SEPTEMBER QUARTERLY REPORT PRESENTATION
Released
Released
Announcement PDF
Q1 FY24 Results
23 October 2023
Presented by: Andre Labuschagne
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”). By attending an investor presentation or
briefing, or accepting, accessing or reviewing this presentation, you
acknowledge and agree to the terms set out below.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris with the Australian Securities Exchange (“ASX”) in
connection with its continuous disclosure obligations. This presentation
does not purport to contain all of the information that an investor should
consider when making an investment decision nor does it contain all of
the information which would be required in a product disclosure
statement or prospectus prepared in accordance with the requirements
of the Corporations Act.
No reliance should be placed on the information or opinions contained
in this presentation, which are provided as at the date of this
presentation (unless otherwise stated) and to the maximum extent
permitted by law, Aeris has no obligation to update the information
contained in this presentation. An investment in securities is subject to
known and unknown risks, some of which are beyond the control of
Aeris. Investors should consult with their own legal, tax, business and/or
financial advisors in connection with any acquisition of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in
Australian Dollars unless stated otherwise. Investors should be aware that
certain financial measures included in this presentation are “non-IFRS
financial information” under ASIC Regulatory Guide 230: “Disclosing nonIFRS financial information” published by ASIC and also “Non-GAAP
financial measures” within the meaning of Regulation G under the US
Securities Exchange Act of 1934 and are not recognised under the AAS
or IFRS. Aeris believes the non-IFRS financial information and non-GAAP
financial measures provide useful information to users in measuring the
financial performance and condition of Aeris.
However, investors should note that the non-IFRS financial information
and non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative
to other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris and its officers. This
includes statements about market and industry trends, which are based
on interpretations of current market conditions.
Indications of, and guidance on, future earnings and financial position
and performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “estimate”, “intend”,
“believe”, “guidance”, “should”, “could”, “may”, “will”, “predict”, “plan”
and other similar expressions.
Forward-looking statements are based on information available to Aeris
as at the date of this presentation and should not be relied upon as an
indication or guarantee of future performance. Except as required by
law or regulation (including the ASX Listing Rules), none of Aeris, its
representatives or advisers undertakes any obligation to provide any
additional or updated information whether as a result of a change in
expectations or assumptions, new information, future events or results or
otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
recent world events such as the COVID-19 pandemic and international
hostilities and associated economic changes.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of
its respective related bodies corporate, shareholders and affiliates, and
each of their respective officers, directors, partners, employees,
representatives, affiliates, agents, consultants and advisers (each a
“Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or
negligent misstatement) for any direct, indirect, consequential or
contingent loss or damage arising from this presentation or reliance
on anything contained in or omitted from it or otherwise arising in
connection with this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in
Aeris, or likelihood of fulfilment of any forward-looking statement or
any event or results expressed or implied in any forward-looking
statement.
PRODUCTION TARGETS CAUTIONARY STATEMENT
The Ore Reserve and Mineral Resource estimates underpinning the
Stockman Production Targets were prepared by a Competent Person in
accordance with the JORC Code 2012.
The material assumptions on which the Production Targets are based is
set out in Appendix C of the ASX Release of Aeris dated 28 April 2022
“Transformational Acquisition and Capital Raise” (Initial Report). Aeris
confirms that all material assumptions underpinning the production
targets in the Initial Report continue to apply and have not materially
changed. The modifying factors used in the estimation of the Ore
Reserve were also applied to the Mineral Resources in the generation of
the Production Targets.
2
Aeris Resources
Australian mid-tier, base and precious metals miner
Mt Colin Mine (100%)
Mine Type
FY24 Production Guidance
U/G Cu, Au
8kt - 10kt Cu
Cracow Operations (100%)
Mine Type
U/G Au
FY24 Production Guidance
38koz - 48koz Au
Barbara Project (100%)
Mine Type
Resource
U/G Cu, Au
45kt Cu1
Jaguar Operations (100%) Care and Maintenance
Mine Type
Resource3
U/G Zn, Cu, Ag, Au
455kt Zn, 97kt Cu
North Queensland
Cracow
Jaguar
Tritton
Stockman Project (100%)
Mine Type
Ave LOM Production
Mine Life
1.
2.
3.
U/G Zn, Cu, Au
~30ktpa Cu eq2
10 years
Refer to ASX release “Barbara Mineral Resource Update” 28 June 2023.
