CORRECTION - JAGUAR DEPOSIT MINERAL RESOURCE UPDATE
Released
Released
Announcement PDF
12 JULY 2023
ASX/MEDIA RELEASE
CORRECTION TO ASX ANNOUNCEMENT DATED 5 JULY 2023 –
“JAGUAR DEPOSIT MINERAL RESOURCE UPDATE”
Aeris Resources Limited (ASX: AIS) advises that additional information has been
added to the announcement to comply with ASX Listing Rules 5.7 and 5.8. The
additional information includes:
1. Summary table listing drill hole collar details for all holes used to inform the
Mineral Resource estimate
2. Summary table listing all drill hole mineralised intercepts included within the
modelled sulphide wireframes used for the Jaguar Mineral Resource
estimate.
3. JORC 2012 Table 1 Section 2 “Reporting of Exploration Results”
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane QLD 4000 Australia
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
JAGUAR DEPOSIT MINERAL RESOURCE UPDATE
Mineral Resource Estimate (MRE) for the Jaguar deposit:
- 840kt at 2.28% copper, 4.66% zinc and 61g/t silver
- Containing 19kt of copper metal, 39kt of zinc metal and 1.65Moz
of silver metal
- Historical MRE information audited and updated by Aeris
88% of the Resource in Measured and Indicated categories
Resource comprises high-grade remnant sills and pillars within the old
mining areas and additional mineralisation beyond this
Significant potential to increase the Mineral Resource with additional
drilling
Established Australian copper-gold producer and explorer, Aeris Resources Limited
(ASX: AIS) (Aeris or the Company) is pleased to announce an updated JORC 2012
Mineral Resource estimate for the Jaguar deposit, located within the Company’s
100% owned Jaguar Operations in Western Australia.
Aeris’ Executive Chairman, Andre Labuschagne, said “The Jaguar deposit is well
understood from previous mining activities.”
“The Jaguar mine is currently being de-watered and we expect to be able to
access by the end of the calendar year, at which time we will be able to assess the
extent of any rehabilitation work required.”
“We believe there is significant potential to grow the resource with further drilling.”
2|P a g e
JAGUAR OPERATIONS OVERVIEW
The Jaguar Operations tenement package is highly prospective for polymetallic (Zn,
Cu, Au, Ag) volcanic hosted massive sulphide (VHMS) deposits. To date, four
significant deposits have been discovered within the Jaguar tenement package:
Teutonic Bore; Jaguar; Bentley (including Turbo); and Triumph (Figure 1).
The Jaguar deposit was discovered in 2002 and was brought into production as an
underground mine in 2007 by Jabiru Metals Limited (JML). JML was subsequently
acquired by Independence Group NL (IGO) in 2011. The Bentley deposit was
discovered in 2008 and commissioned in 2011 and gradually displaced the Jaguar
Mine mineralisation in the Jaguar Operations mineral processing facility. The Jaguar
Mine was eventually decommissioned in February 2014.
Figure 1: Jaguar Operations tenement package
3|P a g e
JAGUAR MINERAL RESOURCE ESTIMATE
The Jaguar Mineral Resource Estimate (MRE) totals 840kt at 2.28% Cu, 4.66% Zn and
61g/t Ag for 19kt of Cu metal, 39kt of Zn metal and 1.65Mozs of Ag metal (Table 1).
Table 1: 2023 Jaguar Mineral Resource with a NSR cut-off of $100.
Category
Tonnes(kt)
Cu (%)
Zn (%)
Ag (g/t)
Cu (kt)
Zn (kt)
Ag (koz)
Measured
260
2.26
3.82
56
6
10
465
Indicated
480
2.41
5.79
73
12
28
1,140
Inferred
100
1.70
1.26
16
2
1
50
Total
840
2.28
4.66
61
19
39
1,650
Notes:
1.
Mr John Hamill MAusIMM MAIG CP (Geo) takes Competent Person responsibility for this Mineral
Resource Estimate in accordance with the JORC Code (2012).
2.
