2025 AGM PRESENTATION
Released
Released
Announcement PDF
AGM Presentation
21 November 2025
Presented by: Andre Labuschagne
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”). By attending an investor presentation or
briefing, or accepting, accessing or reviewing this presentation, you
acknowledge and agree to the terms set out below.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris with the Australian Securities Exchange (“ASX”) in
connection with its continuous disclosure obligations. This presentation
does not purport to contain all of the information that an investor should
consider when making an investment decision nor does it contain all of
the information which would be required in a product disclosure
statement or prospectus prepared in accordance with the requirements
of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, Aeris has no obligation to update the information
contained in this presentation. An investment in securities is subject to
known and unknown risks, some of which are beyond the control of
Aeris. Investors should consult with their own legal, tax, business and/or
financial advisors in connection with any acquisition of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing non-
IFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris believes the non-IFRS financial information and non-GAAP
financial measures provide useful information to users in measuring the
financial performance and condition of Aeris.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris and its officers. This
includes statements about market and industry trends, which are based
on interpretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “estimate”, “intend”,
“believe”, “guidance”, “should”, “could”, “may”, “will”, “predict”, “plan”
and other similar expressions.
Forward-looking statements are based on information available to Aeris
as at the date of this presentation and should not be relied upon as an
indication or guarantee of future performance. Except as required by
law or regulation (including the ASX Listing Rules), none of Aeris, its
representatives or advisers undertakes any obligation to provide any
additional or updated information whether as a result of a change in
expectations or assumptions, new information, future events or results or
otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
recent world events such as the COVID-19 pandemic and international
hostilities and associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which Aeris has no obligation to do or to procure) or are offered or sold
pursuant to an exemption from, or in a transaction not subject to, the
registration requirements of the US Securities Act and any applicable
securities laws of any state or other jurisdiction of the United States.
2
Disclaimer
PRODUCTION TARGETS CAUTIONARY STATEMENT
The Ore Reserve and Mineral Resource estimates underpinning the
Stockman Production Targets were prepared by a Competent Person in
accordance with the JORC Code 2012.
The material assumptions on which the Production Targets are based is
set out in Appendix C of the ASX Release of Aeris dated 28 April 2022
“Transformational Acquisition and Capital Raise” (Initial Report). Aeris
confirms that all material assumptions underpinning the production
targets in the Initial Report continue to apply and have not materially
changed.
The modifying factors used in the estimation of the Ore Reserve were
also applied to the Mineral Resources in the generation of the
Production Targets.
3
Australian mid-tier, base and precious metals producer
Aeris Resources
2 producing operations (FY26: 40-49kt copper eq.)1
3 development projects
Investing in exploration
Substantial copper production and metal inventory
Excellent platform for growth
4
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Aeris confirms that it is the
Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to
be recovered and sold.
