QUARTERLY RESULTS PRESENTATION - MAR 2026
Released
Released
Announcement PDF
Q3 FY26 Results
29 April 2026
Presented by: Andre Labuschagne
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”). By attending an investor presentation or
briefing, or accepting, accessing or reviewing this presentation, you
acknowledge and agree to the terms set out below.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris with the Australian Securities Exchange (“ASX”) in
connection with its continuous disclosure obligations. This presentation
does not purport to contain all of the information that an investor should
consider when making an investment decision nor does it contain all of
the information which would be required in a product disclosure
statement or prospectus prepared in accordance with the requirements
of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, Aeris has no obligation to update the information
contained in this presentation. An investment in securities is subject to
known and unknown risks, some of which are beyond the control of
Aeris. Investors should consult with their own legal, tax, business and/or
financial advisors in connection with any acquisition of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing non-
IFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris believes the non-IFRS financial information and non-GAAP
financial measures provide useful information to users in measuring the
financial performance and condition of Aeris.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris and its officers. This
includes statements about market and industry trends, which are based
on interpretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “estimate”, “intend”,
“believe”, “guidance”, “should”, “could”, “may”, “will”, “predict”, “plan”
and other similar expressions.
Forward-looking statements are based on information available to Aeris
as at the date of this presentation and should not be relied upon as an
indication or guarantee of future performance. Except as required by
law or regulation (including the ASX Listing Rules), none of Aeris, its
representatives or advisers undertakes any obligation to provide any
additional or updated information whether as a result of a change in
expectations or assumptions, new information, future events or results or
otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
recent world events such as the COVID-19 pandemic and international
hostilities and associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
2
Disclaimer
NO NEW INFORMATION STATEMENT
This presentation refers to Exploration Results, estimates of Mineral
Resources and Ore Reserves contained in the Group Mineral Resource
and Ore Reserve Statement as at 31 December 2024 (announced on 22
July 2025 “Group Mineral Resource and Ore Reserve Statement”), as well
as an Ore Reserve Estimate for Constellation (announced on 28 October
2025, “Maiden Open Pit Ore Reserve Estimate for Constellation Project”)
and prior market announcements released by Aeris, (Prior Reports). The
Prior Reports are footnote referenced in this presentation and available
from: https://www.aerisresources.com.au/investor.
Aeris confirms that it is not aware of any new information or data that
materially affects the information included in the Prior Reports and, in the
case of Exploration Results, estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters
underpinning the results or estimates in the Prior Reports continue to
apply and have not materially changed. Aeris confirms that the form
and context in which the Competent Person’s findings are presented in
this document have not been materially modified from the Prior Reports.
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which Aeris has no obligation to do or to procure) or are offered or sold
pursuant to an exemption from, or in a transaction not subject to, the
registration requirements of the US Securities Act and any applicable
securities laws of any state or other jurisdiction of the United States.
3
Australian mid-tier, base and precious metals producer
Aeris Resources
2 producing operations (FY26: 40-49kt copper eq.)1
Multiple development projects
Investing in exploration
Substantial copper production and metal inventory
Excellent platform for growth
4
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Aeris confirms that it is the
Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to
be recovered and sold.
5
Continuing to Deliver on Aeris’ FY26 Strategy
5
Realise
value for
shareholders
01
Sell non-core assets
02 Divested North Queensland
exploration assets for total
consideration up to $15.5M(1)
