Highlights
•
Copper equivalent production of 12.9kt for the quarter at AISC of A$5.44/lb
•
Tritton metal production ahead of plan on improved mined grades
•
Strong final quarter of production at Jaguar with the operation now on care and
maintenance
•
Gold production at Cracow in line with plan
•
Mining operations at Mt Colin performed well although tonnes processed slightly
lower than plan
•
Stockman feasibility well advanced
•
Drilling at Constellation (Tritton) has extended the mineralisation down-plunge
Unit
Jun 23
Qtr
Sep 23
Qtr
FY24
Guidance
/mmhrs
1.33
1.04
-
Copper produced
kt
7.9
8.1
28 - 35
Zinc produced
kt
2.9
3.1
1.2 - 1.5
LTIFR
Gold produced
koz
16.5
15.2
48 - 60
Silver produced
koz
130.4
121.3
181 - 227
Cu eq production
kt
13.1
12.9
40 - 50
Operating Costs
Mining
A$M
67.5
60.1
202 - 243
Processing
A$M
24.8
28.9
84 - 101
Site & G&A
A$M
19.7
12.9
43 - 52
TC/RCs
A$M
10.2
11.4
28 - 34
Product handling
A$M
7.5
7.3
24 - 29
Capital Costs
Sustaining
A$M
27.8
21.8
76 - 91
Growth
A$M
7.1
10.1
34 - 41
Exploration
A$M
3.4
2.6
12 - 15
Projects inc. Stockman
A$M
2.7
1.1
2-3
AISC
A$M
176.5
154.4
-
AISC
$/lb Cu eq
6.11
5.44
-
Aeris Resources Limited
1
Group Safety, Environment and Community
Aeris recorded no lost time injuries during the September quarter, bringing the 12
month rolling LTIFR to1.04.
There were two Reportable Environmental Incidents recorded in the September
quarter:
•
A tailings booster pump discharge line at Cracow was holed when run over by
a scraper working on the TSF2 tailings dam lift project; and
•
Expression of water downstream of the South Sediment Dam embankment at
Mt Colin.
Figure 1 – Group LTIFR
3
No of LTI
LTIFR
2
1
0
2
Tritton Operations (NSW)
Key points for quarter:
•
Copper, gold and silver production ahead of plan on improved mined grades
•
Total copper production of 5.2kt at AISC of A$5.68/lb
•
High-grade copper intersected in drilling at the Constellation deposit, extending
the mineralisation down-plunge and along strike
Production Summary
Unit
Jun 23
Sep 23
Qtr
Qtr
FY24 Guidance
Ore Mined
tonnes
393.8
301.2
Mined Grade
% Cu
1.57
1.59
Ore Milled
tonnes
372.6
332.1
Milled Grade
% Cu
1.53
1.63
Recovery
Cu
95.3%
95.3%
Copper Produced
kt
5.4
5.2
19 – 24
Gold Produced
koz
1.4
1.0
6–7
Silver Produced
koz
39.3
36.9
148 – 185
Mining
A$M
32.7
25.3
113 – 136
Processing
A$M
7.5
8.7
31 – 37
Site G&A
A$M
5.1
5.1
22 – 27
TC/RCs
A$M
4.7
5.4
19 – 23
Product Handling
A$M
3.9
3.3
16 – 20
By-Product Credit
A$M
(4.5)
(4.1)
Royalties
A$M
1.3
1.6
Corporate G&A
A$M
0.5
0.5
Inventory Movements
A$M
0.4
1.7
Sustaining Capital1
A$M
16.4
17.2
A$M
68.1
64.7
A$/lb
5.68
5.68
Growth Capital
A$M
5.6
3.0
10 – 12
Exploration
A$M
2.4
0.6
7–9
A$M
76.1
68.3
A$/lb
6.35
5.99
Cost Summary
All-In Sustaining Costs2
All-In Costs2
57 – 69
1.
Includes sustaining capital, capitalised mine development and financing payments (principal and interest) on
leased assets
2.
All-In Sustaining and All-In Costs are based on copper produced
3
Operations
Tritton performed well for the quarter with copper, gold and silver production ahead
of plan due to strong mined grades. Total ore mined was lower than forecast due to
difficult localised mining conditions at the Tritton and Murrawombie orebodies. Avoca
Tank performed well with the copper grade averaging +2.5%, while operations at
Budgerygar were focused on developing the next stoping levels.
