APPENDIX 4E AND ANNUAL FINANCIAL REPORT
Released
Released
Announcement PDF
Aeris Resources Limited
Appendix 4E
Preliminary final report
1. Company details
Name of entity:
ABN:
Reporting period:
Previous period:
Aeris Resources Limited
30 147 131 977
For the year ended 30 June 2024
For the year ended 30 June 2023
2. Results for announcement to the market
2024
$'000
2023
$'000
Change
$'000
Change
%
Revenues from ordinary activities
Down
540,020
612,490
(72,470)
(12%)
Adjusted Earnings Before Interest, Tax, Depreciation
and Amortisation (Adjusted EBITDA)*
Up
107,039
32,014
75,025
234%
Loss from ordinary activities after tax attributable to
the owners of Aeris Resources Limited
Down
(24,258)
(139,754)
115,496
83%
Loss for the year attributable to the owners of Aeris
Resources Limited
Down
(24,258)
(139,754)
115,496
83%
2024
Cents
2023
Cents
(2.9)
(2.9)
(20.2)
(20.2)
*
Refer to Director's Report for a reconciliation of Non-IFRS Adjusted EBITDA
Earnings per share
Basic loss per share
Diluted loss per share
Dividends
There were no dividends paid, recommended or declared during the current financial period.
Comments
The loss for the consolidated entity after providing for income tax amounted to $24,258,000 (30 June 2023: $139,754,000).
3. Net tangible assets
Net tangible assets per ordinary security
4. Control gained over entities
Not applicable.
Reporting
period
Cents
Previous
period
Cents
32.0
38.6
Aeris Resources Limited
Appendix 4E
Preliminary final report
5. Loss of control over entities
Not applicable.
6. Dividends
Current period
There were no dividends paid, recommended or declared during the current financial period.
Previous period
There were no dividends paid, recommended or declared during the previous financial period.
7. Dividend reinvestment plans
Not applicable.
8. Details of associates and joint venture entities
Not applicable.
9. Foreign entities
Details of origin of accounting standards used in compiling the report:
Not applicable.
10. Audit qualification or review
Details of audit/review dispute or qualification (if any):
The financial statements have been audited by PricewaterhouseCoopers and provide an unqualified opinion, however it
includes a material uncertainty related to going concern.
11. Attachments
Details of attachments (if any):
The Annual Financial Report of Aeris Resources Limited for the year ended 30 June 2024 is attached.
Aeris Resources Limited
ABN 30 147 131 977
Annual Financial Report - 30 June 2024
Aeris Resources Limited
Corporate directory
30 June 2024
Directors
Andre Labuschagne - Executive Chairman
Michele Muscillo - Non-executive Director
Colin Moorhead - Non-executive Director
Robert Millner - Non-executive Director
Company secretaries
Robert Brainsbury
Dane van Heerden
Registered office and principal
place of business
Level 6
120 Edward Street
Brisbane
QLD 4000
Phone: (07) 3034 6200
Share register
Automic
Level 5
126 Phillip Street
Sydney
NSW 2000
Phone: 1300 288 664 (within Australia)
+61 2 9698 5414 (outside Australia)
Auditor
PricewaterhouseCoopers
Level 23
480 Queen Street
Brisbane
QLD 4000
Solicitors
HopgoodGanim Lawyers
Level 8
1 Waterfront Place
Brisbane
QLD 4000
Stock exchange listing
Aeris Resources Limited shares are listed on the Australian Securities Exchange (ASX
code: AIS)
Website
www.aerisresources.com.au
Corporate Governance Statement
www.aerisresources.com.au/about/corporate-governance/
1
Aeris Resources Limited
Directors' Report
30 June 2024
The Directors present their report, together with the consolidated financial report of the Aeris Resources Limited Group
(‘consolidated entity’ or ‘Group’), consisting of Aeris Resources Limited (‘Aeris’ or ‘Company’) and the entities it controlled at
the end of, or during, the year ended 30 June 2024.
