Tritton, Cracow and Mt Colin all met quarterly production targets
Jaguar production exceeded guidance and site now on care and
maintenance
Established Australian copper-gold producer and explorer, Aeris Resources Limited
(ASX: AIS) (Aeris or the Company) is pleased to provide this update on preliminary
production results for the September 2023 quarter.
Aeris’ Executive Chairman, Andre Labuschagne, said “We are very pleased that all
operations are performing to plan. A particular mention goes to the team at Jaguar
that safely delivered an excellent final quarter of production and transitioned the
operation to care and maintenance.”
Tritton
Sep 23
Qtr
FY24
Guidance
kt
301
-
% Cu
1.59
-
Production Summary
Unit
Ore Mined
Mined Grade
Ore Milled
kt
332
-
Milled Grade
% Cu
1.63
-
Recovery (Cu)
%
95.3
-
Copper Produced
kt
5.2
19 – 24
Gold Produced
koz
1.0
6–7
Silver Produced
koz
36.9
148 – 185
Tritton performed well for the quarter with copper, gold and silver production ahead
of plan on strong mined grades, particularly Avoca Tank, which averaged 2.5% Cu
in mined ore. Metallurgical recovery was also slightly ahead of plan.
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane, QLD 4000, Australia
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
Cracow
Sep 23
Qtr
FY24
Guidance
kt
115
-
g/t
3.29
-
Production Summary
Unit
Ore Mined
Mined Grade
Ore Milled
kt
150
-
Milled Grade
g/t
2.84
-
Recovery
%
93.2
-
Gold Produced
koz
12.7
38 – 48
Gold Sold
koz
12.8
-
Gold production at Cracow for the quarter was in line with plan. Run of mine ore
was supplemented with low grade stockpiles at the mill.
North Queensland
Sep 23
Qtr
FY24
Guidance
kt
107
-
Production Summary
Unit
Ore Mined
Mined Grade
% Cu
2.01
-
Ore Milled
kt
127
-
Milled Grade
% Cu
1.96
-
Recovery (Cu)
%
95.2
-
Copper Produced
kt
2.4
8 – 10
Gold Produced
koz
1.1
4–5
Mining operations at Mt Colin performed to plan. Two processing runs were
completed at Ernest Henry during the quarter. Processed tonnes were ahead of
mined tonnes with stockpiled ore also treated.
Jaguar
Sep 23
Qtr
FY24
Guidance
kt
55
-
% Zn
7.05
-
Production Summary
Unit
Ore Mined
Mined Grade
Ore Milled
kt
67
-
Milled Grade
% Zn
5.92
-
Recovery (Zn)
%
78.2
-
Zinc Produced
kt
3.1
1.2 – 1.5
Copper Produced
kt
0.6
0.2 – 0.3
Gold Produced
koz
0.4
0.2 – 0.3
Silver Produced
koz
84.4
33 – 42
2|P a g e
Mining operations at the Bentley mine finished in late August with processing of the
last ore completed in early September, with no safety incidents. Mining and
processing operations achieved better production volumes than planned, allowing
significantly higher metal production. Final zinc and copper concentrate shipments
were fulfilled and have left the port.
Jaguar has now transitioned to care and maintenance with a team of 8 people left
on site. Mobile mining equipment will be transferred to Aeris’ other operations to
improve capital efficiency across the group. Dewatering activities at the Bentley
and Jaguar mines will continue. Aeris is also exploring opportunities to supply excess
water to other nearby gold operations.
Aeris has also retained a small geological team at Jaguar to continue exploration
planning. Aeris considers the Jaguar tenements to be highly prospective for both
base and precious metals mineralisation with a number of walk-up drill targets
already identified.
Feasibility studies on restart options for Jaguar will commence in mid-October. Aeris
remains confident that Jaguar can be re-established as a safe, profitable and highly
productive operation.
Figure 1: Final ore through the mill
3|P a g e
Figure 2: Site demobilisation
Figure 3: Mining equipment parked up
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Mr. Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200, or visit our website at www.aerisresources.com.au
Media:
Ayla Djonlagic
Tel: 0402 763 968
ayla@sabio.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper
dominant portfolio comprises three operating assets, a mine on care and
maintenance, a long-life development project and a highly prospective exploration
portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition
opportunities. The Company’s experienced board and management team bring
significant corporate and technical expertise to a lean operating model. Aeris is
committed to building strong partnerships with its key community, investment and
workforce stakeholders.
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane, QLD 4000, Australia
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
Share your feedback
Discover