STOCKMAN UPDATE - EXCELLENT METALLURGICAL TEST RESULTS
Released
Released
Announcement PDF
04 July 2024
ASX/MEDIA RELEASE
STOCKMAN PROJECT – FLOTATION & ALBION LEACH TESTWORK RESULTS
PROVIDES OPPORTUNITY TO MATERIALLY IMPROVE PROJECT RETURNS
• Metallurgical ‘proof of concept’ testwork improves overall metal
recoveries:
― Modified flotation circuit producing export quality copper
concentrate and bulk concentrate (copper/zinc/gold/silver),
with significantly improved recovery of all metals 1
Metal Recovery to Concentrate–
Original Conventional Flotation
Flowsheet
Cu con
Zn Con
Total
Cu
76.6%
76.6%
Zn
68.9%
68.9%
Au
18.9%
4.5%
23.4%
Ag
27.4%
26.7%
54.1%
Metal Recovery to Concentrate –
Updated Conceptual Flotation
Flowsheet
Cu con
Bulk Con
Total
Cu
46.2%
45.8%
92.0%
Zn
92.8%
92.8%
Au
11.0%
36.9%
47.9%
Ag
15.6%
59.2%
74.8%
― Metal leaching of bulk concentrate in an Albion ProcessTM2
indicates leach recoveries of +98% for copper and zinc
― Overall copper and zinc recoveries now >90% and gold
recoveries significantly improved. Opportunities to improve
silver recovery identified
• Catalyst to significantly improve Stockman Project economics by:
― Increased revenue from higher metal recoveries; and
― Material reduction in physical plant footprint, capital, operating
costs and carbon emissions of the ore processing plant
• Detailed testwork and Options Engineering of a simplified ore
treatment and Albion processing plants can now proceed
Tables show metallurgical recovery results comparisons for metal recovered to concentrate between conventional
flotation flowsheet originally considered and modified flotation flowsheet configuration
2 The Albion Process is a registered trademark of Glencore Technology
1
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane, 4000
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
Aeris Resources Limited (ASX: AIS) (Aeris or the Company) is pleased to announce
this update on the Feasibility Study underway on its 100% owned Stockman Project
in Victoria.
Aeris’ Executive Chairman, Andre Labuschagne said “These latest metallurgical
testwork results validate our view that the Albion Process has the potential to
significantly enhance the overall economics of the Stockman Project.
The plan is now to further study, engineer and complete detailed metallurgical
testwork on the modified flotation flowsheet at the ore processing plant, producing
an export quality copper concentrate and a bulk concentrate containing
copper/zinc/gold/silver for further treatment.
This will result in a simpler flowsheet for the ore processing plant, enhancing project
economics through a smaller physical footprint, lower capital and operating costs
and reduced carbon emissions (reduced energy consumption). The bulk
concentrate will be processed through an offsite Albion Leach facility, producing
saleable copper, zinc and precious metals products.
The Albion Leach testwork results shows +98% recoveries of both copper and zinc
from the bulk concentrate, bringing overall recoveries of these metals to >90%, whilst
also significantly improving overall recovery of gold.”
Background
The Stockman Project Feasibility Study (FS) recommended the investigation of a
modified flotation and metals leaching process (Alternative Processing Route). This
Alternative Processing Route would replace the conventional selective flotation
plant, which would have produced separate export quality copper and zinc
concentrates, for metal recovery by smelting.
The conventional selective flotation process originally considered in the FS results in
modest metal recoveries, requires extensive use of reagents and high-power
consumption for fine grinding to liberate the copper and zinc minerals. The highpower consumption and the isolation of the mine would require a diesel or gas
power station, with attendant carbon emissions, at a significantly higher cost than
grid power.
The Alternative Processing route investigation has conceptually tested the use of
proven metal treatment technologies: the Jameson cell for improved froth flotation;
and the Albion Process for metal leaching.
The investigation was designed to proof, at a laboratory scale, the improved metal
recoveries and lower power and reagent consumption for the ore processing plant,
through inclusion of an Alternative Processing route. The investigation included a
conceptual engineering design of a smaller, simpler and more sustainable (lower
carbon emission) ore flotation processing plant, as well as the remote Albion Process
leach plant.