The cut-off grade applied to the MRE has been derived from the Net Smelter Return (NSR) calculations
currently applied to the Bentley deposit.
3.
The Competent Person considers that the Mineral Resource has reasonable prospects for eventual
economic extraction at the cut-off grade specified and a selective underground mining method.
4.
Numbers may not sum due to rounding.
The MRE has been estimated based on 458 historic underground diamond drill holes
from the database built by JML and IGO during the resource definition and grade
control drilling of the deposit.
The database underwent a thorough audit by Aeris before being accepted as input
to this MRE update. Most surface holes, all underground face samples and probing
sludge holes were excluded from the MRE due to uncertainty in their locational
accuracy, assay QAQC and/or sample quality.
The MRE comprises remnant areas of the Main Lens massive sulphide, along-strike
extensions of the Main Lens, and re-interpreted stringer sulphides in the footwall to
the Main Lens. These areas are currently being assessed for geotechnical stability
and mining accessibility and are considered to have reasonable prospects for
eventual economic extraction by selective underground mining methods.
The cut-off grade applied to the MRE has been derived from the Net Smelter Return
(NSR) calculations currently applied to the Bentley deposit.
4|P a g e
Figure 2 – Long section view (A) and cross section view (B) showing the undepleted Jaguar Mineral
Resource Estimate by NSR looking east and north respectively
5|P a g e
The MRE contains Measured, Indicated and Inferred Resource categories. The
Resource classification followed the current Jaguar Operations classification
method as applied at the Bentley deposit. The classification method was
developed in accordance with the JORC Code (2012) definitions, and considers
the drill spacing, confidence in the interpretation in three dimensions (3D), the
quality of the resulting grade estimate and the quality of the input data.
The resulting Measured category is approximately defined by a combination of ≤20
m × ≤20 m drill spacing within 10 m of existing underground ore drive development.
The Indicated category is approximately equivalent to ≤40 m × ≤40 m spaced
drilling. The Inferred mineralisation has been interpreted from up to 80 m × 80 m
spaced drilling in a manner consistent with the geological understanding of the
Jaguar deposit and based on the considerable geological knowledge gained from
underground mining elsewhere in the Jaguar operations.
Significant potential remains to increase the Jaguar mineralised footprint with further
drilling, most notably down-plunge from the current Mineral Resource. In addition,
there is potential to define mineralisation along two parallel favourable stratigraphic
horizons, one of which contains the mined “Farside” copper sulphide lens.
Previous drilling had largely focused on delineation of the known resource and very
limited exploration drilling was carried out. The Bentley deposit is a good example
of the success that near mine exploration drilling around VMS style deposits can
produce, increasing from an in-situ 3Mt (2011) to over 11Mt at present.
Regional Geology
The Jaguar deposit is an Archaean volcanogenic massive sulphide (VHMS) deposit
and located in the northern portion of the Norseman-Wiluna greenstone belt in the
Yilgarn Craton of Western Australia. The geology is dominated by Archaean mafic
to felsic volcanic rocks with some sedimentary and intrusive rocks, which have all
undergone tight folding and tilting to become sub-vertical. A Tertiary alluvial cover
overlies the Archaean units. Weathering of the Archaean bedrock is intense,
resulting in oxidation levels that are commonly down to 120m deep.
6|P a g e
Figure 3 – Jaguar Regional Geology
7|P a g e
Local Geology
The Jaguar mineralised system is hosted by the “Jaguar stratigraphic package”
which sits within the upper tholeiitic volcanic sequence of the greenstone belt. The
Jaguar stratigraphic package is a mixed unit containing sedimentary and volcanic
rocks; the sediments include graphitic shale, siltstone, greywacke plus some minor
amounts of pebble conglomerate and chert. These sedimentary units are bounded
by massive and pillowed basaltic flows and are cut by related volcanic feeder
dykes.
