MARCH QUARTERLY REPORT PRESENTATION
Released
Released
Announcement PDF
Q3 FY25 Results
28 April 2025
Presented by: Andre Labuschagne
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”). By attending an investor presentation or
briefing, or accepting, accessing or reviewing this presentation, you
acknowledge and agree to the terms set out below.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris with the Australian Securities Exchange (“ASX”) in
connection with its continuous disclosure obligations. This presentation
does not purport to contain all of the information that an investor should
consider when making an investment decision nor does it contain all of
the information which would be required in a product disclosure
statement or prospectus prepared in accordance with the requirements
of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, Aeris has no obligation to update the information
contained in this presentation. An investment in securities is subject to
known and unknown risks, some of which are beyond the control of
Aeris. Investors should consult with their own legal, tax, business and/or
financial advisors in connection with any acquisition of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing nonIFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris believes the non-IFRS financial information and non-GAAP
financial measures provide useful information to users in measuring the
financial performance and condition of Aeris.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris and its officers. This
includes statements about market and industry trends, which are based
on interpretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “estimate”, “intend”,
“believe”, “guidance”, “should”, “could”, “may”, “will”, “predict”, “plan”
and other similar expressions.
Forward-looking statements are based on information available to Aeris
as at the date of this presentation and should not be relied upon as an
indication or guarantee of future performance. Except as required by
law or regulation (including the ASX Listing Rules), none of Aeris, its
representatives or advisers undertakes any obligation to provide any
additional or updated information whether as a result of a change in
expectations or assumptions, new information, future events or results or
otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
recent world events such as the COVID-19 pandemic and international
hostilities and associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
2
Disclaimer
NO NEW INFORMATION STATEMENT
This presentation refers to Exploration Results, estimates of Mineral
Resources and Ore Reserves contained in the Group Mineral Resource
and Ore Reserve Statement as at 31 December 2023 which was
announced on 17 June 2024 (2024 MROR Group Statement), as well as
Updated Mineral Resource Estimate of Constellation (announced on 31
March 2025 “Aeris Delivers Material Increase in Copper and Gold at
Constellation”) and prior market announcements released by Aeris, (Prior
Reports). The Prior Reports are footnote referenced in this presentation
and available from: https://www.aerisresources.com.au/investor.
Aeris confirms that it is not aware of any new information or data that
materially affects the information included in the Prior Reports and, in the
case of Exploration Results, estimates of Mineral Resources or Ore
Reserves, that all material assumptions and technical parameters
underpinning the results or estimates in the Prior Reports continue to
apply and have not materially changed. Aeris confirms that the form
and context in which the Competent Person’s findings are presented in
this document have not been materially modified from the Prior Reports.
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which Aeris has no obligation to do or to procure) or are offered or sold
pursuant to an exemption from, or in a transaction not subject to, the
registration requirements of the US Securities Act and any applicable
securities laws of any state or other jurisdiction of the United States.
3
Aeris Resources
Australian mid-tier, base and precious metals producer
Mt Colin Mine (100%)
Mine Type
FY25 Guidance
U/G Cu, Au
6 - 7kt Cu
Cracow Operations (100%)
Mine Type
U/G Au
FY25 Guidance
40 - 49koz Au
Barbara Project (100%) – Development
Mine Type
Resource1
U/G Cu, Au
45kt Cu
Jaguar Operations (100%) – Care and Maintenance
Mine Type
Resource2
North Queensland
U/G Zn, Cu, Ag, Au
455kt Zn, 97kt Cu
Cracow
Jaguar
Tritton
Stockman Project (100%) – Development
Mine Type
Resource2
Tritton Operations (100%)
U/G Zn, Cu, Au
624kt Zn, 315kt Cu
Stockman
1.
2.
Refer to ASX Announcement “Barbara Mineral Resource Update” released on 28 June 2023. MRE comprises Indicated resource of
1.98Mt at 2.0% Cu, 0.2g/t Au, 3.3g/t Ag and Inferred resource of 0.26Mt at 1.8% Cu, 0.1g/t Au, 3.5g/t Ag
See Appendix for Mineral Resource tables and ASX announcement “Group Mineral Resource and Ore Reserve Statement” released on
17 June 2024
Mine Type
FY25 Guidance
U/G Cu
21 - 25kt Cu
4
Key points for Q3 FY25
Improved group level production and strong operating cash flow
1.
2.
