TRITTON OPERATIONS UPDATE
Released
Released
Announcement PDF
30 MAY 2023
ASX/MEDIA RELEASE
TRITTON OPERATIONS UPDATE
• Escape ladderway to surface at Avoca Tank completed as planned
• Mining of high-grade stopes at Avoca Tank underway and being
delivered to the Tritton mill
• Grade control drilling continues to confirm high-grade tenor of Avoca
Tank deposit, including:
Hole ID
Intersection
(m)
True Width
(m)
Cu (%)
Au (g/t)
Ag
(g/t)
ATGC019
15.1
14.3
6.98
1.23
23
ATGC018
13.0
10.0
6.24
1.03
20
ATGC007
6.0
4.6
5.31
0.33
14
ATGC016
11.0
10.3
4.98
0.41
10
ATGC013
13.7
13.7
4.98
0.78
17
ATGC012
10.6
10.6
4.92
0.86
16
ATEL003
10.9
7.6
5.83
1.03
17
• Raise boring at Budgerygar progressing slower than plan, but not
essential to delivering scheduled ore production and Cu metal
tonnes from Budgerygar for Q4
Established Australian copper-gold producer and explorer, Aeris Resources Limited
(ASX: AIS) (Aeris or the Company) is pleased to provide an update on key
development projects underway at its Tritton Copper Operations in NSW.
Aeris’ Executive Chairman, Andre Labuschagne, commented “the team at Tritton
have done a fantastic job to bring Avoca Tank into production on time. This highgrade ore source will be a major contributor to lifting copper grades at Tritton going
forward. The recent high-grade drill results at Avoca Tank also indicate the potential
for higher grades and a larger metal inventory within the initial mining areas.”
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane QLD 4000 Australia
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
“Unfortunately, geotechnical issues continue to delay the Budgerygar ventilation
raise, with completion now expected in early Q1 FY24, enabling a significant rampup in production from the mine in FY24.”
“Scheduled ore and Cu metal production from Budgerygar in quarter 4 however is
not at risk as the scheduled tonnes can be mined with existing infrastructure, prior to
completion of the primary ventilation shaft.”
AVOCA TANK
Escape ladderway installation to surface has been completed as planned, enabling
stoping to commence. Trucking of the first Avoca Tank stope, delivering 11kt at
~3.0% Cu ore, commenced on 28th May. This high-grade ore will contribute to the
significant increase in copper production forecast at Tritton for Q4.
Figure 1: High-grade blasted ore at Avoca Tank
2|P a g e
An active diamond drill program is continuing at the Avoca Tank mine. Resource
definition and grade control drilling has focused on targeting a 60m high vertical
section covering the initial production front.
To date, the drill program has exceeded expectations with assays returned from
most drill holes intersecting high-grade copper and gold and is associated with
three massive sulphide lenses: two copper-gold and one, smaller gold only. The
lenses remain open down-plunge.
Drilling has confirmed a dominant high-grade copper-gold massive sulphide lens
with a smaller less continuous off-shoot. The larger massive sulphide lens has been
traced 100m along strike and extends vertically beyond the 60m vertical drilling
window. The drill program has not closed off the lens along strike to the north.
High-grade intersections from the dominant high-grade copper-rich massive
sulphide lens include1:
Hole ID
Intersection
(m)
True Width
(m)
Cu (%)
Au (g/t)
Ag (g/t)
ATGC019
15.1
14.3
6.98
1.23
23
ATGC018
13.0
10.0
6.24
1.03
20
ATGC007
6.0
4.6
5.31
0.33
14
ATGC016
11.0
10.3
4.98
0.41
10
ATGC013
13.7
13.7
4.98
0.78
17
ATGC012
10.6
10.6
4.92
0.86
16
ATEL003
10.9
7.6
5.83
1.03
17
High-grade drill intersections through the gold-dominant sulphide lens include:
Hole ID
Intersection
(m)
True Width
(m)
Au (g/t)
Ag (g/t)
Cu (%)
ATGC002
8.6
8.6
3.02
31
0.51
ATGC006
2.0
1.4
2.88
43
0.58
ATGC005
6.8
6.5
2.38
20
0.19
ATGC003
5.0
5.0
2.39
21
0.28
ATGC011
4.0
3.7
2.38
14
0.07
1 Note copper, gold and silver grades from resource drilling don’t necessarily translate to mined grades at a stope by stope
level due to dilution and other modifying factors.