The mineralisation comprises massive and stringer sulphide lenses. Massive sulphides
are typically finely banded with a mineralogy consisting of pyrite, pyrrhotite,
sphalerite and chalcopyrite. These are commonly intergrown with minor amounts
of galena, stannite and arsenopyrite. The massive sulphide mineralisation can also
contain significant silver credits. The stringer sulphide lenses consist of
chalcopyrite/pyrite-rich, sphalerite-poor stringer veinlets, which in places have
partially replaced the sedimentary or pillowed horizons within the basalt. The stringer
sulphide mineralisation contains significantly lower silver credits than the massive
sulphide lens. The stringer zones are likely to represent the fluid feeder zones to the
massive sulphide main lode.
Drilling and Sampling
Drilling conducted by Jabiru Metals Ltd (JML) and IGO at the Jaguar deposit has
been compiled and stored in an acQuire SQL database. A thorough audit of the
database, along with a review of the previous resource estimate was carried out
and the decision was made to exclude the majority of surface drill holes and all face
samples from the estimation due to uncertainty in their locational accuracy, assay
QAQC and/or sample quality. A total of 458 drill holes were used in the estimation.
QAQC reports taken from previous resource estimates have been reviewed, and
the competent person is satisfied that QAQC protocols have been completed to a
satisfactory standard.
Table 2 summarises the subset of drilling that intersects the Mineral Resource
estimation domains and contributes to the grade estimation. No additional drilling
has been completed since the cessation of mining operations at the Jaguar
deposit.
Table 2: Summary of drilling and sampling used for estimation of the Mineral Resource
Sample Type
Drilling
Year
Holes
Historic Surface
2002-2003
2
Drill
Length
912.0
Jabiru Metals UG
2007-2010
392
IGO UG
2011-2012
Company
Total
Samples
Hole Prefix
6
TBD
36,947.7
3,251
JUSD/JUDD
64
12,013.8
451
JUDD
458
49,873.5
3,708
8|P a g e
Appendix A describes all the available data. Diamond NQ2 core was cut in half
longitudinally for sampling, and HQ3 core was quarter cut longitudinally.
Sample preparation and analysis were completed by Ultra Trace, SGS and Genalysis
Laboratories in Perth. Sample preparation consisted of standard drying, LM5 mixer
mill pulverisation to 85% passing 75µm. The analytical techniques used have varied
over the sampling history, including four acid digest with an ICP/OES or ICP/MS finish
(with 25g AE/AAS for gold), or a four acid digest multi element AAS finish and four
acid HF (with 25g AAS for gold). The acids for this digestion are hydrofluoric, nitric,
perchloric and hydrochloric acids, suitable for silica-based samples. The method
approaches total dissolution for most minerals.
The Company’s Quality Assurance / Quality Control (QAQC) protocol included the
following insertions:
― 1 in 30-50 field duplicate samples;
― 1 in 20 samples were blind certified reference material (CRM) i.e.,
standards; and
― 1 in 20-50 samples were coarse blank material.
QAQC was reviewed upon receipt of assay certificates before being accepted into
the database and summarised annually.
Duplicate samples were sent as half core to the laboratory and split after crushing
by the laboratory. Only samples in massive sulphides were submitted for duplicate
testing due to the intrinsic nugget in stringer and disseminated sulphide textures.
The collar positions of all underground diamond drill holes were located by mine
surveyors in local Jaguar Mine Gride coordinates using a Leica TS15P Total Station to
record the position with an accuracy of +/-2mm in three dimensions.
Bulk Density
All measurements prior to 1st June 2008, were excluded from the estimate as the
method applied was incorrect. Aeris established linear regressions between the
post 2008 measured bulk density values and a calculated variable (Cu+Zn+Pb+Fe).
These regressions were established in massive and stringer sulphide mineralisation
styles independently. The Competent Person considered that the correlations were
strong enough to predict bulk density values in the pre-2008 drill holes from the
assays. The predicted values from the regression were then compared to the
measured values by mineralisation style, and the results aligned with expectations.
Based on this assessment, the pre-2008 data were populated with predicted bulk
density values and merged with the measured values in the database.
9|P a g e
Mineral Resource Domains
Massive sulphides and stringer sulphides are the two distinct mineralisation styles
comprising the Jaguar deposit, forming eight distinct, known mineralised domains.
