REFINANCING INVESTOR PRESENTATION
Released
Released
Announcement PDF
Refinancing
Investor presentation
8 May 2025
Disclaimer
This investor presentation has been prepared by Aeris Resources Limited
(“Aeris” or the “Company”). By attending an investor presentation or
briefing, or accepting, accessing or reviewing this presentation, you
acknowledge and agree to the terms set out below.
SUMMARY INFORMATION
This presentation is for information purposes only and should be read in
conjunction with the most recent financial reports and other documents
lodged by Aeris with the Australian Securities Exchange (“ASX”) in
connection with its continuous disclosure obligations. This presentation does
not purport to contain all of the information that an investor should
consider when making an investment decision nor does it contain all of the
information which would be required in a product disclosure statement or
prospectus prepared in accordance with the requirements of the
Corporations Act.
No reliance should be placed on the information or opinions contained in
this presentation, which are provided as at the date of this presentation
(unless otherwise stated) and to the maximum extent permitted by law,
Aeris has no obligation to update the information contained in this
presentation. An investment in securities is subject to known and unknown
risks, some of which are beyond the control of Aeris. Investors should
consult with their own legal, tax, business and/or financial advisors in
connection with any acquisition of securities.
FINANCIAL INFORMATION
All financial information set out in this presentation is expressed in Australian
Dollars unless stated otherwise. Investors should be aware that certain
financial measures included in this presentation are “non-IFRS financial
information” under ASIC Regulatory Guide 230: “Disclosing non-IFRS
financial information” published by ASIC and also “Non-GAAP financial
measures” within the meaning of Regulation G under the US Securities
Exchange Act of 1934 and are not recognised under the AAS or IFRS. Aeris
believes the non-IFRS financial information and non-GAAP financial
measures provide useful information to users in measuring the financial
performance and condition of Aeris.
However, investors should note that the non-IFRS financial information and
non-GAAP financial measures do not have standardised meanings
prescribed by AAS or IFRS. Therefore, the non-IFRS financial information is
not a measure of financial performance, liquidity or value under the IFRS
and may not be comparable to similarly titled measures presented by
other entities, nor should the information be construed as an alternative to
other financial measures determined in accordance with AAS or IFRS.
Investors are cautioned, therefore, not to place undue reliance on any
non-IFRS financial information included in this presentation.
FUTURE PERFORMANCE AND FORWARD-LOOKING STATEMENTS
This presentation contains certain ‘forward-looking’ statements, opinions
and estimates, which are based on assumptions and contingencies that
are subject to change without notice and involve known and unknown
risks and uncertainties beyond the control of Aeris and its officers. This
includes statements about market and industry trends, which are based on
interpretations of current market conditions.
Indications of, and guidance on, future earnings and financial position and
performance are forward-looking statements. As are statements
containing the words “expect”, “anticipate”, “estimate”, “intend”,
“believe”, “guidance”, “should”, “could”, “may”, “will”, “predict”, “plan”
and other similar expressions.
Forward-looking statements are based on information available to Aeris as
at the date of this presentation and should not be relied upon as an
indication or guarantee of future performance. Except as required by law
or regulation (including the ASX Listing Rules), none of Aeris, its
representatives or advisers undertakes any obligation to provide any
additional or updated information whether as a result of a change in
expectations or assumptions, new information, future events or results or
otherwise.
Investors are strongly cautioned against placing undue reliance on
forward-looking statements, especially considering the current economic
climate and significant volatility, uncertainty and disruption caused by
recent world events such as the COVID-19 pandemic and international
hostilities and associated economic changes.
NO NEW INFORMATION STATEMENT
This presentation contains Exploration Results, Mineral Resource and Ore
Reserve information which has been previously issued in prior market
announcements released by Aeris (Prior Reports) with the written consent
of the Competent Person responsible for that information. The Prior Reports
are footnote referenced in this presentation and available from:
https://www.aerisresources.com.au/investor. Aeris confirms that:
•
•
it is not aware of any new information or data that materially affects
the information in the Prior Reports and, in the case of estimates of
Mineral Resources and Ore Reserves, all material assumptions and
technical parameters underpinning the estimates continue to apply
and have not materially changed; and
the form and context in which each Competent Person’s findings
are presented have not been materially modified.
