Q1 FY26 Results
22 October 2025
Presented by: Andre Labuschagne
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”). By attending an investor presentation or
briefing, or accepting, accessing or reviewing this presentation, you
acknowledge and agree to the terms set out below.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris with the Australian Securities Exchange (“ASX”) in
connection with its continuous disclosure obligations. This presentation
does not purport to contain all of the information that an investor should
consider when making an investment decision nor does it contain all of
the information which would be required in a product disclosure
statement or prospectus prepared in accordance with the requirements
of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, Aeris has no obligation to update the information
contained in this presentation. An investment in securities is subject to
known and unknown risks, some of which are beyond the control of
Aeris. Investors should consult with their own legal, tax, business and/or
financial advisors in connection with any acquisition of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing non-
IFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris believes the non-IFRS financial information and non-GAAP
financial measures provide useful information to users in measuring the
financial performance and condition of Aeris.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris and its officers. This
includes statements about market and industry trends, which are based
on interpretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “estimate”, “intend”,
“believe”, “guidance”, “should”, “could”, “may”, “will”, “predict”, “plan”
and other similar expressions.
Forward-looking statements are based on information available to Aeris
as at the date of this presentation and should not be relied upon as an
indication or guarantee of future performance. Except as required by
law or regulation (including the ASX Listing Rules), none of Aeris, its
representatives or advisers undertakes any obligation to provide any
additional or updated information whether as a result of a change in
expectations or assumptions, new information, future events or results or
otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
recent world events such as the COVID-19 pandemic and international
hostilities and associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
2
Disclaimer
NO NEW INFORMATION STATEMENT
This presentation refers to Exploration Results, estimates of Mineral
Resources and Ore Reserves contained in the Group Mineral Resource
and Ore Reserve Statement as at 31 December 2023 which was
announced on 17 June 2024 (2024 MROR Group Statement), as well as
Updated Mineral Resource Estimate of Constellation (announced on 31
March 2025 “Aeris Delivers Material Increase in Copper and Gold at
Constellation”) and prior market announcements released by Aeris, (Prior
Reports). The Prior Reports are footnote referenced in this presentation
and available from: https://www.aerisresources.com.au/investor.
Aeris confirms that it is not aware of any new information or data that
materially affects the information included in the Prior Reports and, in the
case of Exploration Results, estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters
underpinning the results or estimates in the Prior Reports continue to
apply and have not materially changed. Aeris confirms that the form
and context in which the Competent Person’s findings are presented in
this document have not been materially modified from the Prior Reports.
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which Aeris has no obligation to do or to procure) or are offered or sold
pursuant to an exemption from, or in a transaction not subject to, the
registration requirements of the US Securities Act and any applicable
securities laws of any state or other jurisdiction of the United States.
3
Australian mid-tier, base and precious metals producer
Aeris Resources
2 producing operations (FY26: 40-49kt copper eq.)1
3 development projects
Investing in exploration
Substantial copper production and metal inventory
Excellent platform for growth
4
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Aeris confirms that it is the
Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to
be recovered and sold.