Completion Q3 FY26
Operational Delivery
Tritton
Murrawombie Pit
• Constellation on time
• Resource extension
• LOM
Cracow
• Golden Plateau
• Resource extension
• LOM
05
Growth
• Focus on life extensions
through greenfield exploration
Consider external
opportunities
Balance Sheet
06
Repay debt
Assets sales
Consider hedging strategy
Unlock Stockman
04
• Update feasibility study
03 Jaguar strategy
Explore to increase resource
base
• Reduce care and maintenance
• Test base metals targets
1. Refer to ASX release “Agreement to Divest North Queensland Copper Assets”, 27 October 2025.
6
Key points for Q3 FY26
6
Cash and receivables up to $149.8M
Cash flow from operations up 72% to $75.8M for the quarter
Group Cu eq1 production of 10.4kt for the quarter at AISC of
A$4.86/lb Cu eq
Costs well managed – limited impact from diesel pricing
Aeris to acquire South Cobar Copper Project from Peel Mining to
create long-life copper mining hub
Tritton copper production slightly lower than revised plan due to
lower mined grade from open pit and underground
Murrawombie Pit now delivering Stage 2 ore, with the Tritton mill
operating at nameplate capacity
Constellation Project – early works to commence in Q4 to derisk
FY27
Cracow – gold production of 10.1koz on plan
Golden Plateau exploration program at Cracow expanded with
drilling returning multiple high-grade intersections
Strong cash generation and Tritton set up for Q4
1. Refer to ASX release March 2026 Quarterly Activities Report for production detail.
CuEq = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Q3 prices US$12,852/t Cu, US$4,877/oz Au, US$84/oz Ag
7
7
Quarter Cash Flow
March Quarter Group Cash Flow ($M)
Strong operating cash flow supported by higher commodity prices
1. OCF = operating cash flow
2. Finance and other includes gold hedging
88
56
39
(41) (3)
(5)
5
(20)
119
8
8
YTD Cash Flow
YTD Group Cash Flow ($M)
1. OCF = operating cash flow
2. Proceeds from Equity Raise are net of direct costs
3. Finance and other includes gold hedging
28
138
94
(124)
97
(9)
(16)
(40)
5
(54)
119
Tritton
NSW
Increased mined tonnes but lower grades
Q3 FY26 results
Production of 5.3kt Cu at AISC of A$4.53/lb
62% increase in tonnes mined although copper production
slightly below plan due to lower mined grades
63kt ROM ore stockpiled at end of quarter, derisks Q4
FY26 production forecast to be within low end of guidance
Costs well managed – limited impact from diesel pricing
10
Production Summary Unit
Sep 25
Qtr
Dec 25
Qtr
Mar 26
Qtr
YTD
FY26
Guidance
Ore Mined kt 284.7 245.1 392.6 922.4
Mined Grade % Cu 1.98 2.16 1.49 1.82
Ore Milled kt 358.3 251.8 326.0 936.0
Milled Grade % Cu 1.80 2.08 1.74 1.85
Recovery % Cu 95.0 95.7 93.9 94.9
Copper Produced kt 6.1 5.0 5.3 16.5 24 – 29
Gold Produced koz 2.0 1.8 2.2 6.0 8 – 10
Silver Produced koz 72.2 36.6 55.5 164.3 215 – 263
Cost Summary
Mining A$M 28.0 27.2 32.1 87.3
Processing A$M 8.6 8.6 8.8 26.0
Site G&A A$M 6.1 6.3 6.5 18.8
TC/RCs A$M 1.5 1.2 1.5 4.2
Product Handling A$M 5.3 3.5 6.3 15.1
Total Mine Operations A$M 49.5 46.8 55.3 151.5 207 – 253
By-Product Credit A$M (14.8) (13.2) (22.9) (50.8)
Royalties A$M 3.6 3.0 4.6 11.2
Corporate G&A A$M 0.5 0.5 0.5 1.6
Inventory Movements A$M 4.0 (6.8) 2.4 (0.3)
Sustaining Capital A$M 14.3 13.2 13.2 40.8 39 – 48
All-In Sustaining Costs
A$M 57.3 43.6 53.1 154.0
A$/lb 4.24 3.94 4.53 4.24
Growth Capital A$M 25.6 23.3 20.9 69.9 58 – 71
Exploration A$M 1.8 0.7 1.8 4.3 10 – 12