Geological logging is used to determine the massive sulphide domains,
incorporating semi-massive and massive sulphides (>50% total sulphides). As the
mineralisation textures are easily discernible from drill core, this has proved an
extremely robust method of domaining massive sulphide lenses. Stringer sulphide
domains have been modelled to a mineralisation threshold of $30NSR where
geological interpretation shows reasonable continuity of mineralised sulphides.
Figure 4 – Perspective view (looking northwest) of Mineral Resource domain wireframes and drill holes
used to inform the MRE
10 | P a g e
Figure 5 – Plan view of Mineral Resource domain wireframes and drill holes used to inform the MRE
Mineral Resource Estimation
The mineralisation domains were used to populate a block model with a parent
block size of 10m × 1m ×10m and sub-blocked down to 1.25m × 0.25m ×1.25m.
Drill samples were composited to 1m and were capped (top cut) to remove undue
influence of outlier grades in each domain. Top cuts were applied to most domains
and elements where deemed appropriate based on the composited data.
11 | P a g e
Block grade estimation was by Ordinary Kriging (OK) using Leapfrog Edge with:
― A three-pass estimation was used for each domain. Search distances are
based on the modelled variograms;
― A two structured spherical model with variable nugget based off the
downhole variogram;
― Maximum of 30 samples total, three samples per drill hole and a minimum
of seven and four samples for passes one and two respectively. This
resulted in a minimum of three and two drill holes in passes one and two
respectively. Pass three utilised a minimum of three or one samples;
― Predicted (pre-2008) and measured (post-2008) bulk density values were
merged and estimated into the model using OK.
Nearest neighbour estimates and declustered statistics were used to validate the
Ordinary Kriged estimates for copper, zinc, silver, lead, iron and density. Validation
included visual validation in sections and plans, global comparative statistics and
local validation using swath plots. The Competent Person considered the results of
the validation were satisfactory for the resource classifications applied.
Mineral Resource Classification
The Jaguar Mineral Resource has been classified as Measured, Indicated and
Inferred.
The Resource classification followed the current Bentley Mine classification method
in accordance with the JORC Code (2012) definitions, and was based on:
― The drill spacing;
― The confidence in the interpretation in three dimensions;
― The quality of the resulting grade estimate; and
― The quality of the input data.
Measured Mineral Resource is based on a drill spacing to ≤20m × ≤20m with ore drive
development within 10m.
Indicated Mineral Resource is defined by a nominal ≤40m × ≤40m. Inferred Mineral
Resource is defined by a nominal ≤80m × ≤80m drill spacing.
12 | P a g e
Areas of remnant mining, including high-grade sills and pillars left behind during
conventional stoping have been classified as Indicated, even where the drilling and
development meets the stated requirements for Measured classification. This is due
to the increased uncertainty in the surrounding ground stability and geotechnical
status.
The remnant Indicated Mineral Resource totals, 170kt @ 3.41% Cu, 10.45% Zn &
117g/t Ag. The Jaguar Mineral Resource reported in Table 1 is inclusive of the
remnant resource.
Figure 6 displays the overview of the Mineral Resource Classification (1 = Measured,
2 = Indicated and 3 = Inferred) and development solids.
Figure 6 – Long section showing the remnant Mineral Resource for Main Lode and Main Lode Split
shown in orange, looking east
13 | P a g e
Figure 7 – Long section view of the Mineral Resource classification looking east. Note the mineralised
lenses are stacked. An Inferred lens is located behind the Measured and Indicated lens
Figures 8 - 10 include long sections of the MRE for copper, zinc and silver respectively.
14 | P a g e
Figure 8 – Long section view showing estimated Cu (%) grades within the mineralised domains,
facing east
15 | P a g e
Figure 9 – Long section view showing estimated Zn (%) grades within the mineralised domains,
facing east
16 | P a g e
Figure 10 – Long section view showing estimated Ag (g/t) grades within the mineralised domains,
facing east
17 | P a g e
Cut-off Grade, Mining and Metallurgy
The Mineral Resource is reported via a Net Smelter Return (NSR) cut-off, which is
considered appropriate for underground mining methods and is in line with the
current cut-off grade applied at the operational Bentley Mine.