5
Aeris strategy for FY26
5
Realise
value for
shareholders
01
Sell non-core assets
02 • Sell NQ assets
• Consider others
Operational Delivery
Tritton
• Murrawombie Pit
• Constellation on time
• Resource extension
• LOM
Cracow
• Golden Plateau
• Resource extension
• LOM
05
Growth
• Focus on life extensions
through greenfield exploration
• Consider external
opportunities
Balance Sheet
06
• Repay debt by August 26
• Assets sales
• Consider hedging strategy
Unlock Stockman
04
• Finalise Albion test work
• Update study Sep
• Concept study on acid
production
• Find partner to invest to Final FS
03 Jaguar strategy
• Focus on +10 year life
• Reduce care and maintenance
• Test base metals targets
• Potential to JV gold
6
Key points for Q1 FY26
6
Group copper equivalent production of 10.3kt1
Costs well managed across the group
Cash and receivables at end of quarter of $46.4 million
Strong safety performance – no lost time injuries for the quarter
Tritton production of 6.1kt Cu at AISC of A$4.24/lb, consistent with
previous quarter
Avoca Tank mineralisation intersected 400m down plunge of the
current Mineral Resource
Cracow gold production in line with plan – 8.9koz at AISC of
A$3,692/oz
Review of remnant mineralisation in Cracow Western Vein Field has
brought an additional 20koz Au into the mine plan
Grade model2 developed for the Golden Plateau deposit at
Cracow
Advancing divestment options for North Queensland
Solid operating performance
1. Refer to ASX release September 2025 Quarterly Activities Report for production detail.
CuEq = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Commodity prices: US$9,792/t Cu, US$3,454/oz Au, US$39/oz Ag
2. Grade model developed for internal planning only. The grade model is not JORC 2012 compliant and does not
represent either a Mineral Resource or Ore Reserve
7
7
OCF = Operating cash flow
Cash Flow
Sep Quarter Group Cash Flow (A$M)
Strong operating cash flows supporting investment
Tritton
NSW
Production consistent with previous quarter
Q1 FY26 results
Production of 6.1kt Cu at AISC of A$4.24/lb
$25 million growth capital invested in waste stripping at
Murrawombie Pit with ore to be delivered over H2 FY26
Murrawombie Pit Stage 1 ore processing complete and Stage
2 waste stripping underway
Over 17,000m of diamond drilling completed
Avoca Tank mineralisation intersected 400m down plunge of
the current Mineral Resource
9
Production Summary Unit
Jun 25
Qtr
Sep 25
Qtr
FY26
Guidance
Ore Mined kt 455.8 284.7
Mined Grade % Cu 1.49 1.98
Ore Milled kt 382.1 358.3
Milled Grade % Cu 1.70 1.80
Recovery % Cu 95.6 95.0
Copper Produced kt 6.2 6.1 24 – 29
Gold Produced koz 2.0 2.0 8 – 10
Silver Produced koz 60.8 72.2 215 – 263
Cost Summary
Mining A$M 41.8 28.0
Processing A$M 7.7 8.6
Site G&A A$M 5.7 6.1
TC/RCs A$M 1.9 1.5
Product Handling A$M 5.3 5.3
Total mine operations A$M 62.4 49.5 207 – 253
By-Product Credit A$M (12.9) (14.8)
Royalties A$M 3.1 3.6
Corporate G&A A$M 0.5 0.5
Inventory Movements A$M (7.6) 4.0
Sustaining Capital A$M 12.4 14.3 39 – 48
All-In Sustaining Costs
A$M 57.9 57.3
A$/lb 4.22 4.24
Growth Capital A$M 13.1 25.6 58 – 71
Exploration A$M 1.3 1.8 10 – 12
All-In Costs
A$M 72.3 84.7
A$/lb 5.27 6.27
10
Murrawombie Pit waste stripping
10
Mined Ore1
UG Open Pit Mill Capacity
1. Chart is provided to provide a visual representation of the proportion of ore mined from open pit and
