GROUP MINERAL RESOURCE AND ORE RESERVE STATEMENT
Released
Released
Announcement PDF
17 JUNE 2024
ASX/MEDIA RELEASE
GROUP MINERAL RESOURCE AND ORE RESERVE STATEMENT
•
Group Mineral Resource (Group MR) tonnage decreased by 1% to 54.2Mt with
contained copper metal up 1% to 822kt and contained zinc metal up 2% to
1,065kt compared to the previous estimate at 31 December 2023.
•
Group MR includes new resources reported for the Jaguar Deposit.
•
Group Ore Reserve (Group OR) tonnage decreased by 11% to 14Mt due to
mining depletion.
Established Australian copper-gold producer and explorer, Aeris Resources Limited
(ASX:AIS) (Aeris or the Company) is pleased to release its 31 December 2023 Group
Mineral Resource and Ore Reserve Statement for its 100% owned Tritton, Cracow
and North Queensland Operations and the Jaguar and Stockman Projects.
The Mineral Resource and Ore Reserve estimates are reported in accordance with
the guidelines of the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (“JORC 2012”).
Group Mineral Resources and Ore Reserves
Group Mineral Resources and Ore Reserves are presented in Table 1 and Table 2
following.
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane QLD 4000 Australia
Post: GPO Box 2460, Brisbane QLD 4001
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
Table 1: Group Mineral Resource Estimates at 31 December 2023
BASE METALS
Project
Tritton
Jaguar
North Qld
Stockman
GOLD
Project
Cracow
Category
Measured
Indicated
Inferred
Total
Measured
Indicated
Inferred
Total
Measured
Indicated
Inferred
Total
Measured
Indicated
Inferred
Total
Total Measured
Total Indicated
Total Inferred
Grand Total
Tonnes ('000)
1,300
11,200
10,000
22,500
500
3,400
4,000
7,900
300
2,200
600
3,100
13,400
2,400
15,800
2,100
30,200
16,900
49,300
Cu (%)
1.0
1.3
1.8
1.5
1.6
1.3
1.2
1.3
2.8
2.0
2.0
2.1
2.1
1.1
2.0
1.4
1.7
1.6
1.7
Zn (%)
5.0
7.6
4.0
5.6
4.2
2.6
4.0
1.2
2.7
1.3
2.2
Grade
Au (g/t)
0.1
0.3
0.4
0.3
0.3
0.5
0.5
0.5
0.6
0.2
0.1
0.2
1.0
1.5
1.1
0.2
0.6
0.6
0.6
Ag (g/t)
3
4
5
4
63
75
56
65
3
2
2
37
32
36
17
26
21
24
Cu (kt)
13
145
183
342
8
45
47
100
9
44
11
65
288
27
315
31
524
268
822
Contained Metal
Zn (kt)
Au (koz)
4
91
137
232
25
4
256
51
161
68
442
123
6
13
2
21
561
420
62
117
623
537
25
14
817
576
223
323
1,065
913
Ag (koz)
120
1,280
1,440
2,840
1,030
8,170
7,270
16,460
210
30
240
16,000
2,440
18,450
1,150
25,660
11,190
37,990
Category
Measured
Indicated
Inferred
Grand Total
Tonnes ('000)
400
2,100
2,400
4,900
Cu (%)
-
Zn (%)
-
Grade
Au (g/t)
3.9
3.4
2.9
3.4
Ag (g/t)
3
4
4
4
Cu (kt)
-
Contained Metal
Zn (kt)
Au (koz)
52
259
208
519
Ag (koz)
39
249
376
664
Notes:
•
Mineral Resource figures are reported using a variety of cut-off grades (copper or gold) or NSR calculation best suited to each deposit.
•
Discrepancy in summation may occur due to rounding.
•
A detailed description for each Mineral Resource estimate is included in the Appendices (apart from the Budgery resource model, which is JORC 2004 compliant).
