STOCKMAN FEASIBILITY STUDY UPDATE
Released
Released
Announcement PDF
24 January 2024
ASX/MEDIA RELEASE
STOCKMAN FEASIBILITY STUDY UPDATE
• Feasibility Study well advanced:
― Currawong MRE upgrade 1 enables simplification of mine plan and
reduction in up-front capital – 12 years of mine life from Currawong only,
producing up to 850ktpa ore
― Potential to extend mine life from Wilga, Eureka and Bigfoot deposits
― All primary approvals for mining and onsite processing in place with strong
community support
― Functional level designs for site and camp infrastructure completed
― Complex metallurgy impacts capital, operating costs and metal
recoveries – Albion ProcessTM 2 identified as potential solution
• Updating processing flowsheet to include Albion Process:
― Desktop study with technology vendor shows potential step-change in
metal recoveries – Albion Process utilises proven oxidative leaching
technology, with a number of plants globally producing copper, zinc and
gold products
― Move to 2-stage processing strategy:
1. Produce
high-grade
Cu
concentrate
and
polymetallic
(Cu/Zn/Au/Ag) bulk concentrate onsite - reduces site processing
plant footprint and on-site power consumption
2. Bulk concentrate to be further processed at a regional offsite
location utilising the Albion Process, producing separate Cu, Zn and
precious metal saleable products
• Metallurgical test work and engineering design for Albion Process to
commence
• Feasibility Study targeted for completion in second half of 2024
1 See ASX Announcement “Stockman Project – Currawong and Wilga Deposits Mineral Resource Update” dated 17
January 2024
2 The Albion Process is a registered trademark and owned by Glencore Technology
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane, 4000
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
Aeris Resources Limited (ASX: AIS) (Aeris or the Company) is pleased to announce
this update on the Feasibility Study underway on its 100% owned Stockman Project
(Stockman or the Project) in Victoria.
Aeris’ Executive Chairman, Andre Labuschagne said “We are very excited with the
potential of the Stockman Project. Since acquiring Stockman as part of the Round
Oak acquisition in July 2022, our technical teams have materially advanced the
Project.”
"The recently updated Mineral Resource estimate for the Currawong deposit has
enabled us to revise the mine plan. The plan is to now mine only Currawong for the
first 12 years of operations, at a rate of up to 850kt per annum of ore. Mining
Currawong simplifies the operation compared to the previous plan of mining
Currawong and Wilga concurrently, whilst also reducing up-front capital.”
“The complex metallurgy of the Stockman deposits impacts on metal recoveries
and processing plant capital and operating costs. This has been a key factor why
Stockman hasn’t yet been developed. We challenged our team to develop a
processing flowsheet to address these issues, and after exploring multiple
configurations, we are confident that a way forward has been identified.”
“Our new processing strategy will involve two stages. The mine site processing plant
will have a simplified flowsheet producing a high-grade copper concentrate and a
bulk concentrate containing copper, zinc, gold and silver. The copper concentrate
will be transported to market whilst the bulk concentrate will be trucked to a
regional offsite processing facility.”
“The offsite processing facility will utilise ultrafine grinding and the Albion Process to
produce separate copper, zinc and precious metals saleable products. The
addition of the Albion Process has potential to provide a step-change in metal
recoveries and materially improve project economics. An initial desktop study has
been completed with the technology vendor, utilising the recent Feasibility Study
and metallurgical testwork results. A number of potential locations for the offsite
processing facility have already been identified.”
“The Albion Process technology is in operation at multiple locations globally,
processing copper, zinc and precious metals. This is well established, oxidative
leaching technology proven to treat a wide range of concentrates with high metal
recoveries.”
“Opportunities to further improve other aspects of the operations, its ESG footprint
and project economics have also been identified, which we are progressing.”
“The Feasibility Study will now focus on verification of the metallurgical, flowsheet
and economic assumptions associated with incorporating the Albion Process into
the Project. We are targeting to finalise the Feasibility Study in the second half of
2024.”