DIRECTORS
The Directors of the Company in office during the financial year and up to the date of this report were:
Name, experience and other directorships
Andre Labuschagne – Executive Chairman
Mr Labuschagne is an experienced mining executive with a career
spanning over 30 years across operations in Australia, Indonesia, South
Africa, PNG and Fiji. Mr Labuschagne has held various corporate and
operational roles in companies including Norton Gold Fields, Emperor
Gold Mines, DRD Gold and AngloGold Ashanti. Mr Labuschagne holds a
Bachelor of Commerce from Potchefstroom University in South Africa.
Special
Responsibilities
Appointed /
Resigned
Executive Chairman
Appointed
20-Dec-2012
Chairman of the
Audit and Risk
Committee and
member of the
Remuneration and
Nomination
Committee and the
Sustainability
Committee
Appointed
2-May-2013
Chairman of the
Remuneration and
Nomination
Committee and
Member of the
Audit and Risk
Committee and the
Sustainability
Committee
Appointed
27-July-2020
Other current directorships (ASX listed entities): Magontec Limited
(ASX:MGL)
Former directorships in the past 3 years (ASX listed entities): None
Michele Muscillo – Independent Non-Executive Director
Mr Muscillo is a Partner specialising in corporate law with
HopgoodGanim Lawyers. Mr Muscillo is an admitted Solicitor and has a
practice focussed almost exclusively on mergers & acquisitions and
capital raising. Mr Muscillo has acted on a variety of corporate
transactions including initial public offerings, takeovers and acquisitions.
Mr Muscillo has a Bachelor of Laws from Queensland University of
Technology and was a recipient of the QUT University Medal.
Other current directorships (ASX listed entities): Xanadu Mines Limited
(ASX:XAM) and Mako Gold Limited (ASX:MKG).
Former directorships in the past 3 years (ASX listed entities): Cardinal
Resources Limited (ASX:CDV).
Colin Moorhead – Independent Non-Executive Director
Mr Moorhead is an experienced industry executive with a demonstrated
track record over three decades of building value in mining companies
through innovation, discovery, project development and safe, efficient
operations.
A geologist by training, Mr Moorhead is also known for strong leadership,
strategy and execution. Mr Moorhead’s career has involved both
operational and corporate executive responsibilities including global
responsibility for exploration and resource development at Newcrest
Mining and CEO of PT Merdeka Copper Gold (IDX:MDKA), where he built
and led the team that constructed and commissioned the highly successful
Tujuh Bukit Gold Mine. Colin is also currently Non-Executive Chairman of
Xanadu Mines (ASX:XAM), Non-Executive Chairman of Sihayo Gold Limited
(ASX: SIH), Non-Executive Director of Ramelius Resources Limited
(ASX:RMS) and Non-Executive Director of VHM Limited (ASX:VHM)
Former directorships in the past 3 years (ASX listed entities): Finders
Resources Limited and Coda Minerals (ASX:COD)
2
Aeris Resources Limited
Directors' Report
30 June 2024
Name, experience and other directorships
Sylvia Wiggins – Non-Executive Director
Ms Wiggins is a globally experienced senior executive and investment
banker with a demonstrated track record over 25 years in public markets,
with a focus on finance, strategy and risk.
Special
Responsibilities
Appointed /
Resigned
Chairman of the
Sustainability
Committee and
Member of Audit
and Risk
Committee
Appointed
18-October2021
Robert Millner – Non-Executive Director
Mr Millner is the Chairman of Australian investment house Washington H
Soul Pattinson (ASX:SOL). Mr Millner has extensive experience in the
investment industry, and is the Chairman of Brickworks Limited (ASX:
BKW), BKI Investment Co Ltd and New Hope Corporation Limited
(ASX:NHC) and a Non-Executive Director of Tuas Limited (ASX:TUA), Apex
Healthcare Berhad and TPG Telecom Ltd (ASX:TPG).
Resigned
31-December2023
Appointed
1-July-2022
Former directorships in the past 3 years (ASX listed entities): Milton
Corporation Limited (delisted from ASX on 5 October 2021)
COMPANY SECRETARIES
Robert Brainsbury
Mr Brainsbury is an experienced financial executive and has held senior operational and finance roles with several bluechip industrial and resources companies including Norton Gold Fields, MIM Holdings Limited, Xstrata, Rio Tinto and BIS
Industrial Logistics. Mr Brainsbury is a qualified accountant and holds a Bachelor of Business degree with majors in
Accounting and Marketing.