2|Page
Table 2: Group Ore Reserve Estimates at 31 December 2023
BASE METALS
Project
Tritton
Jaguar
North Qld
Stockman
GOLD
Project
Cracow
Category
Proved
Probable
Total
Proved
Probable
Total
Proved
Probable
Total
Proved
Probable
Total
Total Proved
Total
Probable
Grand Total
Tonnes (‘000)
5
2,790
2,790
90
1,060
1,150
90
80
170
9,640
9,640
190
Category
Proved
Probable
Grand Total
Cu (%)
1.8
1.5
1.5
1.4
1.4
1.5
2.4
2.1
2.3
1.9
1.9
1.9
1.8
Zn (%)
8.7
8.3
8.3
4.3
4.3
4.4
3.7
13,750
1.8
3.7
Tonnes (‘000)
100
250
360
Cu (%)
-
Zn (%)
-
13,560
Grade
Au (g/t)
Ag (g/t)
0.3
5
0.3
5
0.8
74
0.6
45
0.6
48
0.5
0.4
0.4
1.0
36
1.0
36
0.6
37
0.8
30
0.8
30
Grade
Au (g/t)
Ag (g/t)
3.5
3.4
3.4
-
Cu (kt)
0.1
41
41
1
16
17
2
2
2
183
183
3
242
Zn (kt)
8
87
95
413
413
8
500
245
508
Cu (kt)
-
Zn (kt)
-
Contained Metal
Au (koz)
Ag (koz)
23
451
23
451
2
225
21
1,534
23
1,759
1
1
2
318
11,409
318
11,409
4
225
363
13,394
367
13,619
Contained Metal
Au (koz)
Ag (koz)
12
28
39
-
Notes:
•
Ore Reserve figures are reported using a variety of cut-off criteria suitable for each deposit.
•
Discrepancy in summation may occur due to rounding.
•
A detailed description for each Ore Reserve estimate is included in the Appendices.
•
The Jaguar Ore Reserve has not been updated since the previous reporting period (end December 2022). Operations were suspended at Jaguar in September 2023 and
the mine placed on care and maintenance pending restart studies (refer to ASX Release “Corporate Update and FY24 Guidance” 2 Aug 2023). Production in 2023 was
233kt @1.2% Cu, 4.5% Zn, 0.6g/t Au & 52g/t Ag. Ore reserve depletion over the same period was 113kt @ 1.4% Cu, 7.3% Zn, 0.8g/t Au & 78g/t Ag.
3|Page
Changes in Group Mineral Resources
Relative to estimates at 31 December 2022, Group Mineral Resources have
decreased by 1 Mt due to a combination of factors as shown in Figure 1 below.
Figure 1: Changes in Group Mineral Resource tonnage relative to 31 December 2022
Mineral Resource changes at each operation are summarised below1:
•
Tritton Operations Mineral Resource tonnage decreased by 2.5Mt mainly due
to mining depletion and reinterpretation of the Tritton, Murrawombie,
Budgerygar and Avoca Tank deposits.
•
Cracow Operations Mineral Resource tonnage remained constant for the
reporting period with mining depletion being offset by resource additions.
•
Jaguar Operations Mineral Resource tonnage increased by 0.75Mt mainly
due to the addition of the Jaguar Deposit.
•
North Queensland Operations Mineral Resource tonnage decreased by
0.3Mt due to mining depletion.
•
Stockman Project Mineral Resource increased by 1Mt mainly due to a
revised interpretation and Net Smelter Return (NSR) calculation.
1 Discrepancy in summation may occur due to rounding
4|Page
Changes in Group Ore Reserves
Relative to estimates at 31 December 2022, Group Ore Reserves have decreased
by 1.7Mt, largely due to mining depletion.
Changes to Group Ore Reserves are shown in Figure 2 below.
Figure 2: Changes in Group Ore Reserve tonnage relative to 31 December 2022
Ore Reserve changes at each operation are summarised below 2:
•
Tritton Ore Reserve tonnage decreased by 1.2Mt, predominantly due to
mining depletion at Tritton and Murrawombie and the remainder due to an
updated mineral resource estimate for Avoca Tank that contains a larger
portion of Inferred resource compared to the model used as the basis for the
December 2022 estimate.
•
Cracow Ore Reserve tonnage decreased by 0.2Mt, predominantly due to
mining depletion
•
North Queensland (Mt Colin) Ore Reserve tonnage decreased by 0.2Mt due
to mining depletion of 0.4Mt partially offset by a 0.2Mt replacement of ore
reserve.