Metal prices of USD8,557/t for Cu, USD2,758/t for Zn and USD21/oz for Ag and an FX
rate of 0.75 have been used in the calculation of the NSR values.
The MRE has been reported inclusive of remnant mining areas previously sterilised.
Further study is ongoing as to the practicality of extracting these areas
economically, considering methods including, but not limited to; non-entry drilling,
injection grouting of previously loose-rock-filled stopes, development of footwall
drives, air leg mining, sub-level caving etc. Many of these techniques have been
used effectively in other areas of the Jaguar operations, including the currently
operating Bentley Mine.
There are no recent metallurgical studies for Jaguar, but the area was previously
mined and is considered consistent with current mining at Bentley that achieves 8090% recovery for copper and zinc.
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Mr. Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200, or visit our website at www.aerisresources.com.au
Media:
Ayla Djonlagic
Tel: 0402 763 968
ayla@sabio.com.au
18 | P a g e
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper
dominant portfolio comprises four operating assets, a long-life development project
and a highly prospective exploration portfolio, spanning Queensland, Western
Australia, New South Wales and Victoria, with headquarters in Brisbane.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition
opportunities. The Company’s experienced board and management team bring
significant corporate and technical expertise to a lean operating model. Aeris is
committed to building strong partnerships with its key community, investment and
workforce stakeholders.
Competent Persons Statement
The information in this report that relates to Exploration Results or Mineral Resources is based on information
compiled by Mr John Hamill. Mr Hamill confirms that he is the Competent Person for the Exploration Results and
Mineral Resource summarised in this Report and he has read and understood the requirements of the 2012
Edition of the Australasian Code for Reporting of Exploration Targets, Exploration Results, Mineral Resources and
Ore Reserves (JORC Code, 2012 Edition). Mr Hamill is a Competent Person as defined by the JORC Code, 2012
Edition, having relevant experience to the style of mineralisation and type of deposit described in the Report
and to the activity for which he is accepting responsibility. Mr Hamill is a Member of the Australasian Institute of
Geoscientists (ID: 7589) and the Australian Institute of Mining and Metallurgy (ID: 3088729). Mr Hamill has
