IGNITE HONG KONG PRESENTATION
Released
Released
Announcement PDF
Aeris Resources
April 2026
Ignite Investment Summit
Presented by: Andre Labuschagne
2
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”) and Peel Mining Limited (“Peel”). By
attending an investor presentation or briefing, or accepting, accessing
or reviewing this presentation, you acknowledge and agree to the terms
set out below.
This presentation has been prepared in relation to the proposed
acquisition by Aeris of all of the issued capital of Peel by way of a
Scheme of Arrangement (“Scheme”) and a proposed demerger
(“Demerger”) of certain Peel assets into a newly formed company.
Further information on the Scheme and the Demerger (together, the
“Transaction”) is included in this presentation and in the announcement
of today’s date released by Aeris on the Australian Securities Exchange
(“ASX”) Market Announcements Platform.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris and Peel with the ASX in connection with its continuous
disclosure obligations. This presentation does not purport to contain all of
the information that an investor should consider when making an
investment decision nor does it contain all of the information which
would be required in a product disclosure statement or prospectus
prepared in accordance with the requirements of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, neither Aeris nor Peel have an obligation to update
the information contained in this presentation. An investment in securities
is subject to known and unknown risks, some of which are beyond the
control of Aeris and Peel. Investors should consult with their own legal,
tax, business and/or financial advisors in connection with any acquisition
of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing non-
IFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris and Peel believe the non-IFRS financial information and
non-GAAP financial measures provide useful information to users in
measuring the financial performance and condition of Aeris or Peel.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris, Peel and their officers.
This includes statements about market and industry trends, which are
based on pretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “aiming”, “estimate”,
“intend”, “believe”, “guidance”, “should”, “could”, “may”, “will”,
“predict”, “plan” and other similar expressions.
Forward-looking statements are based on information available to Aeris
and Peel as at the date of this presentation and should not be relied
upon as an indication or guarantee of future performance. Except as
required by law or regulation (including the ASX Listing Rules), none of
Aeris, Peel their representatives or advisers undertakes any obligation to
provide any additional or updated information whether as a result of a
change in expectations or assumptions, new information, future events or
results or otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
world events such as the COVID-19 pandemic and national hostilities and
associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
3
Disclaimer
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which neither Aeris nor Peel has an obligation to do or to procure) or
are offered or sold pursuant to an exemption from, or in a transaction
not subject to, the registration requirements of the US Securities Act and
any applicable securities laws of any state or other jurisdiction of the
United States.
JORC Code
This presentation is a public report as defined by The JORC Code (2012)
Edition (“JORC Code”) and has been prepared in accordance with the
JORC Code and the ASX Listing Rules. The presentation contains
references to previously reported Mineral Resources, Ore Reserves and
Exploration Results of Aeris and Peel. No new Mineral Resources, Ore
Reserves or Exploration results are reported in this presentation.
NO NEW INFORMATION STATEMENT - Aeris
This presentation refers to Exploration Results, estimates of Mineral
Resources and Ore Reserves contained in the Group Mineral Resource
and Ore Reserve Statement as at 31 December 2024 (announced on 22
July 2025 “Group Mineral Resource and Ore Reserve Statement”), as well
as an Ore Reserve Estimate for Constellation (announced on 28 October
2025, “Maiden Open Pit Ore Reserve Estimate for Constellation Project”)
and prior market announcements released by Aeris, (“Prior
Reports”). The Prior Reports are footnote referenced in this presentation
and available from: https://www.aerisresources.com.au/investor.
Aeris confirms that it is not aware of any new information or data that
materially affects the information included in the Prior Reports and, in the
case of Exploration Results, estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters
underpinning the results or estimates in the Prior Reports continue to
apply and have not materially changed. Aeris confirms that the form
and context in which the Competent Person’s findings are presented in
this document have not been materially modified from the Prior Reports.