Dane van Heerden CA
Ms van Heerden is a qualified chartered accountant, with over 20 years’ experience in both Australia and abroad.
MEETINGS OF DIRECTORS
The attendance of Directors at Board and Committee meetings during the financial year were as follows:
Directors
Andre Labuschagne
Michele Muscillo
Colin Moorhead
Robert Millner
Sylvia Wiggins
Board
A
13
13
13
13
8
ARC
B
13
13
13
13
8
A
6
6
3
B
6
6
3
Sustainability
A
B
2
2
2
2
1
1
Remuneration
A
B
1
1
1
1
1
1
A = Number of meetings held during the time the Director was a member of the Board and/or Committee
B = Number of meetings attended during the time the Director was a member of the Board and/or Committee
CORPORATE GOVERNANCE
The Company’s Corporate Governance Statement for the year ended 30 June 2024 may be accessed from the Company’s
website at https://www.aerisresources.com.au/about/corporate-governance.
PRINCIPAL ACTIVITIES
The principal activities of the consolidated entity for the year ended 30 June 2024 were the production, sale and
exploration of copper, zinc, gold and silver. Other than as referred to on page 4, there were no significant changes in those
activities during the financial year.
3
Aeris Resources Limited
Directors' Report
30 June 2024
SIGNIFICANT CHANGES IN THE STATE OF AFFAIRS
JAGUAR OPERATIONS AND NEW DEBT FINANCING
On 2 August 2023, Aeris announced that it would be placing the Jaguar Zinc/Copper Operations (Jaguar) in Western
Australia on care and maintenance, which took place in September 2023. Aeris is currently reviewing the scope definition
and options to restart Jaguar, particularly focusing on increasing ore production rates; maximising mill throughput;
improving metal recovery and enhancing product quality. A care and maintenance team of 8 people are on site to manage
ongoing activities including mine dewatering at the Bentley and Jaguar underground mines.
The Company also announced on 2 August 2023 that it had entered into a $50 million, 2 year Debt Facility (WHSP Debt
Facility) with its major shareholder, Washington H. Soul Pattinson (WHSP). The WHSP Debt Facility provided working
capital liquidity to enable the Company to deliver on its FY2024 plans, whilst also facilitating an orderly suspension of
activities at Jaguar. The WHSP Debt Facility replaced the ANZ $20 million Working Capital Facility and has second ranking
security to the remaining ANZ facilities.
The ANZ Contingent Instrument Facility ($50 million) has been extended to 15 October 2024.
Financial covenants apply to the Debt Facility and include Net Tangible Assets balance; a ratio of Debt to EBITDA; and an
Interest Cover ratio. A breach of a financial covenant may result in an event of default.
The Company complied with these ratios throughout the reporting period.
COMPLETION OF EQUITY RAISE
In November 2023, the Company undertook a $30 million fully underwritten equity raise, comprising a $13.9 million
institutional placement and a $16.2 million accelerated non-renounceable entitlement offer. Net proceeds from the equity
raise were used to provide general working capital and increased financial flexibility.
This capital raise supported the three operating mines, following the successful transition of Jaguar onto care and
maintenance, and to progress our key growth opportunities in the portfolio namely Stockman, Constellation and Jaguar by
providing additional working capital flexibility.
OPERATING REVIEW
TRITTON COPPER OPERATIONS
Operations
The Tritton Copper Operations (Tritton) produced 19,749 tonnes of copper during the financial year ending 30 June 2024. A total
of 1.20 million tonnes of ore were mined, predominantly from the Tritton, Murrawombie and Avoca Tank underground mines,
at an average grade of 1.69% Cu.