Aeris confirms that the form and context in which the Competent Person’s
findings are presented in this document have not been materially modified
from the Prior Reports.
DISCLAIMER
To the maximum extent permitted by law, Aeris and each of its respective
related bodies corporate, shareholders and affiliates, and each of their
respective officers, directors, partners, employees, representatives,
affiliates, agents, consultants and advisers (each a “Limited Party”):
• expressly disclaim any and all responsibility and liability (including,
without limitation, any liability arising from fault, negligence or negligent
misstatement) for any direct, indirect, consequential or contingent loss
or damage arising from this presentation or reliance on anything
contained in or omitted from it or otherwise arising in connection with
this presentation;
• disclaim any obligations or undertaking to release any updates or
revisions to the information in this presentation and;
• do not make any representation or warranty, express or implied, as to
the accuracy, reliability, completeness or fairness of the information,
opinions and conclusions contained in this presentation or that this
presentation contains all material information about Aeris or the
Transaction or that a prospective investor or purchaser may require in
evaluating a possible investment in Aeris or acquisition of shares in Aeris,
or likelihood of fulfilment of any forward-looking statement or any event
or results expressed or implied in any forward-looking statement.
NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES
This Presentation does not constitute an offer to sell, or the solicitation of
an offer to buy, any securities in the United States. The securities referred
to in this Presentation have not been, and will not be, registered under
the US Securities Act of 1933 (the "US Securities Act") or the securities laws
of any state or other jurisdiction of the United States, and may not be
offered or sold, directly or indirectly, to any person in the United States or
to any person acting for the account or benefit of a person in the United
States unless they have been registered under the US Securities Act
(which Aeris has no obligation to do or to procure) or are offered or sold
pursuant to an exemption from, or in a transaction not subject to, the
registration requirements of the US Securities Act and any applicable
securities laws of any state or other jurisdiction of the United States.
2
Refinancing Overview
Refinance Summary
Binding term sheet executed with Washington H. Soul Pattinson (WHSP) for a $60 million Guarantee Facility to provide long-term
environmental bonding, replacing the current $50 million ANZ Facility
$10 million currently in restricted cash released to provide additional working capital
Existing $50 million Term Facility ($40 million drawn) extended to August 2026
No repayments or cash backing required for over 12 months under either the Guarantee Facility or Term Facility
Post completion of the transaction, Aeris will have proforma unrestricted cash of $32 million 1 and liquidity of $42 million (including
undrawn debt)
All environmental bonds will be covered with $60 million facility and $18 million in restricted cash
Board considered equity to repay the Term Facility but determined that an extension of the facility was more attractive than
raising equity in the current market
1 March 2025 reported cash balance plus $10 million cash released from the ANZ facility
4
New WHSP guarantee facility
Key terms
1.
2.
Provider:
Washington H. Soul Pattinson and Company
Cash Backing:
$3.5 million per quarter commencing 12 months
from financial close
Facility Limit:
$60 million
Security:
First ranking security over all Aeris Group assets,
subsidiaries and undertakings1
Term:
3 years
Covenants:
Market standard for this type of facility
Interest:
8.95%
Conditions:
• Execution of ASX waiver letter or shareholder
approval
• Execution of final documentation
Other Fees:
3% establishment fee
4% exit fee within the first 18 months; 5% thereafter
Bank guarantee provider costs est. 0.5-1.0% p.a.
Make Whole2:
18 months
The granting of security is conditional upon receipt of a ASX waiver from Listing Rule 10.1 or shareholder approval.
If the facility is voluntarily cash backed within the first 18 months after financial close, the lender is entitled to all interest that would have accrued on the outstanding principal had the cash backing not been made for the period
to 18 months from financial close
5
WHSP term facility extension
Key terms
Facility Limit:
$50 million ($40 million drawn)
Term:
Extended to August 2026
Other Fees:
$1.5 million extension fee
2% additional exit fee
Further 2% fee on repayment if not repaid by 31 January 2026
Other :
All other conditions remain the in place
6
Company update
Aeris investment thesis
Australian copper focused miner with high margin
gold cashflows to support growth
Established miner with
focus on copper
•
•
40 – 48kt Cu eq1,3 FY25 guidance
FY25 group production guidance
maintained
Strong gold cashflows
supporting growth
•
Cracow gold mine generated adjusted
EBITDA of $45.9 million in H1 2025
Low risk jurisdiction
•
Australian based portfolio, with assets in
proven mining regions
Large mineral endowment •
and exploration upside
•
1.3Mt Cu eq Resource2,3 across 3 growth
projects
Long history of key assets extending life
Refocused strategy
1.
