BARBARA MINERAL RESOURCE UPDATE
Released
Released
Announcement PDF
28 JUNE 2023
ASX/MEDIA RELEASE
BARBARA MINERAL RESOURCE UPDATE
• Updated Mineral Resource Estimate (MRE) completed for the Barbara
deposit in North Queensland:
- 2.2 million tonnes at 2.0% copper and 0.2g/t gold
- Containing 45,000 tonnes of copper metal and 12,000 ounces of
gold metal
• 89% of Resource now in Indicated category
• Significant potential to increase the Barbara MRE with additional
drilling down-plunge
• Aeris will undertake mining studies to investigate the potential of a
new underground operation at Barbara
Established Australian copper-gold producer and explorer, Aeris Resources Limited
(ASX: AIS) (Aeris or the Company) is pleased to announce an updated JORC 2012
Mineral Resource estimate for the Barbara deposit, located within the Company’s
100% owned North Queensland Copper Operations.
Aeris’ Executive Chairman, Andre Labuschagne, said “the recent in-fill drilling
campaign at Barbara has been a great success. Not only have the ore tonnes and
contained copper and gold increased, but importantly, the majority of the resource
is now classified as Indicated.”
“Barbara is on a current mining lease and the metallurgy is well understood from
when the deposit was previously mined as an open-pit. We will now commence
mining studies to investigate potential for an underground mining operation as well
as update necessary environmental permitting.”
“We believe there is significant potential to increase the size of the Barbara Mineral
Resource with further drilling down-plunge.”
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane QLD 4000 Australia
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
NORTH QUEENSLAND COPPER OPERATIONS OVERVIEW
North Queensland Copper Operations comprises the Mt Colin copper operation,
the Barbara development project and a prospective, 967km2 tenement package
in the Mt Isa/Cloncurry region.
The Barbara deposit is located 60km northeast of Mt Isa and was previously mined
as an open pit operation. A significant copper-gold resource remains below the pit.
Following the completion of the updated MRE, Aeris will undertake mining studies to
investigate the potential of a new underground operation at Barbara. The deposit
is located on an existing mining lease, significantly reducing the potential timeline
to production.
Figure 1 – North Queensland key deposits and exploration tenement package
2|P a g e
BARBARA MINERAL RESOURCE ESTIMATE
The Barbara Mineral Resource Estimate (MRE) totals 2.2Mt at 2.0% Cu, 0.2g/t Au for
45kt Cu metal, 12koz Au metal and 240koz Ag metal (Table 1).
Table 1: June 2023 Barbara Mineral Resource.
JUNE 2023 MINERAL RESOURCE ESTIMATE
Resource
Category
Cut-off
grade
Measured
Indicated
Inferred
Total
$100 NSR
Tonnage
(kt)
Cu (%)
Au (g/t)
Ag (g/t)
Cu metal
(kt)
Au metal
(koz)
Ag metal
(koz)
-
-
-
-
-
-
-
1,980
2.0
0.2
3.3
40
11
210
260
1.8
0.1
3.5
5
1
30
2,230
2.0
0.2
3.4
45
12
240
Notes:
1.
Dr Andrew Fowler MAusIMM CP (Geo) takes Competent Person responsibility for this Mineral Resource
Estimate in accordance with the JORC Code (2012).
2.
The cut-off grade applied to the MRE has been derived from the Net Smelter Return (NSR) calculation.
3.
The Competent Person considers that the Mineral Resource has reasonable prospects for eventual
economic extraction at the cut-off grade specified and a selective underground mining method.
4.
Numbers may not sum due to rounding.
Figure 2 – Longitudinal Projection of the current MRE Main Lens blocks and significant intercepts
coloured by Cu % (legend displayed).
3|P a g e
The MRE has been estimated based on surface diamond and reverse circulation
(RC) drill holes. The database underwent a thorough audit before being accepted
as input to this MRE update. Grade control drill holes from mining the open pit, as
well as some older holes were excluded from the MRE due to uncertainty in their
locational accuracy, assay QAQC and/or sample quality. This is in line with the
approach taken in previous MREs for the Barbara deposit.