Refer to Appendix for copper equivalent production
See ASX announcements “Group Mineral Resource and Ore Reserve Statement” dated 18 April 2023 and “Correction Jaguar Deposit Mineral Resource Update” dated 12 July 2023
Tritton Operations (100%)
Stockman
Mine Type
FY24 Production Guidance
U/G Cu
19kt - 24kt Cu
3
Highlights for Q1 FY24
Copper equivalent production of 12.9kt for the quarter at AISC of
A$5.44/lb
Mining operations at Mt Colin performed well although processing
slightly lower than forecast
Tritton metal production ahead of plan on improved mined grades
Stockman feasibility well advanced
Strong final quarter of production at Jaguar with the operation now
on care and maintenance
Drilling at Constellation (Tritton) has extended the known
mineralisation down-plunge
Gold production at Cracow in line with plan
Cash and receivables increased to $43.4 million at end of quarter
4
Tritton
NSW
Q1 results
Strong production performance from Tritton
Copper, gold and silver production ahead of plan on
improved mined grades
Total copper production of 5.2kt at AISC of A$5.68
Avoca Tank performed well with Cu grade averaging +2.5%
Jameson cell successfully commissioned at the plant
increasing concentrate grade
All-in sustaining costs under forecast in both absolute terms
and on a unit basis
High-grade copper intersected in drilling at Constellation,
extending the known mineralisation
Jun 23
Sep 23
Qtr
Qtr
FY24
Guidance
kt
5.4
5.2
19 – 24
Gold Produced
koz
1.4
1.0
6–7
Silver Produced
koz
39.3
36.9
148 – 185
Mining
A$M
32.7
25.3
113 – 136
Processing
A$M
7.5
8.7
31 – 37
Site G&A
A$M
5.1
5.1
22 – 27
TC/RCs
A$M
4.7
5.4
19 – 23
Product Handling
A$M
3.9
3.3
16 – 20
Sustaining Capital2
A$M
16.4
17.2
57 – 69
Growth Capital
A$M
5.6
3.0
10 – 12
Exploration
A$M
2.4
0.6
7–9
Production Summary
Unit
Copper Produced
Cost Summary
6
Avoca Tank mine
Grade improving with greater geological
understanding
+2.5% Cu and 0.8g/t Au ore currently being mined from
Avoca Tank
Grade control drilling / underground mapping materially
improved geological understanding
Updated Mineral Resource Estimate to be released in
coming weeks
Massive sulphides also intersected 180m below mineral
resource in hole ATEL00521,2,3 to be followed up with future
drilling
1.
2.
3.
Refer to ASX announcement “High Grade Copper and Gold Intersected at Avoca Tank” dated 10 January 2023
Refer ASX Announcement “Tritton Exploration Update” dated 30 January 2023.
Cautionary Statement: In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of sulphide material abundance should never be considered a proxy or substitute for laboratory analysis. Laboratory assay results
are required to determine widths and grade of the visible mineralisation reported in preliminary geological logging. The Company will update the market when laboratory analytical results become available.
7
Constellation Deposit
Potential future baseload feed for Tritton mill
Located 45km northeast of the Tritton plant
Mineral Resource1 of 6.7Mt at 1.85% Cu and 0.58g/t Au
6 drill hole program completed targeting extensions to the Mineral
Resource at depth
Hole TAKD095 is one of the best intersections ever returned from
Constellation
TAKD095 – 25.95m at 3.81% Cu, 1.12g/t Au, 10.3g/t Ag2
Follow up drill program planned for early CY24 to increase the
Mineral Resource and improve resource confidence
1.
2.
Refer to ASX release “Group Mineral Resource and Ore Reserve Statement” 18 April 2023.
Refer to ASX release “High-Grade Copper Intersected at Constellation” dated 20 September 2023
8
Cracow
Queensland
Q1 results
Cracow production and costs to plan
Gold production of 12.7koz at AISC of A$2,398/oz, in line
with plan
Operating and capital costs on plan
Jun 23
Sep 23
Qtr
Qtr
FY24
Guidance
koz
13.8
12.7
38 - 48
koz
13.6
12.8
Mining
A$M
15.8
15.0
50 - 60
Processing
A$M
6.7
6.4
26 - 31
Site G&A
A$M
3.2
2.7
12 - 15
Sustaining Capital
A$M
2.1
2.0
18 - 22
Growth Capital
A$M
1.5
7.1
23 - 28
Exploration
A$M
0.4
1.1
4-5
Production Summary
Unit
Gold Produced
Gold Sold
Cost Summary
Tailings dam lift ahead of schedule - $7.1 million growth
capital invested over the quarter
10
Near mine exploration
Small, high-grade resource additions at current mining
area (Western Vein Field)
Updated geological interpretations have identified targets for
additional mineralisation along existing and new structures
5 drill targets tested via a first-pass drill program – most successfully
intersected the interpreted structures
Further drilling will be planned once assay results are received
Plan view of the Western Vein Field showing underground exploration holes completed within the quarter (blue lines).