2.
3.
•
•
Weighted to copper
FY25 production guidance
29
Cu
79
Au
Copper
Gold
27-32 kt
50-62koz
47
Ag
Silver
200-240koz
Portfolio simplification strategy underway
Investment in Tritton to transition the mine to
a long life / lower cost operation
CuEq t = ((Cu Produced x Cu $/t) + (Au Produced x Au $/oz) + (Ag Produced x Ag $/oz)) / (Cu $/t), Assumed commodity prices: US$9,620/t Cu, US$2,341/oz Au and US$29.43/oz Ag
CuEq t = ((Contained Cu t x Cu recovery % x Cu price $/t) + (Contained Au oz x Au recovery % x Au price $/oz) + (Contained Ag oz x Ag recovery % x Ag price $/oz) + (Contained Zn t x Zn recovery % x Zn price $/t)) / (Cu recovery % x Cu price $/t)
Refer to Appendix for the Mineral Resource Estimates for each project. See also ASX announcements "Group Mineral Resource and Ore Reserve Statement" dated 17 June 2024.
Metal prices used: Cu = US$9,700/t, Au = US$2,800/oz, Ag = US$32/oz, Zn = US$2,800/t
Recovery factors: Tritton = 94.5% Cu, 50% Au, 70% Ag; Jaguar 79% Cu, 37% Au, 74% Ag, 88% Zn; Stockman 81% Cu, 21% Au, 57% Ag, 75% Zn
Recoveries based on long-term achieved averages for Tritton and Jaguar. Stockman based on recovery assumptions outlined in the JORC Ore Reserve Estimate referred to above
Aeris is of the opinion that all metals included in the equivalent calculation have a reasonable potential of being recovered and sold
8
Immediate goals: a simplified, resilient portfolio
High-grade, diversified, copper resource, with +0.5Moz gold in Mineral Resource¹ to support strategic copper growth
Assets aligned with strategic copper focus
Au supporting strategic Cu growth
Tritton
Cracow
1.7%
Cu eq
Jaguar
Stockman
1.3Mt
Cu eq1
3.6%
Cu eq
0.5Moz Au1
Divest and simplify
3.9%
Cu eq
1. CuEq t = ((Contained Cu t x Cu recovery % x Cu price $/t) + (Contained Au oz x Au recovery % x Au price $/oz) + (Contained Ag oz x Ag recovery % x Ag price $/oz) + (Contained Zn t x Zn recovery %
x Zn price $/t)) / (Cu recovery % x Cu price $/t)
Refer to Appendix for the Mineral Resource Estimates for each project. See also ASX announcements "Group Mineral Resource and Ore Reserve Statement" dated 17 June 2024.
Metal prices used: Cu = US$9,700/t, Au = US$2,800/oz, Ag = US$32/oz, Zn = US$2,800/t
Recovery factors: Tritton = 94.5% Cu, 50% Au, 70% Ag; Jaguar 79% Cu, 37% Au, 74% Ag, 88% Zn; Stockman 81% Cu, 21% Au, 57% Ag, 75% Zn
Recoveries based on long-term achieved averages for Tritton and Jaguar. Stockman based on recovery assumptions outlined in the JORC Ore Reserve Estimate referred to above
Aeris is of the opinion that all metals included in the equivalent calculation have a reasonable potential of being recovered and sold.