The MRE comprises shear-hosted copper sulphide mineralisation beneath the
Barbara open pit mine and is considered to have reasonable prospects for eventual
economic extraction by selective underground mining methods.
The cut-off grade applied to the MRE has been derived from a Net Smelter Return
(NSR) calculation based on the NSR used at the nearby Mt Colin operation.
The MRE contains Indicated and Inferred Resource categories. The Resource
classification method was developed in accordance with the JORC Code (2012)
definitions and considered the drill spacing, the number of drill holes used to inform
the estimate, confidence in the geological interpretation in three dimensions (3D),
the quality of the resulting grade estimate and the quality of the input data. The
classification methodology is consistent with the approach taken at the Company's
Mt Colin operation, which has a similar geology and grade variability.
The resulting Indicated category is approximately equivalent to 40m × 40m spaced
drilling. The Inferred mineralisation has been interpreted from up to 80m × 80m
spaced drilling in a manner consistent with the geological understanding of the
Barbara deposit based on mapping in and around the Barbara open pit and based
on the considerable geological knowledge gained from underground mining at the
Company's Mt Colin Mine.
The Barbara mineralised system remains open down-plunge. Mineralisation has
been traced approximately 700m along-strike with 400m vertical extent in the
deepest southern portion of the deposit. There remains significant potential to
increase the MRE with further drilling.
4|P a g e
Barbara Deposit - Geology
The Barbara Deposit is hosted within Proterozoic rocks of the Leichhardt Volcanics
within the Kalkadoon-Leichhardt zone of the Mount Isa inlier. The KalkadoonLeichhardt Domain is a long north-south arcuate belt in the centre of the Mount Isa
Orogen. The orogen was the site for sedimentation, igneous activity, and
deformation from ~1900-1500 Ma. Three superbasins were formed during this period;
the Leichhardt (1798-1738 Ma), Calvert (1728-1680 Ma), and Isa (1667-1575 Ma)
superbasins. Units of the Kalkadoon-Leichhardt domain occur within and
surrounding the Barbara deposit include the Leichhardt Volcanics, Kalkadoon
Granodiorite, Magna Lynn Metabasalt, Argylla formation, Ballara Quartzite, Corella
Formation and Wonga Granite.
The Barbara deposit is best described as an iron-sulphide copper-gold deposit
(ISCG), characterised by semi-massive to disseminated chalcopyrite-pyrrhotite-rich
mineralisation hosted within a biotite-rich shear zone, referred to as the Barbara
Shear Zone. The mineralised system is enriched in Cu, Au, and Ag. The main physical
characteristics of the Barbara deposit are ~700m strike length, ~400m vertical extent
in the deepest southern part, up to 30m horizontal width and 60° dip to the
southwest. The Barbara deposit remains open at depth below the drilling footprint.
A’
A
Figure 3 – Perspective view northeast of the Main Lens interpretation. Drill holes are displayed as black
lines.
5|P a g e
A
A’
Figure 4 – Cross Section centred on approximately 7741455mN: Aeris mineralisation interpretation.
Drill holes coloured by copper grade (legend displayed).
Drilling and Sampling
Drilling of the Barbara deposit has been undertaken since the 1960s. Previous
explorers completed four main drilling campaigns: Nippon Mining Australia Ltd
(Nippon); Cyprus Gold Corporation (Cyprus); Murchison United (Murchison); and
Syndicated Metals Ltd (Syndicated) (Table 2); leading to the resource definition and
open pit mining of the deposit, which ceased in 2020. Drilling activities undertaken
by Aeris have focussed on the potential of a new underground operation at
Barbara. The Syndicated and Aeris drilling accounts for 96% of the drill hole samples
used in the updated 2023 MRE.