2|P a g e
Metallurgical test work
The metallurgical test program sought to validate the assumptions of the Alternative
Processing route:
•
First selective flotation of the easy-to-liberate copper minerals to a clean
export quality copper concentrate. About 40 to 50% of the copper minerals
are liberated without fine grinding and will report to the copper concentrate;
•
Second flotation of all zinc and the remaining copper minerals to a bulk
concentrate. More of the precious metals should also report to this bulk
concentrate;
•
Bulk concentrate is treated in an Albion Process plant by acid leaching to
recover the copper and zinc; and,
•
Precious metals are recovered from the Albion Process tailings via a
cyanidation or similar process. The Albion Process can convert refractory gold
and silver minerals to cyanide soluble form.
Flotation test results
Flotation tests were completed at the AMML laboratory. Experience from earlier test
programs was used to design the test conditions.
The ore samples were provided from the 2023 3 diamond drilling program, which
provided new drill core for metallurgy testing purposes. This drill core has been
carefully managed and stored in refrigeration to reduce rate of oxidation aging.
The modified conceptual flotation flowsheet produces copper concentrate first
and then bulk concentrate. The flotation regime did not require optimisation since
the previous results were already encouraging when using known reagents and
conditions. This supports the concept of a simple, easy-to-run flotation plant with
built-in flexibility.
The modified conceptual flotation flowsheet test results show a significant step-up
in metal recovery compared to the original selective copper and zinc flotation
flowsheet. Total recovery to concentrate for copper and zinc now exceeds 90% see Figure 1 below.
3 Refer JORC Table 1 exploration drill hole 23CWDD006 details in Appendix C
3|P a g e
Figure 1 - Metallurgical recovery results comparisons for metal recovered to concentrate between
conventional flotation flowsheet originally considered and modified flotation flowsheet configuration
Metal Recovery to Concentrate–
Original Conventional Flotation
Flowsheet
Cu con
Zn Con
Total
Cu
76.6%
76.6%
Zn
68.9%
68.9%
Au
18.9%
4.5%
23.4%
Ag
27.4%
26.7%
54.1%
Metal Recovery to Concentrate –
Updated Conceptual Flotation
Flowsheet
Cu con
Bulk Con
Total
Cu
46.2%
45.8%
92.0%
Zn
92.8%
92.8%
Au
11.0%
36.9%
47.9%
Ag
15.6%
59.2%
74.8%
The copper concentrate quality produced from the modified conceptual flotation
flowsheet test results was 18% copper content, before any cleaning or optimisation
of the flotation conditions.
Optimisation of the precious metal recovery was not the focus of the test work. The
recoveries achieved, without any particular attention, are already a significant
improvement on prior selective flotation tests.
Albion Process test results
The Albion Process metallurgical test work program used the bulk concentrate
prepared from the modified flotation flowsheet, containing copper, zinc and gold
and silver, for the leach testing.
Albion Process metallurgical tests were completed at the Core Resources laboratory
in Brisbane and were very encouraging. Core Resources are very experienced in
Albion Process laboratory testing.
Two possible Albion leach flowsheets were tested:
1. A full leach that extracts both copper and zinc; and
2. A zinc-only leach.
The testwork results have shown the ‘full leach’ of both copper and zinc as the
preferred Albion Process flowsheet for the Stockman Project. A ‘zinc-only leach’ was
tested to provide flowsheet options, and it helps to confirm the ‘full leach’ results
under a different test regimen.
Full leach test results
The bulk concentrate was ground to a P80 size 12µm. The oxidative leach treatment
returned zinc extraction of 99.9%, copper of 98.5% and sulphide oxidation of 91%
after 72 hrs (under Acid Albion Leach (AAL) conditions). Sulphur (SOx) oxidation was
83%. High rates of leach extraction (97.7% Cu, 99.8% Zn) were observed in ~36 hrs.
The kinetic leach chart is shown below. A summary of the ‘full leach’ testwork results
is shown in Figure 2.