North Queensland
9
Aeris medium and long term goals
Leading ASX copper company targeting +50ktpa, high margin copper production underpinned by capital investments at Tritton
Immediate
Medium term
Long term
Goals
Tritton
• Fill Tritton mill
• Increase Ore Reserves
• Improve margins
• Develop Constellation
• Target +5 year reserve life
• Maintain +5 year mine life
• Pursue accretive M&A /
regional consolidation
High margin, long life,
+30ktpa copper producer
Cracow
• Maximise cashflows from
current high gold price
• Increase Ore Reserves
• Exploration at SVF1 and
Western Frontier
• Maintain +40koz
production
• Maximise cashflow
generation
Maximise cashflow
generation to support
copper strategy
• Deliver Jaguar Restart PFS
• Deliver Jaguar restart
funding plan
• Increase Ore Reserve
• Explore gold anomalies
• Restart Jaguar
• Monetise potential gold
endowment
Restart Jaguar with +5
year mine life
Maximise asset potential
Positive FID
Maximise asset value
Mimimise equity dilution
Leading ASX listed,
diversified, high margin
copper producer
Jaguar
Stockman
• Stockman test work
program
• Deliver Stockman
feasibility
• Deliver Stockman funding
plan
• Selldown / partner with
strategic investor
Group
• Reset balance sheet
• Simplify portfolio – sale
North Queensland
• Stable +30ktpa Tritton
copper production
• Improve margins
• 3 producing assets
• +50ktpa, high margin
copper production
1. Southern Vein Field
10
Tritton
New South Wales
Tritton: our flagship asset
Strategically located, diversified copper operation with a 20 year operating history
Copper production (kt)1
Logistics
30
Tritton / Budgerygar
21
24
24
23
30
27
26
27
23
25
23
19
FY22
FY21
FY20
FY19
FY18
FY17
FY16
FY15
FY14
FY13
FY12
Avoca Tank
FY11
FY10
• Tritton: Mature mine at depth,
targeting high grade extensions
• Budgerygar: Near surface, high-grade
deposit located adjacent to Tritton
17
20
FY24
Processing
FY23
Mining
• High grade deposit located 27km
north of the Tritton processing plant
Murrawombie Pit
• Stripping commenced in Feb 2025
• Ore will enable mill to reach 1.8Mtpa
capacity in Q4 FY25
1.
• 1.8Mtpa sulphide
ore floatation plant
producing a clean
copper
concentrate with
payable gold and
silver
See each Annual Report for the relevant year, available at https://www.aerisresources.com.au/investor-centre/
• Concentrate
loaded on site and
railed ~600km for
export through Port
of Newcastle
12
Tritton: investment thesis
Large scale copper
operation
•
•
100% owned, integrated mining complex
1.8Mtpa processing facility
•
2,300km2 tenement package, located in
the highly prospective Cobar Basin
adjacent to several proven mining
operations
•
Targeting ~30ktpa copper production
with over 430kt copper produced since
operations began in 2005
•
Multiple open pit and underground
mining operations
•
•
Long history of resource replacement
Opportunity for Ore Reserve expansion
and regional consolidation
Strategic location
Consistent production
Diversified ore sources
Mine life extension
Refer to Appendix for the Mineral Resource Estimates; see also ASX announcements "Group Mineral Resource and Ore
Reserve Statement" dated 17 June 2024 and ASX release “Aeris Delivers Material Increase in Copper and Gold at
Constellation” 31 March 2025
13
Reinvestment strategy for Tritton
•
•
•
•
Key issue 1 – Underutilised mill capacity
Strategy – Murrawombie
1.8Mtpa mill, the largest in the Cobar region, but underutilised
New open pit
Historical production averaged 1.6Mtpa
Reduced to 1.2Mtpa over recent years
Q1-3 FY25 annualised processing run rate of 1.0Mtpa
Q3 production of 4.3kt Cu, FY25 forecast to be around the low end of
the guidance range (21 – 25kt Cu)
•
•
•
Stripping commenced in February
Will enable mill throughput rate to increase to 1.8Mtpa rate in Q4 FY25
Waste to cap old heap leach pads saving ~$8 million in future
rehabilitation costs
Tritton processing rates (Mt)1
1.8Mt processing capacity
Underutilised capacity
1.
May-Jun 25
(annualised)
1.0
Q1-3 FY25
(annualised)
1.2
FY24
1.4
FY23
1.5
FY22
1.6
FY21
1.6
FY20
1.7
FY19
FY18
1.6
See each Annual Report for the relevant year, available at https://www.aerisresources.com.au/investor-centre/
14
Reinvestment strategy for Tritton (cont.)