3|P a g e
Figure 2: Long section looking northwest showing drill intersections associated with the dominant
high-grade copper-gold lens within the initial 60m vertical window at Avoca Tank.
Note: Magenta = dominant high-grade copper-gold lens, red = smaller high-grade copper-gold
lens and yellow = high-grade gold lens.
BUDGERYGAR
Raise boring for the Budgerygar ventilation shaft continues to encounter
geotechnical issues, resulting in slower progress than planned. The 4.0m diameter
vent shaft is expected to be completed early Q1 FY24.
Q4 FY23 production from Budgerygar however is not at risk as the scheduled tonnes
can be mined with existing infrastructure, prior to completion of the primary
ventilation shaft. Completion of the ventilation shaft will enable higher production
rates with multiple headings going forward. Ore development activities are on track
at Budgerygar.
4|P a g e
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Mr. Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200, or visit our website at www.aerisresources.com.au
Media:
Ayla Djonlagic
Tel: 0402 763 968
ayla@sabio.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copperdominant portfolio comprises four operating assets, a long-life development project
and a highly prospective exploration portfolio, spanning Queensland, Western
Australia, New South Wales and Victoria, with headquarters in Brisbane.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition
opportunities. The Company’s experienced board and management team bring
significant corporate and technical expertise to a lean operating model. Aeris is
committed to building strong partnerships with its key community, investment and
workforce stakeholders.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr Brad Cox.
Mr Cox confirms that he is the Competent Person for all Exploration Results, summarised in this Report and he
has read and understood the requirements of the 2012 Edition of the Australasian Code for Reporting of
Exploration Targets, Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012 Edition). Mr Cox
is a Competent Person as defined by the JORC Code, 2012 Edition, having relevant experience to the style of
mineralisation and type of deposit described in the Report and to the activity for which he is accepting
responsibility. Mr Cox is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM No. 220544).
Mr Cox has reviewed the Report to which this Consent Statement applies and consents to the inclusion in the
Report of the matters based on his information in the form and context in which it appears. Mr Cox is a full-time
employee of Aeris Resources Limited.
Mr Cox has disclosed to the reporting company the full nature of the relationship between himself and the
company, including any issue that could be perceived by investors as a conflict of interest. Specifically, Mr Cox
is entitled to 688,450 Performance Rights issued under the Company’s equity incentive plan (details of which
were contained in the Notice of Annual General Meeting dated 20 October 2020). The vesting of these
Performance Rights is subject to certain performance and employment criteria being met.
5|P a g e
APPENDIX A:
Table 1 – Drill hole collar and survey details
Hole ID
Easting1
(m)
Northing1
(m)
RL (m)
Dip
Azimuth2
Total
Depth
(m)