NO NEW INFORMATION STATEMENT - Peel
Previous results referred to herein have been extracted from previously
released ASX announcements included in footnote references. Previous
announcements and reports are available to view on
www.peelmining.com.au and www.asx.com.au. In the case of estimates
of mineral resources or ore reserves, Peel confirms that all material
assumptions and technical parameters underpinning the estimates in
the relevant market announcements continue to apply and have not
materially changed. Peel confirms that it is not aware of any new
information or data that materially affects the information included in
the original market announcements. Peel confirms that the form and
context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcement.
AGGREGATION OF ESTIMATES
This presentation contains pro-forma combined Mineral Resource and
Ore Reserve estimates which represent an aggregation of estimates (with
rounding) of Aeris and Peel. These pro-forma estimates do not represent
new or independent estimates. The aggregated figures are presented for
illustrative and comparative purposes only, are not representative of any
individual deposit and should be read in conjunction with the individual
project-level Mineral Resource and Ore Reserve estimate statements
included in Appendix Supporting Information.
Australian mid-tier, copper and gold producer
Aeris Resources
2 producing operations (FY26: 40-49kt copper Eq)1
Multiple development projects
Investing in exploration
Substantial copper production and metal inventory
Excellent platform for growth
4
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Aeris confirms that it is the
Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to
be recovered and sold.
H1 FY26 Snapshot
Gross profit 57%
$93.5M
$47.9M
Cash flow from operations 67%
$97.3M
Financial results compared to H1 FY25
20.3kt Cu eq
On plan
11.1kt Cu produced
23.8koz Au produced
122.5koz Ag produced
Net profit 62%
Cash and receivables
$106.4M
$452.6M
Net assets 22%1
1. Compared to 30 June 2025
1. As at 9 Apr 2026
2. As at 31 Dec 2025
3. As at 30 June 2025
Corporate overview
6
CAPITALISATION
Market capitalisation1 $490 million
Cash2 $86 million
Debt -
Tax Losses3 $418 million
Michele
Muscillo
Non-Executive
Director
Colin
Moorhead
Non-Executive
Director
Senior Executives
Board of Directors
Andre
Labuschagne
Executive
Chairman
MAJOR SHAREHOLDERS
Washington H. Soul Pattinson 17.1%
Tudor Court 6.8%
Macquarie IM 2.4%
RQI Investors 2.0%
Tribeca 1.9%
AIS SHARE PRICE
BROKER COVERAGE
Paul Harris
COO
Cameron Schubert
CTO
Larnie Roberts
CPO
Dane van
Heerden
CFO
Brad Cox
EGM Exploration
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
New director to
be appointed
?
7
Continuing to Deliver on Aeris’ FY26 Strategy
7
Realise
value for
shareholders
01
Sell non-core assets
02 Divesting North Queensland
exploration assets for total
consideration up to $15.5M(1)
Completion Q3 FY26
Operational Delivery
Tritton
Murrawombie Pit
• Constellation on time
• Resource extension
• LOM
Cracow
• Golden Plateau
• Resource extension
• LOM
05
Growth
• Focus on life extensions
through greenfield exploration
Consider external
opportunities
Balance Sheet
06
Repay debt
Assets sales
Consider hedging strategy
Unlock Stockman
04
• Update feasibility study
03 Jaguar strategy
Explore to increase resource
base
• Reduce care and maintenance
• Test base metals targets
1. Refer to ASX release “Agreement to Divest North Queensland Copper Assets”, 27 October 2025.
Acquiring Peel to Deliver
Aeris’ Growth Strategy
9
314
122
75
Tritton Mallee Bull Wirlong
9
Strategic Acquisition to Transform Tritton
Measured & Indicated Resources (Contained Cu kt)
Inferred Resources (Contained Cu kt)
Grade (Cu %)
1.7%
1.9%
1.8%
1. Refer to the Appendix for a breakdown of the underlying Mineral Resource and Ore Reserve Statements. Mineral Resources are inclusive of Ore Reserve.