2|P a g e
Project History
The Stockman Project was acquired by Round Oak Minerals Pty Ltd (ROM) from
Independence Group NL (IGO) in December 2017. Aeris subsequently acquired the
ROM businesses, including the Stockman Project, in July 2022.
The Project is located near the alpine town of Omeo, 19km east of Benambra in the
East Gippsland region of Victoria, and approximately 300km northeast of
Melbourne.
In 2019, ROM completed a Selection Phase Study (SPS), consolidating and
advancing earlier studies undertaken by previous owners of the Project, IGO and
Jabiru Metals Limited. The ROM SPS comprised the development of two
underground mines (Wilga and Currawong), mining approximately 1Mtpa, and an
on-site flotation processing plant producing copper and zinc concentrates with
precious metal by-products. Results from the SPS provided the basis for ROM to
commence a Definition Phase Study (DPS).
Project Status
Since acquiring the Stockman Project, Aeris has progressed the study work, taking
many workstreams to a Feasibility Study level. The next stage of the study work
involves incorporating the flowsheet changes, including the Albion Process, into the
proposed onsite and offsite processing facilities. The table below outlines the status
of the key workstreams of the Feasibility Study.
Feasibility Study Workstreams:
Status
Geology and Resource Definition
Geotechnical
UG Mining and Mine Infrastructure
Metallurgy/Processing
Crushing and screening
Grinding and flotation
Thickening, dewatering, tails pumping
Infrastructure and Services
Power
Water
Tails deposition/storage
3|P a g e
Other facilities (e.g. roads, camp, paste fill, magazine)
Concentrate Transport and Logistics
Environment and Community
Permitting
Vegetation clearing offsets
Regulatory / council engagement
ESG / carbon footprint
Community engagement
Project Development Strategy
Meets feasibility-level maturity
Requires further study work
Geology and Mineral Resources
New Mineral Resource estimates (MRE) 3 have been prepared for the Currawong
and Wilga deposits – see Tables 1 and 2 below.
Table 1 – Updated Mineral Resource estimates for Currawong and Wilga deposits
Tonnes
Deposit
Currawong
Category
('000)
Grade
Contained Metal
Cu
Zn
Au
Ag
kt
kt
koz
koz
(%)
(%)
(g/t)
(g/t)
Cu
Zn
Au
Ag
-
-
-
-
-
-
-
-
Measured
-
Indicated
10,200
2.15
4.06
1.14
39.6
219
415
374
13,000
Inferred
1,000
1.24
2.32
0.68
26.0
13
24
22
900
Total
11,300
2.06
3.90
1.10
38.4
232
439
397
13,900
-
-
-
-
-
-
-
-
Measured
-
Indicated
3,200
2.16
4.57
0.45
29.0
69
146
46
3,000
Inferred
300
2.12
1.69
0.22
20.8
7
6
2
200
3,500
2.16
4.29
0.43
28.2
76
152
48
3,200
Total Indicated
13,400
2.15
4.18
0.97
37.1
288
561
420
16,000
Total Inferred
1,400
1.45
2.17
0.57
24.69
20
30
25
1,100
Grand Total
14,800
2.09
4.00
0.94
35.9
308
591
445
17,100
Wilga
Total
3 See ASX Announcement “Stockman Project – Currawong and Wilga Deposits Mineral Resource Update” dated 17
January 2024
4|P a g e
Notes:
1. Dr Andrew Fowler MAusIMM CP(Geo) takes Competent Person responsibility for this Mineral Resource
Estimate in accordance with the JORC Code (2012).
2.
The cut-off grade applied to the MRE has been derived from the Net Smelter Return (NSR) calculations.
The MRE metal prices used were Cu: USD 9110/t, Zn: USD 2660/t, Au: USD 1870/oz, Ag: USD 23.5/oz
3.
The Competent Person considers that the Mineral Resource has reasonable prospects for eventual
economic extraction at the cut-off grade specified and a selective underground mining method.
4.
Numbers may not sum due to rounding.