Type
ATEL001
17615.03
25322.37
4926.44
-5.3
22.1
521.3
DD
ATEL003
17690.49
25562.08
4896.55
6.7
28.8
300.1
DD
ATEL011
17648.12
25660.87
4886.60
15.0
79.0
300
DD
ATGC003
17758.04
25675.24
4880.64
1.8
64.2
70
DD
ÂTGC004
17757.67
25675.69
4881.61
22.5
57.7
85.3
DD
ATGC006
17757.48
25675.66
4880.45
-8.0
54.7
81
DD
ATGC007
17757.90
25675.41
4880.35
-10.1
66.7
70
DD
ATGC009
17757.95
25675.2
4881.63
22.9
72.1
85.1
DD
ATGC010
17758.19
25675.05
4880.33
-9.0
80.5
75
DD
ATGC011
17758.11
25674.94
4881.94
26.8
80.2
85
DD
ATGC012
17759.74
25704.03
4880.80
1.2
16.7
75
DD
ATGC013
17759.9
25703.4
4880.80
1.4
24.4
65
DD
ATGC014
17760.52
25702.94
4880.79
1.5
41.6
60
DD
ATGC015
17760.72
25702.12
4880.55
-7.7
60.3
65.9
DD
ATGC016
17760.45
25701.9
4881.37
16.1
63.4
70
DD
ATGC017
17760.26
25702.10
4882.07
29.9
54.2
75.1
DD
ATGC018
17760.58
25702.89
4880.55
-6.9
43.2
60
DD
ATGC019
17760.12
25703.66
4880.50
-6.6
26.2
60
DD
ATGC020
17760.15
25702.93
4882.34
29.0
34.6
78.1
DD
ATGC021
17760.12
25703.50
4881.58
15.1
27.1
75.1
DD
ATGC022
17759.74
25703.84
4881.19
7.7
17.4
75
DD
ATGC023
17760.90
25702.62
4879.99
-23.1
53.0
64.7
DD
ATGC024
17758.99
25704.06
4880.94
4.0
0.9
35
DD
ATGC025
17757.62
25704.10
4880.77
0.0
336.8
35.7
DD
Comment
1 Easting, northing and RL coordinates are reported in the Northeast mine grid.
2 Azimuth values are transposed to the Northeast mine grid.
6|P a g e
Table 2 – Summary of significant copper intersections through both copper-rich sulphide
lenses. Assay intervals have been reported based on a combination of logged sulphide
textures or a 0.5% Cu cut-off grade with a maximum of 3.0m of internal dilution. D Cu-Au =
dominant high-grade copper-gold lens, S Cu-Au = small high-grade copper-gold lens.
Hole ID
ATEL001
ATEL003
ATEL011
ATGC003
ÂTGC004
ATGC006
ATGC007
ATGC009
ATGC010
ATGC011
ATGC012
ATGC013
ATGC014
ATGC014
ATGC015
ATGC015
ATGC016
ATGC017
ATGC018
ATGC018
ATGC019
ATGC020
ATGC021
ATGC022
ATGC023
ATGC023
ATGC024
ATGC025
From
(m)
428.3
170.6
139.7
45.0
44.0
49.0
58.0
48.4
51.0
42.0
20.6
23.3
21.0
30.3
21.4
31.0
28.0
34.0
21.9
31.0
22.2
25.8
26.4
21.0
23.0
33.7
15.9
17.6
To
(m)
439.0
181.5
146.0
56.5
58.0
52.0
64.0
51.7
55.0
46.2
31.2
37.0
26.4
46.0
22.9
48.0
39.0
40.0
32.0
44.0
37.3
33.0
35.0
27.2
27.7
48.0
29.5
24.0
Length
(m)
10.7
10.9
6.3
11.5
14.0
3.0
6.0
3.3
4.0
4.2
10.6
13.7
5.4
15.7
1.5
17.0
11.0
6.0
10.1
13.0
15.1
7.2
8.6
6.2
4.7
14.3
13.6
6.4
True width
(m)
7.8
7.6
6.0
9.9
14.0
2.8
4.6
3.3
3.5
4.0
10.6
13.7
5.1
14.3
1.4
16.0
10.3
5.9
6.3
10.0
14.3
6.5
8.4
6.0
3.6
8.8
13.6
6.4
Cu
%
5.48
5.83
1.44
5.52
2.31
1.16
5.31
3.01
1.27
7.22
4.92
4.98
4.83
3.02
0.90
3.01
4.98
4.09
3.05
6.24
6.98
3.57
3.19
2.45
2.04
2.67
3.34
2.94
Au
g/t
0.30
1.03
1.54
0.33
0.94
3.31
0.33
0.26
0.16
0.47
0.86
0.78
1.77
0.39
2.23
0.21
0.41
0.85
1.06
1.03
1.23
1.03
0.61
0.77
1.34
0.37
0.79
1.12
Ag
g/t
10
17
23
14
19
51
14
7
4
22
16
17
23
10
25
6
10
14
16
20
23
15
13
12
17
10
13
13
Lode
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
S Cu-Au
D Cu-Au
S Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
S Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
S Cu-Au
D Cu-Au
D Cu-Au
D Cu-Au
Table 3 – Summary of significant gold intersections through the gold-only sulphide body.
Assay intervals have been reported based at a 0.5% Au cut-off grade with a maximum of
3.0m of internal dilution.
Hole ID
ATEL001
ATGC002
ATGC003
ATGC004
ATGC005
ATGC006
ATGC007
ATGC008
ATGC009
ATGC010
ATGC011
From
(m)
410
28.4
29
29
29.6
35
39
29.7
29.5
35.8
29
To
(m)
416
37
34
37.5
36.4
37
42
33.7
33
45.9
33
Length
(m)
6
8.6
5
8.5
6.8
2
3
4
3.5
10.1
4
True width
(m)
5
8.6
5
7.5
6.5
1.4
2
4
3.5
5
3.7
Cu
%
0.36
0.51
0.28
0.55
0.19
0.58
0.72
0.23
0.21
0.33
0.07
Au
g/t
2.78
3.02
2.39
1.25
2.38
2.88
1.24
1.70
1.63
1.72
2.38
Ag
g/t
31
31
21
18
20
43
40
18
22
25
14
Lode
Au
Au
Au
Au
Au
Au
Au
Au
Au
Au
Au
7|P a g e
APPENDIX B:
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Avoca Tank underground drill program
Criteria
Commentary
Sampling techniques
All samples have been collected from diamond drill core.