Improved group copper equivalent production of 10.7kt1
Tritton delivered improved production of 4.3kt Cu at AISC of
A$6.16/lb Cu
Costs well managed with reduced AISC of A$4.91/lb Cu eq
Final stockpiles at Mt Colin processed, producing 2.6kt Cu. Final
FY25 production of 5.5kt Cu and strong gold production of 4.0koz
Cash and receivables at end of quarter up to $33.6M with cash flow
from operations increasing 37% Q-on-Q to $45.4M
Continuing to progress feasibility studies on Jaguar and Stockman
Strong safety performance – no lost time injuries for the quarter
Constellation updated Mineral Resource Estimate increased
contained copper metal by 24% and contained gold metal by 29%2
Cracow continues to deliver cash flow above budget despite lower
gold production on 9.0koz and remains on track for guidance
Aeris remains on track for group copper equivalent production
guidance
Refer to ASX release “Quarterly Activities Report – March 2025”, 28 April 2025 for production detail.
CuEq = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Commodity prices: US$9,345/t Cu, US$2,861/oz Au and US$32/oz Ag
Refer to ASX announcement “Material Increase in Copper and Gold at Constellation”, dated 31 March 2025
5
Cash Flow
Strong operating cash flows funding investment into assets
March QTR Group Cash Flow (A$M)
6
17
35
(32)
(2)
(10)
26
1. OCF = Operating cash flow
(14)
(4)
22
6
YTD Cash Flow
A$ million
16
59
60
(74)
(7)
(23)
25
(19)
(14)
1. OCF = Operating cash flow
22
7
Tritton
NSW
Q3 results
Tritton production improved; no change to annual
guidance
Improved production of 4.3kt Cu at AISC of A$6.16/lb
Mining improvement project delivering increased
development, backfill and diamond drilling rates
Murrawombie Open Pit production commenced, delivering
ore to the mill and waste to cap old heap leach pads
Mill forecast to reach capacity (1.8Mtpa rate) in Q4 with
Murrawombie Pit ore
No change to annual guidance
1.
Sep 24
Dec 24
Mar 25
FY25
Qtr
Qtr
Qtr
YTD
FY25
Guidance
kt
5.0
3.9
4.3
13.2
21 - 25
Gold Produced
koz
1.5
1.1
1.4
4.0
7-9
Silver Produced
koz
43.9
35.2
45.2
124.3
200 - 240
Mining
A$M
27.4
24.9
28.1
80.4
105 - 128
Processing
A$M
7.4
7.8
7.5
22.7
29 - 36
Site G&A
A$M
5.2
6.5
6.4
18.1
21 - 25
TC/RCs
A$M
4.2
3.4
0.8
8.4
13 - 16
Product Handling
A$M
3.7
3.2
3.4
10.2
14 - 17
Sustaining Capital
A$M
11.5
14.8
13.8
40.0
51 - 63
Growth Capital
A$M
2.7
4.0
12.2
18.9
37 - 45
Exploration
A$M
0.5
0.2
0.9
1.6
1-2
Production
Summary
Unit
Copper Produced
Cost Summary
Refer to ASX release “Constellation Project Update”, 22 January 2025
9
Murrawombie Pit
Murrawombie Pit operations
Progressive mine rehabilitation of old heap leach pads underway using clean waste
rock from Murrawombie Pit
10
Constellation
Updated Mineral Resource Estimate
Long section looking west showing the March 2025
Mineral Resource and open pit shell
Updated Mineral Resource Estimate 7.6Mt of 2.01% copper and
0.66g/t gold containing 153kt copper and 161koz gold1
Represents a 24% increase in contained copper and 29% increase in
contained gold2
Indicated Resource 5.3Mt at 1.75% copper and 0.66g/t gold provides
a strong foundation for potential conversion to Ore Reserve3
Open pit resource increased by 46% to 4.7Mt at 1.9% Cu and 0.6g/t
Au4 with 3.2Mt5 of potential high-grade, primary/supergene mill feed
Constellation deposit remains open down-plunge, with strong
potential for further growth
1.
2.
3.
4.
5.