reviewed the Report to which this Consent Statement applies and consents to the inclusion in the Report of the
matters based on his information in the form and context in which it appears. Mr Hamill is a full-time employee
of Aeris Resources Limited.
APPENDIX A: Summary of Jaguar Mineral Resource drill holes
Hole ID
TBD-0225
TBD-0245
07JUDD002
07JUDD003
07JUDD005
07JUDD007
07JUDD010
07JUDD014
07JUDD015
07JUDD016
07JUDD017
07JUDD018
07JUDD019
07JUDD020
07JUDD025
07JUDD027
Easting1
(m)
9681.6
9588.0
9907.8
9907.9
9908.0
9908.5
9908.0
9879.2
9879.3
9879.2
9879.2
9879.0
9878.7
9878.8
9843.2
9878.5
Northing1
(m)
56093.6
55843.7
56059.0
56058.8
56058.9
56058.8
56058.1
56021.8
56021.5
56021.0
56020.4
56019.8
56018.7
56018.1
56035.9
55939.6
RL (m)
Dip
Azimuth1
4452.1
4452.0
4113.8
4114.0
4114.0
4113.6
4114.5
4103.6
4103.5
4103.4
4103.4
4103.4
4103.4
4103.3
4061.5
4095.5
-61.0
-68.1
20.0
17.8
6.7
14.8
6.4
-14.0
-16.5
-19.5
-23.1
-23.2
-20.0
-18.5
-20.3
-15.0
100.8
89.7
258.1
247.3
228.0
229.1
214.3
338.0
331.5
321.5
309.6
286.0
252.0
242.5
108.2
270.5
Total
Depth (m)
408.0
504.0
80.5
90.0
95.0
136.7
205.8
131.7
131.5
116.6
93.0
95.9
101.4
105.0
47.7
95.8
Company
Immet
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
19 | P a g e
Hole ID
Easting1
(m)
Northing1
(m)
RL (m)
Dip
Azimuth1
Total
Depth (m)
Company
07JUDD028
07JUDD031
07JUDD034
07JUDD036
07JUDD037
07JUDD039
07JUSD001
07JUSD002
07JUSD003
07JUSD005
07JUSD006
07JUSD007
07JUSD010
07JUSD011
07JUSD012
07JUSD013
07JUSD014
07JUSD015
07JUSD016
07JUSD017
07JUSD018
07JUSD019
07JUSD020
07JUSD021
07JUSD022
07JUSD023
07JUSD024
07JUSD025
07JUSD026
07JUSD027
07JUSD028
07JUSD029
07JUSD030
07JUSD031
07JUSD032
07JUSD033
07JUSD034
07JUSD035
07JUSD036
07JUSD037
07JUSD038
07JUSD040
07JUSD041
9878.5
9879.1
9843.0
9843.1
9843.1
9842.9
9870.5
9870.4
9869.9
9872.9
9872.9
9861.6
9864.8
9868.3
9821.2
9821.5
9820.3
9818.6
9822.9
9822.5
9822.5
9822.0
9820.3
9821.5
9821.5
9821.3
9820.3
9818.9
9819.5
9819.3
9819.2
9818.9
9817.8
9829.4
9828.5
9827.9
9839.3
9839.3
9839.3
9838.7
9837.6
9846.7
9845.4
55939.6
55939.1
56035.7
56035.4
56035.4
56036.4
56068.7
56068.8
56068.9
56079.1
56079.0
56042.3
56050.8
56059.6
55940.3
55940.2
55940.3
55940.6
55960.2
55960.2
55960.2
55960.3
55960.4
55979.9
55979.8
55979.8
55979.7
55979.9
56000.0
55999.9
55999.9
55999.9
56000.0
56020.5
56020.8
56020.4
56040.0
56040.0
56040.0
56040.0
56040.0
56061.2
56061.3
4095.5
4095.3
4061.0
4061.5
4061.2
4061.0
4117.3
4118.7
4120.4
4118.9
4117.0
4119.5
4120.1
4120.5
4129.6
4132.1
4133.6
4134.0
4129.3
4132.1
4132.1
4133.0
4133.5
4130.0
4130.7
4131.7
4132.4
4132.8
4128.3
4130.0
4130.9
4131.7
4131.8
4129.4
4130.5
4130.7
4127.9
4129.1
4130.2