Strategy – Constellation
Key issue 2 – Declining reserve life
• Ore Reserves have depleted over the last 5 years due to capital
prioritisation at Cracow, Jaguar operational issues and working
capital constraints at North Queensland
• Consistent Mineral Resource replacement to maintain ~300kt
contained copper however recent underinvestment in drilling has
reduced conversion to reserves
• Constellation deposit – the new potential baseload ore source:
–
Indicated Mineral Resource of 5.3Mt at 1.75% Cu and 0.7g/t
Au (94kt contained copper)2 provides foundation for potential
conversion to Ore Reserve
–
Mining study and permitting progressing
• 7.9Mt Inferred Mineral Resource across all Tritton deposits to be
targeted with future drilling programs
Contained copper1,2 (kt)
Current ore sources
3.0%
Reserve grade3
Unmined deposits
Avoca Tank
2.5%
154
FY15
179
170
172
150
FY16
FY17
Ore Reserve
1.
2.
3.
238
180
130
FY18
190
277
164
314
301
161
94
100
86
69
67
55
41
41
FY19
FY20
FY21
FY22
FY23
FY24
Apr-25
Constellation (Indicated)
Mineral Resource
Cu Grade
232
Indicated resource grade2
Bubble size represents
contained Cu
2.0%
Budgerygar
1.5%
1.0%
Constellation
(Indicated)
Murrawombie Pit
Tritton
0.0
1.0
2.0
3.0
4.0
Tonnes (Mt)
5.0
6.0
7.0
See each annual Group Mineral Resource and Ore Reserve Statement available in the Company’s Annual Report for each relevant year, available at https://www.aerisresources.com.au/investor-centre/. Details for individual categories of
mineralisation are also provided. Mineral Resources are exclusive of Ore Reserves. Apr-25 assumes Reserves and Resources reported as at Dec 2023 adjusted for the updated Constellation Mineral Resource (ASX release “Aeris Delivers Material
Increase in Copper and Gold at Constellation” 31 March 2025). Mineral Resource shown for Apr-25 excludes the Constellation Indicated resource shown separately
Refer to ASX release “Aeris Delivers Material Increase in Copper and Gold at Constellation” 31 March 2025
As at Dec 2023. Refer to ASX release "Group Mineral Resource and Ore Reserve Statement" dated 17 June 2024
8.0
15
Constellation overview
Tritton’s future baseload copper-gold ore source
Long section looking west showing the March 2025 Indicated and
Inferred Mineral Resource
Updated Mineral Resource Estimate 7.6Mt of 2.01% copper and
0.66g/t gold containing 153kt copper and 161koz gold1
Represents a 24% increase in contained copper and 29% increase in
contained gold2
Indicated Resource 5.3Mt at 1.75% copper and 0.66g/t gold provides
a strong foundation for potential conversion to Ore Reserve3
Open pit resource increased by 46% to 4.7Mt at 1.9% Cu and 0.6g/t
Au4 with 3.2Mt5 of potential high-grade, primary/supergene mill feed
Constellation deposit remains open down-plunge, with strong
potential for further growth
1.
2.
3.
4.
5.
See ASX release “Aeris Delivers Material Increase in Copper and Gold at Constellation” 31 March 2025. Comprises
Indicated resource of 5.3Mt at 1.8% Cu, 0.7g/t Au, and Inferred resource of 2.3Mt at 2.6% Cu, 0.7g/t Au
Compared to previous estimate; refer to ASX release “Constellation Mineral Resource Update”, 18 August 2022
Conversion to Ore Reserve is subject to economic assessment and the application of appropriate modifying factors
Comprises Indicated resource of 4.1Mt at 1.7% Cu, 0.6g/t Au and Inferred resource of 0.6Mt at 3.5% Cu, 0.5g/t Au
Comprises Indicated resource of 2.6Mt at 2.3% Cu, 0.9g/t Au and Inferred resource of 0.6Mt at 3.5% Cu, 0.5g/t Au
subject to conversion to an Ore Reserve
16
Constellation development pathway
Potential long life mine from three stages
1. Oxide for heap leach
• 1.5Mt @ 0.6% Cu with high-grade zones (1-2% Cu)
• Starting 5m below surface
2. Supergene and primary open pit feed to Tritton mill:
• 3.2Mt at 2.5% Cu and 0.7g/t Au, starts 50m below surface