6|P a g e
Table 2: Summary of drilling in the Barbara Mineral Resource model area
Company
Hole
Type
Size
Year
No.
Holes
Metres
Nippon
DDH
unknown
1965-1967
7
786.32
RC
5.5 inch
3
264
1 tail
73.2
9
323
118
13,743.80
58
6,945.18
7
793
Cyprus
Murchison
Syndicated
DDH
NQ2
RC
unknown
RC
5.25 inch
DDH
NQ/NQ2/HQ
1993-1995
1995-2000
2008-2014
RAB
Syndicated
RC
Unknown
-
253
11,483
Aeris
DDH
HQ/NQ
2021-2023
20
6,530
475
40,942.09
TOTAL
Appendix A and B summarise the drill collars and estimation domain intercepts.
Little information is available on drilling and sampling methods prior to 2008,
however, these drilling campaigns have not materially contributed to the MRE input
data. Murchison RC drilling utilised spear collection techniques to give 1-2m
composites. Cyprus RC holes were sampled via 1m intervals, composited to 2m,
although there is no indication of the sampling method. RC drilling by Syndicated
followed conventional industry standards and used ~5-inch face sampling hammers
with an onboard cyclone and a ‘1-in-8’ riffle splitter to achieve a target sample of
~3 kg. Syndicated drilled diamond drill core with NQ (51mm), HQ (63mm) and PQ
(83mm) diameters. Diamond drill core was cut in half longitudinally for sampling of
NQ sized core, while ~1/3 core samples were taken from HQ and ~1/4 samples taken
from PQ core to achieve a similar sample size between the three drill diameters.
Diamond sample weights varied between 2 and 3.5kg.
Aeris drilled diamond core with NQ (51mm) and HQ (63mm) diameters. Diamond
drill core was cut in half longitudinally for sampling of both HQ and NQ core.
Sample Preparation and Assaying
Assaying of Cyprus samples was completed by ALS (Townsville) using geochemical
technique G101 for Cu and fire assay technique PM209 for Au. These methods are
equivalent to modern ME_ICP41 and Au_AA25 techniques respectively. Diamond
core samples were analysed via the A101 ore grade method for Cu and PM203 for
Au (aqua regia), equivalent to modern ME_OG46 and Au-TL44 techniques
respectively. The Murchison samples were analysed by AMDEL using aqua regia
digest with AAS finish for Cu and fire assay (FA1) for Au.
7|P a g e
The Syndicated samples were transported to SGS Laboratories in Townsville or ALS
Laboratories in Mt Isa for preparation and multi-element and fire assay analyses. ALS
laboratories in both Mt Isa and Townsville were used for earlier drilling programs,
while SGS in Townsville was used for the later drilling. For ALS samples Au analysis was
completed using AA25 scheme and Cu analysis was conducted using ME_ICP41
(Aqua Regia) with an ICP-AES finish. For samples with elevated Cu grade, OG46 was
used. For SGS samples Cu analysis was completed via ICP41Q (four acid digestion)
followed by ICPMS and AAS finish and Au analysis was completed via FAA505. SGS
and ALS followed industry best standards in sample preparation including optimal
drying of the sample (temperature and time for base metal sample), crushing and
pulverising the entire sample in an LM2 ring mill to a grind size of 85% passing at 75
microns.
Assaying of Aeris samples was completed by ALS (Mount Isa). Diamond core
samples were analysed via AA25 scheme program which involves fire assay fusion
with an AAS finish. During 2021, diamond core samples were analysed for Cu via
ME_4ACD81 (four acid digestion) with ICP-MS/AES finish. During 2022-2023, Cu was
analysed via ME_ICP6 (four acid digestion) with ICP-AES finish. Throughout the
program, OG62 was used for samples returning overlimit Cu grades (>10,000ppm).
Sample preparation by ALS included optimal drying of samples, crushing and
pulverising samples to a grind size of 85% passing a nominal 75 micron.