See ASX release “Aeris Delivers Material Increase in Copper and Gold at Constellation” 31 March 2025. Comprises
Indicated resource of 5.3Mt at 1.8% Cu, 0.7g/t Au, and Inferred resource of 2.3Mt at 2.6% Cu, 0.7g/t Au
Compared to previous estimate; refer to ASX release “Constellation Mineral Resource Update”, 18 August 2022
Conversion to Ore Reserve is subject to economic assessment and the application of appropriate modifying factors
Comprises Indicated resource of 4.1Mt at 1.7% Cu, 0.6g/t Au and Inferred resource of 0.6Mt at 3.5% Cu, 0.5g/t Au
Comprises Indicated resource of 2.6Mt at 2.3% Cu, 0.9g/t Au and Inferred resource of 0.6Mt at 3.5% Cu, 0.5g/t Au
subject to conversion to an Ore Reserve
11
Constellation development pathway
Potential long life mine from three stages
1. Oxide for heap leach
• 1.5Mt @ 0.6% Cu with high-grade zones (1-2% Cu)
• Starting 5m below surface
2. Supergene and primary open pit feed to Tritton mill:
• 3.2Mt at 2.5% Cu and 0.7g/t Au, starts 50m below surface
• Potential significant contribution to gold production with
contained Au metal of 91koz
3. Underground grades of +2%
• 1.2Mt @ 2.1% Cu and 0.8g/t Au (Indicated)
• 1.7Mt @ 2.3% Cu and 0.7g/t Au (Inferred)
• Development to be funded from open pit operations
March 2025 Constellation Mineral Resource
Mining
Method
Cu
(%)
Au
(g/t)
Ag
(g/t)
Cu
metal
(kt)
Au
metal
(koz)
Ag
metal
(koz)
$18
1,500
0.6
0.2
0.9
9
9
46
$59
2,600
2.3
0.9
3.5
60
73
294
$59
600
3.5
0.5
3.1
20
9
55
4,100
1.7
0.6
2.6
69
82
341
600
3.5
0.5
3.1
20
9
55
Total
4,700
1.9
0.6
2.6
88
91
396
Indicated
1,200
2.1
0.8
3.1
25
31
121
1,700
2.3
0.7
1.6
40
39
92
Total
2,900
2.2
0.7
2.3
65
69
212
Indicated
5,300
1.8
0.7
2.7
94
112
462
2,300
2.6
0.7
2.0
60
48
147
7,600
2.0
0.7
2.5
153
161
608
Oxide
Indicated
OPEN PIT
Supergene/Primary Indicated
(OP)
Supergene/Primary Inferred
Various
Total
(UG)
Total
(OP & UG)
Primary
Primary
Inferred
Inferred
Inferred
Total
Refer to ASX release “Aeris Delivers Material Increase in Copper and Gold at Constellation” 31 March 2025
1. Environmental Impact Statement
Cut-off
($/t) NSR
Indicated
Total
(OP)
Development plan
• EIS1 lodged with regulator – expect approval Q2 FY26
• Feasibility study and Maiden Ore Reserve targeted Q2 FY26
• Investigating larger open pit operation with potential to delay
capital associated with underground development
• High gold recoveries into concentrate to improve economics
• Potential for Murrawombie Pit contractor to transition to
Constellation in early CY26 to commence early works
Tonnes
(kt)
Cu Mineralisation Resource
Category
Type
Various
$108
Various
12
Cracow
Queensland
Q3 results
Operation generating strong cash flow at current gold
price
Gold production slightly lower than plan producing 9.0koz
at increased AISC of $3,473/oz
Sustaining capital spend includes investment in the
secondary cyclone project to improve recoveries
Sep 24
Dec 24
Mar 25
FY25
Qtr
Qtr
Qtr
YTD
FY25
Guidance
koz
12.9
12.2
9.0
34.1
40 - 49
koz
12.6
12.4
9.4
34.5
Production
Summary
Unit
Gold Produced
Gold Sold
Cost Summary
Cracow generating free cash flow significantly above
budget at current gold prices
Mining
A$M
14.0
14.5
16.4
44.9
57 - 70
Processing
A$M
6.5
6.6
6.8
19.9
24 - 30
Secondary cyclone circuit being commissioned – forecast
to improve gold recoveries by ~1%
Site G&A
A$M
2.7
2.8
2.7
8.1
11 - 13
Sustaining Capital
A$M
3.6
4.6
3.5
11.8
13 - 16
Growth Capital
A$M
-
-
-
-
0-1
Exploration
A$M
2.0
1.2
0.9
4.1
3-4
Remains on track to achieve annual production guidance
14
Mt Colin
North Queensland
Q3 results
Final processing completed, Mt Colin now on care
and maintenance
Final stockpiled material processing was completed and Mt Colin
operations moved into care and maintenance
2.6kt Cu produced at AISC of A$1.64/lb
Sep 24
Dec 24
Mar 25
FY25
Qtr
Qtr
Qtr
YTD
FY25
Guidance
kt
1.0
1.9
2.6
5.5
6-7
koz
0.8
1.8
1.5
4.0
3-4
Mining
A$M
7.6
5.5
-
13.2
10 - 12
Processing
A$M
7.7
4.8
6.9
19.3
16 - 19
Site G&A
A$M