All-In Costs
A$M 84.7 67.6 75.9 228.2
A$/lb 6.27 6.12 6.48 6.29
Delivering Stage 2 ore
Murrawombie Pit
Pit moved into Stage 2 ore late in Q3
Increased ore supply now enabling Tritton mill to run at nameplate
capacity in Q4
Lower grade transitional ore also impacted recoveries but pit now in
primary sulphide material
Rehabilitation of old heap leach pads using open pit waste is
progressing to plan
No further growth capital forecast for the pit now it is mining ore
11
Project development on track for operations Q1 FY27
Constellation
Early construction works approved to commence in May,
starting with the haul road and services corridor to site
$10-15 million planned project capital will be brought forward
from FY27 to Q4 FY26 to derisk development
Capital to be funded with operational cash flow
Updated mine design comprises smaller, two-stage open pit,
to enhance cash flow and provide more consistent ore feed
Permitting and approvals on track – mining lease expected to
be granted in Q4 FY26 to support the commencement of
open pit operations in Q1 FY27
12
Constellation 2-stage pit and underground design
Targeting updated MRE in Q4
Tritton exploration
Avoca Tank – drilling continues to intersect
mineralisation outside the boundaries of the
current Mineral Resource1
Drilling to continue at Avoca Tank through
Q4 to inform an updated Mineral Resource
Budgerygar – resource definition drilling is
focused on conversion of Inferred resource to
Indicated as well as testing extensions below
the current resource
Resource definition drilling also underway at
South Wing, an inferred resource located
directly along strike from the Tritton deposit
and close to existing UG infrastructure
Targeting updated Mineral Resource
estimates and exploration update for Q4
13
1. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22nd July 2025
Cracow
Queensland
Q3 FY26 results
Gold production 10.1koz in line with plan, at AISC of
A$3,442/oz
Costs well managed and on budget
Cracow remains on track for mid-point of guidance range
for FY26
Drilling program at Golden Plateau expanded following
successful results
15
Quarter production on plan, costs on track
Production Summary Unit
Sep 25
Qtr
Dec 25
Qtr
Mar 26
Qtr
YTD
FY26
Guidance
Ore Mined kt 142.3 150.9 137.1 430.3
Mined Grade g/t 2.16 2.49 2.40 2.35
Ore Milled kt 154.3 157.3 155.3 466.9
Milled Grade g/t 1.98 2.43 2.23 2.22
Recovery Au 90.4% 90.5% 90.6% 90.5%
Gold Produced koz 8.9 11.1 10.1 30.1 36 – 46
Gold Sold koz 8.8 11.0 10.1 29.9
Cost Summary
Mining A$M 19.6 16.2 17.6 53.4
Processing A$M 7.2 7.1 7.7 22.0
Site G&A A$M 2.8 2.9 3.5 9.2
Total Mine Operations A$M 29.6 26.3 28.8 84.6 95 – 116
By-Product Credit A$M (0.5) (0.5) (0.7) (1.7)
Royalties A$M 2.6 3.7 3.6 9.9
Corporate G&A A$M 0.4 0.4 0.4 1.3
Inventory Movements A$M (1.9) 0.9 (1.8) (2.8)
Sustaining Capital A$M 2.3 5.4 4.4 12.1 18 – 22
All-In Sustaining Costs
A$M 32.5 36.1 34.7 103.3
A$/oz 3,692 3,278 3,442 3,455
Growth Capital A$M 5.5 2.1 0.6 8.2 6 – 8
Exploration A$M 1.0 0.7 3.4 5.2 5 – 7
All-In Costs
A$M 39.0 38.9 38.8 116.7
A$/oz 4,437 3,528 3,841 3,901
Golden Plateau exploration
16
Drilling increasing confidence in future open pit
opportunity
1. Refer to ASX releases Golden Plateau Drill Program More Than Doubled as High Grade Drill Results Continue,
dated 30 March 2026, and Significant Gold Intersections from Golden Plateau Drilling, dated 9 February 2026 for
more information.