Table 2 - Percentage changes in current 2023 MRE compared with previous 2022 MRE
Deposit
Tonnes
Contained
copper
metal
Currawong
+9%
+14%
+6%
+5%
+4%
Wilga
0%
-10%
-14%
-7%
-10%
Currawong/Wilga combined
+7%
+6%
0%
+4%
+1%
Contained
zinc metal
Contained
gold
metal
Contained
silver
metal
The Project tenements also include the Bigfoot and Eureka deposits and remain
highly prospective for further discoveries, with over 50 drill targets already identified.
Mining
The ROM DPS was in progress when Aeris acquired the Project in mid-2022 and at
that time the plan was for the Currawong and Wilga deposits to be mined
concurrently at a 1Mtpa rate.
Aeris subsequently undertook a review and revalidation of the preliminary outputs
from the ROM DPS and completed a full revision of the mine designs and schedules,
based on new geological models. In addition, external consultants AMC, Phronis
and Minefill Services undertook further work to refine the mine services and
infrastructure and paste fill plant designs.
Both Currawong and Wilga underground mines have been redesigned and
rescheduled. At Currawong, the decline has been relocated and redesigned in a
spiral arrangement providing access to lower and upper mineralised horizons and is
strategically positioned for future access to the Bigfoot and Eureka deposits. This
design enabled a revised mining schedule providing increased flexibility through
more working fronts and enabling uncoupling of stope sequences.
The revised design for Currawong also reduces peak waste to surface by
reconfiguring the stoping panels, combined with increased uncemented rock fill,
plus co-disposal of waste rock with paste fill as part of the mine backfilling strategy.
Similar design and schedule changes were made to the Wilga mine.
5|P a g e
Following the redesign and rescheduling of both Currawong and Wilga, multiple
scenarios were investigated to determine the optimum mining configuration. This
resulted in a Currawong only mining scenario, at a maximum 850ktpa production
rate, being selected as the new preferred case.
The Wilga mine, which has a relatively high capital intensity for the defined mining
inventory, and is located further from the processing plant, remains an opportunity
for future development.
Total lateral development of the Currawong mine will be ca. 28km with 1.0km of
vertical development to establish ventilation and escapeway access.
Total mined ore tonnes from the Currawong only scenario is 9.4Mt over 12 years, at
average grades of 2.0% Cu, 3.7% Zn, 1.0g/t Au and 36g/t Ag4.
The mine plan is based on 96% indicated resources and 4% inferred resources. There
is a low level of geological confidence associated with inferred mineral resources
and there is no certainty that further exploration work will result in the determination
of indicated mineral resources or that the production target itself will be realised.
Figure 1 - Currawong mine design looking west
4 Refer to the Appendix A for the material assumptions underpinning the production target
6|P a g e
Figure 2 – Indicative Mine Production Schedule from Currawong
6.00%
1,000
900
Ore mined (kt)
700
4.00%
600
500
3.00%
400
2.00%
300
200
1.00%
100
0
Cu/Zn grade
5.00%
800
1
2
3
4
5
Ore mined
6
7
8
Zn grade
9
10
11
12
13
0.00%
Cu grade
Metallurgy and Processing
The Stockman mineralogy is fine grained, requiring 3-stage crushing and ultrafine
grinding to achieve target liberation and flotation to saleable metal concentrates.
Aeris and the previous project owners have completed a number of metallurgical
testwork programs. As a result of the complex mineralogy of the Stockman ore, the
results of these programs have indicated sub-optimal metallurgical recoveries
through conventional flotation.
The latest feasibility work, which is based on the original conventional flotation circuit
producing separate copper and zinc concentrates, resulted in overall metallurgical
recoveries of approximately 77% for copper and 70% for zinc, and relatively low
recoveries of precious metals (gold and silver).
To improve recoveries and product qualities, Aeris has investigated alternative
metal treatment technologies, targeting both front-end process optimisation as well
as downstream. A formal desktop study was undertaken, in consultation with
Glencore Technology, to assess the application of ultrafine grinding in conjunction
with the Albion processing technology (Albion Process), an oxidative leach
treatment, as part of the flowsheet. Initial indications are that the Albion Process
has the potential to address the current process challenges, including materially
improving metallurgical recoveries.