Ore mined
Grade mined
Ore milled
Grade milled
Recovery
Total copper produced
Gold produced
Units
tonnes
% Cu
tonnes
% Cu
%
tonnes
Oz
30 June 2024
1,195,375
30 June 2023
1,369,364
30 June 2022
1,488,120
1.69
1,215,692
1.71
95.0
1.36
1,352,424
1.34
94.6
1.30
1,500,463
1.30
94.6
19,749
4,899
17,205
4,582
18,581
4,312
During the year, production levels ramped up at the Avoca Tank and Budgerygar mines. The higher grades in these mines
contributed to the significant increase in mined grade and produced copper from the previous financial year. Operational
issues with equipment and labour availability were addressed with additional trucks and loaders and contractor labour.
Production at Murrawombie was prioritised in the later half of the year to ensure underground mining would be completed
ahead of the open pit cutback commencing in FY25.
At the processing plant, the Jameson Cell was successfully commissioned resulting in improved concentrate grades.
Metallurgical recovery was slightly above plan for the year, averaging 95.0%.
Limited growth capital was incurred at Tritton for the year with the Avoca Tank and Budgerygar mines now in production.
4
Aeris Resources Limited
Directors' Report
30 June 2024
Exploration
In FY24, the Mineral Resource Estimate (MRE) for Avoca Tank was updated with new drilling information. The updated
MRE resulted in a 35% increase in copper grade and 16% increase in contained copper metal totalling 720kt @ 3.4% Cu,
1.1g/t Au, 17g/t Ag, containing 24kt Cu metal, 24koz Au metal and 382koz Ag metal1. The Avoca Tank mineralised system
remains open down-plunge. Mineralisation has been traced 340m down-plunge, and there remains significant potential to
increase the MRE with further drilling.
Two drill programs were also undertaken at the Constellation deposit. The first program targeted the deeper primary
sulphide portion of the deposit below the MRE. Five of the six holes intersected copper mineralisation, successfully
extending the known sulphide mineralisation 100m along strike and 200m down-plunge of the current MRE. Drill hole
TAKD095 returned the most significant intersection from the primary sulphide domain to date outside the current MRE.
The second drill program focused on the interpreted subvertical mineralised zone on the northern margin of the deposit
(referred to as the “stand-up zone”) and on improving resource confidence. At the end of the year, seven holes had been
completed with drilling continuing through the first half of FY25 2.
CRACOW GOLD OPERATIONS
Operations
Cracow Operations (Cracow) produced 45.7koz gold in FY24, towards the upper end of production guidance. All operating
and capital costs for the year were at the low end of guidance ranges.
Cracow Operations performed well for the year, achieving planned production. Mining operations continued in the
Western Vein Field. Grades and metallurgical recoveries in FY24 were higher year on year.
During the year, the tailings storage facility upgrade was completed at a cost of $17.3 million. The project was completed
ahead of schedule and below budget and provides Cracow an additional 1 million cubic metres of tailings capacity to extend
the mine life.
Ore mined
Grade mined
Ore milled
Grade milled
Recovery
Gold produced
Units
Tonnes
g/t Au
Tonnes
g/t Au
%
Oz
30 June 2024
450,985
30 June 2023
575,382
30 June 2022
505,260
3.13
585,256
2.65
2.75
666,978
2.50
3.26
663,912
2.80
91.6
90.0
90.2
45,651
48,221
53,920
Exploration
Exploration activities at Cracow focused on near mine extensions to mineralisation in the Western Vein Field. Five priority
targets were drill tested with all targets returning anomalous gold mineralisation. Within the second half of the reporting
period follow-up drilling commenced, targeting the Apollo, Bazsickle and Coronation West targets. High-grade gold
mineralisation was reported from the Apollo structure3.
A 15 hole exploration program was also completed at the Golden Plateau deposit in the Eastern Vein Field. The program
was focused on testing Au prospectivity along the remaining untested interpreted structures south of the historical
workings. Previous drill programs completed by Aeris to inform the maiden Mineral Resource were focused on the Harry’s,
Chaz and King north-south structures. Although drilling successfully intersected the structures, they failed to host
epithermal quartz veining/gold mineralisation. The prospectivity along these structures has been downgraded. Several
holes targeted strike extensions to the modelled Chaz and King lodes. Drilling intersected epithermal quartz veining with
modest drill grades4.