The known high-grade structures are shown by the semi-transparent grey wireframes
11
Mt Colin
North Queensland
Q1 results
Mining performing well and costs managed well
Copper production of 2.4kt at AISC of A$3.66/lb
Mining operations at Mt Colin performed to plan at slighter
better than planned copper grades
Re-scheduling of toll processing runs by Ernest Henry(EHM)
resulted in 18kt less tonnes processed than forecast
Approximately 86kt of the ore processed at EHM was presold in Q4 FY23, offsetting revenues received this quarter
Stockpiles of 70kt of ore at Ernest Henry at quarter end
Jun 23
Sep 23
Qtr
Qtr
FY24
Guidance
kt
2.0
2.4
8 - 10
koz
0.9
1.1
4-5
Mining
A$M
10.7
10.9
34 - 41
Processing
A$M
5.5
5.9
25 - 30
Site G&A
A$M
2.9
1.7
7-8
TC/RCs
A$M
1.5
1.8
7-9
Product Handling
A$M
1.8
1.9
7-9
Sustaining Capital
A$M
0.0
(0.1)
0
Exploration
A$M
0.2
0.5
0
Production Summary
Unit
Copper Produced
Gold Produced
Cost Summary
13
Barbara project
Potential follow-on operation to Mt Colin
Updated resource of 2.2Mt at 2.0% Cu and 0.2g/t Au1 completed
Resource remains open down-plunge
Feasibility studies underway on a potential underground operation
Situated on a mining lease – can be brought into production
quickly
1.
Refer to ASX announcement “Barbara Mineral Resource Update” dated 28 June 2023
14
Jaguar
Western Australia
Q1 results
Jaguar transitioned to care and maintenance
Strong final quarter of production, approximately double
planned metal output
Jun 23
Sep 23
Qtr
Qtr
FY24
Guidance
kt
2.9
3.1
1.2 - 1.5
Copper Produced
kt
0.5
0.6
0.2 - 0.3
Gold Produced
koz
0.4
0.4
0.2 - 0.3
Silver Produced
koz
91
84
33 - 42
Mining
A$M
8.3
8.8
5-6
Processing
A$M
5.1
7.8
3-4
Site G&A
A$M
8.5
3.4
2-3
TC/RCs
A$M
4.0
4.3
2-3
Product Handling
A$M
1.8
2.0
1-2
Sustaining Capital
A$M
9.2
2.7
1–2
Growth Capital
A$M
0.1
0.0
1–2
Exploration
A$M
0.4
0.5
1–2
Production Summary
Unit
Zinc Produced
Cost Summary
3.1kt of Zn produced at AISC of A$3.17/lb Zn
Operation now on care and maintenance
Team of 8 people on site to manage ongoing activities
including dewatering of the Bentley and Jaguar mines
16
Jaguar mine
Copper dominant restart opportunity
Mineral Resource of 0.8Mt at 2.28% Cu, 4.66% Zn and 61g/t Ag1
Resource consists of high-grade remnant sills and pillars along
with additional mineralisation outside the old mine workings
Multiple targets for further exploration identified
Significant potential to extend mineralisation, particularly down
plunge
Dewatering underway to enable review of ground conditions
in the decline
1.
Refer to ASX release “Jaguar Deposit Mineral Resource Update” dated 12 July 2023
Long section view of the 2023 Jaguar deposit Mineral Resource classification looking east. Note the
mineralised lenses are stacked. An Inferred lens is located behind the Measured and Indicated lens.
17
Regional exploration
Tenements well known for base metals prospectivity
but also hosts multiple gold targets
Tenement package also highly prospective for gold –
regional endowment of +25Moz
Several multi-million ounces deposits located within 50km of
Jaguar tenements
Exploration efforts during the quarter focused on gold
prospectivity
Primary target is Heather Bore, a 2km long gold anomaly
located 8km from Northern Star’s Thunderbox mine and on
the same structural corridor
Simplified regional geology across the broader Jaguar Operation showing significant gold deposits.
18
Stockman Project
Victoria
Q1 Activities
High-grade, long life, Zn-Cu-Ag-Au development
project
Feasibility study progressed – market update due Q2
Metallurgical drilling at Wilga and Currawong completed and
assayed
Interim feasibility study largely completed – draft report being
compiled
Next stage work plan to advance the project development being
finalised (including metallurgical test work program)
Balance of secondary environmental permitting and license
approvals progressing
20
Corporate
Corporate
Focus on stabilisation of the business and consistent operating
performance
Jun
Sep
2023
2023
Qtr
Qtr
Closing cash
19.5
21.9
Jaguar - concentrate receivables
0.8
11.5
Mt Colin
0.0
1.6
Cracow - gold dore
0.1
0.3
Tritton - concentrate receivables
9.1
8.1
Useable Cash and Receivables
29.5
43.4
(A$ Million)
Site leadership changes to drive performance
Reduction in corporate costs
Cash and receivables increased to $43.4 million
$50 million debt facility from WHSP to replace ANZ facility - $40 million
drawn down in August to fund closure of Jaguar and paydown of
trade creditors