underground sources and should not be considered guidance
11
Project technical work progressing:
Constellation
Open cut and underground mine design
Preparation for maiden open cut Ore Reserve
Metallurgical testwork on sulphide and oxide ore
Finalisation of infrastructure designs
Permitting and environmental approvals
12
12
1. Refer to September 2025 Quarterly Activities Report
Exploration
Sulphide mineralisation intersected
250 – 400m below the base of the
Avoca Tank Mineral Resource1
Cracow
Queensland
Q1 FY26 results
Gold production of 8.9koz at AISC of A$3,692/oz as planned
despite some operational challenges
Review of remnant mineralisation in the Western Vein Field
has brought an additional 20koz Au into the mine plan
TSF lift construction progressing ahead of schedule
Exploration activities advanced at Golden Plateau and
across the broader tenement package
14
1. Grade model developed for internal planning only. The grade model is not JORC 2012 compliant and does not
represent either a Mineral Resource or Ore Reserve
Quarter production and costs on track Production Summary Unit
Jun 25
Qtr
Sep 25
Qtr
FY26
Guidance
Ore Mined kt 133.8 142.3
Mined Grade g/t 2.68 2.16
Ore Milled kt 159.6 154.3
Milled Grade g/t 2.36 1.98
Recovery Au 91.1% 90.4%
Gold Produced koz 11.0 8.9 36 – 46
Gold Sold koz 10.8 8.8
Cost Summary
Mining A$M 16.3 19.6
Processing A$M 7.2 7.2
Site G&A A$M 2.9 2.8
Total mine operations A$M 26.5 29.6 95 – 116
By-Product Credit A$M (0.5) (0.5)
Royalties A$M 3.0 2.6
Corporate G&A A$M 0.4 0.4
Inventory Movements A$M (1.0) (1.9)
Sustaining Capital A$M 4.9 2.3 18 – 22
All-In Sustaining Costs
A$M 33.3 32.5
A$/oz 3,075 3,692
Growth Capital A$M - 5.5 6 – 8
Exploration A$M 1.2 1.0 5 – 7
All-In Costs
A$M 34.5 39.0
A$/oz 3,187 4,437
Cracow exploration
Developed grade model1 of the mineralisation at Golden
Plateau
Mineralisation extends approximately 150m below the base
of the current pit
7,000m drill program planned to commence in Nov 2025
Airborne magnetic and radiometric survey completed of
the entire 890km2 tenement package to define greenfield
targets
15
1. Grade model developed for internal planning only. The grade model is not JORC 2012 compliant and does not
represent either a Mineral Resource or Ore Reserve
Focus on Golden Plateau
Projects
Q1 FY26 activities
Jaguar – on care and maintenance, incurred costs of $2.1 million
Defining drill targets for Jaguar exploration program to commence
later this year
Stockman – test work and assessment of processing options
completed, reviewing next steps to progress project
North Queensland – divestment options advanced
17
Project updates
18
Corporate
Closing cash and receivables of $46.4 million with cash of $32.0 million
Restricted cash related to environmental bonds unchanged at ~$17
million
Cash flow from operations increased to $53.1 million
Entered into unsecured gold hedges for ~20koz at A$5,145/oz with
3.6koz delivered during the quarter
Debt unchanged with $40 million drawn on the WHSP facility
(A$ Million)
Jun 25 Sep 25
QTR QTR
Closing Cash 28.2 32.0
Receivables
Cracow - -
Tritton 21.3 14.4
Useable Cash and Receivables 49.5 46.4
(A$ Million)
Jun 25 Sep 25
QTR QTR
Opening cash 22.4 28.2
Cash flow from operations 34.0 53.1
Cash flow from capital exp. (24.9) (46.6)
Cash flow from financing (3.2) (2.7)
Closing cash 28.2 32.0
Appendix
Group Ore Reserves
20