The proposed process flowsheet, incorporating the Albion Process, will be
redesigned to produce a clean, high-grade copper concentrate at the mine site,
along with a polymetallic (Cu/Zn/Au/Ag) bulk concentrate for further processing via
the Albion Process at a regional offsite location. As a result, the processing plant on
the mine site will require less grinding and power capacity due to the coarser grind,
and also a smaller plant footprint, reducing site-based processing and power
generation capital and operating costs.
7|P a g e
The ultrafine grinding capacity, Albion Process and associated infrastructure will be
located at a regional offsite facility, with better access to transport infrastructure
and cheaper grid power. Bulk concentrate trucked from the mine site will be treated
through the offsite facility to produce zinc, copper and precious metals saleable
products. Tailings from the offsite facility will be dewatered and backhauled to the
mine site for co-blending with existing tailings destined for paste fill used in
underground mine backfilling.
The Albion Process involves oxidative leaching at atmospheric pressure. The
chemical liberation of the contained metals is achieved by injecting supersonic
oxygen into the base of a series of Albion Process Leach Reactors, continuously fed
with the ground bulk concentrate. Oxygen is injected using the HyperSparge
supersonic oxygen injection system to maximise oxygen mass transfer and drive the
oxidative leaching reactions.
The Albion Process can oxidise and leach multiple metals into solution
simultaneously, making it suitable for polymetallic feeds such as the bulk
(Cu/Zn/Au/Ag) concentrate proposed from Stockman.
The process was developed in 1994 by Xstrata PLC and is now owned by Glencore
Technology. It is a “bankable” technology installed at numerous operating sites in
Australia and around the world including 5:
•
McArthur River (Australia) – Pb/Zn
•
Mount Isa Mines (Australia) – Cu
•
Las Lagunas (Dominican Republic) – Au
•
San Juan de Neiva refinery (Spain) – Zn
•
Sable (Zambia) – Cu
•
Nordenham refinery (Germany) – Zn.
The Albion Process tolerates significant feed variations with high metal recoveries
and delivers a fast commissioning and ramp-up period. The Albion Process also
offers a wide range of metal product routes. More work is required to identify the
preferred saleable product(s) and flowsheet.
Further metallurgical testwork and engineering design will be undertaken to bring
this revised processing route into the Feasibility Study.
5 Refer Glencore Technology website
8|P a g e
Transport to market of saleable products
Several transport and logistics options for the export of the clean copper
concentrate from the mine site have been examined. The proposed logistics
pathway is for saleable copper concentrate to be loaded into half height
containers at the mine and transported via B-double trucks to the selected port.
Shipping will be via Handysize vessels (15,000-35,000wmt) with options for 5,000 or
10,000wmt parcels.
The backhaul leg from the port to the mine offers opportunities to supply bulk
commodities to site at a reduced delivered cost.
Various options for transporting the copper, zinc and precious metals products from
the offsite processing facility to market will be examined as part of the next stage of
the Feasibility Study.
Infrastructure and Services
Feasibility / functional level design work has been undertaken on site infrastructure
and services. The site layout has been optimised to consider environmentally
sensitive species, bush fire risk, traffic flow and keeping the cleared footprint to a
minimum.
Proposed onsite facilities include a paste fill plant with concrete batch plant, surface
magazines, diesel storage, power supply, various water storage infrastructure, and
associated buildings.
A range of power supply options for the mine site were investigated, with renewable
energy or grid solutions not economically viable at this stage, resulting in diesel
powered generators selected as the short-term base case. There is potential to
incorporate hydrogen as a potential future fuel source into the power generation
configuration. The offsite processing facility will be powered from the grid in the
short-term with a range of renewables to be considered as the longer term energy
source.
The mine site includes an existing Tailings Storage Facility (TSF) containing
approximately 690,000 tonnes of tailings produced during previous operations in the
1990’s by Denehurst Mining. This tailings dam will be upgraded for use with the new
operation. A four stage TSF embankment raise strategy will be employed to support
life of mine tailings requirements. The stage 1 lift will provide capacity for the first 4-5
years of operation.