1. Samples taken over a mineralised interval are collected in
a fashion to ensure a majority are 1.0m in length, whilst the
HW and FW samples are as close to 1.0m as possible. Most
samples are collected at 1.0m intervals. HW and FW
intervals are taken as close to 1m.
Drilling techniques
1. Drilling results reported are via diamond drill core (NQ
diameter).
Drill sample recovery
1. Core recoveries are recorded by the drillers on-site at the
drill rig. Core recoveries are checked and verified by an
Aeris Resources field technician and/or geologist.
2. Diamond drill core is pieced together as part of the core
orientation process. During this process depth intervals are
recorded on the core and checked against downhole
depths recorded by drillers on core blocks within the core
trays.
3. Historically, core recoveries are very high within and outside
zones of mineralisation. Diamond core drilled to date from
the current drill program have recorded very high
recoveries and is in line with historical observations.
Logging
1. All diamond core is geologically logged, recording
lithology, presence/concentration of sulphides, alteration,
and structure.
2. All geological data recorded during the core logging
process is stored in Aeris Resources’ AcQuire database.
3. All diamond drill core is photographed and digitally stored
on the Company network.
4. Core is stored in core trays and labelled with downhole
meterage intervals and drill hole ID.
Sub-sampling
techniques and sample
preparation
1. All samples are collected in a consistent manner. Samples
are cut via an automatic core saw, and half-core samples
are collected between sample lengths from 0.4m and a
maximum length of 1.4 metres.
2. No field duplicates have been collected.
3. The sample size is considered appropriate for the style of
mineralisation and grain size of the material being sampled.
Quality of assay data
and laboratory tests
1. All samples have been sent to ALS Laboratory Services at
their Orange facility.
2. Samples are analysed by a 3-stage aqua regia digestion
with an ICP finish (suitable for Cu 0.01-1%) – ALS method MEICP41. Samples with Cu assays exceeding 1% are resubmitted for an aqua regia digest using ICP-AES analysis –
8|P a g e
Criteria
Commentary
ALS method ME-OG46. Au analyses are completed on a
30g fire assay fusion with an AAS finish (suitable for Au
grades between 0.001-10ppm) – ALS method Au-AA22. If a
sample records an Au grade above 1ppm a second sample
will be re-submitted for another 30g fire assay charge using
ALS method AuAA25 (0.01-100ppm).
3. QA/QC protocols include the use of blanks, duplicates, and
standards (commercial-certified reference materials used).
The frequency rate for each QA/QC sample type is 5%.
Verification of sampling
and assaying
1. Logged drill holes are reviewed by the logging geologist
and a senior geologist. All geological data is logged
directly into Aeris Resources’ logging computers following
the standard Aeris Resources geology codes. Data is
transferred to the AcQuire database and validated on
entry.
2. Upon receipt of the assay data no adjustments are made
to the assay values.
Location of data points
1. Drill hole collar locations are surveyed via a qualified
surveyor.
2. All drill hole locations at Avoca Tank are referenced in a
Northeast local mine grid. The Northeast Mine Grid origin
(0E, 0N) = 490306.92mE 482601.87mE 6530140.69mN
6517252.09mM (AGD66). Grid North = 329.095 true.
3. Quality and accuracy of the drill collars are suitable for
exploration results.
4. Downhole surveys are completed by the drill contractor.
Survey information is taken at the completion of each hole
at 20m or 30m intervals. Downhole surveying of diamond
drill holes is completed using a Reflex gyroscopic tool
measuring azimuth and dip orientations every 30m, or
shorter intervals if required.
Data spacing and
distribution
1. Drill spacing at the Avoca Tank deposit is spaced between
15m to 40m. Drill hole spacing along strike is similarly varied
ranging between 15m to 40m.
2. Drill holes are designed to intersect mineralisation at a
perpendicular angle to the interpreted mineralised system.
In some instances, the sulphide lode geometry has
changed from the predicted model resulting in some drill
holes not intersecting the lode at near right angles.