•
The Jaguar Ore Reserve has not been updated since the previous reporting
period (end December 2022). Operations were suspended at Jaguar in
September 2023 and the mine placed on care and maintenance pending
restart studies (refer to ASX Release “Corporate Update and FY24 Guidance”
2 Aug 2023). Production in 2023 was 233kt @1.2% Cu, 4.5% Zn, 0.6g/t Au &
52g/t Ag. Ore reserve depletion over the same period was 113kt @ 1.4% Cu,
7.3% Zn, 0.8g/t Au & 78g/t Ag.
•
No change to the Stockman Project Ore Reserve.
2 Discrepancy in summation may occur due to rounding
5|Page
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper
dominant portfolio comprises three operating assets, a mine on care and
maintenance, a long-life development project and a highly prospective exploration
portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition
opportunities. The Company’s experienced board and management team bring
significant corporate and technical expertise to a lean operating model. Aeris is
committed to building strong partnerships with its key community, investment and
workforce stakeholders.
6|Page
Competent Persons Statements
Tritton Operation Mineral Resource Estimate
The Mineral Resource Estimates reported for the Tritton, Murrawombie, Budgerygar, Avoca Tank and
Budgery deposits is based on information compiled by Angela Dimond (BSc (Hons), MAusIMM) who
is a full-time employee of Aeris Resources Limited. Mrs Dimond is a Competent Person as defined by
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’, having sufficient experience relevant to the style of mineralisation and type of deposit
described in the Report and to the activity for which she is accepting responsibility. Mrs Dimond has
reviewed the Mineral Resource section (Tritton, Murrawombie, Budgerygar, Avoca Tank and
Budgery) of this Report to which this Consent Statement applies and consents to the inclusion in the
Report of the matters based on her information in the form and context in which it appears.
The Mineral Resource Estimate reported for the Constellation deposit is based on information
compiled by Brad Cox (BSc (Hons), MAusIMM) who is a full-time employee of Aeris Resources Limited.
Mr Cox is a Competent Person as defined by the 2012 Edition of the ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’, having sufficient experience relevant to
the style of mineralisation and type of deposit described in the Report and to the activity for which
he is accepting responsibility. Mr Cox has reviewed the Constellation deposit Mineral Resource
section of this Report to which this Consent Statement applies and consents to the inclusion in the
Report of the matters based on his information in the form and context in which it appears. Mr Cox
discloses that he holds 688,445 shares in Aeris Resources.
The Mineral Resource Estimate reported for the Kurrajong deposit is based on information compiled
by Andrew Fowler (PhD, MAusIMM) who is a full-time employee of Aeris Resources Limited. Dr Fowler
is a Competent Person as defined by the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’, having sufficient experience relevant to
the style of mineralisation and type of deposit described in the Report and to the activity for which
he is accepting responsibility. Dr Fowler has reviewed the Kurrajong Mineral Resource section of this
Report to which this Consent Statement applies and consents to the inclusion in the Report of the
matters based on his information in the form and context in which it appears.
Tritton Operation Ore Reserve Estimate
The Ore Reserve Estimates reported for the Tritton, Budgerygar, Avoca Tank and Murrawombie
(underground) deposits is based on information compiled by Tim Brettell (BEng, MAusIMM) who is a
full-time employee of Aeris Resources Limited. Mr Brettell is a Competent Person as defined by the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’, having sufficient experience relevant to the style of mineralisation and type of deposit
described in the Report and to the activity for which he is accepting responsibility. Mr Brettell has
reviewed the Ore Reserve section (Tritton, Budgerygar, Avoca Tank and Murrawombie
(underground)) of this Report to which this Consent Statement applies and consents to the inclusion
in the Report of the matters based on his information in the form and context in which it appears.
The Ore Reserve Estimates reported for the Murrawombie open pit deposit is based on information
compiled by Cam Schubert (BSc (Hons), MEngSc, MAppSc, MBA FAusIMM) who is a full-time
employee of Aeris Resources Limited. Mr Schubert is a Competent Person as defined by the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’, having sufficient experience relevant to the style of mineralisation and type of deposit
described in the Report and to the activity for which he is accepting responsibility. Mr Schubert has
reviewed the Ore Reserve section (Murrawombie open pit) of this Report to which this Consent
Statement applies and consents to the inclusion in the Report of the matters based on his information
in the form and context in which it appears.