• Potential significant contribution to gold production with
contained Au metal of 91koz
3. Underground grades of +2%
• 1.2Mt @ 2.1% Cu and 0.8g/t Au (Indicated)
• 1.7Mt @ 2.3% Cu and 0.7g/t Au (Inferred)
• Development funded from open pit operations
March 2025 Constellation Mineral Resource
Mining
Method
Cu
(%)
Au
(g/t)
Ag
(g/t)
Cu
metal
(kt)
Au
metal
(koz)
Ag
metal
(koz)
$18
1,500
0.6
0.2
0.9
9
9
46
$59
2,600
2.3
0.9
3.5
60
73
294
$59
600
3.5
0.5
3.1
20
9
55
4,100
1.7
0.6
2.6
69
82
341
600
3.5
0.5
3.1
20
9
55
Total
4,700
1.9
0.6
2.6
88
91
396
Indicated
1,200
2.1
0.8
3.1
25
31
121
1,700
2.3
0.7
1.6
40
39
92
Total
2,900
2.2
0.7
2.3
65
69
212
Indicated
5,300
1.8
0.7
2.7
94
112
462
2,300
2.6
0.7
2.0
60
48
147
7,600
2.0
0.7
2.5
153
161
608
Oxide
Indicated
OPEN PIT
Supergene/Primary Indicated
(OP)
Supergene/Primary Inferred
Various
Total
(UG)
Total
(OP & UG)
Primary
Primary
Inferred
Inferred
Inferred
Total
Refer to ASX release “Aeris Delivers Material Increase in Copper and Gold at Constellation” 31 March 2025
1. Environmental Impact Statement
Cut-off
($/t) NSR
Indicated
Total
(OP)
Development plan
• EIS1 lodged with regulator – expect approval Q2 FY26
• Feasibility study and Maiden Ore Reserve targeted Q2 FY26
• Investigating larger open pit operation with potential to delay
capital associated with underground development
• High gold recoveries into concentrate to improve economics
• Potential for Murrawombie Pit contractor to transition to
Constellation in early CY26 to commence early works
Tonnes
(kt)
Cu Mineralisation Resource
Category
Type
Various
$108
Various
17
Other exploration potential
Multiple targets provide potential to further extend
mine life
Extensions: Tritton, Murrawombie, Avoca Tank and Budgerygar all
still open at depth
Kurrajong: high grade deposit, open at depth
Budgery: potential open pit target located close to infrastructure
Numerous other targets identified with drilling still to be followed up
Tritton mill strategically located in the Cobar basin creating the
potential for regional consolidation
Refer to Appendix for the Mineral Resource Estimates; see also ASX announcements "Group Mineral Resource and Ore Reserve
Statement" dated 17 June 2024
18
Cracow
Queensland
Cracow
520
510
450
350
390
460
530
520
1,069
1,160
1,250
1,340
1,421
1,509
1,582
1,636
1,684
1,730
FY19
FY20
FY21
FY22
FY23
FY24
FY18
500
FY17
Conventional crush and grind CIP processing plant
710
FY16
High margin, underground gold mine located 500km northwest of
Brisbane
History of stable production and resource replacement (Au koz)2
FY15
High margin gold mine
Resource
Produced +1.7Moz gold since first production in 2004
Cumulative production
Completed tailings storage facility
Track record of meeting or exceeding budget
Strong history of resource replacement with a current Mineral
Resource of ~500koz1
1.
2.
Refer to Appendix for the Mineral Resource Estimates; see also ASX announcement "Group Mineral Resource and
Ore Reserve Statement" dated 17 June 2024
See each annual Group Mineral Resource and Ore Reserve Statement within the Annual Report for Aeris
Resources Ltd and Evolution Mining Ltd available on the respective company’s website. Details for individual
categories of mineralisation are also provided
20
Historical profitability
History of stable operations and high margin cashflow
generation
+220koz gold produced under Aeris ownership
Gold production (koz)1
74
FY21
54
48
46
FY25 guidance
40-49
FY22
FY23
FY24
FY25
EBITDA (A$m)1
$45.9 million adjusted EBITDA generated in 1H FY25
$98.1
$50.6
Q3 FY25 production of 9.0koz
$28.9
$49.1
$45.9
FY21
See each Annual Report for the relevant year, available at https://www.aerisresources.com.au/investor-centre/
FY23
FY24
1H FY25
Average gold price (A$oz)
Spot gold price A$2,000/oz higher than FY24 average price
1.