Other facilities will comprise the offsite accommodation village and various road
and transport upgrades to facilitate project construction and operation. The
accommodation village will be located 22km northeast of the town of Benambra
to support a mostly drive-in drive-out workforce, with employees transported by bus
the 9km to the mine site.
9|P a g e
Community Engagement
The Stockman Project has a community engagement plan and social management
plan, as per the EES requirements. A number of forums and groups have been
established and the Project enjoys strong community support.
The Community Reference Group meets quarterly to discuss progress of the Project
and represents a wide range of local opinions and experience. Representatives
come from directly impacted towns, including Benambra, Omeo, Swifts Creek and
Ensay.
The Stockman Project also supports events and services throughout the Omeo
region including health providers, Landcare, schools, sporting clubs and important
annual events, such as the Omeo Show and Tambo Valley Races.
Permitting
Permitting for the Stockman Project is well advanced. All key primary permits have
been received and many secondary permits are well advanced, as outlined in the
following table.
Primary Permits
Status
Environmental Effect Statement (EES)
Mine Work Plan (MWP)
Variation 1 – Various plans and MWP update
Variation 2 – Approval of tailings paste disposal
East Gippsland Shire Council (EGSC) Incorp Document 2020
EPBC approval
Mining Licenses (MIN5523 & MIN006642) - 5yr renewed until 2027
Mining Licenses - additional 10yr pending
Secondary Permits
Vegetation clearing offsets - Federal
State vegetation clearing offsets:
Aeris-owned
Other offset sites being considered
Surface water licenses (80ML + 20ML)
10 | P a g e
Additional ground and surface water licenses (if required)
Accommodation village groundwater license
Dewatering groundwater license
EPA construction and operating licenses
Dangerous Goods licensing (explosives, diesel storage)
Road-Use Agreements (VicRoads + EGSC)
Approved | On track | Remaining works
Permits required for the offsite Albion Process facility will be investigated in the next
phase of study work.
Forward Work Plan
Aeris is excited with the potential of the Stockman Project and will continue to
advance the updated Feasibility Study over the next 12 months. The key next phase
workstreams will involve metallurgical testwork and processing plant design to
incorporate the proposed offsite processing facility, including the Albion Process,
into the Project. This will also impact favourably on power and water demands at
the mine site as well as tailings and other environmental factors.
A number of potential sites for the offsite processing facility have been identified
and will be investigated along with any associated permitting/licensing
requirements.
Aeris is targeting completion of the Feasibility Study in the second half of 2024.
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
11 | P a g e
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate
Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper
dominant portfolio comprises three operating assets, a mine on care and
maintenance, a long-life development project and a highly prospective exploration
portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition
opportunities. The Company’s experienced board and management team bring
significant corporate and technical expertise to a lean operating model. Aeris is
committed to building strong partnerships with its key community, investment and
workforce stakeholders.
12 | P a g e
Appendix A – Production Target Material Assumptions
Criteria
Commentary
Mineral Resource
estimate
•
The Production Target is based on the Mineral Resource Estimate (MRE) reported
in the ASX Announcement “Stockman Project – Currawong and Wilga Deposits
Mineral Resource Update” dated 17 January 2024.
•
The MRE is reported inclusive of the Production Target.
•
The Stockman Project (Project) was acquired by Round Oak Minerals Pty Ltd
(ROM) from Independence Group NL (IGO) in December 2017. Aeris
subsequently acquired the ROM businesses, including the Stockman Project, in
July 2022.
In 2019, ROM completed a Selection Phase Study (SPS), consolidating and
advancing earlier studies undertaken by previous owners of the Project, IGO and
Jabiru Metals Limited. Results from the SPS provided the basis for ROM to
commence a Definition Phase Study (DPS).
Since acquiring the Stockman Project, Aeris has progressed this DPS work, taking
many workstreams to a Feasibility Study (FS) level in its base form.
The next stage of the study work involves incorporating the flowsheet changes,
including the Albion Process, into the proposed onsite and offsite processing
facilities.