7|Page
Cracow Operation Mineral Resource Estimate
The Mineral Resource Estimates reported for the Cracow deposit were prepared by Gerson Sternadt
(BSc, MAusIMM) who is a full-time employee of Aeris Resources Limited. Mr Sternadt is a Competent
Person as defined by the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’, having sufficient experience relevant to the style of
mineralisation and type of deposit described in the Report and to the activity for which he is
accepting responsibility. Mr Sternadt has reviewed the Cracow deposits Mineral Resource section
of this Report to which this Consent Statement applies and consents to the inclusion in the Report of
the matters based on his information in the form and context in which it appears.
Cracow Operation Ore Reserve Estimate
The Ore Reserve Estimates reported for the Cracow operation is based on information compiled by
Max McInnis (BEng, MAusIMM) who is a full-time employee of Aeris Resources Limited. Mr McInnis is
a Competent Person as defined by the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’, having sufficient experience relevant to
the style of mineralisation and type of deposit described in the Report and to the activity for which
he is accepting responsibility. Mr McInnis has reviewed the Cracow Ore Reserve section of this Report
to which this Consent Statement applies and consents to the inclusion in the Report of the matters
based on his information in the form and context in which it appears.
Jaguar Operation Mineral Resource Estimates
The Mineral Resource Estimates reported for the Jaguar deposits (Bentley, Triumph and Teutonic Bore)
were prepared by Andrew Fowler (PhD, MAusIMM) who is a full-time employee of Aeris Resources
Limited. Dr Fowler is a Competent Person as defined by the 2012 Edition of the ‘Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves’, having sufficient
experience relevant to the style of mineralisation and type of deposit described in the Report and to
the activity for which he is accepting responsibility. Dr Fowler has reviewed the Jaguar deposits
(Bentley, Triumph, Jaguar and Teutonic Bore) Mineral Resource section of this Report to which this
Consent Statement applies and consents to the inclusion in the Report of the matters based on his
information in the form and context in which it appears.
Jaguar Operation Ore Reserve Estimate
The Ore Reserve Estimate reported for the Jaguar Operation (Bentley deposit) is based on
information compiled by Benjamin James (MAusIMM) who was a full-time employee of Aeris
Resources Limited at the time of the preparation of the estimate. Mr James is a Competent Person
as defined by the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’, having sufficient experience relevant to the style of mineralisation and
type of deposit described in the Report and to the activity for which he has accepted responsibility.
The Ore Reserve estimate for the Jaguar Operation has not been updated since it was first publicly
reported by Aeris Resources Ltd on 18th April 2023. Aeris Resources Ltd confirms that it is not aware
of any new information or data that materially affects the previous Ore Reserve estimate and all
material assumptions and technical parameters underpinning the previous Ore Reserve estimate
continue to apply and have not materially changed. Aeris Resources Ltd confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified.
8|Page
North Queensland Operation Mineral Resource Estimates
The Mt Colin and Barbara Mineral Resource Estimates reported for North Queensland were prepared
by Andrew Fowler (PhD, MAusIMM) who is a full-time employee of Aeris Resources Limited. Dr Fowler
is a Competent Person as defined by the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’, having sufficient experience relevant to
the style of mineralisation and type of deposit described in the Report and to the activity for which
he is accepting responsibility. Dr Fowler has reviewed the Mt Colin and Barbara Mineral Resource
sections of this Report to which this Consent Statement applies and consents to the inclusion in the
Report of the matters based on his information in the form and context in which it appears.
The Mineral Resource Estimate reported for the Lillymay deposit was prepared by Brad Cox (BSc
(Hons), MAusIMM) who is a full-time employee of Aeris Resources Limited. Mr Cox is a Competent
Person as defined by the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’, having sufficient experience relevant to the style of
mineralisation and type of deposit described in the Report and to the activity for which he is
accepting responsibility. Mr Cox has reviewed the Lillymay Mineral Resource section of this Report
to which this Consent Statement applies and consents to the inclusion in the Report of the matters
based on his information in the form and context in which it appears. Mr Cox discloses that he holds
688,445 shares in Aeris Resources.