1. As at 18 November 2025
2. Cash at 30 Sep 2025 plus net placement proceeds less repayment of $40M WHSP term facility and fees
3. As at 30 June 2025
Corporate overview
5
CAPITALISATION
Market capitalisation1 $488 million
Cash2 $62 million
Debt -
Tax Losses3 $434 million
Michele
Muscillo
Non-Executive
Director
Colin
Moorhead
Non-Executive
Director
Robert Millner
Non-Executive
Director
Senior Executives
Board of Directors
Andre
Labuschagne
Executive
Chairman
MAJOR SHAREHOLDERS
Washington H. Soul Pattinson 26.4%
Tudor Court 7.1%
AIS SHARE PRICE
BROKER COVERAGE
Paul Harris
COO
Cameron Schubert
CTO
Larnie Roberts
CPO
Dane van
Heerden
CFO
$0.00
$0.10
$0.20
$0.30
$0.40
$0.50
$0.60
$0.70
Brad Cox
EGM Exploration
Equity raise overview
6
Placement completed raising $80 million gross proceeds
SPP underway, targeting $10 million
Use of proceeds:
Repayment of WHSP debt (done)
• Additional exploration drilling at Cracow
• Bring forward early works at Constellation into FY26 to de-risk
development
• Resource extension drilling at Tritton
• General working capital
Strong balance sheet with no debt
SPP Event Date
Record Date for SPP Offer
7.00pm Thursday, 30
October 2025
Closing date of SPP
5.00pm Tuesday, 2
December 2025
Announcement of results of SPP Friday, 5 December 2025
Allotment and issue of New Shares under the SPP
Before 12:00pm, Tuesday,
9 December 2025
CASH AND RECEIVABLES $22.7m
$49.5 MILLION
Net Profit $69.5m
$45.2 MILLION
FY25
Snapshot
INCREASED REVENUE $37m
$577.1 MILLION
$160.5
Capital investment
$104.9 MILLION
Results compared to FY24
42.1kt
Cu produced
FY24
WITHIN GUIDANCE
24.9kt
55.2koz
Cu eq
Au produced
185.2kozAg produced
Lower production offset by increased pricing
$2m
MILLION
INCREASED EBITDA $68.6m
Down 2.3kt
Down 55koz
Down 0.1koz
Exploration
$18-23 MILLION
Starting cash and receivables2
$49.5 MILLION
FY26 Guidance
Mine operating costs
MILLION
Sustaining capital
$57-70 MILLION
Growth capital
MILLION
Compared to FY25 results
40-49kt
Cu produced
24-29kt
44-56koz
Cu eq1
Au produced
240-293koz Ag produced
$302-369
$65-80
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Aeris confirms that it is the Company’s opinion that all the elements included in the metal equivalents calculation have reasonable potential to be recovered
and sold.
2. Unaudited
9
Aeris strategy for FY26
9
Realise
value for
shareholders
01
Sell non-core assets
02 Divesting North Queensland
exploration assets for total
consideration up to $15.5M1
• Completion expected Dec 2025
Operational Delivery
Tritton
• Murrawombie Pit
• Constellation on time
• Resource extension
• LOM
Cracow
• Golden Plateau
• Resource extension
• LOM
05
Growth
• Focus on life extensions
through greenfield exploration
• Consider external
opportunities
Balance Sheet
06
Repay debt by August 26
Assets sales
Consider hedging strategy
Unlock Stockman
04
Finalise Albion test work
• Update study Dec
• Concept study on acid
production
• Find partner to invest to Final FS
03 Jaguar strategy
Focus on +10 year life
• Reduce care and maintenance
• Test base metals targets
• Potential to JV gold
1. Refer to ASX release “Agreement to Divest North Queensland Copper Assets”, 27 October 2025
New South Wales
Tritton
11
1. Refer to Appendix for categories of the Mineral Resource; see also ASX announcements "Group Mineral Resource and Ore
Reserve Statement" dated 22 July 2025.
