Optimiser shapes used to constrain reportable Mineral Resource.
Cracow maintains a rolling 12-month inventory of Reserves within the life of mine plan by drilling priority
inventory within current Resources. Historically approximately 30% of annual ore production comes from
local extensions to the mineralisation that are not reported within current Reserves.
Costs were contained through the year, enabling strong margins to be maintained. Capital was
invested in a tailings dam lift, which was completed in the financial year, ahead of schedule and within
budget.
Exploration
Exploration at Cracow was focused on the Golden Plateau deposit, which has potential to become a
major new ore source in the near future. Golden Plateau is a known deposit last mined in the 1980s,
located 3km from the processing plant. A 14,000m drill program is currently underway to test
mineralisation below the open pit and around historic underground workings.
Assays have been returned for approximately 70% of the holes, consistently intersected gold
mineralisation at predicted positions. The drilling is confirming the continuity of the interpreted system
and increasing confidence in the geological interpretation of the deposit. Exploration will continue into
FY27 to inform an updated Mineral Resource Estimate and preliminary mine designs.
A regional airborne magnetic and radiometric survey was also completed over the entire 890km2
tenement package. Data from the survey has been analysed to identify prospective targets in the
Southern Vein Field for future drilling.
Units 30 June 2026 30 June 2025 30 June 2024
Ore mined Tonnes 580,632 506,601 450,985
Grade mined g/t Au 2.35 2.89 3.13
Ore milled Tonnes 633,958 617,584 585,256
Grade milled g/t Au 2.21 2.51 2.65
Recovery % 90.1 90.5 91.6
Gold produced Ounces 40,599 45,126 45,651
Aeris Resources Limited
Directors’ Report
30 June 2026
7
STOCKMAN PROJECT
At the Stockman Project in Victoria, metallurgical test work and technical studies were undertaken on
alternative processing routes. This work concluded that a conventional flotation circuit would give the
best economic outcome. The feasibility study was advanced during the year and is targeting
completion in the first half of FY27.
Updated technical studies enabled the release of new Mineral Resource and Ore Reserve estimates at
30 June 2026. The Ore Reserve work confirmed the viability of mining both the Wilga and Currawong
deposits to lift production rates and extend the mine life of Stockman.
JAGUAR OPERATIONS
Feasibility studies undertaken in FY26 on the Jaguar Project concluded that the remaining resources at
the project are insufficient to justify a restart of the mining operation. As a result, care and maintenance
transitioned from keeping the site restart ready to low cost, essential activities only while exploration is
undertaken with the goal of increasing the resource base.
The 10km volcanic corridor east of the known base metals mineralised trend was reinterpreted and
seven geology and gravity anomalies were identified in prospective stratigraphy along with one
electromagnetic (EM) target along strike from the Jaguar deposit. A first-pass drill program and
downhole EM was completed on these targets, with assays yet to be received.
The tenement package remains highly prospective for gold mineralisation as well. Drill targets have
been finalised for a future exploration campaign.
Aeris Resources Limited
Directors’ Report
30 June 2026
8
FINANCIAL REVIEW
Financial Results
During the year ended 30 June 2026, the consolidated entity recorded an Adjusted EBITDA of $318.192
million, $138.593 million higher than the previous year (2025: $179.599 million). Similarly, the consolidated
entity’s profit after tax of $178.539 million, presented a strong improvement from a profit after tax of
A$45.202 million, for the year ended 30 June 2025.
The results for the year were influenced by a number of key factors, which included:
• Revenue from contracts with customers was A$702.769 million, compared to A$577.058 million for
the previous corresponding period. This mainly reflects the following factors:
o Tritton revenue of $467.393 million was higher than the prior corresponding period ($303.089
million) due to higher copper price received (A$17,794/t vs A$14,164/t), and higher copper
production (22,999 vs 19,398);
o Cracow revenue of $234.383 million compared to $197.479 million in FY2025, due to higher
gold prices (A$6,286/oz vs A$4,332/oz), partially offset by lower gold produced (40,599oz vs
45,126oz);
• Cost of goods sold increased to $492.404 million from $461.623 million in FY25 from higher mine
properties amortisation;
• Care and maintenance costs of $14.706 million, reduced from the prior year, for Jaguar and North
Queensland Operations;
• Administration increased to $32.109 million from $27,044 million in the prior year, primarily due to
increased share-based payments expenses, recognising improved vesting probabilities, resulting
from increase in reserves and resources;
• Other expenses increased to $12.211 million from $3.103 million in FY25 due to a change in estimate
in the mining royalty payable to the former owners of Lion Mining Pty Ltd and a loss on disposal of
North Queensland Copper assets;
• A foreign exchange loss of A$1.053 million was recognised for the year ended 30 June 2026 (30 June
2025: loss of A$0.516 million);
• Finance costs of $23.274 million reduced slightly when compared to $24.076 million in the prior
corresponding period, primarily due the repayment and cancellation of the $50.000 million (drawn
$40.000 million) WHSP loan facility during the financial year; and
• Income tax benefit of $51.527 million was recognised at 30 June 2026, reflecting the Company’s
expectation that it will utilise carried-forward tax losses.
The following table contains a reconciliation of profit before income tax to EBITDA (earnings before
income tax and depreciation and amortisation) and Adjusted EBITDA:
2026 2025
$'000 $'000
Profit before income tax expense 127,012 45,202
Depreciation and amortisation 139,936 91,208
Finance costs 23,274 24,076
EBITDA 290,222 160,486
Care & maintenance 14,706 15,494
Loss on sale of North Queensland Copper assets 1,963 0
Net foreign exchange loss / (gain) 1,053 516
Movement in financial assets and liabilities at fair value through profit or loss 10,248 3,103
Adjusted EBITDA 318,192 179,599
Aeris Resources Limited
Directors’ Report
30 June 2026
9
Financial Position
At 30 June 2026, the consolidated entity recorded a positive net asset position of A$599.529 million (30
June 2025: A$317.769 million), representing an 89% increase year on year.