The Avoca Tank ore body is demonstrating significantly higher grades than the current
geological model. An update to the Mineral Resource Estimate is underway and will
be released in the coming weeks.
At the processing plant the Jameson cell was successfully commissioned during the
quarter, increasing concentrate grade. Optimisation work on the Jameson cell is
continuing. Metallurgical recovery was also above plan for the quarter.
Costs
Costs were managed well during the quarter with all-in sustaining costs under forecast
in both absolute terms and on a unit basis. Limited growth capital was incurred, as
scheduled, with Avoca Tank and Budgerygar now in production.
Exploration
Exploration during the quarter focused on the Constellation deposit, located 45km
north of the Tritton processing plant. A total of 6 holes were drilled in the current
campaign, targeting extensions of the Mineral Resource at depth.
Drilling successfully intersected copper sulphides, extending the known mineralisation
200m down plunge and 80m along strike. Assay results have been received for two of
the holes 1:
•
TAKD095 – 25.95m at 3.81% Cu, 1.12g/t Au, 10.3g/t Ag (from 460m)
•
TAKD094 – 5.85m at 2.23% Cu, 1.14g/t Au, 3.15g/t Ag (from 387m).
Drill hole TAKD095 targeted a previously untested down-hole electromagnetic (DHEM)
plate. The high-grade intersection from TAKD095 is the most significant intersection
reported from the primary sulphide domain to-date, suggesting the DHEM plate could
define a thick high-grade portion of the deposit. The DHEM plate dimensions are
approximately 80m x 100m.
Assay results are pending for the remaining four holes.
A follow-up drill program is being planned for Constellation in early calendar 2024. This
program will aim to increase the proportion of the Mineral Resource in the Indicated
category as well as expand the overall resource.
1 Refer to ASX announcement “High-Grade Copper Intersected at Constellation” dated 20 September 2023
4
Figure 2 – Long section view looking west showing drill hole pierce points through the
Constellation deposit. Drill holes from the current program are labelled.
5
Cracow Operations (QLD)
Key points for quarter:
•
Gold production of 12.7koz at AISC of A$2,398/oz, in line with plan
•
Operating and capital costs on plan
•
Gold recovery ahead of plan
•
Tailings dam lift ahead of schedule
Jun 23
Sep 23
Qtr
Qtr
kt
152.7
115.6
Mined Grade
g/t
2.92
3.29
Ore Milled
kt
173.3
149.4
Milled Grade
g/t
2.74
2.84
Recovery
Au
90.7%
93.3%
Gold Produced
koz
13.8
12.7
Gold Sold
koz
13.6
12.8
Mining
A$M
15.8
15.0
50 - 60
Processing
A$M
6.7
6.4
26 - 31
Site G&A
A$M
3.2
2.7
12 - 15
By-Product Credit
A$M
(0.3)
(0.3)
Royalties
A$M
2.2
2.1
Corporate G&A
A$M
0.4
0.4
Inventory Movements
A$M
(0.2)
2.4
Sustaining Capital1
A$M
2.1
2.0
A$M
29.8
30.7
A$/oz
2,187
2,398
Growth Capital
A$M
1.5
7.1
23 - 28
Exploration
A$M
0.4
1.1
4-5
A$M
31.7
38.9
A$/oz
2,328
3,038
Production Summary
Unit
Ore Mined
FY24
Guidance
38 - 48
Cost Summary
All-In Sustaining Costs2
All-In Costs2
18 - 22
1.
Includes sustaining capital, capitalised mine development and financing payments (principal and interest) on
leased assets
2.
All-In Sustaining and All-In Costs are based on gold sold
Operations
Ore mined and milled was in-line with plan, with run of mine ore supplemented with
low grade stockpiles. Mining grades improved materially from the previous quarter, to
3.29g/t Au. Metallurgical recovery was above plan and total gold production of
12.7koz was in line with plan.
6
Costs
All-in sustaining costs were in line with plan. The mill shutdown was completed
successfully, at lower than budgeted costs. Construction commenced on the tailings
dam lift at TSF2 with capital expenditure of $7.1 million by quarter end. The project is
progressing well and is approximately one month ahead of schedule.