4130.8
4130.9
4130.0
4130.4
-14.5
-23.2
-40.1
-20.4
-33.7
-60.2
-0.3
30.0
59.6
31.3
2.3
57.7
57.5
60.6
1.6
40.6
68.3
73.3
0.8
31.1
56.4
75.3
72.3
0.5
29.2
47.1
68.5
76.0
-0.2
27.7
50.7
65.4
85.2
25.8
53.8
74.1
6.1
32.3
47.6
65.4
82.8
57.9
79.1
250.9
242.5
129.3
132.3
153.6
129.6
110.3
111.7
109.9
111.7
110.7
111.4
108.8
107.2
90.2
92.8
92.4
279.2
90.0
88.8
87.9
83.3
274.0
91.9
95.8
94.1
101.1
264.6
90.3
95.3
92.7
98.2
283.5
89.9
76.8
88.0
88.7
89.1
90.9
91.8
280.5
86.3
288.2
95.7
120.6
62.5
59.9
65.6
85.8
14.7
20.6
26.2
20.7
15.0
25.0
25.5
23.6
11.8
23.1
12.3
12.5
17.7
20.1
14.0
14.0
13.6
14.6
20.3
29.2
16.0
8.1
18.0
25.3
16.2
19.3
8.2
9.4
19.3
7.3
7.5
14.6
26.4
11.5
8.6
14.8
8.6
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
20 | P a g e
Hole ID
Easting1
(m)
Northing1
(m)
RL (m)
Dip
Azimuth1
Total
Depth (m)
Company
07JUSD043
07JUSD044
07JUSD053
07JUSD055
07JUSD056
07JUSD057
07JUSD058
07JUSD059
07JUSD060
07JUSD061
07JUSD062
07JUSD063
07JUSD067
07JUSD068
07JUSD069
07JUSD070
07JUSD073
07JUSD074
07JUSD077
07JUSD078
07JUSD079
08JUDD001
08JUDD002
08JUDD003
08JUDD004
08JUDD005
08JUDD006
08JUDD007
08JUDD008
08JUDD009
08JUDD010
08JUDD011
08JUDD012
08JUDD014
08JUDD018
08JUDD019
08JUDD020
08JUDD021
08JUDD022
08JUDD023
08JUDD024
08JUDD025
08JUDD026
9853.5
9852.9
9811.3
9813.8
9816.0
9815.2
9814.3
9822.0
9835.7
9835.0
9835.3
9840.9
9882.8
9882.8
9882.8
9865.1
9849.0
9842.2
9863.1
9855.0
9847.8
9879.2
9879.2
9879.5
9879.5
9879.4
9879.4
9879.4
9879.4
9879.3
9879.4
9879.3
9879.5
9879.2
9879.4
9879.4
9879.5
9879.4
9879.5
9879.7
9803.0
9801.7
9801.6
56080.4
56080.4
55920.4
55941.3
55960.4
55960.3
55960.3
55981.0
55991.8
55998.6
56000.1
55994.1
56114.5
56114.5
56114.5
56080.9
56039.2
56019.2
56059.6
56039.5
56020.0
55954.5
55954.2
55954.0
55953.6
55953.6
55953.2
55953.2
55952.8
55952.4
55952.4
55951.9
55952.0
55951.2
55951.9
55952.6
55952.9
55953.2
55953.4
55953.6
55960.9
55970.0
55970.2
4129.7
4129.8
4107.4
4107.1
4103.7
4106.1
4106.8
4103.2
4104.4
4104.5
4104.2
4102.1
4120.4
4120.4
4120.4
4104.9
4104.5
4104.0
4103.0
4102.1
4103.5
4056.9
4056.9
4056.6
4056.6
4056.9
4056.9
4056.5
4056.8
4056.9
4056.4
4056.4
4056.1
4056.2
4056.2
4056.3
4056.4
4056.5
4056.4
4056.6
4043.4
4043.1
4045.0
67.2
86.7
87.8
89.5
-0.2
59.4
88.1
-0.1
34.0
35.9
34.8
1.2
-8.0
-9.0
-7.0
25.3
35.9
33.4
0.5
1.3
0.0
-3.2
-3.0
-14.7
-16.0
-3.7
-3.5
-15.2
-3.0
-2.5
-15.0
-13.1
-22.3
-16.1
-21.2
-24.2
-23.9
-26.9
-26.1
-24.5
1.0
-0.7
49.5
95.6
89.0
179.2
89.5
88.5
88.7
222.8
91.3
243.2
263.9
305.6
115.4
311.0
279.0
323.0
325.7
268.2
271.3
90.8
93.0
90.0
312.0
304.0
300.0
288.0
292.0
275.0
273.3
260.5
248.0
248.0
240.3
239.8
218.9
231.0
249.5