South Cobar Copper Project resources to extend Tritton
mine life
Significant growth upside for Aeris and Peel
shareholders, with both projects open at depth
Peel assets to benefit from Aeris’ operational skills
and existing Tritton mill and infrastructure
Mallee Bull to be prioritised as a near term,
high-grade base load ore source
Aeris to acquire Peel’s South Cobar Copper Project
(Mallee Bull + Wirlong) via Scheme of Arrangement
Tritton mine life to be underpinned by base load feed from
Constellation and Mallee Bull
Mallee Bull expected to be fully permitted for stoping and ore
transport in H2 FY291
Aeris to release integrated life of mine plan aiming for a +10 year
mine life within the next 6 months1
Potential cost benefits from increased throughput and maximising
mill capacity
Wirlong has potential to become another future ore source –
following further resource definition drilling and studies
Extending Tritton’s mine life
10
Increasing mine life by combining Tritton’s processing
capacity with Mallee Bull high-grade ore
1. Subject to feasibility study, NSW Government Mining Activity Approval and FID.
Tritton Copper Production (kt)
24
17
20 19
29
FY23
FY24
FY25
FY26
Guidance
Constellation
Other Tritton
Mallee Bull
Wirlong
Current Producing Deposits
M+I: 65kt
Inferred: 26kt
Contained
Copper
Resources(2)
M+I: 94kt
Inferred: 60kt
M+I: 108kt
Inferred: 14kt
M+I: 21kt
Inferred: 44kt
M+I: 44kt
Inferred: 31kt
Guidance
Range
2. Refer to the Appendix for a breakdown of the underlying Mineral Resource and Ore Reserve Statements. Mineral
Resources are inclusive of Ore Reserve. Current Producing Deposits include Tritton, Avoca Tank, Murrawombie and
Budgerygar. Other Tritton includes South Wing, Tritton Remnants, Budgery, Kurrajong and ROM Stockpiles.
11
11
Note: The conceptual Exploration Decline has been designed for the purposes of a Review of Environmental Factors
(REF) submission to the NSW Resources Regulator. No economic studies have been completed as part of its design.
1. Refer to Appendix for Mallee Bull Mineral Resource.
Advanced copper project expected to become a near term, high-grade ore source for Tritton
Mallee Bull
Pre-Development Milestones & Next Steps
Preliminary mine design / scheduling
completed
Metallurgical testwork, geotechnical
engineering, project design
Construction of exploration decline and surface
infrastructure approved by NSW Resources
Regulator
Extensive flora, fauna and heritage studies
Ownership of land over the project site
Preliminary feasibility study well progressed
Integration study with Tritton commenced,
expected to be completed within 6 months
Development of exploration decline and
resource definition drilling
Location
Stage
Resource(1)
Approvals
Status
South of Cobar
New South Wales
c. 130km from Tritton
Development ready
6.3Mt
@ 1.92% Cu, 0.35g/t Au
for 122kt Cu, 71koz Au
Exploration Decline
Approved
Mallee Bull Summary
Deposit open
at depth
New South Wales
Tritton
13
1. Refer to Appendix for categories of the Mineral Resource; see also ASX announcements "Group Mineral Resource and Ore
Reserve Statement" dated 22 July 2025.