The Quality Assurance / Quality Control (QAQC) protocol employed by Syndicated
and Aeris included the following insertions:
Syndicated
- 1 in 20 samples were of blind certified reference material (CRM) i.e.
standards.
- 1 in 56 samples were field duplicates.
Aeris
-
1 in 25 samples were CRMs.
One sample from the main mineralised zone of each drill hole was taken
as field duplicate (only during 2022-2023). No duplicates were taken in
2021.
Syndicated drilling QAQC was assessed and summarised in the 2014 MRE report.
Aeris has reviewed the 2014 report and underlying data and considers that no
significant QAQC issues were outstanding from that assessment. QAQC for the Aeris
drilling program was reviewed batch-by-batch and at the end of the program for
overall assay reliability.
The collar positions of Syndicated drill holes were determined by differential GPS,
while the collar positions of Aeris drill holes were determined by handheld GPS. All
collar positions were adjusted vertically to match the pre-mining topographic
surface constructed from a LiDAR survey in 2014. The current MRE work has been
completed in the Map Grid of Australia 1994 (MGA94) coordinate system.
8|P a g e
Downhole surveying completed for Syndicated drill campaigns was completed by
various independent contractors, tools and at varying intervals. Downhole surveying
completed for Aeris drill campaigns was completed by the drilling contractors. In
2021, a single Shot Reflex Ezi-Gyro system was used to provide downhole survey
information upon completion of each drill hole and readings were taken at a 5m
interval. In 2022-2023, single shot reflex EZ-TRAC system provided downhole survey
information while drilling and readings were taken at 12m intervals. Aeris notes that
survey results were thoroughly reviewed before being accepted into the database
and considers that any discrepancies introduced by the variety of surveying
methods would not be material due to the relatively shallow depth of the deposit.
No information on assay QAQC, collar co-ordinate precision or downhole surveying
is available for the drilling campaigns prior to Syndicated.
The drill hole database was audited by Aeris prior to the MRE by cross-checking 10%
of mineralised intervals in the database with the original assay certificates from the
laboratory. Minor errors were identified; however, these were rectified or mitigated,
and the resulting database was considered suitable as input to the MRE.
Bulk Density
Bulk Density has been measured at Barbara via Archimedes’ Principle liquid
displacement (WD) methods and utilising a downhole gamma radiation tool (GT).
GT accounts for 80% by length of all density measurements. A study comparing the
WD and GT methods conducted by Syndicated showed close agreement. On this
basis, the two methods have been combined for the MRE.
Mineral Resource Domains
Mineralised lenses have been interpreted principally from Cu (%) grade and guided
by geological logging. Mineralised lenses were interpreted at a threshold of 0.8%
Cu, consistent with the previous MRE, and were correlated following the lens
definitions of the previous MRE. Aeris also added a low-grade Cu halo to include
material in the range 0.1 to 0.8 % Cu. These thresholds were supported by statistical
analysis. Au and Ag grades were visually confirmed to be well-constrained by the
Cu-based interpretation. An example cross section of the mineralisation
interpretation is provided in Figure 4.
Additionally, Aeris constructed surfaces that model the base of complete oxidation
(BOCO) and top of fresh rock (TOFR). These surfaces were used as constraints in the
grade and density estimation. Dolerite dykes were also modelled but were not
found to significantly control the distribution of Cu (%) at the level of detail provided
by the current drill spacing. The dykes were not used to constrain the estimates.
9|P a g e
Mineral Resource Estimation
Cu, Au, Ag, Fe, S, and As grades and bulk density values have been estimated into
parent cells with dimensions of 2 mE × 8 mN × 10 mRL. Sub-cells have been used to
fit the geometry of the input wireframes more precisely, with these sub-cells
estimated at the parent cell scale.
Drill samples were composited to 1m and were capped (top cut) to remove undue
influence of outlier grades in each domain.