FY22
2H FY25
FY25 guidance 40 – 49koz maintained
1H FY25
n/a
$5,197
$2,508
$2,539
$2,698
FY21
FY22
FY23
$3,174
FY24
Spot
(24 Apr 25)
21
Exploration
Highly prospective greenfield targets
Continuing to drill near mine targets in the Western Vein Field (WVF) for
incremental additional ounces
Priority conceptual greenfield targets with the potential to host new
mineralised structures
Western Frontier represents a potential new structural corridor located
relatively close to existing mine infrastructure
Southern Vein Field potential for a new mineralised field analogous to
the WVF under deeper cover
Reviewing historical seismic geophysical surveys to refine geological
interpretation and drill targeting
Both areas deemed highly prospective
22
Other Assets
Jaguar
Brownfield copper/zinc restart opportunity
Mineral Resource1 8Mt @ 1.3% Cu, 5.6% Zn, 0.5g/t Au and 65g/t Ag
across 4 deposits
Transitioned to care and maintenance in Q1 FY24
Potential restart on resources at Bentley with development out to
high-grade Turbo lens
Restart to include mill and infrastructure upgrades
Potential to increased production rates from identified exploration
targets
Advancing study to feasibility level
1.
Refer to Appendix for categories of Mineral Resource; see also ASX announcements “Group Mineral Resource and Ore
Reserve Statement” dated 17 June 2024
24
Jaguar gold exploration
Focus on five prospective areas
①
1. Heather Bore Shear – 12km structure including 2km shallow gold
anomaly1 along strike from Northern Star’s Thunderbox operation
2. Aesop – Halloween Trend – 6km structural corridor consider
prospective but subject to limited exploration
⑤
⑤
②
3. Pterodactyl – South Possie Well – 10km orogenic structure poorly
tested
4. Southern Boundary – interpreted extension of the orogenic
structure between Pterodactyl and South Possie Well
5. Granite Margin – structural complexity within and along the
margins of large granite bodies
③
1.
Refer to ASX release “Exploration and Resource Drilling Update”, dated 17 June 2024
⑤
④
25
Stockman
Concentrator flowsheet for Albion Process
Long life, Cu-Zn-Au-Ag project with all primary permits
Feasibility study well advanced
12 year mine plan producing at up to 850ktpa1 from a single deposit
Potential to extend mine life with other known deposits
Albion leaching technology being investigated to improve recoveries
impacted by complex metallurgy – very positive initial results1
Currawong mine plan
Potential to make a high-grade Cu concentrate on the mine site and
a bulk polymetallic concentrate for leaching at an offsite location
Metallurgical test work and engineering design for Albion Process
continuing
All key project consents in place for mining and onsite processing
1.
Refer to ASX announcement “Stockman Feasibility Study Update” dated 24 January 2024.
Aeris confirms that it is not aware of any new information or data that materially affects the information included in the
relevant announcement and that all material assumptions and technical parameters underpinning the production
target in the relevant announcement continue to apply and have not materially changed
26
North Queensland
Mining completed; non-core tenement package
Mining and processing now completed at Mt Colin
Rehabilitation activities underway
Part of an attractive 952km2 tenement package including
the feasibility-stage Barbara project
Considering options for divestment
27
Aeris Resources
Set for growth in copper production with reset
balance sheet and strong operating cash flows
Refinance reset provides flexibility to deliver business
strategy
Strong Cracow cash flows to support copper growth
Constellation the game changer – potential long life
ore source to support increased Tritton production
and life
Further copper and gold growth and exploration
options at Jaguar and Stockman
28
Thank you
Appendix A
Reserve and Resource
Tables
Group Ore Reserves
PROJECT
CATEGORY
TONNES (‘000)
Base Metals
Tritton
Jaguar
North Queensland
Stockman
GRADE
CONTAINED METAL
% Cu
% Zn
g/t Au
g/t Ag
kt Cu
kt Zn
koz Au
koz Ag
5
1.8
-
-
-
0.1
-
-
-
Probable
2,790
1.5
-
0.3
5
41
-
23
451
Total
2,790
1.5
-
0.3
5
41
-
23
451
Proved
90
1.4
8.7
0.8
74
1
8
2
225
Probable
1,0