Exploration
During the quarter exploration activities were focused on drill testing near mine
exploration targets within the underground mining infrastructure footprint at the
Western Vein Field.
Updated geological interpretations across the Western Vein Field identified
opportunities to discover additional gold mineralization, either along new structures or
isolated “pockets” along known structures.
By quarter end 5 drill targets were tested via a first-pass drill program (refer to Figure
3). In most cases, drilling successfully intersected the interpreted structures. Assay
results from the drill program are pending and further drilling will be planned once
received.
Figure 3 – Plan view of the Western Vein Field showing underground exploration holes
completed within the quarter (blue lines). The known high-grade structures are shown by the
semi-transparent grey wireframes.
7
North Queensland Operations (QLD)
Key points for quarter:
•
Mining operations at Mt Colin performed to plan at slighter better than planned
copper grades
•
Re-scheduling of toll processing runs by the Ernest Henry Processing Plant (EHM)
resulted in 127kt being milled in the quarter, 18kt less than plan
•
Copper production of 2.4kt for the quarter at improved AISC of A$3.66/lb
•
Ore stockpiles of 70kt at EHM at quarter end
Production Summary
Unit
Jun 23
Sep 23
Qtr
Qtr
FY24
Guidance
Ore Mined
kt
104.1
106.9
Mined Grade
% Cu
2.02
2.01
Ore Milled
kt
105.6
127.4
Milled Grade
% Cu
2.18
1.96
Recovery
Cu
86.2%
95.2%
Copper Produced
kt
2.0
2.4
8 - 10
Gold Produced
koz
0.9
1.1
4-5
Mining
A$M
10.7
10.9
34 - 41
Processing
A$M
5.5
5.9
25 - 30
Site G&A
A$M
2.9
1.7
7-8
TC/RCs
A$M
1.5
1.8
7-9
7-9
Cost Summary
Product Handling
A$M
1.8
1.9
By-Product Credit
A$M
(3.8)
(1.3)
Royalties
A$M
1.5
1.3
Corporate G&A
A$M
0.3
0.3
Inventory Movements
A$M
0.1
(3.4)
Sustaining Capital1
A$M
0.0
(0.1)
A$M
20.6
19.0
A$/lb
4.71
3.66
A$M
0.2
0.5
A$M
20.8
19.5
A$/lb
4.76
3.75
All-In Sustaining Costs2
Exploration
All-In Costs2
1.
2.
0
0
Includes sustaining capital, capitalised mine development and financing payments (principal and interest) on
leased assets
All-In Sustaining and All-In Costs are based on copper produced
8
Operations
Ore mined was in-line with plan, with mined copper grade slightly above. Mining of
the cave section in the upper levels of the mine is progressing well.
Ore milled was ahead of tonnes mined with additional stockpiled material processed
but slightly lower than forecast due to timing of the two processing runs at EHM.
Metallurgical recovery was considerably higher than plan, with a total of 2.4kt of
copper produced during the quarter.
At the end of the quarter, approximately 70kt of stockpiled ore remained at EHM.
Costs
Costs were managed well during the quarter with all-in sustaining costs of A$3.60/lb,
below forecast levels.
Approximately 86kt of the ore processed at EHM was pre-sold in Q4 FY23 (provisional
payment received), offsetting revenues received this quarter.
Exploration
No material exploration activities were undertaken in North Queensland during the
quarter.
9
Jaguar Operations (WA)
Key points for quarter:
•
Strong final quarter of production, approximately double planned metal output
•
3.1kt of Zn produced for the quarter at AISC of A$3.17/lb Zn (AISC includes
workforce separation costs)
•
Operation now on care and maintenance
Jun 23
Sep 23
Production Summary
Unit
Qtr
Qtr
FY24
Guidance
Ore Mined
Mined Grade
Ore Milled
Milled Grade
Recovery
Zinc Produced
Copper Produced
Gold Produced
Silver Produced
tonnes
% Zn
tonnes
% Zn
Zn
kt
kt
koz
koz
69.0
3.91
93.3
3.64
85.0%
2.9
0.5
0.4
91
55.2
7.05
66.8
5.92
78.2%
3.1
0.6
0.4
84
1.2 - 1.5
0.2 - 0.3
0.2 - 0.3
33 - 42
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
A$M
8.3
5.1
8.5
4.0
1.8
(9.7)
0.4
0.7
11.3
9.2
8.8
7.8
3.4
4.3
2.0
(12.6)
1.0
0.0
4.2
2.7
A$M
39.6
21.6
A$/lb
6.21
3.17
A$M
A$M
0.1
0.4
0.0
0.5
A$M
40.1
22.1
A$/lb
6.29
3.24
Cost Summary
Mining
Processing
Site G&A
TC/RCs
Product Handling
By-Product Credit
Royalties
Corporate G&A
Inventory Movements
Sustaining Capital1
All-In Sustaining Costs2
Growth Capital
Exploration
All-In Costs2
1.