2. Estimated true thickness
Drill program underway to test remnant mineralisation around
historic stoping areas
Program expanded to approximately 14,000m
Total of 32 holes completed, with assays returned for 15
Key intersections include1:
GPS140 34.5m2 at 3.1g/t Au (South lode)
GPS134 7.1m2 at 4.9g/t Au (West lode)
GPS139B 6.8m2 at 4.2g/t Au (West lode)
GPS130 5.0m2 at 12.7g/t Au (Ferneyside)
GPS135 10.0m2 at 2.9g/t Au (Sunnyside)
Projects
Q3 FY26 activities
Jaguar – drill rig mobilised for base metals exploration program to
test 8 high priority targets (drilling commenced in April)
Stockman – updating feasibility study for public release in early FY27
North Queensland – divestment completed for cash consideration of
$5M plus the release of ~$6.5M from cash backed environmental
bonds
18
Project updates
19
Corporate
Closing cash and receivables increased to $149.8 million
Restricted cash held against environmental bonds $17.7 million
Cash flow from operations strong at $75.8 million, a 72% increase
quarter-on-quarter, supported by higher commodity prices
5.5koz remain to be delivered into the Cracow gold hedge
Acquisition of Peel Mining announced 12 February is underway.
Shareholder meeting to approve the scheme and demerger is
expected to occur in mid-June 2026, with final implementation
anticipated in early July
(A$ Million)
Sep 25 Dec 25 Mar 26
QTR QTR QTR
Closing cash 32.0 87.9 119.1
Tritton - copper concentrate receivables 14.4 18.4 30.7
Useable Cash and Receivables 46.4 106.4 149.8
(A$ Million)
Sep 25 Dec 25 Mar 26
QTR QTR QTR
Opening cash 28.2 32.0 87.9
Cash flow from operations 53.1 44.0 75.8
Cash flow from capital expenditure (46.6) (43.8) (41.7)
Cash flow from financing (2.7) 55.8 (3.0)
Closing cash 32.0 87.9 119.1
Peel Transaction
Tenements to be
acquired:
1,479km2
21
314
122
75
Tritton Mallee Bull Wirlong
21
Strategic Acquisition to Transform Tritton
Measured & Indicated Resources (Contained Cu kt)
Inferred Resources (Contained Cu kt)
Grade (Cu %)
1.7%
1.9%
1.8%
1. Refer to the Appendix for a breakdown of the underlying Mineral Resource and Ore Reserve Statements. Mineral Resources are inclusive of Ore Reserve.
South Cobar Copper Project resources to extend Tritton
mine life
Significant growth upside for Aeris and Peel
shareholders, with both projects open at depth
Peel assets to benefit from Aeris’ operational skills
and existing Tritton mill and infrastructure
Mallee Bull to be prioritised as a near term,
high-grade base load ore source
Aeris to acquire Peel’s South Cobar Copper Project
(Mallee Bull + Wirlong) via Scheme of Arrangement
Tritton mine life to be underpinned by base load feed from
Constellation and Mallee Bull
Mallee Bull expected to be fully permitted for stoping and ore
transport in H2 FY291
Aeris to release integrated life of mine plan aiming for a +10 year
mine life within the next 6 months1
Potential cost benefits from increased throughput and maximising
mill capacity
Wirlong has potential to become another future ore source –
following further resource definition drilling and studies
Extending Tritton’s mine life
22
Increasing mine life by combining Tritton’s processing
capacity with Mallee Bull high-grade ore
1. Subject to feasibility study, NSW Government Mining Activity Approval and FID.
Tritton Copper Production (kt)
24
17
20 19
29
FY23
FY24
FY25
FY26
Guidance
Constellation
Other Tritton
Mallee Bull
Wirlong
Current Producing Deposits
M+I: 65kt
Inferred: 26kt
Contained
Copper
Resources(2)
M+I: 94kt
Inferred: 60kt
M+I: 108kt
Inferred: 14kt
M+I: 21kt
Inferred: 44kt
M+I: 44kt
Inferred: 31kt
Guidance
Range
2. Refer to the Appendix for a breakdown of the underlying Mineral Resource and Ore Reserve Statements. Mineral
Resources are inclusive of Ore Reserve. Current Producing Deposits include Tritton, Avoca Tank, Murrawombie and
Budgerygar. Other Tritton includes South Wing, Tritton Remnants, Budgery, Kurrajong and ROM Stockpiles.