The June 2026 net asset position for the consolidated entity was impacted by a number of key factors,
including:
• Full repayment of the $50.000 million term facility ($40.000 million drawn) with WHSP in November
2025;
• Cash and cash equivalents increased to $164.920 million (FY25: $28.201 million), up $136.719 million,
on the back of higher commodity prices and well controlled operating expenses. This was further
supplemented by an equity raise and SPP in November 2025;
• Trade receivables increased to $48.649 million, compared to $25.267 million in the corresponding
period due to higher production and favourable metal pricing in the final quarter of the financial
year;
• Inventories increased to $44.479 million, (FY25: $40.919 million) due to higher ore inventory at Tritton,
mainly from stockpiles delivered from Stage 2 Murrawombie Open Pit;
• All current government bonding requirements with the New South Wales and Queensland
governments are fully covered by the A$60.000 million SPAM guarantee facility and restricted cash
of A$17.679 million (FY25: $17.677), which remained broadly consistent with the prior year;
• The Company invested $119.617 million into new mining projects, including exploration, compared
to $47.118 million in the corresponding period; and
• A deferred tax asset of $52.978 million was recognised at 30 June 2026, reflecting the Company’s
expectation that it will utilise carried-forward tax losses.
Furthermore, the Company recorded a net current asset position of $138.977 million, previously a net
current liability position of $10.161 million in FY25.
The group generated strong positive cash flows due to improved commodity pricing during the
financial year, with operating costs well managed. An equity raise and SPP in November 2025 further
enhanced cash flows across the group. The consolidated entity’s net cash inflow from operating
activities during the financial year was $275.648 million, with net cash outflows from investing activities
of $186.298 million and net cash inflows from financing activities of $47.795 million.
The Group has been able to continue to meet its working capital requirements principally as a result of
positive operating cashflows generated by the two operating mines (Tritton and Cracow).
The Directors have reviewed the ability of the consolidated entity to continue as a going concern and
based on its cash flow and covenant compliance forecasts for a period of 12 months from the signing
of the financial statements and current access to funding, concluded there are reasonable grounds to
believe the consolidated entity will continue as a going concern.
SIGNIFICANT EVENTS AFTER THE BALANCE DATE
On 12 February 2026, Aeris announced it would acquire Peel Mining’s South Cobar Copper Project
(Mallee Bull and Wirlong) by entering into a scheme of arrangement under which Aeris would acquire
100% of the issued capital of Peel Mining Limited.
In exchange for their shares, Peel shareholders will receive 0.3363 Aeris shares for every one (1) Peel
share held, resulting in 20.5% ownership of the pro-forma shares outstanding of the enlarged Aeris
(combined group).
The transaction completed on 1 July 2026.
MATERIAL BUSINESS RISKS
Aeris prepares its business plan using estimates of production and financial performance based on a
range of assumptions and forecasts. There is uncertainty in these assumptions and forecasts, and risk
that variation from them could result in actual performance being different to expected outcomes.
Aeris Resources Limited
Directors’ Report
30 June 2026
10
Aeris acknowledges that business risks have the potential to change over time and continually reviews
key risks and uncertainties that have the potential to impact the business.
The uncertainties arise from a range of factors, including the nature of the mining industry, and general
economic factors. The material business risks faced by the Group that may have an impact on the
operating and financial prospects of the Group at period end are outlined below.
Supply, Demand and Commodity Prices
Aeris derives its revenues mainly from the sale of copper, zinc and gold and/or associated minerals.
Consequently, Aeris’ potential future earnings, profitability and growth are influenced by the demand
for and price of these commodities.
Copper, zinc and gold are globally traded commodities and their prices over time may rise or fall.
Commodity prices fluctuate and are affected by factors including supply and demand for mineral
products, hedge activities associated with commodity markets, the costs of production and general
global economic and financial market conditions.
These factors may cause volatility which in turn, may affect the Aeris’ ability to finance its operations
and/or bring Aeris’ products to market. Aeris may enter into hedging arrangements from time to time
to partially protect against changes in commodity prices. When these arrangements expire, there is no
guarantee that the Company will be able to secure replacement hedging arrangements on terms
satisfactory to the Company.
Aeris’ prospects and market value will be influenced from time to time by the actual and prevailing
views on the short-term and long-term prices of these commodities.
Exchange rate risk
A number of the Company’s commercial arrangements, including copper and gold sale and finance
arrangements, are based on US dollars. The Company also acquires equipment from overseas using
foreign currency. Accordingly, the revenues, earnings, costs, expenses, assets and liabilities of the
Company may be exposed adversely to exchange rate fluctuation. Further, the future market value of
the Company’s shares may fluctuate in accordance with movements in the exchange rates and
interest rates.
Operational Performance and Business Continuity
The Company is a producer of copper and gold which is sold under commercial contracts. The
Company’s immediate plans and objectives are dependent upon a continuation of such production
generating operating surpluses to assist the Company in funding its planned expenditure programs.
Whether it can do so will depend largely upon an efficient and successful, operation and exploitation
of the resources and associated business activities and management of commercial factors.
Delivery of required operational performance may be impacted by a range of factors including but
not limited to geological conditions; natural hazards and signif
Share your feedback
Discover