1.3
1.6
0.5
3.4
3-4
TC/RCs
A$M
0.7
1.3
0.6
2.6
4-5
Product Handling
A$M
0.8
1.6
2.1
4.5
5-6
Sustaining Capital
A$M
-
-
0.3
0.3
0
Growth
A$M
0.2
0.2
-
0.4
1-3
Exploration
A$M
0.1
0.0
-
0.1
0-1
Production
Summary
Unit
Copper Produced
Gold Produced
Cost Summary
FY25 production of 5.5kt Cu and 4koz Au
Higher gold production improved overall Group Cu eq production
Rehabilitation activities commenced including removal of surface
infrastructure and reprofiling/seeding of areas no longer in use
Options for divestment of the North Queensland assets including
Barbara are being considered
16
Jaguar
Western Australia
Q3 activities
Advancing restart studies to feasibility level
Operation on care and maintenance with costs of $2.9M for the
quarter
Feasibility study continuing
Focus on technical review of ventilation and ground control
requirements
Infrastructure review of power supply and distribution options to
meet revised mine design requirements
Several prospective VMS areas identified by gravity anomalies,
surface alteration and geochemical pathfinders
18
Stockman Project
Victoria
Q3 activities
Albion process feasibility study progressing
Albion leach metallurgical test work underway, due for completion in
Q4
Further investigation of off-mine site locations for the downstream ore
processing facility with access to power, water and rail infrastructure
Reviewing options for metal products and qualities that can be
produced and impacts on final processing flowsheet design
Concentrator flow sheet design for Albion Process
20
Corporate
Closing cash and receivables of $33.6 million with cash of $22.4 million
Sep
Dec
Mar
2024
2024
2025
QTR
QTR
QTR
25.5
26.4
22.4
Mt Colin
3.6
0.3
-
Cracow
-
0.1
-
Tritton
10.0
6.2
11.2
39.1
33.0
33.6
(A$ Million)
$10M cash backed against ANZ guarantee facility during the quarter
Closing cash
Receivables
Total restricted cash $28.9 million at end of quarter
Cash flow from operations increasing 37% quarter on quarter to $45.4
million
Useable Cash and Receivables
Debt unchanged with $40 million drawn on the WHSP facility
21
Aeris Resources
Australian mid-tier, base and precious metals
producer
2 producing operations
3 development / re-start projects
Highly prospective for further discoveries
FY25 production guidance of 40-48kt Cu eq1
Substantial copper metal inventory
Excellent platform for growth
1.
Copper Equivalent (CuEq) values – Requirements under the JORC Code
Formula: CuEq = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed commodity prices are US$9,620/t Cu, US$2,341/oz Au and US$29.43/oz Ag
Aeris Resources confirms that it is the Company’s opinion that all the elements included in the metal equivalents
calculation have a reasonable potential to be recovered and sold.
22
Appendix
FY25 guidance
Group
Production
Copper
Gold
Silver
Copper equivalent1
Operating Costs
Mining
Processing
Site G&A
TC/RCs
Product handling
1.
2.
kt
koz
koz
kt
FY25
Guidance
FY24
Actual
27 – 32
50 - 62
200 - 240
40 - 48
27.2
55.3
240.4
42.0
Care and maintenance2
$M
$M
$M
$M
$M
$M
172 - 210
69 - 85
35 - 42
17 - 21
19 - 23
3-5
204.6
91.1
44.6
25.4
22.4
n/a
Capital Costs
Sustaining
Growth
Exploration
Projects
$M
$M
$M
$M
64 - 79
38 - 49
5-8
1-2
74.7
21.5
8.8
2.5
Tritton
FY25
Guidance
FY24
Actual
Production
Copper
Gold
Silver
kt
koz
koz
21 - 25
7-9
200 - 240
19.7
4.9
156
Operating Costs
Mining
Processing
Site G&A
TC/RCs
Product handling
$M
$M
$M
$M
$M
105 - 128
29 - 36
21 - 25
13 - 16
14 - 17
104.9
30.7
19.9
18.3
14.8
Capital Costs
Sustaining
Growth
Exploration
$M
$M
$M
51 - 63
37 - 45
1 -2
57.2
5.4
1.8
Copper Equivalent (CuEq) values – Requirements under the JORC Code
Formula: CuEq = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed commodity prices are US$9,620/t Cu, US$2,341/oz Au and US$29.43/oz Ag
Aeris Resources confirms that it is the Company’s opinion that all the elements included in the metal equivalents
calculation have a reasonable potential to be recovered and sold.