23
23
Indicative Transaction Timeline
Timeline Indicative Date
Scheme and Demerger Timeline
First Court Date for Scheme Early May 2026
Scheme Booklet sent to Peel shareholders Early May 2026
Scheme Meeting of Peel Shareholders to approve Scheme and Demerger Mid June 2026
If the Scheme and Demerger are approved by Peel shareholders
Second Court Date Mid to late June 2026
Effective Date Mid to late June 2026
Scheme and Demerger Record Date Late June 2026
Demerger implementation (transfer of NewCo shares) Late June 2026
Implementation Date for Scheme Early July 2026
Proposed NewCo ASX listing (subject to ASX and other required approvals) Q3 CY26
Scheme Booklet expected to be dispatched to Peel shareholders in early May 2026, ahead of a Scheme Meeting
in mid June 2026 and transaction completion by early July 2026
Note: The dates referred to above are indicative and may change.
Australian mid-tier, base and precious metals producer
Aeris Resources
2 producing operations (FY26: 40-49kt copper eq.)1
Multiple development projects
Investing in exploration
Substantial copper production and metal inventory
Excellent platform for growth
24
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Aeris confirms that it is the
Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to
be recovered and sold.
Appendix
Group Ore Reserves
26
As at December 2024. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22 July 2025
BASE METALS Category Tonnes
(‘000)
Grade Contained Metal
Asset Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Tritton Proved 100 0.7 - - - 1 - - -
Probable 2,280 1.6 - 0.3 6 36 - 23 444
Total 2,380 1.5 - 0.3 6 37 - 23 444
North Qld Proved - - -- - -- - - - -
Probable 1,600 1.9 - 0.2 - 30 - 9 -
Total 1,600 1.9 - 0.2 - 30 - 9 -
Stockman Proved - - - - - - - - -
Probable 9,640 1.9 4.3 1.0 37 183 413 318 11,409
Total 9,640 1.9 4.3 1.0 37 183 413 318 11,409
Total Total Proved 100 0.7 - - - 1 - - -
Total Probable 13,530 1.8 3.1 0.8 27 249 413 350 11,853
Grand Total 13,630 1.8 3.0 0.8 27 249 413 350 11,853
GOLD Category Tonnes (‘000) Grade Contained Metal
Asset Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Cracow Proved 145 - - 3.0 - - - 14 -
Probable 360 - - 2.9 - - - 33 -
Total Grand Total 505 - - 2.9 - - - 48 -
Group Mineral Resources
27
BASE METALS Category Tonnes
(Mt)
Grade Contained Metal
Project Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Tritton Measured 0.4 1.0 - 0.1 2 4 - 1 30
Indicated 11.0 1.6 - 0.4 4 179 - 158 1,270
Inferred 7.5 1.8 - 0.3 4 131 - 73 840
Total 18.9 1.7 - 0.4 4 314 - 233 2,140
Jaguar Measured 0.5 1.6 5.0 0.3 63 8 25 4 1,030
Indicated 4.2 1.4 6.4 0.4 67 59 268 53 8,950
Inferred 2.0 1.1 6.5 1.0 83 23 128 62 5,260
Total 6.6 1.4 6.3 0.6 71 90 422 119 15,240
North Qld Measured 0.2 2.3 - 0.5 0 5 - 3 0
Indicated 2.4 2.0 - 0.2 3 47 - 16 210
Inferred 0.6 2.0 - 0.1 2 12 - 2 30
Total 3.2 2.0 - 0.2 2 64 - 21 240
Stockman Measured - - - - 0 - - - 0
Indicated 13.4 2.1 4.2 1.0 37 288 561 420 16,000
Inferred 2.4 1.1 2.6 1.5 32 27 62 117 2,440
Total 15.8 2.0 4.0 1.1 36 315 624 537 18,450
Total Total Measured 1.1 1.5 2.3 0.2 29 17 25 9 1,060
Total Indicated 31.0 1.9 2.7 0.6 27 574 829 647 26,440
Total Inferred 12.4 1.6 1.5 0.6 22 193 191 254 8,580
Grand Total 44.5 1.8 2.3 0.6 25 784 1,045 910 36,070
GOLD Category Tonnes
(Mt)
Grade Contained Metal
Asset Au (g/t) Ag (g/t) Au (koz) Ag (koz)
Cracow Measured 0.4 4.0 3 46 37
Indicated 1.9 3.6 4 224 229
Inferred 2.1 2.6 4 181 305
Total Grand Total 4.4 3.2 4 452 571
As at December 2024. Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22 July 2025
28
28
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. FY25 as detailed in
quarterly reports. Aeris confirms that it is the Company’s opinion that all the elements included in the metal
equivalents calculation have a reasonable potential to be recovered and sold.