North Queensland Operation Ore Reserve Estimate
The Ore Reserve Estimates reported for the Mt Colin Operation is based on information compiled by
Aaron Layt (MAusIMM) who is a full-time employee of Aeris Resources Limited. Mr Layt is a
Competent Person as defined by the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’, having sufficient experience relevant to
the style of mineralisation and type of deposit described in the Report and to the activity for which
he is accepting responsibility. Mr Layt has reviewed the Ore Reserve section (Mt Colin deposit) of this
Report to which this Consent Statement applies and consents to the inclusion in the Report of the
matters based on his information in the form and context in which it appears.
Stockman Mineral Resource Estimates
The Mineral Resource Estimates reported for the Stockman deposits (Currawong, Wilga, Eureka and
Bigfoot) were prepared by Andrew Fowler (PhD, MAusIMM) who is a full-time employee of Aeris
Resources Limited. Dr Fowler is a Competent Person as defined by the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’, having
sufficient experience relevant to the style of mineralisation and type of deposit described in the
Report and to the activity for which he is accepting responsibility. Dr Fowler has reviewed the
Stockman deposits (Currawong, Wilga, Eureka and Bigfoot) Mineral Resource section of this Report
to which this Consent Statement applies and consents to the inclusion in the Report of the matters
based on his information in the form and context in which it appears.
Stockman Ore Reserve Estimate
The Ore Reserve Estimates reported for the Currawong and Wilga deposits is based on information
compiled by John McKinstry (MAusIMM). Mr McKinstry is a Competent Person as defined by the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’, having sufficient experience relevant to the style of mineralisation and type of deposit
described in the Report and to the activity for which he is accepting responsibility. Mr McKinstry is a
former employee of Round Oak Minerals Ltd who were the owners of the Stockman project at the
time of preparation of the Ore Reserve Estimate for Stockman included in this report.
The Ore Reserve estimate for the Currawong and Wilga deposits has not been updated since it was
first publicly reported by Aeris Resources Ltd on 19th September 2022 in its Group Mineral Resource
and Ore Reserve Statement. Aeris Resources Ltd confirms that it is not aware of any new information
or data that materially affects the previous Ore Reserve estimate and all material assumptions and
technical parameters underpinning the previous Ore Reserve estimate continue to apply and have
not materially changed. Aeris Resources Ltd confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified.
9|Page
Table of Contents
GROUP MINERAL RESOURCE AND ORE RESERVE STATEMENT .................................................... 1
Group Mineral Resources and Ore Reserves.......................................................................... 1
Changes in Group Mineral Resources .................................................................................... 4
Changes in Group Ore Reserves ............................................................................................. 5
Competent Persons Statements .............................................................................................. 7
Tritton Mineral Resources and Ore Reserves ............................................................................ 13
1.
Summary ........................................................................................................................... 13
2.
Introduction ...................................................................................................................... 14
3.
Material assumptions for Mineral Resource Estimate .................................................... 15
4.
Changes from prior Mineral Resource Estimate ............................................................ 20
5.
Material assumptions for Ore Reserve Estimate ............................................................ 21
6.
Changes from prior Ore Reserve Estimate ..................................................................... 22
Cracow Mineral Resources and Ore Reserves......................................................................... 23
7.
Summary ........................................................................................................................... 23
8.
Introduction ...................................................................................................................... 23
9.