Includes Jaguar and Mt Colin post completion of mining
24
FY25 guidance
Cracow
FY25
Guidance
FY24
Actual
Production
Gold
koz
40 - 49
45.7
Operating Costs
Mining
Processing
Site G&A
$M
$M
$M
57 - 70
24 - 30
11 - 13
51.3
25.6
11.7
Capital Costs
Sustaining
Growth
Exploration
$M
$M
$M
13 - 16
0-1
3-4
14.8
16.0
4.9
North Queensland
FY25
Guidance
FY24
Actual
Production
Copper
Gold
kt
koz
6 -7
3-4
6.8
4.3
Operating Costs
Mining
Processing
Site G&A
TC/RCs
Product handling
$M
$M
$M
$M
$M
10 - 12
16 - 19
3-4
4-5
5-6
36.7
25.2
5.5
5.0
5.5
Capital Costs
Sustaining
Growth
Exploration
$M
$M
$M
0-0
1-3
0-1
(0.1)
0.0
0.9
25
Group Mineral Resources
PROJECT
CATEGORY
TONNES (‘000)
Base Metals
Tritton
Jaguar
North Queensland
CONTAINED METAL
% Cu
% Zn
g/t Au
g/t Ag
kt Cu
kt Zn
koz Au
koz Ag
Measured
1,300
1.0
-
0.1
3
13
-
4
120
Indicated
11,200
1.4
-
0.3
4
145
-
91
1,280
Inferred
10,000
1.7
-
0.3
4
183
-
137
1,440
Total
22,500
1.5
-
0.3
4
342
-
232
2,840
Measured
500
1.6
5.0
0.3
63
8
25
4
1,030
Indicated
3,400
1.3
7.6
0.5
75
45
256
51
8,170
Inferred
4,000
1.2
4.0
0.5
56
47
161
68
7,270
Total
7,900
1.3
5.6
0.5
65
100
442
123
16,460
Measured
300
2.8
-
0.6
-
9
-
6
-
Indicated
2,200
2.0
-
0.2
3
44
-
13
210
Inferred
600
2.0
-
0.1
2
11
-
2
30
3,100
2.1
-
0.2
2
65
-
21
240
Measured
-
-
-
-
-
-
-
-
-
Indicated
13,400
2.1
4.2
1.0
37
288
561
420
16,000
Inferred
2,400
1.1
2.6
1.5
32
27
62
117
2,440
Total
15,800
2.0
4.0
1.1
36
315
623
537
18,450
49,300
1.7
2.2
0.6
24
882
1,065
913
37,990
Measured
400
-
-
3.9
3
-
-
52
39
Indicated
2,100
-
-
3.4
4
-
-
259
249
Inferred
2,400
-
-
2.9
4
-
-
208
376
Grand Total
4,900
-
-
3.4
4
-
-
519
664
Total
Stockman
GRADE
Grand Total
GOLD
Cracow
As at December 2023. Refer to ASX Announcement “Group Mineral Resource And Ore Reserve Statement” dated 17 June 2024
26
Group Ore Reserves
PROJECT
CATEGORY
TONNES (‘000)
Base Metals
Tritton
Jaguar
North Queensland
Stockman
GRADE
CONTAINED METAL
% Cu
% Zn
g/t Au
g/t Ag
kt Cu
kt Zn
koz Au
koz Ag
5
1.8
-
-
-
0.1
-
-
-
Probable
2,790
1.5
-
0.3
5
41
-
23
451
Total
2,790
1.5
-
0.3
5
41
-
23
451
Proved
90
1.4
8.7
0.8
74
1
8
2
225
Probable
1,060
1.4
8.3
0.6
45
16
87
21
1,534
Total
1,150
1.5
8.3
0.6
48
17
95
23
1,759
Proved
90
2.4
-
0.5
-
2
-
1
-
Probable
80
2.1
-
0.4
-
2
-
1
-
Total
170
2.3
-
0.4
-
2
-
2
-
-
-
-
-
-
-
-
-
Proved
Proved
Probable
9,640
1.9
4.3
1.0
36
183
413
318
11,409
Total
9,640
1.9
4.3
1.0
36
183
413
318
11,409
13,750
1.8
3.7
0.8
30
245
508
367
13,619
Proved
100
-
-
3.5
-
-
-
12
-
Probable
250
-
-
3.4
-
-
-
28
-
Grand Total
360
-
-
3.4
-
-
-
39
-
Grand Total
Gold
Cracow
As at December 2023. Refer to ASX Announcement “Group Mineral Resource And Ore Reserve Statement” dated 17 June 2024
27
Share your feedback
Discover