2. To midpoint of guidance
Strategic, cornerstone asset
Tritton
Strategic location in the Cobar region of NSW
~450kt copper produced since operations began in 2005 and over
300kt still in Resource1
2,330km2 prospective tenement package
FY26 guidance of 24 – 29kt Cu, a 37% improvement on FY252
Excess mill capacity longer term – ability to expand copper output
with new mines and regional deposits
Increasing Tritton production
Operational performance
FY26 guidance of 24 – 29kt,up 37%1 on previous year
Stockpiled ore from Murrawombie Pit will enable mill to run at 2Mtpa
rate2 (above nameplate capacity)
Sustaining material improvements in key production enablers in FY26
Potential for additional production from high grade Avoca Tank
extensions to offset lower grade open pit ore and further increase
Cu tonnes
Prioritising Constellation project development to maintain higher
copper production in future years
12
1. To midpoint of guidance
2. In July 25 and H2 FY26
0
5
10
15
20
25
30
FY23 FY24 FY25 FY26
Guidance
Cu
Produced
(kt)
Murrawombie Pit
Murrawombie Pit ore to provide approx. 35% FY26 mill feed
Murrawombie Pit Stage 1 ore processing complete and Stage 2 waste
stripping underway to deliver ore in Jan 2026
Waste from cut back used to concurrently cap old heap leach pads,
saving c.$8M rehabilitation costs
High open pit mining rates in the second half of the year result in an
ore stockpile of over 900kt to be processed in FY27
13
Waste stripping in first half of year with ore delivery in
second half
1. Chart is provided to provide a visual representation of the proportion of ore mined from open pit and underground sources
and should not be considered guidance
UG Open Pit Mill Capacity
Tritton Mined Ore1
14
Potential long-life mine to commence in FY27
Constellation
Large Mineral Resource defined: 7.6Mt of 2.01% Cu and 0.66g/t Au
containing 153kt copper and 161koz gold1
Maiden Ore Reserve declared for open pit material: 2.3Mt at 2.0%
Cu, 0.6g/t Au2
Reserve excludes high-grade Inferred resource within the pit shell:
0.6Mt at 3.2% Cu, 0.5g/t Au
Ore Reserve supports a 5-7 year open pit mine life, with studies
underway on a potential underground operation
Major capital spend to start in FY27 following EIS and mining license
approval, expected in Q3 FY26
1. See ASX release “Aeris Delivers Material Increase in Copper and Gold at Constellation” 31 March 2025. Comprises
Indicated resource of 5.3Mt at 1.8% Cu, 0.7g/t Au, and Inferred resource of 2.3Mt at 2.6% Cu, 0.7g/t Au
2. Probable Reserve. Refer to ASX release “Maiden Open Pit Ore Reserve Estimate for Constellation Project”, 28 October
2025.
Ore Reserve pit shells showing Indicated and Inferred Resource
from the March 2025 MRE
Ramping up drilling at Tritton
Extend mine lives
Strong focus on Mineral Resource growth at multiple deposits
~80,000m underground diamond drilling planned in FY26
Target depth extensions at Avoca Tank, Budgerygar and Tritton
15
-
20,000
40,000
60,000
80,000
100,000
FY20 FY21 FY22 FY23 FY24 FY25 FY26F
Underground Drill Metres
16
16
All current ore sources still open at depth
Mine Life Growth
Cracow
Queensland
18
High margin gold mine with long operating history
Cracow
Underground gold mine in continuous production since 2004
Conventional crush and grind CIP processing plant
Produced +1.7Moz gold since first production in 2004
FY26 guidance 36 – 46koz Au
Strong history of resource replacement through exploration
1. See each annual Group Mineral Resource and Ore Reserve Statement within the Annual Report for Aeris
Resources Ltd on the company’s website. Details for individual categories of mineralisation are also provided.
Also refer to ASX announcement "Group Mineral Resource and Ore Reserve Statement" dated 22 July 2025
-
100
200
300
400
500
600
700
800
FY21 FY22 FY23 FY24 FY25
koz
Au
Cracow production and Resources1 under Aeris ownership
Annual Production Cumulative Production Resources
Golden Plateau
Exploration
19
1. Vigar, A.J, 1994 Grade Modelling Reconciled to Open Pit Mining at the Golden Plateau Mine, Cracow,
Queensland. AusIMM Student Conference – Pathway to Industry page 49-54.
2. Refer to ASX announcement "Quarterly Report – June 2025"
3. Refer to ASX announcement "Group Mineral Resource and Ore Reserve Statement“ 17 June 2024."
~850koz produced via open-pit and underground (~260m
below surface)
Open-pit proportion 190koz1 from remnants to ~120m below
surface)
Investigating large, lower grade mineralised halo around old
stoping areas below the Golden Plateau pit2
A majority of the Mineral Resource3 positioned south and west
of the open-pit
Key exploration target for FY26
Greenfield targets
Exploration
20
Targeting a +1Moz Western Vein Field analogue at the
Southern Vein Field
Airborne magnetic survey completed to aid finalisation of drill
targets under 500m cover
Drilling planned for FY26 to test geology model and identify
prospective structures (limited historical drilling)
Western Frontier is an interpreted structural corridor approx.