Strategic, cornerstone asset
Tritton
Strategic location in the Cobar region of NSW
~450kt copper produced since operations began in 2005 and over
300kt still in resource(1)
2,343km2 prospective tenement package to be supplemented by
1,479km2 acquired through the transaction
FY26 guidance of 24 – 29kt Cu
Excess mill capacity longer term – ability to expand copper output
with new mines and regional deposits
Tritton
tenements:
2,343km2
Tenements to
be acquired:
1,479km2
Murrawombie Pit
Now delivering Stage 2 ore to the mill
Latest grade control model shows 10% increase in contained copper
to be mined in FY26/27
Waste from cut back used to concurrently cap old heap leach pads,
saving c.$8M rehabilitation costs
High open pit mining rates in the second half of the year result in an
ore stockpile of over 900kt to be processed in FY27
14
Waste stripping in first half of year with ore delivery in
second half
Above: Murrawombie Pit operation in Stage 2 ore
Left: Rehabilitation of old heap leach pads at March 2026
15
Potential long-life mine to commence in FY27
Constellation
Large Mineral Resource defined: 7.6Mt of 2.01% Cu and 0.66g/t Au
containing 153kt copper and 161koz gold1
Maiden Ore Reserve declared for open pit material: 2.3Mt at 2.0%
Cu, 0.6g/t Au2
Studies underway to optimise open pit/underground transition point,
with maiden underground Ore Reserve planned for Q1 FY27
Development Consent received from NSW Department of Planning,
Housing and Infrastructure
Major capital spend to start in FY27 following EIS and mining license
approval, expected in Q4 FY26
1. See ASX release “Aeris Delivers Material Increase in Copper and Gold at Constellation” 31 March 2025. Comprises
Indicated Resource of 5.3Mt at 1.8% Cu, 0.7g/t Au, and Inferred resource of 2.3Mt at 2.6% Cu, 0.7g/t Au
2. Probable Reserve. Refer to ASX release “Maiden Open Pit Ore Reserve Estimate for Constellation Project”, 28 October
2025.
Constellation 2-stage pit and underground design
Encouraging drill result from Avoca Tank and
Budgerygar
Extending Mine Lives
~80,000m underground diamond drilling planned in FY26
At Avoca Tank, drilling has intersected high-grade copper within the
100m interval below the current Mineral Resource
Also, a new zone of mineralisation has been identified along strike
from Avoca Tank
At Budgerygar, drilling has returned significantly thicker mineralised
intersections than expected in the Inferred Resource
16
1. Refer to ASX release Clarification - Tritton Operation Drilling Update, dated 18 Dec 2025.
Avoca Tank long section showing drill intersections
below the current Mineral Resource
17
17
All current ore sources still open at depth
Mine Life Growth
Cracow
Queensland
19
High margin gold mine with long operating history
Cracow
Underground gold mine in continuous production since 2004
Conventional crush and grind CIP processing plant
Produced +1.7Moz gold since first production in 2004, strong history
of resource replacement through exploration
FY26 guidance 36 – 46koz Au(2)
6,400m drill program at Golden Plateau commenced, key target for
resource growth and mine extension
1. See each annual Group Mineral Resource and Ore Reserve Statement within the Annual Report for Aeris
Resources Ltd on the company’s website. Details for individual categories of mineralisation are also provided.
Also refer to ASX announcement "Group Mineral Resource and Ore Reserve Statement" dated 22 July 2025
2. Refer to ASX announcement “Company Update and FY26 Guidance” dated 22 July 2025.
-
100
200
300
400
500
600
700
800
FY21 FY22 FY23 FY24 FY25
koz
Au
Cracow production and Resources1 under Aeris
ownership
Annual Production Cumulative Production Resources
Golden Plateau target
Cracow Exploration
20
1. Vigar, AJ, 1994 Grade Modelling Reconciled to Open Pit Mining at the Golden Plateau Mine, Cracow, Queensland.
AusIMM Student Conference, April 1994. Production includes the CEX and Golden Mile pits located within 1km of the
Golden Plateau mine footprint.
2. Estimated true thickness. Refer to ASX release “Significant gold intersections from Golden Plateau drilling”, 9 February
2026 and “Golden Plateau drill program more than doubled as high-grade results continue”, 30 March 2026.