3. The Avoca Tank deposit has a reported Mineral Resource.
Drillhole ATEL001 has intersected sulphide mineralisation
within the Mineral Resource footprint.
Orientation of data in
relation to geological
structure
1. All drill holes from the current drill campaign are designed
to intersect the target at, or near right angles. The
mineralised system has a steep dip with holes designed to
intersect mineralisation close to perpendicular.
2. Most drill holes completed have not deviated significantly
from the planned drill hole path.
3. Drill hole intersections through the target zone(s) are not
biased.
9|P a g e
Criteria
Commentary
Sample security
1. Drill holes sampled at the Avoca Tank deposit are not
sampled in their entirety. Samples are collected from
sections of the drill hole containing visible sulphides.
Samples are collected up to 10m beyond the sulphide
intersection(s).
2. Sample security protocols follow current procedures, which
include samples being secured within calico bags and
transported to the laboratory in Orange, NSW via a courier
service or with Company personnel.
Audits or reviews
1. Data is validated when uploading into the Company’s
AcQuire database.
2. No formal audit has been conducted.
Section 2 Reporting of Exploration Results
Avoca Tank underground drill program
Criteria
Commentary
Mineral tenement and
land tenure status
1. The Tritton Regional Tenement package is located
approximately 45km northwest of the township of Nyngan
in central western New South Wales.
2. The Tritton Regional Tenement package consists of 8
Exploration Licences and 4 Mining Leases. The mineral and
mining rights are owned 100% by the Company’s subsidiary,
Tritton Resources Pty Ltd.
3. The Avoca Tank deposit is located within ML1818. The
mining licence is in good standing and no known
impediments exist.
Exploration done by
other parties
1. Regional exploration has been completed over the
currently held tenement package by Utah Development
Co in the early 1960’s to early 1970’s. Australian Selection P/L
completed exploration throughout the 1970’s to late 1980’s
prior to NORD Resources throughout the late 1980’s and
1990’s. This included soil sampling and regional magnetics
which covered the Avoca, Greater Hermidale, Belmore
and Thorndale project areas. Principally exploration efforts
were focused on the discovery of oxide copper
mineralisation. NORD Resources also completed some
shallow reverse circulation (RC) drilling over the Avoca Tank
Resource. Subsequent exploration efforts have been
completed by Tritton Resources Pty Ltd with the drilling over
a number of RC drill holes within the Greater Hermidale
region in the late 1990’s similarly focused on heap
leachable oxide copper mineralisation, prior to the
acquisition of the Tritton Resources Pty Ltd by Straits
Resources Limited in 2006.
Geology
1. Regionally, mineralisation is hosted within early to midOrdovician turbidite sediments, forming part of the
Girilambone group. Mineralisation is hosted within
greenschist facies, ductile deformed pelitic to psammitic
10 | P a g e
Criteria
Commentary
sediments and sparse zones of coarser sandstones.
2. Sulphide mineralisation at the Avoca Tank deposit is
characterised by short strike length (<100m) steeply dipping
sulphide lenses. Sulphide textures vary from massive,
banded, stringer and disseminated. Pyrite is the dominant
sulphide mineral. Chalcopyrite is the primary copper
mineral forming erratic stringer/veinlets within the sulphide
package.
Drill hole information
1. All relevant information pertaining to the drill hole data has
been provided.
Data aggregation
methods
1. All reported drill hole assay results represent lengthweighted composited assays.
2. Compositing for the copper-rich lenses was based on a
combination of logged sulphide textures and a Cu cut-off
grade. If the contact (HW or FW) is denoted by a massive
sulphide lens the Cu grade is ignored. If the sulphide
contact is banded/disseminated/remobilised a 0.5% Cu
cut-off grade was applied.
3. Compositing for the gold-rich lens was based on a 0.5 g/t
Au cut-off grade.
4. A maximum of 3.0m internal dilution. No top cutting of assay
results was applied.
Relationship between
mineralisation widths
and intercept lengths
1. Drill holes are generally designed to intersect the target
horizon across strike at or near right angles.
2. The mineralised bodies often change orientation resulting in
some drill holes intersecting mineralisation at poor angles.
Diagrams
1. Relevant diagrams are included in the body of the report.
Balanced reporting
1. The reporting is considered balanced and all material
information associated with the electromagnetic surveys
has been disclosed.
Other substantive
exploration data
1. There is no other relevant substantive exploration data to
report.
Further work
1. Underground resource definition and grade control drilling
is ongoing.
11 | P a g e