4|P a g e
Figure 2 – Albion Leach testwork results showing copper and zinc recoveries over time based on
maximising recoveries of both metals
Zinc-only leach test results
The bulk concentrate was ground to P80 of 18µm. Oxidative leach treatment
returned zinc extraction of 99.7%, copper 64.9% and sulphide oxidation of 63% after
24hrs (under AAL conditions). High rates of zinc extraction (95.8%) were observed
after 12 hrs. The fast leach kinetics of the zinc metal in the Albion Process have been
confirmed. A summary of the ‘Zinc only leach’ testwork results is shown in Figure 3.
Figure 3 – Albion Leach testwork results showing copper and zinc recoveries based on maximising
zinc metal recoveries after 24 hours
5|P a g e
Precious metals leaching and cyanidation
Oxidised residues from the oxidative leach were further treated through a
cyanidation process, realising recoveries of gold between 72% - 88%. Silver
recoveries were lower at 3% - 36%.
The low silver extraction rate is likely due to the formation of argentojarosites in the
AAL process and can be addressed through a ‘lime boil’ pre-treatment process,
which will be tested in the next phase.
Commentary on Testwork results
•
Given the fast-leaching kinetics in both scenarios, there are opportunities to
optimise leaching conditions (e.g. grind, residence time, acid consumption);
•
Process optimisation has significant potential to improve project economics
(e.g. a smaller plant and lower capital or operating costs);
These opportunities will be explored in the next phase of the investigation
•
Zinc and copper metal in the leach solution will be recovered into payable
products by precipitation to intermediate products or electrowinning of metal
from the solution; and
•
There are a number of potential copper and zinc intermediate products that
can be precipitated, with a wide range of options for the sale of the products.
Further investigation to determine the optimum precipitation chemistry and
the marketing terms for the intermediate products will be included in the next
phase of the study
Engineering Study
Results from the test work program have enabled an updated engineering study
(conceptual) for the ore processing plant located at the mine and the offsite Albion
Process plant.
Ore Processing Plant
The results from these latest and previous flotation tests have been used to simulate
the use of Jameson cell flotation equipment in the ore processing plant. Simulation
of Jameson cell performance from standard laboratory flotation test results is
common practice and delivered the following estimate of performance:
•
The first selective flotation of the copper circuit achieved an estimated
recovery of 41% at 21% Cu to a copper-only concentrate for export and
smelting; and
•
The bulk flotation circuit achieved a copper and zinc recovery to a bulk
concentrate of 51% and 95% respectively (slightly higher than the test work
due to the inclusion of the tail from the copper cleaner). This bulk concentrate
is feed for the Albion Process plant.
6|P a g e
The reason for engineering a Jameson cell-only flotation circuit is to significantly
reduce the size of the ore processing plant at the mine, compared to a
conventional sequential flotation layout. A smaller plant footprint will reduce
vegetation clearing, environmental offsets and land disturbance at the mine. The
smaller plant will also benefit from lower capital for the building construction. Yet to
be determined are the power and carbon emission savings from running a smaller
simpler flotation plant. Figure 4 shows a 3-dimensional snippet from the conventional
flotation circuit at the ore processing plant (at Feasibility level) and Figure 5 shows
the conceptual Jameson cell flotation plant being explored.
Figure 4 – Original Conventional flotation circuit (at Feasibility level)
Figure 5 – Conceptual Jameson cell flotation circuit
7|P a g e
Albion Process leach plant
The engineering study has recommended conceptual level flowsheets, equipment
sizes and reagent consumption rates for the Albion Process plant. The fast kinetics of
the leaching of the Stockman bulk concentrate allows for a modest size plant.
Further plant options engineering including site layout, general arrangement and
cost estimates require more work before public reporting. The final selection of the
most likely intermediate products for copper and zinc metal will influence the plant
design including further product refinement, as required.
From a plant location perspective, the concept is for the Albion plant to be located
remote from the mine site but within reasonable trucking distance. There are several
locations in the region being considered that are adjacent to major electricity grids,
have excellent logistics access and available industrial land.
Summary
The ‘proof of concept’ engineering and testwork for the modified flotation and
Albion Process plant have proved that the Stockman Project offers material upside
in metal recoveries and estimated project economics. The Albion Process in
combination with a simpler ore processing plant, either in a conventional or
Jameson cell flotation configuration, will enable the development of a more
sustainable project, resulting in significantly reduced carbon emissions and less land
clearing impacts.