Historically produced ~850koz Au via open-pit (to ~120m below
surface) and underground (to ~260m below surface)1
Investigating large, lower grade mineralised halo around old stoping
areas below the Golden Plateau pit
Drill program expanded to 14,000m with 32 holes completed
High grade results including:
GPS140 34.5m2 at 3.1g/t Au (South lode)
GPS134 7.1m2 at 4.9g/t Au (West lode)
GPS130 5.0m2 at 12.7g/t Au (Fernyside lode)
GPS139B 6.8m2 at 4.2g/t Au (West lode)
Greenfield targets
Exploration
21
Exploring for a Western Vein Field analogue at the Southern Vein
Field
Airborne magnetic survey completed to aid finalisation of drill
targets under 500m cover
Drilling planned for FY26 to test geology model and identify
prospective structures (limited historical drilling)
Western Frontier is an interpreted structural corridor approx. 1km west
of current UG infrastructure within existing mining lease boundary
Potential to also drill Western Frontier structure in FY26 targeting
multiple high-grade shoots
Projects
Jaguar
Stockman
Reducing holding costs while undertaking low cost,
high return exploration
Revised Jaguar Strategy
Significant base metal resource already identified – 6.6Mt at 1.4%
Cu, 6.3% Zn, 0.6g/t Au, 71g/t Ag1
Pausing feasibility study while exploration is undertaken to define
additional resources and support longer life operations
8 high priority base metals drill targets to be tested
$3.1 million exploration program planned for FY26
23
1. Refer to Appendix for categories of the Mineral Resource; see also ASX announcements "Group Mineral Resource
and Ore Reserve Statement" dated 22 July 2025.
24
1. Thunderbox Reported Mineral Resource at 31 March 2025. Refer to Northern Star Resources ASX Announcement "Resources,
Reserves and Exploration Update" 15 May 2025.
2. King Of The Hills Reported Mineral Resource at 30th April 2025. Refer to Vault Minerals ASX Announcement "KOTH OP Ore
Reserve accelerates Leonora Plant Upgrade" 26 May 2025.
Tenements highly prospective for gold mineralisation
Jaguar gold
Very significant gold endowment in the region
4.7Moz Thunderbox Operation1 located 8km north of the Jaguar
tenements, 3.5Moz King of the Hills mine2 located 10km west
Jaguar tenements highly prospective but had limited exploration
Several advanced prospects including Heather Bore; a 2km long,
shallow gold anomaly
Reviewing next steps to unlock long term value
Unlock Stockman
High-grade Ore Reserve of 9.6Mt at 1.9% Cu, 4.3% Zn, 1.0g/t Au,
36g/t Ag1
Multiple processing routes assessed along with detailed cost
estimates
Potential to create a long life, high value operation
Completing feasibility study early FY27
Holding costs minimal
25
1. Probable Ore Reserve. Refer to ASX announcement "Group Mineral Resource and Ore Reserve Statement" dated
22 July 2025
Currawong mine design
Australian mid-tier, copper and gold producer
Summary
2 producing operations (FY26: 40-49kt copper Eq)1
Multiple development projects
Investing in exploration
Substantial copper production and metal inventory
Excellent platform for growth
26
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Aeris confirms that it is the
Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to
be recovered and sold.
Appendix
Group Ore Reserves
28
Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22 July 2025. Mineral Resource estimates are reported using a variety of cut-off criteria (NSR, copper or gold) depending on which is best suited to each deposit.
Discrepancy in summation may occur due to rounding. Excludes Constellation open pit Probable Ore Reserve of 2.3Mt at 2.0% Cu, 0.6g/t Au, 3.0g/t Ag. Refer to ASX release “Maiden Open Pit Ore Reserve Estimate for Constellation Project”, 28 October
2025.