Block grade estimation was by Ordinary Kriging using a conventional estimation
approach where:
-
-
-
-
Data available as of 10th May 2023 has been used as the basis of the
estimate.
All grade control drill holes were excluded from the estimate. Additionally,
some older holes that had questionable survey data were also excluded
in line with previous estimates.
Variography was modelled for domains with sufficient sample pairs.
Otherwise, variograms were copied from geologically similar domains.
A three-pass search was used with a combination of soft and hard
boundaries based on a contact analysis. All search ellipsoid dimensions
were set to the range of the variogram.
Maximum of 16 samples total, three samples per drill hole and minimum of
three and two drill holes per estimate for passes one and two respectively.
Locally varying anisotropy was used to orient the search and variographic
rotations to align with local flexures in the lens orientations.
On average, 99% of blocks were estimated with Cu, Au or Ag values. Fewer
blocks were estimated for some of the less important variables due to
fewer samples being available for the estimate. For the grade variables,
unestimated blocks after three passes were assigned the 25th percentile
grade for the mineralised domains. Unestimated bulk density blocks were
assigned the mean bulk density of the mineralised or waste domains.
The block model has been depleted for previous mining with the same
topographic surfaces as were used in the previous MRE.
Nearest neighbour and declustered statistics were used to validate the Ordinary
Kriged estimates for all variables. Validation included visual validation in sections
and plans, global comparative statistics and local validation using swath plots. The
Competent Person considered the results of the validation were satisfactory for the
resource classifications applied.
10 | P a g e
Mineral Resource Classification
The MRE contains Indicated and Inferred Resource categories. The Barbara
Resource classification followed the current Mt Colin Operations classification
method, as the mineralisation style and grade distributions are similar between the
two deposits and the Mt Colin Operation consistently achieves production targets
within the tolerance expected from its resource classification. The classification
method was developed in accordance with the JORC Code (2012) definitions, and
considered:
- the drill spacing,
- the number of drill holes used to inform the estimate,
- confidence in the interpretation in three dimensions (3D),
- the quality of the resulting grade estimate and
- the quality of the input data.
The resulting Indicated category is approximately equivalent to 40m × 40m spaced
drilling. The Inferred mineralisation has been interpreted from up to 80m × 80m
spaced drilling in a manner consistent with the geological understanding of the
Barbara deposit based on mapping in and around the Barbara open pit and based
on the considerable geological knowledge gained from underground mining at the
Mt Colin Mine.
Figure 5 displays a longitudinal projection of the Mineral Resource Classification of
the Main Lens with drilling intercepts (black = holes available for the previous MRE,
red = holes drilled since the previous MRE).
Figure 5 – Longitudinal projection of current MRE Main Lens Main Lens Resource Categories (legend
displayed)
11 | P a g e
Cut-off grade, mining and metallurgy
The Mineral Resource is reported via a Net Smelter Return (NSR) cut-off, which is
considered appropriate for selective underground mining methods.
There are no recent metallurgical studies for Barbara, however the deposit was
previously open-pit mined and sulphide ore toll-treated at Glencore’s processing
facility in Mt Isa from 2019 to 2021. Glencore reported Cu recoveries to be between
84.5% and 93.5% with 11 out of 12 batches achieving recoveries >89%. For Au, a 69%
recovery has been assumed based on initial studies.
Metal prices of USD9,150/t for Cu, USD2,000/oz for Au and an FX rate of 0.73 have
been used in the calculation of the NSR values.
The Competent Person considers that the MRE has reasonable prospects for
eventual economic extraction at the cut-off grade specified and according to the
mining, processing recovery, costs and metal price assumptions used as input to the
NSR calculation.
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Mr. Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200, or visit our website at www.aerisresources.com.au
Media:
Ayla Djonlagic
Tel: 0402 763 968
ayla@sabio.com.au
12 | P a g e
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper
dominant portfolio comprises four operating assets, a long-life development project
and a highly prospective exploration portfolio, spanning Queensland, Western
Australia, New South Wales and Victoria, with headquarters in Brisbane.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition
opportunities. The Company’s experienced board and management team bring
significant corporate and technical expertise to a lean operating model. Aeris is
committed to building strong partnerships with its key community, investment and
workforce stakeholders.