As at December 2024. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22 July 2025
BASE METALS Category Tonnes
(‘000)
Grade Contained Metal
Asset Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Tritton Proved 100 0.7 - - - 1 - - -
Probable 2,280 1.6 - 0.3 6 36 - 23 444
Total 2,380 1.5 - 0.3 6 37 - 23 444
North Qld Proved - - -- - -- - - - -
Probable 1,600 1.9 - 0.2 - 30 - 9 -
Total 1,600 1.9 - 0.2 - 30 - 9 -
Stockman Proved - - - - - - - - -
Probable 9,640 1.9 4.3 1.0 37 183 413 318 11,409
Total 9,640 1.9 4.3 1.0 37 183 413 318 11,409
Total Total Proved 100 0.7 - - - 1 - - -
Total Probable 13,530 1.8 3.1 0.8 27 249 413 350 11,853
Grand Total 13,630 1.8 3.0 0.8 27 249 413 350 11,853
GOLD Category Tonnes (‘000) Grade Contained Metal
Asset Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Cracow Proved 145 - - 3.0 - - - 14 -
Probable 360 - - 2.9 - - - 33 -
Total Grand Total 505 - - 2.9 - - - 48 -
Group Mineral Resources
21
BASE METALS Category Tonnes
(Mt)
Grade Contained Metal
Project Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Tritton Measured 0.4 1.0 - 0.1 2 4 - 1 30
Indicated 11.0 1.6 - 0.4 4 179 - 158 1,270
Inferred 7.5 1.8 - 0.3 4 131 - 73 840
Total 18.9 1.7 - 0.4 4 314 - 233 2,140
Jaguar Measured 0.5 1.6 5.0 0.3 63 8 25 4 1,030
Indicated 4.2 1.4 6.4 0.4 67 59 268 53 8,950
Inferred 2.0 1.1 6.5 1.0 83 23 128 62 5,260
Total 6.6 1.4 6.3 0.6 71 90 422 119 15,240
North Qld Measured 0.2 2.3 - 0.5 0 5 - 3 0
Indicated 2.4 2.0 - 0.2 3 47 - 16 210
Inferred 0.6 2.0 - 0.1 2 12 - 2 30
Total 3.2 2.0 - 0.2 2 64 - 21 240
Stockman Measured - - - - 0 - - - 0
Indicated 13.4 2.1 4.2 1.0 37 288 561 420 16,000
Inferred 2.4 1.1 2.6 1.5 32 27 62 117 2,440
Total 15.8 2.0 4.0 1.1 36 315 624 537 18,450
Total Total Measured 1.1 1.5 2.3 0.2 29 17 25 9 1,060
Total Indicated 31.0 1.9 2.7 0.6 27 574 829 647 26,440
Total Inferred 12.4 1.6 1.5 0.6 22 193 191 254 8,580
Grand Total 44.5 1.8 2.3 0.6 25 784 1,045 910 36,070
GOLD Category Tonnes
(Mt)
Grade Contained Metal
Asset Au (g/t) Ag (g/t) Au (koz) Ag (koz)
Cracow Measured 0.4 4.0 3 46 37
Indicated 1.9 3.6 4 224 229
Inferred 2.1 2.6 4 181 305
Total Grand Total 4.4 3.2 4 452 571
As at December 2024. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22 July 2025
22
22
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. FY25 as detailed in
quarterly reports. Aeris confirms that it is the Company’s opinion that all the elements included in the metal
equivalents calculation have a reasonable potential to be recovered and sold.
2. Excludes royalties
FY26 Guidance
Group FY26 Guidance FY25 Actual
Production
Copper kt 24 - 29 24.9
Gold koz 44 - 56 55.2
Silver koz 240 - 293 185.2
Copper equivalent1
kt 40 - 49 42.1
Operating Costs
Mine operations2
$M 302 - 369 344.9
Care and maintenance $M 6 - 7 10.8
Corporate $M 21 - 26 23.6
Capital Costs
Sustaining $M 57 - 70 69.4
Growth & projects $M 65 - 80 35.1
Exploration $M 18 - 23 9.8
Tritton FY26 Guidance FY25 Actual
Production
Copper kt 24 - 29 19.4
Gold koz 8 - 10 6.1
Silver koz 215 - 263 185.2
Operating Costs
Mine operations $M 207 - 253 202.1
Capital Costs
Sustaining $M 39 - 48 52.5
Growth $M 58 - 71 32.0
Exploration $M 10 - 12 2.9
Cracow FY26 Guidance FY25 Actual
Production
Gold koz 36 - 46 45.1
Operating Costs
Mine operations $M 95 - 116 99.4
Capital Costs
Sustaining $M 18 - 22 16.7
Growth $M 6 - 8 0.0
Exploration $M 5 - 7 5.3