Established Australian copper-gold producer and explorer, Aeris Resources Limited
(ASX: AIS) (Aeris or the Company) is pleased to provide an update on its FY24
production guidance.
•
Tritton (Cu); Cracow (Au) and Jaguar (Zn) met FY24 production guidance:
– Tritton FY24 copper production of 19.7kt. Stronger June quarter with 5.4kt
– Cracow FY24 gold production of 45.9koz. Q4 gold production of 11.8koz
•
Mt Colin (Cu) ore production overachieved plan by >20% but copper recovered
(6.8kt) was below guidance due to fewer toll processing slots than planned:
–
End of June ore stockpiles of +200kt @ +2% Cu (4kt contained Cu)
–
Mine life has been extended from May to October 2024 due to
overperformance of “cave zone” and remnant stopes
•
Available cash at 30 June of $24.8m ($19.4m March Qtr end) plus $10m in
restricted cash ($4m end March Qtr) for environmental bonding
•
Positive metallurgical testwork results for Stockman
•
Barbara FS and Jaguar PFS progressing
•
Resource in-fill drilling commenced at Constellation during the June quarter
Aeris’ Executive Chairman, Andre Labuschagne said “Despite a challenging year
for the Company it was pleasing to end the year on a positive note with improved
production at Tritton, and with Mt Colin and Cracow continuing to deliver.
“Mt Colin was originally planned to close in May but thanks to great work done by
the site and corporate technical teams, additional ore has been identified,
meaning that not only has FY24 ore production been ~20% higher than plan but
production will now continue through to October 2024.”
Aeris Resources Limited ABN 30 147 131 977
Level 6, 120 Edward Street, Brisbane, QLD 4000, Australia
E: info@aerisresources.com.au T: +61 7 3034 6200
aerisresources.com.au
ABN 30 147 131 977
ABN 30 147 131 | Page1 977
FY24 AERIS GROUP PRODUCTION:
Group
Unit
Sep 23
Qtr
Dec 23
Qtr
Mar 24
Qtr
Jun 24
Qtr
Total
FY24
FY24
Guidance
Copper
Kt
8.1
6.4
5.9
6.7
27.1
28 – 35
Zinc
Kt
3.1
-
-
-
3.1
1.2 – 1.5
Gold
Koz
15.2
13.2
12.7
14.3
55.3
48 – 60
Silver
Koz
121.3
39.2
37.3
42.6
240.4
181 - 227
Copper
Kt
5.2
4.8
4.3
5.4
19.7
19 – 24
Gold
Koz
1.0
1.2
1.2
1.5
4.9
6–7
Silver
Koz
36.9
39.2
37.3
42.6
156.0
148 - 185
Koz
12.7
11.1
10.2
11.8
45.9
38 – 48
Copper
Kt
2.4
1.6
1.6
1.3
6.8
8 – 10
Gold
Koz
1.1
0.8
1.3
1.0
4.2
4-5
Copper
Kt
0.6
-
-
-
0.6
0.2 – 0.3
Zinc
Kt
3.1
-
-
-
3.1
1.2 – 1.5
Gold
Koz
0.4
-
-
-
0.4
0.2 – 0.3
Silver
Koz
84.4
-
-
-
84.4
33 – 42
Tritton
Cracow
Gold
Mt Colin
Jaguar
* Discrepancy in summation may occur due to rounding.
* Q4 and Full year actual cost information to be provided in June Quarterly Activities Report.
This announcement is authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200
Stefan Edelman
General Manager – Corporate Development
investorrelations@aerisresources.com.au
or visit our website at www.aerisresources.com.au
2|P a g e
Share your feedback
Discover