Competent Persons Statement
The information in this report that relates to Exploration Results or Mineral Resources is based on information
compiled by Dr Andrew Fowler. Dr Fowler confirms that he is the Competent Person for all Exploration Results
and Mineral Resources summarised in this Report and he has read and understood the requirements of the 2012
Edition of the Australasian Code for Reporting of Exploration Targets, Exploration Results, Mineral Resources and
Ore Reserves (JORC Code, 2012 Edition). Dr Fowler is a Competent Person as defined by the JORC Code, 2012
Edition, having relevant experience to the style of mineralisation and type of deposit described in the Report
and to the activity for which he is accepting responsibility. Dr Fowler is a Chartered Professional in the Geology
discipline and Member of the Australasian Institute of Mining and Metallurgy (MAusIMM No. 301401). Dr Fowler
has reviewed the Report to which this Consent Statement applies and consents to the inclusion in the Report of
the matters based on his information in the form and context in which it appears. Dr Fowler is a full-time
employee of Aeris Resources Limited.
13 | P a g e
APPENDIX A: Summary of Barbara Mineral Resource drill holes
DHID
BA2
BA3
BADD001
BADD002
BADD003
BADD004
BADD005
BADD006
BADD007
BADD008
BADD009
BADD010
BADD011
BADD012
BADD013
BADD014
BADD015
BADD016
BADD017
BADD018
BADD019
BADD020
BADD021
BADD022
BADD023
BADD024
BADD025
BADD026
BADD028
BADD029
BADD033
BADD034
BADD035
BADD036
BADD037
BADD038
BADD039
BADD040
BADD041
BADD042
BADD043
BADD044
BADD045
BADD046
BADD047
BADD048
BADD049
BADD050
BADD052
BADD053
BADD054
BADD055
BADD056
Easting
(m)
380,215.6
380,191.0
380,215.8
380,146.3
380,148.9
380,007.4
380,034.1
379,967.0
380,145.6
380,144.8
380,145.0
379,927.5
379,905.7
380,099.8
380,132.6
380,098.0
380,259.5
380,279.4
380,249.4
380,231.1
380,195.2
380,185.8
380,128.3
380,214.3
379,891.8
379,895.4
379,852.8
379,958.4
379,858.7
379,900.2
380,185.2
380,100.1
380,210.0
380,171.4
380,161.6
380,178.5
380,152.3
380,144.0
379,913.8
379,899.5
379,873.1
380,211.0
379,940.1
379,930.5
379,919.1
379,904.8
379,892.9
379,880.5
380,102.4
380,072.2
379,987.7
380,085.1
379,914.4
Northing
(m)
7,741,582.4
7,741,623.4
7,741,592.9
7,741,436.4
7,741,503.9
7,741,401.6
7,741,365.0
7,741,325.9
7,741,390.5
7,741,390.0
7,741,434.0
7,741,866.5
7,741,927.5
7,741,265.0
7,741,286.5
7,741,264.0
7,741,513.5
7,741,504.8
7,741,532.3
7,741,556.5
7,741,637.0
7,741,493.2
7,741,475.3
7,741,533.2