An updated Mineral Resource Estimate for Golden Plateau is expected to be completed in early FY25.
1 Refer to ASX announcement “Avoca Tank Mineral Resource Update” dated 25 October 2023
2 Refer to ASX announcement “Quarterly activities report – June 2024” dated 30 July 2024
3
Refer to ASX announcements “Quarterly Activities Report – March 2024” dated 30 April 2024 and “Quarterly Activities Report – June 2024” dated 30
July 2024.
4
Refer to ASX announcement “Quarterly Activities Report – June 2024” dated 30th July 2024.
5
Aeris Resources Limited
Directors' Report
30 June 2024
NORTH QUEENSLAND OPERATIONS
Operations
6.8kt of copper was produced in FY24 from the Mt Colin mine at North Queensland Operations. Mining operations
performed better than plan for the year however, the lack of toll processing windows resulted in copper production below
the guidance range. Costs were within guidance.
Ore mined
Grade mined
Ore milled
Grade milled
Recovery
Copper produced
Gold produced
Units
Tonnes
% Cu
Tonnes
% Cu
%
Tonnes
Oz
30 June 2024
510,483
2.15
410,861
2.11
78.3
6,803
4,328
30 June 2023
426,135
2.39
362,876
2.18
89.8
7,110
3,852
During FY24, mining at Mt Colin was focused on final stopes, the cave zone below the old open pit and on pillar extraction.
The cave zone performed well and mining tonnages were above plan. The ability to continue to draw the cave material
longer than expected along with additional pillar recovery, has enabled the mine life of Mt Colin to be extended into midFY25.
A lack of available toll processing slots at Ernest Henry however resulted in reduced milled tonnages. As a result, total
copper and gold production for the year was below guidance. Metallurgical recoveries were also negatively impacted by
the increased volumes of oxidised and transitional ore through the processing plant.
At the end of the year, significant stockpiles of mined ore remained at the mine site and Ernest Henry, available for
processing in FY25.
Exploration
No material exploration activities were undertaken in North Queensland during the year.
Barbara Project
The Barbara Project is a potential underground copper mine to be developed beneath the old Barbara open pit, which
ceased operations in 2020. A feasibility study on the project has commenced and is due for completion in early FY25. Aeris
has also submitted the Environmental Amendment for the proposed underground mining operations and is currently in
discussions with the regulator on the permitting pathway.
JAGUAR OPERATIONS
Operations
Jaguar Operations (Jaguar) completed final mining and processing in September 2023 and transitioned to care and
maintenance.
Jaguar Operations had a strong final quarter of production with mining tonnages and metal production ahead of guidance.
A team of 8 people now remain on site to manage care and maintenance activities.
Ore mined
Grade mined
Ore milled
Grade milled
Zinc recovery
Zinc produced
Copper produced
Gold produced
Silver produced
Units
Tonnes
% Zn
Tonnes
% Zn
%
Tonnes
Tonnes
Oz
Oz
30 June 2024
55,228
7.05
30 June 2023
402,574
5.95
66,763
432,631
5.92
78.2
3,090
604
388
84,419
5.97
87.1
22,479
3,057
2,958
718,147
6
Aeris Resources Limited
Directors' Report
30 June 2024
Exploration
During the year, an updated MRE was completed on the Jaguar deposit based on an updated geological interpretation.
The updated Jaguar deposit MRE totals 840kt @ 2.28% Cu, 4.66% Zn and 61g/t Ag, for 19kt Cu metal, 39kt Zn metal and
1.65Moz Ag metal5.
Significant potential remains to increase the Jaguar mineralised footprint with further drilling, most notably down-plunge
from the current Mineral Resource. In addition, there is potential to define mineralisation along two parallel favourable
stratigraphic horizons, one of which contains the mined “Farside” copper sulphide lens.
The Jaguar exploration tenement package is also highly prospective for gold mineralisation. The regional gold endowment
is in excess of 25Moz, with several multi-million ounce deposits located within 50km of the Jaguar tenement package.