Material Assumptions for Mineral Resource Estimate.................................................... 25
10. Changes from prior Mineral Resource Estimate ............................................................ 28
11. Material Assumptions for Ore Reserve Estimate ............................................................ 30
12. Changes from prior Ore Reserve Estimate ..................................................................... 30
Jaguar Mineral Resources and Ore Reserves .......................................................................... 32
13. Summary ........................................................................................................................... 32
14. Introduction ...................................................................................................................... 33
15. Material Assumptions for Mineral Resource Estimate.................................................... 35
16. Changes from prior Mineral Resource Estimate ............................................................ 39
17. Material Assumptions for Ore Reserve Estimate ............................................................ 42
18. Changes from Prior Ore Reserve Estimate ..................................................................... 42
North Queensland Mineral Resources and Ore Reserves ....................................................... 43
19. Summary ........................................................................................................................... 43
20. Introduction ...................................................................................................................... 44
21. Material Assumptions for Mineral Resource Estimate.................................................... 45
22. Changes from prior Mineral Resource Estimate ............................................................ 48
23. Material Assumptions for Ore Reserve Estimate ............................................................ 50
24. Changes from prior Ore Reserve Estimate ..................................................................... 51
Stockman Mineral Resources and Ore Reserves ..................................................................... 53
25. Summary ........................................................................................................................... 53
26. Introduction ...................................................................................................................... 54
27. Material Assumptions for Mineral Resource Estimate.................................................... 56
28. Changes from prior Mineral Resource Estimate ............................................................ 58
10 | P a g e
29. Material Assumptions for Ore Reserve Estimate ............................................................ 60
30. Changes from prior Ore Reserve Estimate ..................................................................... 61
APPENDICES – JORC Code 2012, Table 1 ................................................................................. 62
TRITTON OPERATIONS.................................................................................................................. 63
Avoca Tank Deposit - JORC Code, 2012 - Table 1 .................................................................. 64
Section 1 Avoca Tank Deposit - Sampling Techniques and Data .......................................... 64
Section 3 Avoca Tank Deposit - Estimation and Reporting of Mineral Resources ................ 67
Section 4 Avoca Tank Deposit - Estimation and Reporting of Ore Reserves ......................... 71
Budgerygar Deposit - JORC Code, 2012 - Table 1 .................................................................. 79
Section 1 Budgerygar Deposit - Sampling Techniques and Data .......................................... 79
Section 3 Budgerygar Deposit - Estimation and Reporting of Mineral Resources................. 83
Section 4 Budgerygar Deposit - Estimation and Reporting of Ore Reserves ......................... 86
Constellation Deposit JORC Code, 2012 Edition Table 1 ........................................................ 94
Section 1 Constellation Deposit - Sampling Techniques and Data........................................ 94
Section 3 Constellation Deposit - Estimation and Reporting of Mineral Resources .............. 99
Kurrajong Deposit JORC Code, 2012 Edition Table 1 ............................................................ 103
Section 1 Kurrajong Deposit - Sampling Techniques and Data ............................................ 103
Section 3 Kurrajong Deposit - Estimation and Reporting of Mineral Resources .................. 106
Murrawombie Deposit JORC Code, 2012 Edition Table 1..................................................... 110
Section 1 Murrawombie Deposit - Sampling Techniques and Data .................................... 110
Section 3 Murrawombie Deposit - Estimation and Reporting of Mineral Resources ........... 113
Section 4 Murrawombie Deposit - Estimation and Reporting of Ore Reserves ................... 116
Tritton Deposit JORC Code, 2012 Edition Table 1 .................................................................. 129
Section 1 Tritton Deposit - Sampling Techniques and Data .................................................. 129
Section 3 Tritton Deposit - Estimation and Reporting of Mineral Resources......................... 134
Section 4 Tritton Deposit - Estimation and Reporting of Ore Reserves ................................. 138
CRACOW OPERATION.............................................................................................................. 146
Cracow Operation JORC Code, 2012 Edition Table 1 .......................................................... 147
Section 1 Cracow Operation - Sampling Techniques and Data ......................................... 147
Section 3 Cracow Operation - Estimation and Reporting of Mineral Resources ................ 152
Section 4 Cracow Operation - Estimation and Reporting of Ore Reserves ......................... 156
JAGUAR COMPLEX ................................................................................................................... 163
Teutonic Bore Deposit JORC Code, 2012 Edition Table 1 ..................................................... 164
Section 1 Teutonic Bore Deposit - Sampling Techniques and Data ..................................... 164
Section 3 Teutonic Bore Deposit - Estimation and Reporting of Mineral Resources ........... 168
Triumph Deposit JORC Code, 2012 Edition Table 1 ............................................................... 171
Section 1 Triumph Deposit - Sampling Techniques and Data ............................................... 171
Section 3 Triumph Deposit - Estimation and Reporting of Mineral Resources ..................... 174
Bentley Deposit JORC Code, 2012 Edition Table 1 ................................................................ 178
Section 1 Bentley Dep