3 AUGUST 2026
FY27 GUIDANCE – INVESTING IN THE NEXT
PHASE OF GROWTH
Australian mid-tier copper and gold producer, Aeris Resources Limited (ASX:AIS)
(Aeris or the Company) is pleased to release its production and cost guidance for FY27.
Group Guidance
Group FY27 Guidance FY26 Actual
Production
Copper kt 22 - 27 23
Gold koz 42 - 51 49
Silver koz 130 - 160 256
Copper equivalent1 kt 37 - 46 42
Operating Costs
Mine operations2 $M 320 - 390 332
Care & maintenance $M 3 - 4 12
Corporate $M 24 - 29 26
Capital Costs
Sustaining $M 81 - 98 71
Growth & projects $M 170 - 210 102
Exploration $M 29 - 35 17
Group production guidance will be broadly similar to FY26. Growth capital is materially higher
in FY27 due to the construction and waste stripping at Constellation. Exploration spend will also
ramp up with significant drill programs planned at the operating assets.
Care and maintenance costs will be significantly less than FY26 to support essential activities
only at Jaguar.
1 Copper Equivalent (Cu eq) = (Cu produced x Cu price + Au produced x Au price + Ag produced x Ag price) / Cu
price. Commodity prices: Cu US$13,571/t, Au US$4,734/oz, Ag US$75/oz. Aeris confirms that it believes all metals
included in the metal equivalent calculation have a reasonable potential to be recovered and sold.
2 Excludes by-product credits, royalties and inventory movements
AIS:AIX 2
Tritton Guidance
Tritton FY27 Guidance FY26 Actual
Production
Copper kt 22 - 27 23
Gold koz 8 - 10 8
Silver koz 100 - 130 229
Operating Costs
Mine operations $M 210 - 260 219
Capital Costs
Sustaining $M 54 - 65 54
Growth $M 160 - 190 93
Exploration $M 10 - 12 7
During H1, ore mined will predominantly be from Murrawombie open pit, with underground
mine tonnes mainly from Budgerygar and Tritton underground mines. While the mill will run at
full capacity, the grade from these ore sources is lower resulting in lower copper production in
H1.
Waste stripping at the Constellation open pit will commence in Q1 with first sulphide ore to the
mill in late Q3. In H2, ore from the Constellation open pit will replace lower grade ore from other
sources, gradually increasing copper production. In the final quarter of the year,
approximately 45% of mill feed will be high grade supergene and primary ore from
Constellation, significantly increasing the ore feed grade to the mill. The split of production by
financial year half is shown in the table below.
FY27 H1 FY27 H2
Ore Milled (kt) 920 900
Copper Grade (% Cu) 1.2% 1.8%
Copper Produced (kt Cu) ~10 ~15
Growth capital for FY27 relates predominantly to infrastructure and capitalised waste stripping
at Constellation, most of which will be in H1. $10-20 million has also been allowed for a tailings
dam lift, electrical works at Tritton and studies for Mallee Bull.
At Tritton, the aggressive resource definition drill program will continue in FY27, focused on
converting the large Inferred Mineral Resource defined during FY26 to Indicated status for Ore
Reserve consideration. In parallel, surface greenfields exploration will commence, testing a
pipeline of early-stage prospects targeting a further Constellation type discovery (discovered
2020), across a highly prospective tenement package.
AIS:AIX 3
Cracow Guidance
Cracow FY27 Guidance FY26 Actual
Production
Gold koz 34 - 41 41
Operating Costs
Mine operations $M 110 - 130 113
Capital Costs
Sustaining $M 27 - 33 17
Growth $M 14 - 17 8
Exploration $M 12 - 15 8
Mined and processed tonnes for FY27 are forecast to be similar to FY26, although grade will
decrease, resulting in lower gold production year on year.
Growth capital is mostly related to a tailings dam lift, with some minor study costs for Golden
Plateau. Sustaining capital is forecast to increase from FY26 as key underground equipment is
upgraded in expectation of extended operating life.
At Cracow, annual exploration expenditure will increase by more than 50% in FY27, reflecting
the significant opportunity to extend mine life at the asset. The Golden Plateau drill program is
planned to be further extended beyond the 14,000m committed in FY26 with a dedicated rig
undertaking resource definition and exploration drilling over a 12-month period, while a
pipeline of shallow early-stage targets along the Golden Plateau trend will be drill-tested. At
the Western Vein Field underground operation an additional drill rig will be added to the
underground fleet (three in total), supporting a 12-month program targeting near-mine
exploration targets looking for +50koz ore shoots.
This announcement authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
Investor enquiries: Stefan Edelman, General Manager Corporate Development
investorrelations@aerisresources.com.au
Follow Aeris Resources: Subscribe to email announcements and join our Investor Hub to stay
up to date and connect to Aeris leaders.
About Aeris
Aeris Resources Limited (ASX:AIS) is an Australian mid-tier copper and gold producer. Aeris
owns and operates two producing assets, Tritton Copper Operations (NSW) and Cracow Gold
Operations (Qld), along with a strong pipeline of growth projects and a highly prospective
exploration portfolio. Its experienced board and management have significant corporate
and technical expertise to drive an efficient operating model. Aeris continues to investigate
strategic mergers and acquisitions to build value for its stakeholders. Find out more at
www.aerisresources.com.au and follow Aeris on LinkedIn.
Share your feedback
Discover