7,741,918.9
7,741,975.3
7,741,894.5
7,741,937.4
7,741,627.8
7,741,583.7
7,741,586.4
7,741,480.0
7,741,551.7
7,741,622.3
7,741,663.4
7,741,439.4
7,741,563.8
7,741,610.6
7,741,880.2
7,741,902.1
7,741,930.5
7,741,603.2
7,741,900.4
7,741,941.0
7,741,960.2
7,741,982.5
7,741,992.9
7,741,958.4
7,741,408.9
7,741,393.1
7,741,336.1
7,741,196.0
7,741,249.0
Elevation
(m)
343.0
343.6
343.6
335.7
335.3
329.5
332.7
329.2
337.4
337.4
335.8
324.9
316.4
337.0
338.5
337.0
339.8
338.2
340.9
342.5
343.1
335.8
329.2
341.2
315.8
315.0
320.0
322.7
325.3
334.7
342.1
328.0
341.5
343.9
340.0
333.0
343.1
341.8
324.1
316.4
320.0
344.0
325.8
319.0
316.3
316.5
315.0
318.9
334.8
334.6
331.4
336.0
329.1
Total Depth
(m)
39.0
35.0
66.3
231.1
150.0
331.9
369.6
447.0
275.2
356.7
329.5
131.1
72.6
443.5
365.4
512.5
50.5
32.6
41.7
45.2
40.0
125.0
165.5
82.8
81.6
45.7
119.2
21.6
381.5
339.3
81.4
187.7
87.5
69.1
62.7
158.6
114.5
99.4
99.7
75.6
90.6
41.7
58.0
44.5
29.4
41.5
53.5
81.6
249.5
280.6
382.0
421.0
574.3
Bearing
Dip
Drill Type
Company
Period
66.4
66.4
56.4
57.7
57.4
55.5
64.7
70.2
51.3
109.8
354.2
57.0
32.0
56.7
48.9
51.3
59.6
57.3
59.3
58.9
57.9
56.2
59.4
57.4
57.4
59.9
59.6
58.6
54.1
57.4
57.8
57.6
58.2
55.9
57.0
55.0
55.1
60.3
60.7
61.8
57.0
61.9
56.2
57.3
64.0
53.2
52.9
56.4
58.1
55.5
55.5
55.7
58.8
-60.0
-60.0
-60.0
-82.1
-65.0
-67.0
-73.2
-76.6
-69.0
-89.6
-89.9
-90.0
-50.0
-78.6
-72.6
-82.4
-60.1
-60.7
-60.1
-60.2
-60.6
-59.9
-59.8
-60.5
-60.7
-59.7
-60.8
-60.6
-59.6
-57.0
-60.1
-60.2
-60.9
-61.0
-60.0
-59.1
-60.6
-59.7
-61.2
-61.0
-61.0
-61.6
-60.2
-60.7
-59.7
-60.0
-60.3
-59.7
-59.5
-58.7
-57.8
-70.3
-68.8
PERC
PERC
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
RC
DDH
DDH
DDH
DDH
Murchison
Murchison
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Syndicated
Aeris
Aeris
1995-2000
1995-2000
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2008-2014
2015-2023
2015-2023
14 | P a g e
DHID
BADD057
BADD058
BADD059
BADD060
BADD064
BADD065
BADD066
BADD067
BADD069
BADD070
BADD071
BADD072A
BADD073A
BADD074
BAGT002
BAQ9301
BAQ9303
BARC001
BARC002
BARC003
BARC004
BARC005
BARC006
BARC007
BARC008
BARC009
BARC010
BARC014
BARC015
BARC018
BARC019
BARC020
BARC021
BARC023
BARC024
BARC025
BARC026
BARC027
BARC028
BARC029
BARC030
BARC031
BARC032
BARC033
BARC034
BARC036
BARC037
BARC038
BARC039
BARC040
BARC041
BARC042
BARC044
BARC045
BARC047
Easting
(m)
379,899.4
379,862.0
379,846.4
379,934.5
380,048.0
380,046.4
380,066.5
380,101.2
380,079.8
380,134.0
380,086.3
380,084.2
379,964.5