North Queensland assets were divested in March 2026
BASE METALS Category Tonnes
(‘000)
Grade Contained Metal
Asset Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Tritton Proved 100 0.7 - - - 1 - - -
Probable 2,280 1.6 - 0.3 6 36 - 23 444
Total 2,380 1.5 - 0.3 6 37 - 23 444
North Qld Proved - - -- - -- - - - -
Probable 1,600 1.9 - 0.2 - 30 - 9 -
Total 1,600 1.9 - 0.2 - 30 - 9 -
Stockman Proved - - - - - - - - -
Probable 9,640 1.9 4.3 1.0 37 183 413 318 11,409
Total 9,640 1.9 4.3 1.0 37 183 413 318 11,409
Total Total Proved 100 0.7 - - - 1 - - -
Total Probable 13,530 1.8 3.1 0.8 27 249 413 350 11,853
Grand Total 13,630 1.8 3.0 0.8 27 249 413 350 11,853
GOLD Category Tonnes (‘000) Grade Contained Metal
Asset Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Cracow Proved 145 - - 3.0 - - - 14 -
Probable 360 - - 2.9 - - - 33 -
Total Grand Total 505 - - 2.9 - - - 48 -
(At 31 Dec 2024)
Group Mineral Resources
29
BASE METALS Category Tonnes
(Mt)
Grade Contained Metal
Project Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Tritton Measured 0.4 1.0 - 0.1 2 4 - 1 30
Indicated 11.0 1.6 - 0.4 4 179 - 158 1,270
Inferred 7.5 1.8 - 0.3 4 131 - 73 840
Total 18.9 1.7 - 0.4 4 314 - 233 2,140
Jaguar Measured 0.5 1.6 5.0 0.3 63 8 25 4 1,030
Indicated 4.2 1.4 6.4 0.4 67 59 268 53 8,950
Inferred 2.0 1.1 6.5 1.0 83 23 128 62 5,260
Total 6.6 1.4 6.3 0.6 71 90 422 119 15,240
North Qld Measured 0.2 2.3 - 0.5 0 5 - 3 0
Indicated 2.4 2.0 - 0.2 3 47 - 16 210
Inferred 0.6 2.0 - 0.1 2 12 - 2 30
Total 3.2 2.0 - 0.2 2 64 - 21 240
Stockman Measured - - - - 0 - - - 0
Indicated 13.4 2.1 4.2 1.0 37 288 561 420 16,000
Inferred 2.4 1.1 2.6 1.5 32 27 62 117 2,440
Total 15.8 2.0 4.0 1.1 36 315 624 537 18,450
Total Total Measured 1.1 1.5 2.3 0.2 29 17 25 9 1,060
Total Indicated 31.0 1.9 2.7 0.6 27 574 829 647 26,440
Total Inferred 12.4 1.6 1.5 0.6 22 193 191 254 8,580
Grand Total 44.5 1.8 2.3 0.6 25 784 1,045 910 36,070
GOLD Category Tonnes
(Mt)
Grade Contained Metal
Asset Au (g/t) Ag (g/t) Au (koz) Ag (koz)
Cracow Measured 0.4 4.0 3 46 37
Indicated 1.9 3.6 4 224 229
Inferred 2.1 2.6 4 181 305
Total Grand Total 4.4 3.2 4 452 571
Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22 July 2025. Mineral Resource estimates are reported using a variety of cut-off criteria (NSR, copper or gold) depending on which is best suited to each deposit.
Discrepancy in summation may occur due to rounding
North Queensland assets were divested in March 2026
(At 31 Dec 2024)
Tritton Operations Mineral Resources
30
Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22 July 2025. Mineral Resource estimates are reported using a variety of cut-off criteria (NSR, copper or gold) depending on which is best suited to each deposit.