Next Steps
The next phase of test work and options engineering will focus on:
•
Optimising the grind size, leaching chemistry and residence time to support
both the flotation plant and Albion Process plant design;
•
Selection of intermediate copper and zinc products and marketing
payability estimates; test further product refinement paths and value;
•
Improved silver and gold recovery and saleable product pathways;
•
Ore variability testing;
•
Potential economic recovery of sulphur through the production of
sulphuric acid (used in the leach process); and
•
Updated estimation of capital and operating costs;
An ASX update on the concept engineering study results should be available in the
next quarter.
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
8|P a g e
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper
dominant portfolio comprises three operating assets, a mine on care and
maintenance, a long-life development project and a highly prospective exploration
portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition
opportunities. The Company’s experienced board and management team bring
significant corporate and technical expertise to a lean operating model. Aeris is
committed to building strong partnerships with its key community, investment and
workforce stakeholders.
Competent Persons Statement
The information in this Press Release that relates to exploration results is based on information compiled by Dr
Andrew Fowler, a Competent Person and a Member of the Australasian Institute of Mining and Metallurgy
(MAusIMM ID: 301401). Dr Fowler has sufficient experience to the style of mineralisation and type of deposit
described in the Report and to the activity for which he is accepting responsibility. Dr Fowler has reviewed the
Press Release to which this Consent Statement applies and consents to the inclusion in the Press Release of the
matters based on his information in the form and context in which it appears. Dr Fowler is a full-time employee
of Aeris Resources Limited.
9|P a g e
APPENDIX A: Drillhole 23CWDD006 Collar details
Hole ID
Total
Depth (m)
23CWDD006
299.7
Easting
(m)
MGA z55
Northing
Elevation
(m)
(m)
581111
5906681
1010.891
SRG
Azimuth
(°)
Easting
(m)
Northing
(m)
180
43757.825
800982.73
Elevation
(m)
Azimuth
(°)
Dip
(°)
6010.891
150
-39
1 SRG = Stockman Regional Grid
APPENDIX B: Drillhole 23CWDD006 Significant intercept
Hole ID
Domain
DH Length
(m)
True Thickness
(m)
Cu
(%)
Zn
(%)
Au
(g/t)
Ag
(g/t)
23CWDD006
M lens
35.03
31.6
2.1
4.7
0.62
33.8
1 All reported grades are length-weighted mean grades.
APPENDIX C: JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
Commentary
•
•
•
•
Drilling
techniques
•
•
Drill sample
recovery
•
•
Logging
•
•
•
A metallurgical sample was taken over a contiguous interval
from 241.9m - 276.03 m from one HQ drillhole.
The drillhole was designed specifically for metallurgical test
work to obtain as much sample as possible for analysis. The
location was chosen to be representative of the
mineralisation in general.
Mineralisation was defined based on visual observations of
massive, stringer or disseminated sulphides in drill core,
consistent with normal logging procedures at the Stockman
Project.
Sampling followed industry standard procedures for sampling
of diamond drill core.
The drilling method was HQ diamond drilling (nominal 63.5 mm
core diameter).
Core was not orientated.
Core recovery was >95%, with minimal losses except in highly
fractured ground outside of the mineralisation.
Generally at Stockman there are no observed relationships
between sample recovery and grades. Assay biases due to
the preferential loss or gain of core are not observed.
The drill crew included core blocks at every drill run interval
that displayed information regarding the previous run, interval
length, recovery and depth. If any core loss was experienced,
this was reflected in the core recovery.
RQD measurements were completed as routine.
Drill core was logged to geological boundaries. The total
10 | P a g e
•
Sub-sampling
techniques
and sample
preparation
•
•
length of the hole was logged, with greater detail captured
through zones of mineralisation and the footwall and
hangingwall rocks up to 30 m from mineralisation.
Core was photographed both wet and dry, after logging had
taken place, and qualitatively logged.
The core was cut longitudinally along the core axis in half and
quarters. One quarter was sent for assay and three quarters
were sent for metallurgical test work.
The samples sent for assay were cut at nominal 1m intervals,
while the core sent for metallurgical test work was composited
and sent in bulk.
Assay samples
• Core sampling intervals were based on geological
boundaries varying between 10cm and 1.4m, with the
majority 1m in length. All core processing was completed at
the Company’s core yard in Benambra. Core was cut using a
Corewise Pty Ltd automatic core saw.