2.
5-6
3-4
2-3
2-3
1-2
1–2
1–2
1–2
Includes sustaining capital, capitalised mine development and financing payments (principal and interest) on
leased assets
All-In Sustaining and All-In Costs are based on zinc produced
Operations
Jaguar had a strong final quarter of production with mined and milled tonnages
higher than plan, resulting in metal production significantly above guidance. Final ore
processing was completed in September and the site has now transitioned to care
and maintenance. A team of 8 people will remain on site to manage ongoing
activities including mine dewatering at Bentley and Jaguar.
10
Costs
Costs were higher than guidance on the back of significantly higher mining and
processing tonnages but below forecast unit cost rates.
Brownfield Exploration – Jaguar Deposit
An updated Mineral Resource Estimate (MRE) was completed at the Jaguar deposit
during the quarter, following the completion of an updated geological interpretation.
The Jaguar deposit was discovered in 2002 with underground mining occurring over
a 7 year period from 2007 to 2014. The decision to cease mining operations at the
Jaguar deposit was largely based on bringing the higher margin Bentley deposit into
production.
The updated Jaguar deposit MRE totals 840kt @ 2.28% Cu, 4.66% Zn and 61g/t Ag, for
19kt Cu metal, 39kt Zn metal and 1.65Moz Ag metal. The updated MRE incorporates
results from an updated geological interpretation.
Significant potential remains to increase the Jaguar mineralised footprint with further
drilling, most notably down-plunge from the current Mineral Resource. In addition,
there is potential to define mineralisation along two parallel favourable stratigraphic
horizons, one of which contains the mined “Farside” copper sulphide lens.
Table 1: 2023 Jaguar Mineral Resource 12345
2023 JAGUAR DEPOSIT MINERAL RESOURCE ESTIMATE
Resource Category
Cut-off
grade
Measured
Indicated
Inferred
Total
$100 NSR
Tonnes (kt)
Cu (%)
Zn (%)
Ag (g/t)
Cu metal
(kt)
Zn metal
(kt)
Ag metal
(koz)
260
2.26
3.82
56
6
10
465
480
2.41
5.79
73
12
28
1,140
100
1.70
1.26
16
2
1
50
840
2.28
4.66
61
19
39
1,650
1 Refer to ASX announcement “Correction – Jaguar Deposit Mineral Resource Update” dated 12th July 2023
2 Mr John Hamill MAusIMM MAIG CP (Geo) takes Competent Person responsibility for this Mineral
Resource Estimate in accordance with the JORC Code (2012)
3 The cut-off grade applied to the Jaguar deposit MRE has been derived from the Net Smelter Return
(NSR) calculations applied to the Bentley deposit.
4 The Competent Person considers that the Mineral Resource has reasonable prospects for eventual
economic extraction at the cut-off grade specified and a selective underground mining method.
5 Numbers may not sum due to rounding.
11
Figure 4 – Long section view of the 2023 Jaguar deposit Mineral Resource classification looking
east. Note the mineralised lenses are stacked. An Inferred lens is located behind the Measured
and Indicated lens.
Greenfield Exploration
The Jaguar exploration tenement package is also highly prospective for gold
mineralisation. The regional gold endowment is in excess of 25Moz, with several multimillion ounces deposits located within 50km of the Jaguar tenement package.
Within the quarter, exploration efforts shifted focus toward gold prospectivity.
Although a vast majority of the exploration over the tenement package to-date has
focused primarily on base metal mineralisation, some early-stage gold focused
exploration has been completed by previous explorers. The notable stand-out target
is a 2km gold anomaly referred to as the “Heather Bore” prospect. This gold anomaly
is interpreted to occur along the structural corridor that hosts Northern Star’s
Thunderbox deposit, 8km to the north.