Study status
•
•
•
Cut-off
parameters
•
•
•
•
•
•
Mining factors or
assumptions
•
The mine plan informing the Production Target was based on a Net Smelter Return
(NSR) cut-off which is considered appropriate for underground mining methods
and is in line with the approach at other polymetallic deposits within the
company’s portfolio.
Cut-off values of $130/t NSR for stoping and $50/t for development were used.
Metal prices of USD 7,900/t for Cu, USD 2,546/t for Zn, USD 1,498/oz for Au and USD
19.66/oz for Ag and a AUD:USD exchange rate of 0.73 have been used in the
calculation of the NSR values.
The cut-off values are not break-even based. They incorporate a margin in
addition to All site costs including development, stoping, haulage, sustaining
capital, processing and administration.
Costs beyond the mine gate including concentrate haulage, port facilities,
shipping, penalties and royalties are netted from revenues of concentrates and
create the NSR estimates.
Preliminary metallurgical recoveries used in the NSR calculation were based on
metallurgical testwork completed to date for the original conventional flotation
circuit producing separate copper and zinc concentrates. The recoveries were
derived from non-linear equations and are dependent on mineralisation type,
head grade and end-product quality (Cu concentrate of Zn concentrate).
The Production Target is derived from a mine schedule based on feasibility study
level stope and development designs.
The selected mining method is a combination of transverse longhole open
stoping and longitudinal bench stoping.
13 | P a g e
•
•
•
•
The transverse stopes would be mined in a bottom-up sequence in panels 3-4
Levels high. Primary and secondary stoping is planned.
The longitudinal stopes would be mined in a bottom-up sequence in panels 3-4
Levels high, retreating back to the Level access.
All stopes are planned to be filled. The majority will be filled with cemented paste
fill to improve stope stability and increase ore recovery. Some stopes are planned
to be filled with development waste rock based backfill or a combination of
paste fill and rock based fill.
A 20m Level spacing has been applied throughout Currawong. This spacing was
an outcome of a geotechnical feasibility study completed by AMC Consultants.
Stable stope dimensions and unplanned dilution (overbreak) estimates were also
informed by this geotechnical work and are detailed in the table below. A
minimum stoping width of 3m has been used.
•
Mining recoveries applied were:
•
Underground services, i.e. power demand and distribution, feed water,
dewatering systems and compressed air systems, have been designed to
feasibility study level maturity by Phronis.
Other mine infrastructure, i.e. Boxcut, portal facilities, primary ventilation system,
second means of egress, explosives magazines have been designed to feasibility
study level maturity by AMC Consultants, Phronis and Aeris Resources.
The paste fil plant and associated reticulation has been designed by Minefill
Services to feasibility study level.
The relevant portions of each Mineral Resource category that makeup the
Production Target are:
o Measured Resource = 0% (there is no Measured Resource at Currawong)
o Indicated Resource = ~96%
o Inferred Resource = ~4%
Less than ~0.5% of the Production Target is based on Exploration Target.
•
•
•
•
14 | P a g e
Metallurgical
factors or
assumptions
•
On an annual basis, the contribution of Inferred Resource to the Production Target
is less than ~4%
•
The Production Target is predicated on the original proposed ore processing flow
sheet of conventional crush, grind and then differential flotation to produce
saleable concentrates (copper-rich and zinc-rich).
Aeris and the previous project owners have completed a number of metallurgical
testwork programs on drill core composite samples. Representative samples have
been selected from each of the different geometallurgical domains.
Geometallurgical algorithms have been developed that indicated recoveries will
vary over time in accordance with the mineralogy, head grade and end-product
quality present at the time of processing. These algorithms resulted in overall
average metallurgical recoveries of approximately 77% for copper and 70% for
zinc, and relatively low recoveries of precious metals (gold and silver).
•
•
Note: All other assumptions, including environmental, social, economic and market related, are
currently being progressed and will be outlined when the results of the completed feasibility study
are released to the market.
15 | P a g e
Share your feedback
Discover