• Sample preparation and analysis was undertaken at Intertek
Genalysis.
• The samples are dried at 105C for a minimum of 5 hours.
• Core samples are crushed using an Essa JC2500 to produce a
product of <6mm particle size. If the sample is >3kg it is rotary
split in a Boyd crusher to generate a sample <3kg and placed
in an LM5 pulveriser. All excess material from splitting is
collected and stored.
• The pulverising stage generates an 85% passing 75 µm particle
size sample. A pulp is taken from the bowl and the remainder
of the sample removed and retained as a residue. Every 50th
sample has an additional portion removed from the bowl and
sieved @ 75 µm to confirm quality of product. The LM5 bowl is
then vacuumed before pulverising the next sample.
• Samples are then analysed by the following methods (lower
detection limits in ppm):
- Au by method FA25/OE04 (Ore grade Au, Fire Assay,
25g sample, ICP-OES finish).
- Multi-element suite analysed by 4A/OE33; Trace level of
33 elements by 4-acid digest with an ICP OES finish.
- Over range results on selected elements (Cu, Pb, Zn, As,
S) as directed by Aeris was completed via 4AHBr/OM.
Metallurgical samples
The metallurgical program was supervised by Simon Loro. Mr Loro is
Senior Metallurgist at Aeris Resources Limited and has 18 years
experience relevant to the activity that is being reported in this
study.
11 | P a g e
•
•
Quality of
assay data
and
laboratory
tests
•
•
•
Verification of
sampling and
assaying
•
Location of
data points
•
•
•
•
•
•
•
Data spacing
and
distribution
•
•
•
Core was kept in a refrigerated shipping container on site to
minimise the rate of oxidation.
Sample preparation and flotation test work was completed
by Australian Minmet Metallurgical Laboratories, NSW, with
assays completed by ALS. The test work proceeded as follows:
- Receive and inventory ~ 235 sample of 5kg - 15kg
- The samples are initially stage crushed to a size of 9.5mm, blended, then riffle split to isolate a portion
(~40kg - 80kg). The residual coarse crushed material is
returned to cold storage for reuse later.
- The isolated portion is further crushed to -3.35mm,
blended and riffle split into 2 kg portions.
Assay techniques are considered total.
No geophysical tools were used in the program.
QA/QC was undertaken by the laboratory as part of their
standard operating procedures.
Aeris considered that this QA/QC was appropriate given the
small batch and objectives of the study.
No independent verification has been undertaken. Twinned
holes have not been drilled.
Aeris considers that this was appropriate given the nature and
objectives of the study.
The grid system for drilling is the Stockman Regional Grid (SRM)
which was prepared as a two-point transformation from
GDA94 Zone 55, AHD using the following control points:
- Point 1: 581,179.03 MGA east = 43,855.34 SRG east,
5,906,758.20 MGA north = 801,015.57 SRG north,1,005.56
AHD = 6,005.56 SRG RL
- Point 2: 578,741.74 MGA east = 40,610.25 SRG
east,5,904,489.51 MGA north = 800,269.47 SRG
north,687.90 AHD = 5,687.90 SRG RL.
This transformation results in a 30-degree counter-clockwise
rotation from GDA north.
The Stockman topography DTM was prepared by a
contractor as part of a 2008 aeromagnetic survey.
Downhole surveys were completed by an independent
contractor using a gyroscopic tool.
Aeris considers that the topographic and down hole survey
control was suitable for the objectives of the study.
Sample compositing was applied for the metallurgical test
work.
The single drill hole was considered by Aeris to be
representative of Stockman mineralisation.
Data spacing and distribution is not considered relevant in this
12 | P a g e
study.
Orientation of
data in
relation to
geological
structure
•
Sample
security
•
•
The drillhole is orientated approximately perpendicular to the
overall orientation of the M Lens. The relationship between the
DH length and the true thickness is displayed in the table
above.
The sampling is considered to be unbiased with respect to the
orientation of the mineralisation, nevertheless, Aeris does not
consider that the orientation of the mineralisation in relation
to the drill hole is material for the study.
•
•
Samples are secured on site in a locked shipping container.