379,973.2
380,193.5
380,237.5
380,113.4
380,145.7
380,170.4
380,201.1
380,188.2
380,149.2
380,178.6
380,145.0
380,144.0
380,143.4
380,147.2
380,245.5
380,150.5
379,952.9
379,905.8
379,818.2
380,103.0
379,896.2
379,870.8
379,898.6
379,924.2
379,926.6
379,978.3
379,999.8
380,019.7
380,059.4
380,192.2
380,194.6
380,148.5
379,837.9
379,864.3
379,856.4
379,928.3
379,907.3
379,897.0
379,893.2
379,902.1
379,900.4
379,921.9
Northing
(m)
7,741,589.0
7,741,633.0
7,741,720.6
7,741,689.8
7,741,430.0
7,741,431.0
7,741,377.0
7,741,309.5
7,741,330.4
7,741,290.2
7,741,197.4
7,741,196.5
7,741,325.6
7,741,306.7
7,741,468.2
7,741,552.3
7,741,462.0
7,741,634.2
7,741,531.4
7,741,478.4
7,741,562.1
7,741,531.7
7,741,608.5
7,741,579.8
7,741,634.5
7,741,668.8
7,741,437.2
7,741,507.7
7,741,531.8
7,741,870.3
7,741,927.0
7,741,998.3
7,741,604.2
7,741,918.4
7,741,986.7
7,741,957.2
7,741,884.1
7,741,868.0
7,741,855.7
7,741,822.4
7,741,789.0
7,741,763.4
7,741,486.6
7,741,420.4
7,741,383.9
7,741,966.2
7,741,936.9
7,741,890.1
7,741,938.2
7,741,962.1
7,741,888.3
7,741,885.4
7,741,845.5
7,741,844.3
7,741,818.2
Elevation
(m)
333.6
324.0
324.2
321.2
329.8
329.5
335.7
336.8
337.1
338.7
336.2
336.0
329.1
330.2
336.4
342.0
330.4
341.2
338.0
336.5
339.5
338.8
343.8
343.7
341.1
339.0
335.7
338.7
338.8
327.4
316.4
325.1
340.1
316.5
319.6
315.0
325.2
324.8
330.2
329.7
321.6
333.4
336.0
335.0
337.7
325.0
321.9
319.7
318.9
315.4
316.1
316.0
316.0
316.0
320.8
Total Depth
(m)
327.9
305.0
252.7
195.1
240.0
261.0
325.5
287.9
393.3
315.4
377.1
516.6
516.7
429.1
170.6
72.0
193.2
157.0
121.0
121.0
102.0
180.0
96.0
150.0
120.0
96.0
192.0
108.0
150.0
96.0
68.8
120.0
161.0
102.0
73.0
62.0
82.0
106.0
80.0
80.0
80.0
60.0
160.0
214.0
304.0
140.0
120.0
142.0
70.0
60.0
148.0
160.0
142.0
170.0
184.0
Bearing
Dip
Drill Type
Company
Period
70.6
69.9
66.0
41.7
47.1
30.0
62.3
56.2
50.7
48.0
47.0
55.0
60.0
79.1
55.8
360.0
60.4
56.4
56.4
56.4
57.4
57.4
52.5
57.4
57.4
84.3
57.4
360.0
54.4
57.0
57.0
57.0
57.4
56.6
57.0
57.0
41.4
56.4
57.0
57.0
58.4
57.0
40.2
52.2
57.5
55.4
54.4
59.2
57.0
56.9
54.4
54.4
53.4
53.4
57.0
-62.8
-57.4
-61.0
-57.0
-51.9
-54.0
-72.7
-56.6
-79.4
-69.5
-62.4
-76.2
-73.0
-63.0
-59.5
-90.0
-70.0
-60.0
-60.0
-60.0
-60.0
-84.0
-76.5
-75.0
-85.0
-87.8
-60.0
-90.0
-65.0
-60.0
-60.0
-58.0
-82.0
-80.6
-60.0
-86.0
-60.0
-63.0
-60.0
-60.0
-60.0
-60.0
-80.1
-79.1
-87.0
-60.0
-75.0
-74.4
-86.0
-55.0
-70.0
-87.0
-77.0
-89.0
-90.0
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
DDH
Share your feedback
Discover