Discrepancy in summation may occur due to rounding
(At 31 Dec 2024)
Deposit Category
Tonnes
(kt)
Grade Contained Metal
Cu
(%)
Au
(g/t)
Ag
(g/t)
Cu
(kt)
Au
(koz)
Ag
(koz)
Tritton
Measured 400 1.1 0.1 2 4 1 30
Indicated 400 1.2 0.1 2 5 1 30
Inferred 600 1.2 0.0 2 7 1 30
Total 1,400 1.2 0.1 2 16 3 100
South Wing
Measured - - - - - - -
Indicated - - - - - - -
Inferred 600 1.5 0.3 8 9 5 160
Total 600 1.5 0.3 8 9 5 160
Tritton Remnants
Measured - - - - - - -
Indicated 200 2.5 0.2 8 4 1 40
Inferred - - - - - - -
Total 200 2.5 0.2 8 4 1 40
Murrawombie
Open Pit
(oxide)
Measured - - - - - - -
Indicated 0 1.6 0.1 3 0 0 0
Inferred 100 0.5 0.0 1 0 0 0
Total 100 0.6 0.1 1 1 0 0
Murrawombie
Open Pit
(supergene/sulphide)
Measured - - - - - - -
Indicated 1,000 1.3 0.2 4 13 7 130
Inferred 700 0.4 0.1 2 2 1 30
Total 1,700 0.9 0.2 3 15 9 160
Murrawombie
Underground
Measured - - - - - - -
Indicated 1,100 1.3 0.3 4 15 10 150
Inferred 200 1.0 0.2 4 2 1 30
Total 1,400 1.2 0.3 4 17 11 170
Murrawombie Total 3,200 1.0 0.2 3 32 20 330
Avoca Tank
Measured - - - - - - -
Indicated 400 3.8 0.9 18 17 13 250
Inferred 100 3.3 0.9 17 3 3 50
Total 500 3.7 0.9 17 20 16 300
Budgerygar
Measured - - - - - - -
Indicated 1,000 1.5 0.2 7 15 7 210
Inferred 1,000 1.2 0.1 3 12 2 80
Total 2,000 1.4 0.1 5 27 8 300
Constellation
Open Pit
(oxide)
Measured - - - - - - -
Indicated 1,500 0.6 0.2 1 9 9 50
Inferred - - - - - - -
Total 1,500 0.6 0.2 1 9 9 50
Constellation
Open Pit
(supergene/sulphide)
Measured - - - - - - -
Indicated 2,600 2.3 0.9 4 60 73 290
Inferred 600 3.5 0.5 3 20 9 60
Total 3,200 2.5 0.8 3 79 83 350
Constellation
Underground
Measured - - - - - - -
Indicated 1,200 2.1 0.8 3 25 31 120
Inferred 1,730 2.3 0.7 2 40 39 90
Total 2,900 2.2 0.7 2 65 69 210
Constellation Total 7,600 2.0 0.7 3 153 161 610
Deposit Category
Tonnes
(kt)
Grade Contained Metal
Cu
(%)
Au
(g/t)
Ag
(g/t)
Cu
(kt)
Au
(koz)
Ag
(koz)
Budgery
Open Pit
(oxide)
Measured - - - - - - -
Indicated 0 1.4 0.1 - 0 0
Inferred 0 0.9 0.0 - 0 0 -
Total 0 1.4 0.1 - 0 0 -
Budgery
Open Pit
(supergene/sulphide)
Measured - - - - - - -
Indicated 1,000 1.3 0.2 - 13 5 -
Inferred 100 1.3 0.2 - 1 1 -
Total 1,100 1.3 0.2 - 14 6 -
Budgery
Underground
Measured - - - - - - -
Indicated 400 1.0 0.1 - 4 2 -
Inferred 100 0.9 0.0 - 1 0 -
Total 600 1.0 0.1 - 5 2 -
Budgery Total 1,700 1.2 0.1 - 20 7 -
Kurrajong
Measured - - - - - - -
Indicated - - - - - - -
Inferred 1,700 1.9 0.2 6 33 11 300
Total 1,700 1.9 0.2 6 33 11 300
ROM Stockpiles
Measured 100 0.7 - - 0 - -
Indicated - - - - - - -
Inferred - - - - - - -
Total 100 0.7 - - 0 - -
Total
Measured 400 1.0 0.1 2 4 1 30
Indicated 11,000 1.6 0.4 4 179 158 1,270
Inferred 7,500 1.8 0.3 4 131 7
Share your feedback
Discover