2. Excludes royalties
FY26 Guidance
Group FY26 Guidance FY25 Actual
Production
Copper kt 24 - 29 24.9
Gold koz 44 - 56 55.2
Silver koz 240 - 293 185.2
Copper equivalent1
kt 40 - 49 42.1
Operating Costs
Mine operations2
$M 302 - 369 344.9
Care and maintenance $M 6 - 7 10.8
Corporate $M 21 - 26 23.6
Capital Costs
Sustaining $M 57 - 70 69.4
Growth & projects $M 65 - 80 35.1
Exploration $M 18 - 23 9.8
Tritton FY26 Guidance FY25 Actual
Production
Copper kt 24 - 29 19.4
Gold koz 8 - 10 6.1
Silver koz 215 - 263 185.2
Operating Costs
Mine operations $M 207 - 253 202.1
Capital Costs
Sustaining $M 39 - 48 52.5
Growth $M 58 - 71 32.0
Exploration $M 10 - 12 2.9
Cracow FY26 Guidance FY25 Actual
Production
Gold koz 36 - 46 45.1
Operating Costs
Mine operations $M 95 - 116 99.4
Capital Costs
Sustaining $M 18 - 22 16.7
Growth $M 6 - 8 0.0
Exploration $M 5 - 7 5.3
Deposit
MRE
Category
South Cobar Project Copper MREs as at January 2023 ($A80/t NSR cut-off)
Tonnes (kt) Cu (%) Au (g/t) Ag (g/t) Zn (%) Pb (%) Cont Cu (kt) Cont Au (koz) Cont Ag (Moz) Cont Zn (kt) Cont Pb (kt)
Mallee Bull
Ind 5,590 1.93 0.38 27 0.13 0.21 108 68 4.85 7.3 11.7
Inf 750 1.87 0.11 21 0.04 0.08 14 2.7 0.51 0.3 0.6
Total 6,340 1.92 0.35 26 0.12 0.19 122 71 5.36 7.6 12.3
Wirlong
Ind 2,290 1.92 0.03 6 0.08 0.03 44 1.9 0.47 1.9 0.6
Inf 2,010 1.54 0.03 6 0.07 0.01 31 1.7 0.37 1.4 0.3
Total 4,300 1.75 0.03 6 0.08 0.02 75 3.6 0.84 3.3 0.9
Combined
Ind 7,880 1.93 0.28 21 0.12 0.16 152 70 5.33 9.2 12.4
Inf 2,760 1.63 0.05 10 0.06 0.03 45 4.4 0.87 1.7 0.9
Total 10,640 1.85 0.22 18 0.10 0.12 197 74 6.20 10.8 13.3
29
South Cobar Copper Project Resources
Note: The South Cobar Project Copper MRE utilises A$80/tonne NSR cut-off mineable shapes that include minimum mining widths and internal dilution to bound the MREs. Figures are rounded to reflect the precision of estimates and include rounding
errors. Refer to ASX announcement “20MT Resource Base for South Cobar Project” dated 9 January 2023.