A strategic review of the tenement package and identified five priority corridors considered highly prospective for gold
mineralisation. A two-hole diamond drill program was completed at the Heather Bore prospect late in FY24. The program
was designed to test for the presence of primary gold mineralisation in fresh rock below an extensive, shallow +0.5g/t gold
anomaly in the weathered rock profile. Results from the drilling are expected in FY25.
STOCKMAN PROJECT
At the Stockman Project, feasibility study and permitting activities continued throughout FY24. A robust mine plan has
been developed involving +12 years of ore production from the single Currawong deposit at a mining rate of 850ktpa 6.
The metallurgy of the Stockman deposits is complex and impacts metal recovery and processing costs through a standard
flotation circuit. Aeris is investigating the feasibility of introducing the Albion oxidative leach process to the flowsheet to
provide a step change in recoveries.
The revised processing route will incorporate onsite production of a clean copper concentrate for sale and a bulk
Cu/Zn/Au/Ag concentrate for further processing. The bulk concentrate is to be trucked to a regional offsite location with
access to lower cost power for treatment through the Albion process into saleable copper, zinc and precious metal
products. Initial test work has demonstrated high recoveries of metal into the copper concentrate and bulk concentrate
and through the Albion process leaching.
Work continues on detailed metallurgical testing and engineering studies for the revised processing flowsheet. The
feasibility study is expected to be completed in FY25.During the year, Aeris also released an updated MRE for the
Currawong and Wilga deposits at the Stockman Project. The updated resource increased total tonnes by 7% and contained
copper by 6% from the previous estimate7.
5 Refer to ASX announcement “Correction - Jaguar Deposit Mineral Resource Update” dated 12 July 2023.
6
Refer to ASX announcement “Stockman Feasibility Study Update” dated 24 January 2024 for more information and for the material assumptions
underpinning the production target.
7 Refer to ASX announcement “Stockman Project – Currawong and Wilga Deposits Mineral Resource Update” dated 17 January 2024
7
Aeris Resources Limited
Directors' Report
30 June 2024
FINANCIAL REVIEW
Financial Results
During the year ended 30 June 2024, the consolidated entity recorded an Adjusted EBITDA of $107.039 million, $75.025
million higher than the previous year (2023: $32.014 million). Similarly, the consolidated entity’s loss after tax of $24.258
million, presented a strong improvement from a loss after tax of $139.754 million, for the year ended 30 June 2023.
The results for year were influenced by a number of key factors, which included:
•
•
•
•
•
•
Revenue from contracts with customers was $540.020 million, compared to $612.490 million for the previous
corresponding period. This reflects the following factors:
o Tritton revenue of $272.603 million was higher than the prior corresponding period ($208.659 million) due
to higher copper production (19,749 tonnes vs 17,205 tonnes in FY2023) and higher copper price received
(A$13,365/t vs A$11,045/t);
o Cracow revenue of $147.026 million compared to $130.120 million in FY2023, due to higher gold prices
(A$3,174/oz vs A$2,698/oz), partially offset by lower gold produced (45,651oz vs 48,221oz);
o Revenue from North Queensland Operations of $96.991 million was lower than prior corresponding period
($107.698 million) due to timing of third party processing runs, offset partially by improved copper prices
realised; and
o The Jaguar operations contributed $23.38 million in revenue (compared to $166.007 million for the previous
corresponding period) prior to being put on care and maintenance in September 2023.
Cost of goods sold decreased to $504.353 million from $705.464 million in the prior corresponding period largely due
to Jaguar being placed in care and maintenance in September 2023;
Care and maintenance costs of $7.857 million, for Jaguar operations, were recognised for FY2024;
Employee separation costs amounting to $5.824 million were incurred by placing Jaguar onto care and maintenance;
A foreign exchange loss of $1.081 million was recognised for the year ended 30 June 2024 (30 June 2023: gain of
$1.969 million); and
Finance costs of $21.505 million were significantly higher when compared to $8.511 million in the prior corresponding
period, primarily due to the interest charges on the WHSP Debt Facility.
The following table contains a reconciliation of profit before income tax to EBITDA (earnings before income tax
and depreciation and amortisation) and Adjusted EBITDA.