12
Figure 5 – Simplified regional geology across the broader Jaguar Operation showing significant
gold deposits.
13
Stockman Project (VIC)
Key points for quarter:
Feasibility study and permitting activities continued during the quarter, including:
•
Metallurgical drilling at Wilga and Currawong ore bodies completed and
assayed
•
Interim feasibility study revalidation completed – draft report being prepared
•
Next stage work plan to advance the project development being finalised
(including metallurgical test work program)
•
Balance of secondary environmental permitting and license approvals
progressing.
Aeris expects to update the market on feasibility progress in the December quarter.
Other Projects
Canbelego Joint Venture (Aeris 30%)
Aeris, through subsidiary Tritton Resources Pty Ltd, holds a 30% interest in the
Canbelego Project (EL 6105) in NSW, a joint venture (JV) with Oxley Resources (70%
interest), a subsidiary of Helix Resources (ASX:HLX). Exploration activities and
management of the exploration licence are undertaken by our JV partner.
No exploration activities were undertaken at the Canbelego Project during the
quarter.
Torrens Joint Venture (Aeris 70%)
During the quarter, the transaction to divest Aeris’ interest in the Torrens Joint Venture,
in return for a 2.5% royalty, was completed.
14
Corporate
Strategic Actions
For FY24, the Aeris team is focused on stabilisation of the business and improving
consistency of operating performance. A number of leadership changes have been
implemented including the transfer of the Cracow Operations GM to Tritton, to drive
better compliance to plan. With the transition of Jaguar to care and maintenance, a
review of costs across the business has also resulted in a reduction in support roles in
the corporate office.
Cash and Receivables
At the end of the quarter, Aeris increased useable cash and receivables to $43.4
million with a closing cash balance of $21.9 million. Cash flow from operations was
impacted by additional payments made during the quarter to reduce the balance
of operational trade creditors, using funds from operations and the WHSP debt facility.
(A$ Million)
Jun
2023
Qtr
Sep
2023
Qtr
Closing cash
Jaguar - concentrate receivables
Mt Colin
Cracow - gold dore
Tritton - concentrate receivables
19.5
0.8
0.0
0.1
9.1
21.9
11.5
1.6
0.3
8.1
Useable Cash and Receivables
29.5
43.4
Jun
Sep
2023
2023
Qtr
Qtr
Opening cash
Cash flow from operations
Cash flow from capital expenditure
45.3
18.5
(44.3)
19.5
0.1
(32.0)
Cash flow from financing
0.0
34.3
Closing cash
19.5
21.9
(A$ Million)
Debt and Hedging
To ensure sufficient working capital liquidity to deliver on FY24 plans, Aeris secured a
$50 million debt facility with its major shareholder, Washington H Soul Pattinson (WHSP).
The facility is non-dilutive to shareholders, with no equity or production-linked
components. The WHSP Facility replaces the ANZ $20 million Working Capital Facility.
For further details see ASX Announcement “Corporate Update and FY24 Guidance”
dated 2 August 2023. Drawdown of $40 million was completed on 7 August 2023.
The Company had no hedges in place at the end of the quarter.
15
Authorised for lodgement by:
Andre Labuschagne
Executive Chairman
ENDS
For further information, please contact:
Mr. Andre Labuschagne
Executive Chairman
Tel: +61 7 3034 6200, or visit our website at www.aerisresources.com.au
Media:
Ayla Djonlagic
Tel: 0402 763 968
About Aeris
Aeris Resources is a mid-tier base and precious metals producer. Its copper dominant
portfolio comprises three operating assets, a mine on care and maintenance, a longlife development project and a highly prospective exploration portfolio.
Aeris has a strong pipeline of organic growth projects, an aggressive exploration
program and continues to investigate strategic merger and acquisition opportunities.
The Company’s experienced board and management team bring significant
corporate and technical expertise to a lean operating model. Aeris is committed to
building strong partnerships with its key community, investment and workforce
stakeholders.
References in this report to “Aeris Resources Limited”, “Aeris” and “Company” include, where applicable,
its subsidiaries.
16
Share your feedback
Discover