Samples were dispatched to the laboratories via reputable
delivery contractors.
Upon sample receipt, laboratory staff reconciled the client
submission form against the submitted samples prior to
placing them in sequential order onto a trolley. This
information was forwarded to the office to prepare
paperwork and labels in the LIMS as well as report all
discrepancies noted in each delivery.
No discrepancies were noted.
•
No audits or reviews have been completed.
•
Audits or
reviews
Section 2 Reporting of Exploration Results
Criteria
Mineral tenement
and land tenure
status
Commentary
•
•
•
•
Exploration done
by other parties
•
•
The Currawong deposit of the Stockman Project is wholly
within Victorian mining tenement MIN5523, which is held in
good standing.
There are no native title claims registered over the lease, but
an agreement is in place with a prior claimant that makes
provision for both the prior claimant and/or other indigenous
groups to assert an interest in the future. However, no
significant heritage sites have been identified.
The lease is located on rugged and heavily forested crown
land administered by the Department of Environment, Land,
Water and Planning.
The security of tenure at the time of reporting is secure with
no known impediments to obtaining a licence to operate on
the mining tenement.
The Stockman area was identified as being prospective for
base metals, by stream sediment sampling and mapping in
the early 1970s by WMC.
The Wilga deposit was discovered in drilling by a WMC/BP
13 | P a g e
Criteria
Commentary
•
•
•
•
Geology
•
•
Drillhole
information
•
•
Data aggregation
methods
•
•
•
Minerals JV in 1977, and the Currawong deposit was
discovered by drilling 1979.
The project was then explored and drilled by several
companies.
Denehurst commenced mining of the Wilga high grade
copper zones in 1992, the switched to the high-grade zinc
zone, before closing the mine in 1996. Mine closure was
attributed to unfavourable exchanges rates, poor
metallurgical recovery, and high smelter charges. Denehurst
went into receivership in 1998.
Mine-claimed ore mined from Wilga was 0.96Mt grading
6.04% Cu and 8.68% Zn.
Further exploration drilling was completed by other
companies following closure, including Austminex, JML, IGO
and ROM.
The Stockman Currawong polymetallic VHMS deposit (ZnCu-Pb-Ag-Au) occurs in the Upper Silurian age Cowombat
Rift in the Palaeozoic Lachlan Fold Belt of south-eastern
Australia. The Cowombat Rift has undergone strong regional
deformation, and the Stockman deposits are both located
in a remnant fault bound tectonostratigraphic block known
as the Limestone Creek Graben. Both deposits (which are
3.5 km apart) are hosted by the Enano Group which locally
overlies Ordovician to Silurian turbidite metasediments, with
lesser basaltic and andesitic volcanic components. The
Enano Group is overlain by early Devonian age welded
ignimbrites of the Snowy River Volcanics and limestones of
the Buchans Group.
The Currawong deposit comprises five stacked stratiform
massive sulphide lenses and other minor discontinuous
massive sulphide/stringer zones, found at the Gibson’s Folly
Formation. The sulphide mineralogy is analogous to the
Wilga mineralogy.
Drill hole information has been retained at site digitally on
the server in the inherited SQL database, as well as physical
drill core.
Sampled material was utilised from drill hole 23CWDD006.
The quoted drill hole intercepts are length-weighted
averages.
Drill hole intercepts are averaged across a contiguous
interval within each estimation domain.
No metal equivalent values are used for reporting
14 | P a g e
Criteria
Commentary
exploration results.
Relationship
between
mineralisation
widths and
intercept lengths
•
•
The drillhole is orientated approximately perpendicular to
the overall orientation of the M Lens. The relationship
between the DH length and the true thickness is displayed in
the table above.
The sampling is considered to be unbiased with respect to
the orientation of the mineralisation, nevertheless, Aeris does
not consider that the orientation of the mineralisation in
relation to the drill hole is material for the study.
15 | P a g e
Diagrams
Plan view:
Vertical section aligned with drill hole 23CWDD006:
Balanced
reporting
•
The reporting is considered balanced, and all material
information associated with the metallurgical sample has
been disclosed.
Other substantive
exploration data
•
There is no other relevant substantive exploration data to
report.
Further work
•
The metallurgical test work will support ongoing mining
studies.
16 | P a g e