1km west of current UG infrastructure within existing mining
lease boundary
Potential to also drill Western Frontier structure in FY26
targeting multiple +100koz shoots
Projects
Jaguar
Stockman
Reducing holding costs while undertaking low cost,
high return exploration
Revised Jaguar strategy
Strategy is to focus on +10 year life operations
Pausing feasibility study while further exploration is undertaken
8 high priority base metals drill targets to be tested
$3.1 million exploration program planned for FY26
Numerous gold targets – investigating options to joint venture gold
rights to advance exploration while minimising Aeris spend
22
23
1. Thunderbox Reported Mineral Resource at 31 March 2025. Refer to Northern Star Resources ASX Announcement "Resources,
Reserves and Exploration Update" 15 May 2025.
2. King Of The Hills Reported Mineral Resource at 30th April 2025. Refer to Vault Minerals ASX Announcement "KOTH OP Ore
Reserve accelerates Leonora Plant Upgrade" 26 May 2025.
Highly prospective for gold mineralisation
Jaguar
Very significant gold endowment in the region
4.7Moz Thunderbox Operation1 located 8km north of the Jaguar
tenements, 3.5Moz King of the Hills mine2 located 10km west
Jaguar tenements highly prospective but had limited exploration
Several advanced prospects including Heather Bore; a 2km long,
shallow gold anomaly
Consider partnering to unlock long term value
Unlock Stockman
High-grade Ore Reserve of 9.6Mt at 1.9% Cu, 4.3% Zn, 1.0g/t Au,
36g/t Ag1
Multiple processing routes assessed along with detailed cost
estimates
Potential to create a long life, high value operation
Considering options to bring on a strategic partner to assist with
funding and ongoing technical work
Holding costs minimal
24
1. Probable Ore Reserve. Refer to ASX announcement "Group Mineral Resource and Ore Reserve Statement" dated
22 July 2025
Currawong mine plan
Australian mid-tier, base and precious metals
producer
Summary
2 producing operations (FY26: 40-49kt copper eq.)1
3 development projects
Investing in exploration
Substantial copper production and metal inventory
Excellent platform for growth
25
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. Aeris confirms that it is the
Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to
be recovered and sold.
Appendix
Group Ore Reserves
27
Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22 July 2025.
Excludes Constellation open pit Probable Ore Reserve of 2.3Mt at 2.0% Cu, 0.6g/t Au, 3.0g/t Ag. Refer to ASX release “Maiden Open Pit Ore Reserve Estimate for Constellation Project”, 28 October 2025.