Reconciliation of profit before income tax to EBITDA and Adjusted EBITDA:
Loss before income tax expense
Depreciation and amortisation
Finance costs
EBITDA
Care & maintenance
Separation costs
Net foreign exchange loss / (gain)
Movement in financial assets at fair value through profit or loss
Transaction expense
Impairment of assets
Adjusted EBITDA
2024
$'000
2023
$'000
(24,258)
94,632
21,505
91,879
(139,754)
150,571
8,511
19,328
7,857
5,824
1,081
398
-
(1,969)
1,375
11,580
1,700
107,039
32,014
EBITDA and adjusted EBITDA are non-IFRS earnings measures that do not have any standardised meaning prescribed by
IFRS and therefore may not be comparable to EBITDA presented by other companies. These measures, which are
unaudited, are important to management as an additional way to evaluate the consolidated entity's performance.
8
Aeris Resources Limited
Directors' Report
30 June 2024
Financial Position
At 30 June 2024, the consolidated entity had a positive net asset position of $271.788 million (30 June 2023: $266.369
million). The June 2024 net asset position for the consolidated entity was impacted by a number of key factors, including:
•
•
•
•
On 2 August the Company announced that it has entered into a $50 million WHSP Debt Facility (as at 30 June 2024
$40 million was drawn);
In November 2023, the Company undertook a $30.0 million fully underwritten equity raise, to provide general working
capital and increased financial flexibility;
Investments of $30.358 million into new mining projects, including exploration for the financial year ended 30 June
2024, compared to $59.784 million in the corresponding period; and
Working capital deficit of $33.354 million, compared to a working capital deficit in the prior year of $55.501 million,
as creditors from FY2023 were paid down in FY2024 using debt and equity funds raised.
The consolidated entity’s net cash inflow from operating activities during the financial year was $62.542 million, with net
cash outflows from investing activities of $105.891 million and net cash inflows from financing activities of $48.896 million.
Cash flows from operating activities were impacted by additional payments made during the year to reduce the balance
of trade creditors.
The Group has been able to continue to meet its working capital requirements principally as a result of positive operating
cashflows generated by the three operating mines (Tritton, Cracow and North Queensland Operations), utilisation of the
$50 million WHSP Debt Facility and the $30 million equity raise.
At 30 June 2024 $10 million of the WHSP Facility remains undrawn. The WHSP Facility has a 2-year term, expiring on 1
August 2025.
On 30 June 2024, the Company had $0.266 million undrawn on its Contingent Instrument Facility (CIF) with Australia and
New Zealand Banking Group Limited (ANZ). After year end the CIF was extended to 15 October 2024. The consolidated
entity is subject to certain financing arrangements covenants.
The Directors have reviewed the ability of the consolidated entity to continue as a going concern and, based on its cash
flow and covenant compliance forecasts for a period of 12 months from the signing of the financial statements and current
access to funding, concluded there are reasonable grounds to believe the consolidated entity will continue as a going
concern.
The Group is required to refinance and increase its extended CIF and WHSP facility before their expiry dates. Therefore,
included within the annual financial report for the year ended 30 June 2024 is an independent auditor’s report that includes
a statement on “Material uncertainty relating to going concern”. For further information, refer to Note 35 in the annual
financial report, together with the auditor's report.
SIGNIFICANT EVENTS AFTER THE BALANCE DATE
Contingent Instrument Facilities (CIF)
On 28 August 2024, the Group executed an amendment to its Contingent Instrument Facilities (CIF) with ANZ which extends
the maturity date to 15 October 2024.
Also, on 28 August, the Group executed an extension to the WHSP facility’s availability period of the undrawn commitment
from 29 August 2024 to 1 August 2025, aligning with the term of the drawn facility.
Other events
No other matter or circumstance has arisen since 30 June 2024 that has significantly affected, or may significantly affect
the consolidated entity's operations, the results of those operations, or the consolidated entity's state of affairs in future
financial years.
MATERIAL BUSINESS RISKS
Aeris prepares its business plan using est
Share your feedback
Discover