260.2
273.6
285.7
300.8
90.1
91.0
87.4
14.8
7.4
11.6
13.0
50.7
14.6
14.4
5.0
34.6
34.7
35.3
36.0
48.9
41.3
56.3
41.2
71.3
29.7
17.1
20.8
25.5
114.3
104.7
108.0
102.0
93.0
96.0
98.3
95.8
100.1
105.0
119.3
127.4
166.4
141.5
121.2
115.6
110.3
117.2
119.8
10.2
10.3
15.1
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
21 | P a g e
Hole ID
Easting1
(m)
Northing1
(m)
RL (m)
Dip
Azimuth1
Total
Depth (m)
Company
08JUDD027
08JUDD028
08JUDD029
08JUDD030
08JUDD031
08JUDD033
08JUDD034
08JUDD035
08JUDD036
08JUDD037
08JUDD041
08JUDD042
08JUDD043
08JUDD044
08JUDD045
08JUDD046
08JUDD047
08JUDD048
08JUDD049
08JUDD050
08JUDD051
08JUDD052
08JUDD053
08JUDD054
08JUDD055
08JUDD056
08JUDD057
08JUDD058
08JUDD059
08JUDD060
08JUDD061
08JUDD062
08JUDD063
08JUDD064
08JUDD065
08JUDD068
08JUDD069
08JUDD070
08JUDD071
08JUDD072
08JUDD073
08JUDD074
08JUDD075
9802.7
9802.6
9802.3
9801.8
9802.8
9901.1
9901.1
9901.3
9901.3
9901.4
9816.2
9809.6
9810.7
9811.1
9809.8
9809.7
9809.8
9809.2
9808.5
9808.5
9807.5
9807.5
9806.5
9806.5
9804.5
9802.4
9803.1
9901.0
9901.0
9901.0
9901.2
9901.1
9901.2
9901.2
9901.5
9808.3
9808.3
9804.7
9804.7
9805.6
9804.9
9804.9
9803.9
55980.7
55990.2
55990.1
55999.7
56010.0
56054.5
56055.3
56055.7
56055.7
56056.9
56120.2
56110.2
56110.2
56110.3
56098.3
56090.0
56090.0
56079.5
56070.3
56070.3
56060.4
56060.4
56051.3
56051.3
56039.8
56029.7
56029.7
56054.5
56054.4
56054.5
56054.8
56055.2
56055.5
56055.9
56056.2
56118.4
56118.5
56108.1
56108.2
56098.9
56088.2
56088.2
56079.3
4042.9
4042.6
4045.1
4042.4
4042.2
4045.7
4045.8
4045.8
4045.8
4045.8
4044.3
4047.4
4045.8
4044.2
4043.9
4045.0
4043.6
4043.5
4043.4
4043.4
4043.2
4044.6
4044.6
4043.1
4042.8
4044.1
4042.8
4045.5
4045.2
4044.9
4045.4
4045.4
4045.3
4045.3
4045.3
4024.4
4027.8
4024.2
4026.0
4024.1
4023.9
4025.0
4023.7
0.3
-0.7
52.3
0.3
-1.0
2.6
4.9
4.6
3.6
3.8
-0.3
77.6
31.3
2.6
0.6
38.8
0.7
-0.3
39.6
-0.3
0.1
42.3
42.7
0.9
0.0
55.3
0.9
-6.4
-16.6
-25.2
-5.8
-6.7
-7.1
-8.5
-6.1
0.9
48.6
-0.5
31.7
0.5
1.0
29.7
-0.3
87.0
90.8
93.5
92.5
91.0
259.9
282.9
297.9
309.7
319.1
91.5
101.6
91.3
90.6
87.6
89.9
90.6
91.0
87.5
87.4
88.8
89.3
90.3
92.7
92.9
87.4
93.2
261.4
260.0
260.7
271.5
282.1
296.9
308.4
317.0
88.5
86.3
89.6
86.4
88.0
90.4
89.3
91.1
10.2
15.0
24.1
14.8
15.2
117.1
110.6
113.4
116.3
124.6
12.6
20.0
23.5
14.1
16.2
20.1
13.3
14.8
18.3
13.0
10.1
18.0
17.1
10.3
14.7
15.3
10.1
118.2
125.9
140.6
113.8
113.7
118.3
121.1
131.3
41.7
17.0
44.8
23.7
44.6
47.7
26.6
45.1
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
Jabiru Metals
22 | P a g e
Hole ID
Easting1
(m)
Northing1
(m)
RL (m)
Dip
Azimuth1
Total
Depth (m)
Company
08JUDD
Share your feedback
Discover