BASE METALS Category Tonnes
(‘000)
Grade Contained Metal
Asset Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Tritton Proved 100 0.7 - - - 1 - - -
Probable 2,280 1.6 - 0.3 6 36 - 23 444
Total 2,380 1.5 - 0.3 6 37 - 23 444
North Qld Proved - - -- - -- - - - -
Probable 1,600 1.9 - 0.2 - 30 - 9 -
Total 1,600 1.9 - 0.2 - 30 - 9 -
Stockman Proved - - - - - - - - -
Probable 9,640 1.9 4.3 1.0 37 183 413 318 11,409
Total 9,640 1.9 4.3 1.0 37 183 413 318 11,409
Total Total Proved 100 0.7 - - - 1 - - -
Total Probable 13,530 1.8 3.1 0.8 27 249 413 350 11,853
Grand Total 13,630 1.8 3.0 0.8 27 249 413 350 11,853
GOLD Category Tonnes (‘000) Grade Contained Metal
Asset Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Cracow Proved 145 - - 3.0 - - - 14 -
Probable 360 - - 2.9 - - - 33 -
Total Grand Total 505 - - 2.9 - - - 48 -
(At 31 Dec 2024)
Group Mineral Resources
28
BASE METALS Category Tonnes
(Mt)
Grade Contained Metal
Project Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz)
Tritton Measured 0.4 1.0 - 0.1 2 4 - 1 30
Indicated 11.0 1.6 - 0.4 4 179 - 158 1,270
Inferred 7.5 1.8 - 0.3 4 131 - 73 840
Total 18.9 1.7 - 0.4 4 314 - 233 2,140
Jaguar Measured 0.5 1.6 5.0 0.3 63 8 25 4 1,030
Indicated 4.2 1.4 6.4 0.4 67 59 268 53 8,950
Inferred 2.0 1.1 6.5 1.0 83 23 128 62 5,260
Total 6.6 1.4 6.3 0.6 71 90 422 119 15,240
North Qld Measured 0.2 2.3 - 0.5 0 5 - 3 0
Indicated 2.4 2.0 - 0.2 3 47 - 16 210
Inferred 0.6 2.0 - 0.1 2 12 - 2 30
Total 3.2 2.0 - 0.2 2 64 - 21 240
Stockman Measured - - - - 0 - - - 0
Indicated 13.4 2.1 4.2 1.0 37 288 561 420 16,000
Inferred 2.4 1.1 2.6 1.5 32 27 62 117 2,440
Total 15.8 2.0 4.0 1.1 36 315 624 537 18,450
Total Total Measured 1.1 1.5 2.3 0.2 29 17 25 9 1,060
Total Indicated 31.0 1.9 2.7 0.6 27 574 829 647 26,440
Total Inferred 12.4 1.6 1.5 0.6 22 193 191 254 8,580
Grand Total 44.5 1.8 2.3 0.6 25 784 1,045 910 36,070
GOLD Category Tonnes
(Mt)
Grade Contained Metal
Asset Au (g/t) Ag (g/t) Au (koz) Ag (koz)
Cracow Measured 0.4 4.0 3 46 37
Indicated 1.9 3.6 4 224 229
Inferred 2.1 2.6 4 181 305
Total Grand Total 4.4 3.2 4 452 571
Refer to ASX announcement “Group Mineral Resource and Ore Reserve Statement” dated 22 July 2025
(At 31 Dec 2024)
29
29
1. Cu Eq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t)
Assumed average commodity prices FY26: US$9,429/t Cu, US$3,241/oz Au, US$35/oz Ag. FY25 as detailed in
quarterly reports. Aeris confirms that it is the Company’s opinion that all the elements included in the metal
equivalents calculation have a reasonable potential to be recovered and sold.
2. Excludes royalties
FY26 Guidance
Group FY26 Guidance FY25 Actual
Production
Copper kt 24 - 29 24.9
Gold koz 44 - 56 55.2
Silver koz 240 - 293 185.2
Copper equivalent1
kt 40 - 49 42.1
Operating Costs
Mine operations2
$M 302 - 369 341.4
Care and maintenance $M 6 - 7 10.8
Corporate $M 21 - 26 26.0
Capital Costs
Sustaining $M 57 - 70 69.4
Growth & projects $M 65 - 80 38.6
Exploration $M 18 - 23 9.8
Tritton FY26 Guidance FY25 Actual
Production
Copper kt 24 - 29 19.4
Gold koz 8 - 10 6.1
Silver koz 215 - 263 185.2
Operating Costs
Mine operations $M 207 - 253 198.6
Capital Costs
Sustaining $M 39 - 48 52.5
Growth $M 58 - 71 35.5
Exploration $M 10 - 12 2.9
Cracow FY26 Guidance FY25 Actual
Production
Gold koz 36 - 46 45.1
Operating Costs
Mine operations $M 95 - 116 99.4
Capital Costs
Sustaining $M 18 - 22 16.7
Growth $M 6 - 8 0.0
Exploration $M 5 - 7 5.3